FILED
United States Court of Appeals
Tenth Circuit
PUBLISH July 23, 2013
Elisabeth A. Shumaker
UNITED STATES COURT OF APPEALS Clerk of Court
TENTH CIRCUIT
WILDEARTH GUARDIANS,
Petitioner,
v. No. 11-9559
UNITED STATES ENVIRONMENTAL
PROTECTION AGENCY; LISA
JACKSON, Administrator, U.S. EPA,
Respondents.
PUBLIC SERVICE COMPANY OF
COLORADO, d/b/a Xcel Energy, Inc.,
Intervenor.
ON PETITION FOR REVIEW OF AN ORDER OF THE UNITED STATES
ENVIRONMENTAL PROTECTION AGENCY
EPA No. VIII-2010-XX
Ashley D. Wilmes of WildEarth Guardians, Boulder, Colorado, for Petitioner.
Christina L. Richmond, United States Department of Justice, Environmental Defense
Section, Washington D.C. (Elyana Sutin, U.S. EPA, Region 8, Office of Regional
Counsel, and Richard Vetter, U.S. EPA, Office of General Counsel, of counsel; Ignacia S.
Moreno, Assistant Attorney General, Environmental and Natural Resources Division,
with her on the briefs) for Respondents.
A. Kent Mayo (Michael Heister with him on the brief) of Baker Botts L.L.P.,
Washington, D.C., for Intervenor.
Before O’BRIEN, McKAY, and TYMKOVICH, Circuit Judges.
McKAY, Circuit Judge.
Petitioner WildEarth Guardians seeks review of an order of the Environmental
Protection Agency denying in part Petitioner’s petition for an objection to a Title V
operating permit issued by the Colorado Department of Public Health and Environment
(CDPHE) to Intervenor Public Service Company of Colorado, d/b/a Xcel Energy, for its
coal-fired power station located in Morgan County, Colorado. In its petition for an
objection, Petitioner argued, among other things, that the permit needed to include a plan
to bring the power station into compliance with the Clean Air Act’s Prevention of
Significant Deterioration requirements. Petitioner contended these PSD requirements,
which apply to the construction or “major modification” of a stationary source of air
pollution, 40 C.F.R. § 51.166(a)(7)(ii), had been triggered when the station underwent
major modifications in 1994, 1997, and possibly other years. For support, Petitioner
relied in part on a Notice of Violation issued to Intervenor by the EPA in 2002. However,
the EPA denied Petitioner’s petition for an objection on this ground, holding that the
NOV was insufficient to demonstrate noncompliance with the Clean Air Act and that
Petitioner’s additional evidence also failed to demonstrate a violation. The EPA further
held the state agency had adequately responded to Petitioner’s comments regarding the
PSD requirements before it issued the permit. The EPA thus denied the petition for an
objection on this ground as well. Petitioner now seeks review of the EPA’s denial of the
-2-
petition on these two grounds.1
I.
Under Title V of the Clean Air Act, a “major source” of air pollution, such as the
power station at issue in this case, must obtain an operating permit from the applicable
state agency. See 42 U.S.C. § 7661a. After providing the public with an opportunity to
comment on a proposed permit, the state agency submits the permit to the EPA, which
has 45 days to review it. See Sierra Club v. U.S. EPA, 557 F.3d 401, 403 (6th Cir. 2000)
(citing 42 U.S.C. §§ 7661a(b)(6), 7661d(b)(1)). If the EPA does not file a written
objection during this time period, “any person may petition the Administrator within 60
days after the expiration of the 45-day review period.” 42 U.S.C. § 7661d(b)(2). “The
petition shall be based only on objections to the permit that were raised with reasonable
specificity during the public comment period provided by the permitting agency . . . .” Id.
The EPA has 60 days to respond to the petition, and “shall issue an objection within such
period if the petitioner demonstrates to the [agency] that the permit is not in compliance
with the requirements of [the Clean Air Act], including the requirements of the applicable
[state] implementation plan.” Id. “Any denial of such petition shall be subject to judicial
review under section 7607 of this title.” Id.
In 2009, the applicable state agency in this case, CDPHE, published a proposed
1
The EPA granted Petitioner’s petition to object on two grounds that are not at
issue in this appeal. It denied the petition on all other grounds, only two of which are at
issue on appeal.
