Sellick v. Pennsylvania Contracting Co.

Opinion by

Orlady, J.,

The plaintiff recovered a verdict of $500 in the court below as damages for injuries received by him while he was handling heavy timbers used in a river improvement work which was being done by the defendant company.

The general manager of the company was A. M. *45Bowman, who employed the plaintiff, and placed him under the direction and charge of a Mr. Fulton, as the foreman of work on the ground, and on the resignation of this officer, under one Al. Rarick, who was substituted for Fulton and he had full charge of fifteen or sixteen men. During the progress of the work and while he was engaged under the personal direction of Rarick, in literally obeying his instructions, the plaintiff was injured.

There is no substantial dispute in the testimony in determining the controlling facts. Bowman, the general manager, stated to the plaintiff, when Fulton quit the service of the company — “From this on you will receive your orders from Al. (Rarick).” The government inspector had condemned one of the timbers and ordered that it be removed to the pile of culls, when Rarick gave this plaintiff the order, “Lay down your axe and come over and put the hooks on this, I have to throw it out on the pile.” In directing this particular work, Rarick placed himself on top of a pile of lumber where he could have in view, the engineer in charge of the hoisting machinery, and also the plaintiff. Owing to intervening objects the plaintiff could not see the hoist engineer. A stick of timber twelve by twelve by sixteen feet long was to be moved and Rarick directed the plaintiff to “put the hooks on that,” which was done and on a signal from the plaintiff to Rarick, he (Rarick) transmitted the signal with his hand to the hoist engineer “to take it up.” This was done, but the hooks slipped off, and the timber fell back on the framing table. Rarick signaled the engineer to stop and directed the plaintiff to “hook her on again.” At this critical moment, while the plaintiff was adjusting the hooks and fastening them to the timber, Rarick gave a premature signal to the engineer, who applied the power and the timber was unexpectedly “shot up endways about three feet.” In trying to get off from it the plaintiff, to avoid being thrown off, “grabbed the wire *46rope, above the sheave which caught his hand and se? riously injured it.” At this instant, Rarick was standing in full view of the engineer and the plaintiff, and gave the signal to start the engine. These facts do not depend'alone on the testimony of the plaintiff, as he was corroborated in every essential detail by Parrish and Bell, though as directly contradicted by Rarick and Price, another employee of the defendant.

It is conceded that Selliclc was working in a reasonably safe place with reasonably safe appliances, but it is contended that these were changed into a place of great peril by the negligent act of Rarick in giving the premature signal, which caused the accident.

From the defendant’s own version of the facts there can be no doubt of Rarick’s authority and superintendence of the work. It was for the jury to say whether he created the dangerous situation. He was not a fellow servant with the plaintiff, but his boss or foreman by personal direction of the general manager. At most there were but two witnesses on each side who described the accident, and their respective versions of it, and the question of their credibility were fairly submitted to the jury in an adequate charge.

The appellant has omitted to print the charge of the court in his paper-book, and while we do not quash the appeal for that omission it must not be taken for a precedent that we will overlook or condone such a flagrant violation of our rules.

The judgment is affirmed.