-3-
renewal permit for Intervenor’s Pawnee power station in Morgan County, Colorado.
Petitioner submitted comments on the proposed permit. Among other things, Petitioner
raised a concern regarding the proposed permit’s alleged failure to include a plan to bring
the power station into compliance with the Clean Air Act’s PSD requirements, as
implemented in the Colorado State Implementation Plan. Petitioner contended these PSD
requirements were triggered when the power station “underwent major modifications in
1994 and 1997 without obtaining the required PSD permit.” (J.A. at 2.) For support,
Petitioner relied on a Notice of Violation the EPA issued to Intervenor in 2002, which
included the following allegations:
11. Xcel has made “major modifications” of the Pawnee and
Comanche Stations as defined by both 40 CFR §52.21 and
Colorado SIP Rules . . . .
i) The major modifications at its Pawnee Station include
but are not limited to the following physical or
operational changes, alone or in combination: a
reheater redesign and replacement in 1994, and a
redesign and upgrade of the condenser tubes in 1997 to
regain lost generation due to condenser tube failures.
....
12. Each of the modifications resulted in a net significant increase in emissions
for SO2, NOx, and/or PM as defined by 40 CFR §§52.21(b)(3) and (23) and
Colorado SIP Rules . . . .
13. For each of the modifications identified in 11 above, Xcel did not obtain a
PSD permit pursuant to 40 CFR §52.21 and Colorado SIP Rules . . . .
....
17. Therefore, Xcel violated and continues to violate Clean Air Act, Part C:
Prevention of Significant Deterioration of Air Quality (“PSD”), 42 U.S.C.
§§7470 to 7492, and the permitting requirements of Colorado Air Quality
-4-
Control Commission Regulation No. 3, Part B, IV.D.3 and 40 C.F.R.[ ]
§52.21, by constructing and operating modifications at the Pawnee Station .
. . without the necessary permits and by constructing and operating without
the application of BACT required by the Colorado SIP.
(J.A. at 173-74.)
Petitioner contended this Notice of Violation demonstrated the Pawnee power
station was not in compliance with PSD requirements, and thus the Title V Permit needed
to include a PSD compliance plan. Petitioner argued “[t]he 2002 NOV is sufficient to
demonstrate noncompliance with PSD for the purposes of a Title V Permit,” relying for
support on a Second Circuit case that found a state agency notice of violation sufficient to
demonstrate noncompliance under Title V. (J.A. at 2 (citing N.Y. Pub. Interest Research
Grp. v. Johnson, 427 F.3d 172 (2d Cir. 2005)).)
Petitioner further argued that even if the NOV was insufficient on its own to
demonstrate noncompliance with established PSD requirements, other documents helped
demonstrate that Intervenor made major modifications at the Pawnee power station, thus
triggering PSD requirements. For support, Petitioner submitted the following: (1) an
Xcel Capital Project Summary Sheet stating “[t]he top bank plus all 256 reheater
assemblies in the two middle banks will be replaced during the planned ten-week outage
in 1994” (J.A. at 177); (2) a document stating that $4.5 million in emergency funding was
allocated for new condenser tubes to be installed in early 1997 (J.A. at 183); (3) a
document showing planned outages for “major turbine overhaul (720 hours or longer)” in
late 1994 and early 1997, plus a planned outage for a “major boiler overhaul (720 hours
-5-
or longer)” in 1998 (J.A. at 179 (capitalization standardized)); (4) documents reflecting
limited or zero hours of operation for certain months in late 1994 and early 1997 (J.A. at
181, 187); (5) another document showing planned outages for a “major turbine overhaul
(720 hours or longer)” in 1989 and a “major boiler overhaul (720 hours or longer)” in
1990 (J.A. at 189 (capitalization standardized)); and (6) a document showing a planned
outage for a “major boiler overhaul (720 hours or longer)” in 2000 (J.A. at 191
(capitalization standardized)). Petitioner contended these documents demonstrated that
major modifications occurred at the Pawnee station during the 1990s. Petitioner further
argued these modifications “clearly resulted in significant emissions increases,” based on
a table showing annual emissions at the Pawnee station from 1995 through 2007. (J.A. at
4-5.) Petitioner argued the documents at least raised a “valid suspicion of noncompliance
with PSD,” giving the state agency “a minimum responsibility to respond.” (J.A. at 5.)
In response, CDPHE stated it considered the NOV to be “only an allegation of a
violation and not a determination that violations actually occurred.” (J.A. at 17.) CDPHE
also noted that Intervenor and the EPA had disagreed as to whether a major modification
had occurred, and the EPA had not initiated any related enforcement action since issuing
the NOV seven years previously. Citing for support to an EPA order and a Colorado state
court case, CDPHE concluded that the NOV alone did not demonstrate noncompliance
with PSD. As for the other documents submitted by Petitioner, CDPHE concluded that
these documents did not prove a major modification had occurred. The mere fact that the
word “major” was used in the phrases “major turbine overhaul” and “major boiler
-6-
overhaul” did not demonstrate that “major modifications” had occurred for purposes of
PSD requirements. (J.A. at 21.) “A major modification is a physical change or change in
the method of operation, or addition to, a major stationary source that would result in a
significant net emissions increase using the actual to potential test.” (J.A. at 21.)
Moreover, CDPHE noted that “routine maintenance, repair and replacement” is not
considered to be a modification for purposes of this definition, and the fact that turbine
and boiler overhauls “have occurred frequently over the time periods addressed in the
exhibits support[s] the inference that these activities are routine.” (J.A. at 21.) CDPHE
thus concluded that Petitioner had not shown the PSD requirements had been triggered.
After making certain other revisions not relevant to this appeal, CDPHE submitted
the proposed final permit to the EPA, which did not file any written objections during its
45-day review period. Petitioner then petitioned for an objection to the issuance of the
permit. In its petition, Petitioner raised many of the same grounds it had raised in its
comments to CDPHE, including its concern about PSD compliance. Petitioner reiterated
its argument that the NOV was sufficient to demonstrate noncompliance with PSD
requirements for purposes of objecting to the Title V Permit. Petitioner also relied again
on the documents regarding the 1994 reheater redesign project, the 1997 upgrade of
condenser tubes, various periods of planned outages for “major turbine” and “major
boiler” overhauls, the limited or zero hours of operation reported in late 1994 and early
1997, and the table showing annual emissions amounts. Petitioner argued that “at a
minimum the NOV shows clear evidence of a valid suspicion of noncompliance,” which
-7-
the additional documents confirmed. (J.A. at 45.) Petitioner further argued that CDPHE
had not complied with its responsibility to respond to significant comments regarding
noncompliance, since CDPHE’s response “neither provides nor points to any explanation,
information, or analysis demonstrating that the reheater design and replacement and
condenser tube upgrades did not constitute physical changes or changes in the methods of
operation and/or lead to significant net emissions increases.” (J.A. at 47-48.) The state
agency’s response “fail[ed] to demonstrate that the reheater redesign and replacement and
condenser tube upgrades did not constitute major modifications of the Pawnee coal-fired
power station.” (J.A. at 48.) Petitioner therefore argued the EPA “must object to the
issuance of the Title V Permit on the basis of [CDPHE’s] failure to adequately respond to
significant comments presented by WildEarth Guardians.” (J.A. at 49.)
The EPA rejected these arguments. The EPA explained that “the issuance of an
NOV and reference to information contained therein are not sufficient to satisfy the
demonstration requirement under section 505(b)(2).” (J.A. at 198.) The EPA then
concluded that Petitioner had “failed to provide sufficient additional information to
‘demonstrate’ that PSD applies.” (J.A. at 200.) The agency explained:
As discussed above, . . . the test for PSD applicability is whether there has
been a major modification under the Colorado SIP. To determine whether a
net emissions increase would occur, the Colorado SIP requires: (1) a
determination of the actual emissions increase that would result from a
particular physical change or change in the method of operation; and (2) a
determination of any other increases and decreases in actual emissions at
the source that are contemporaneous with the particular change and are
otherwise creditable. In responding to Petitioner’s comment on the draft
title V permit in this regard, CDPHE concluded that the record was
-8-
insufficient to indicate a major modification occurred. Petitioner has not
submitted information sufficient to demonstrate that CDPHE was incorrect
in this regard. Specifically, for example, the emissions information in the
petition does not demonstrate the existence of a significant net emissions
increase since it fails to show the increase in actual emissions from the
reheater design and replacement, identify the contemporaneous period,
determine any other contemporaneous increases and decreases in emissions,
or determine whether the contemporaneous increases and decreases were
credible.
(J.A. at 200-01 (citation omitted).) Because Petitioner had not demonstrated that the test
for PSD applicability had been met, the EPA denied the petition on this issue. As for
CDPHE’s response to Petitioner’s comments, the EPA concluded that CDPHE had given
an adequate response since the state agency explained the test for determining whether a
major modification has occurred, explained that the use of the word “major” in
Intervenor’s planned outage reports was not determinative on this point, noted that the
EPA and Intervenor had disagreed on the facts at issue in the NOV, and stated that an
NOV is not conclusive evidence of a violation. The EPA accordingly denied Petitioner’s
petition on this ground as well.
Petitioner now seeks review of these decisions, arguing again that the NOV was
sufficient in itself to demonstrate PSD noncompliance, that the other documents further
demonstrate noncompliance, and that CDPHE failed to adequately respond to Petitioner’s
comments.
II.
Our review of the EPA’s order is governed by the Administrative Procedure Act,
and we accordingly will not set aside the agency’s decision “unless it is procedurally
-9-
defective, arbitrary or capricious in substance, or manifestly contrary to the statute.” Ariz.
Pub. Serv. Co. v. U.S. EPA, 562 F.3d 1116, 1122 (10th Cir. 2009) (internal quotation
marks omitted).2 “Under the arbitrary or capricious standard, we must determine whether
the agency considered the relevant data and rationally explained its decision.” Id.
Agency action is arbitrary or capricious if the agency has relied on factors
which Congress has not intended it to consider, entirely failed to consider
an important aspect of the problem, offered an explanation for its decision
that runs counter to the evidence before the agency, or is so implausible that
it could not be ascribed to a difference in view or the product of agency
expertise.
Id. at 1123 (internal quotation marks omitted).
As discussed above, the EPA must issue an objection if a “petitioner demonstrates
to the [agency] that the permit is not in compliance with the requirements of [the Clean
Air Act], including the requirements of the applicable [state] implementation plan.” 42
U.S.C. § 7661d(b)(2). A central dispute in this case is the question of what is required for
a petitioner to “demonstrate” noncompliance. To resolve this dispute, we must first
consider whether the agency’s interpretation of this requirement is entitled to any
deference.
To the extent a statute “speaks clearly to the precise question at issue, we must
2
Petitioner argues that we should review the agency’s decision de novo, citing for
support to legislative history discussing how citizen suits filed under Section 304 of the
Clean Air Act could be used to enforce the EPA’s non-discretionary duty to object to
permits that violate the Act. However, whatever the appropriate standard of review for
such Section 304 citizen suits, this is not a Section 304 citizen suit. Rather, Petitioner
filed a petition for review of the EPA’s agency action under Section 307, and de novo
review is not appropriate for such a petition.
-10-
give effect to the unambiguously expressed intent of Congress.” Barnhart v. Walton, 535
U.S. 212, 217 (2002) (internal quotation marks omitted). “If, however, the statute is
silent or ambiguous with respect to the specific issue,” id. at 218 (internal quotation
marks omitted), the agency’s interpretation of the statute is entitled to some degree of
deference, see United States v. Mead Corp., 533 U.S. 218, 227-29, 234-35 (2001).
Here, Petitioner contends the EPA’s interpretation is entitled to no deference
because the term “demonstrate” is unambiguous. However, whether or not this term is
ambiguous, deference is warranted based on the statute’s silence about the specific
dispute at issue here—the showing required for a petitioner to satisfy this demonstration
requirement. The Clean Air Act does not set forth any factors the EPA must take into
account in determining whether a petitioner has demonstrated noncompliance under
§ 7661d(b)(2). Indeed, the statute “does not resolve important questions that are part and
parcel of the Administrator’s duty to evaluate the sufficiency of a petition, for example,
the type of evidence a petitioner may present and the burden of proof guiding the
Administrator’s evaluation of when a sufficient demonstration has occurred.” Sierra
Club v. Johnson, 541 F.3d 1257, 1266 (11th Cir. 2008) The statutory silence on these
important questions suggests that “Congress has delegated to the EPA some discretion in
determining whether, in its expert opinion, a petitioner has presented sufficient evidence
to prove a permit violates clean air requirements,” and thus some level of deference is
warranted. Id.
The exact degree of deference we should apply is less clear. The parties both
-11-
assume that Chevron deference applies, to the extent any deference is warranted.
However, an argument could be made that the agency interpretation in this case, which
was not the result of a formal adjudication or notice-and-comment rulemaking, should
instead be reviewed under the less deferential Skidmore standard, under which an
agency’s “informal interpretations are entitled to respect, . . . but only to the extent that
those interpretations have the power to persuade,” McGraw v. Barnhart, 450 F.3d 493,
501 (10th Cir. 2006) (internal quotation marks omitted). Cf. MacClarence v. U.S. EPA,
596 F.3d 1123, 1131 (9th Cir. 2010) (discussing both Chevron and Skidmore deference in
resolving the same issue that is before us in this case); Sierra Club v. Johnson, 541 F.3d
at 1265 n.3 (noting that “Chevron deference . . . does not necessarily apply to every
interpretation offered by an agency,” but declining to “identify the precise level of
deference in the instant matter since we are persuaded that the EPA’s position would
survive even the least deferential degree of review”). We need not resolve this potential
issue in this case, since we conclude that the EPA’s interpretation is persuasive even
under Skidmore’s less deferential standard of review, and this interpretation would thus
prevail under either standard.
Here, the EPA stated that a petitioner cannot rely solely on the existence of a
previously issued NOV to demonstrate noncompliance, although an NOV may be “a
relevant factor when determining whether the overall information presented by
Petitioner—in light of all the factors that may be relevant—demonstrates the applicability
of a requirement for the purposes of title V.” (J.A. at 198-99.) “Other factors that may be
-12-
relevant in this determination include the quality of the information, whether the
underlying facts are disputable, the types of defenses available to the source, and the
nature of any disputed legal questions . . . .” (J.A. at 199.) The agency then explained:
“If, in any particular case, these factors are relevant and Petitioner does not present
information concerning them, then the EPA may find that Petitioner has failed to present
sufficient information to demonstrate that the requirement is applicable.” (J.A. at 199.)
The agency noted that it had similarly explained in several previous Title V orders that an
NOV alone is not sufficient to demonstrate noncompliance under § 7661d(b)(2). We find
this interpretation of the demonstration requirement persuasive and thus defer to the
agency’s interpretation.
The EPA is directed to issue an NOV “[w]henever, on the basis of any information
available to the Administrator, the Administrator finds that any person has violated or is
in violation of any requirement or prohibition of an applicable implementation plan or
permit.” 42 U.S.C. § 7413(a)(1). Although this statute “talks in terms of the
Administrator making a finding, it merely describes the EPA’s process for leveling
allegations against any party it perceives to be violating clean air requirements.” Sierra
Club v. Johnson, 541 F.3d at 1267. Thus, the statute “helps guarantee that a party
receives notice of the accusations leveled against them prior to the EPA taking further
enforcement action.” Id. (citing 42 U.S.C. § 7431(a)(1)). Accordingly, an NOV “reflects
the agency’s first, not its last, word on the subject,” marking “only the beginning of a
process designed to test the accuracy of the agency’s initial conclusions.” Sierra Club v.
-13-
EPA, 557 F.3d at 408. “And that process may prove the opposite: The statute
contemplates that litigation may disprove the agency’s allegations, may disprove the
reasonableness of the agency’s allegations, or may result in a stalemate or settlement.”
Id. (citations omitted) (citing 42 U.S.C. §§ 7413(b)(3), 7413(g)).
If the agency were required to find that a previous NOV demonstrated
noncompliance under Title V, as Petitioner suggests, “the agency would have to cling to
an initial conclusion reached months or years earlier . . . based on ‘any information
available’ to it at the time,” even if further evidence had disproved the agency’s initial
allegations. Id. (quoting 42 U.S.C. § 7413(a)(1)). “Besides giving short shrift to the
truth-seeking function of litigation, this interpretation could discourage the EPA from
engaging in discretionary enforcement actions in the first place.” Id. Moreover, as the
Eleventh Circuit has explained:
[Petitioner’s] argument threatens to render meaningless the statutory
requirement that private citizens demonstrate noncompliance. Had
Congress intended the Administrator to object to an operating permit every
time a violation notice is issued, it could have easily made that an explicit
part of the Title V permit review process. It did not. Instead it chose to
require private citizens to “demonstrate” a violation, and at least in this
case, the agency was entitled to conclude that a mere reminder of its past
actions was an insufficient demonstration.
Sierra Club v. Johnson, 541 F.3d at 1269 (citation omitted).
We are not persuaded by the Second Circuit’s contrary conclusion that an NOV
suffices to demonstrate non-compliance, see N.Y. Pub. Interest Research Grp., Inc., 427
F.3d at 181-82, since this conclusion fails to adequately take into account the preliminary
-14-
nature of an NOV. Instead, like the Sixth and Eleventh Circuits, we find the EPA’s
interpretation of the demonstration requirement to be persuasive and thus entitled to
deference. Nothing about the statute requires the EPA to find that a petitioner has
demonstrated noncompliance simply by pointing to the existence of an NOV, and we will
defer to the EPA’s persuasive conclusion that an NOV alone is insufficient to meet this
burden of demonstration.
Petitioner further suggests that once a petitioner has submitted evidence regarding
the existence of a previously issued NOV, this creates in effect a presumption of
noncompliance, which the agency must affirmatively rebut with a persuasive explanation
of the reasons why it now concludes that the source is in compliance. (See, e.g., Pet’r’s
Opening Br. at 36 (“EPA also provides no discussion or explanation for its inconsistency.
. . . Because EPA must determine whether the Petition demonstrates sufficient
information, EPA failed in its affirmative duty to refute or confirm the information in the
Petition.”); see also J.A. at 47-48 (complaining that the state agency’s response “neither
provides nor points to any explanation, information, or analysis demonstrating that the
reheater design and replacement and condenser tube upgrades did not constitute physical
changes or changes in the methods of operation and/or lead to significant net emissions
increases”).) However, the statutory text does not shift the burden in this manner. The
statute places the burden on the petitioner to demonstrate noncompliance, not on the
agency to disprove such allegations, and we will defer to the agency’s conclusion that a
petitioner must affirmatively point to evidence other than an NOV in order to make this
-15-
demonstration. Petitioner further argues this conclusion places an unreasonable burden
on citizen–petitioners by requiring them to provide technical information that may not be
publicly available and to prove each element of the complex legal tests required to
demonstrate noncompliance with PSD or other requirements. We are not persuaded,
however, that it is unreasonable for the agency to require petitioners to meet a high
burden of proof before they can trigger the EPA’s mandatory duty to object to a Title V
petition. We therefore see no error in the EPA’s persuasive interpretation of the
demonstration requirement.
We further conclude that the agency did not act arbitrarily or capriciously in
concluding that Petitioner failed to demonstrate noncompliance in this case. The agency
held that Petitioner had not demonstrated PSD noncompliance because Petitioner’s
evidence failed to show there had been a major modification as defined by the Colorado
SIP, which requires, among other things, consideration of the actual emissions increase
resulting from a particular modification, as well as “a determination of any other
increases and decreases in actual emissions at the source that are contemporaneous with
the particular change and are otherwise creditable.” (J.A. at 200-01.) As the agency
explained, Petitioner’s evidence did not address key parts of this test, particularly the
question of net emissions increases. The table of annual emission levels submitted by
Petitioner fell far short of the proof required to demonstrate that a major modification had
occurred under the Colorado SIP, and none of Petitioner’s other evidence, besides the
bare allegations in the 2002 NOV, addressed the question of actual emissions. Viewing
-16-
the record as a whole, we are not persuaded that the EPA acted arbitrarily or capriciously
in holding that Plaintiff had not demonstrated noncompliance. Thus, under our
deferential standard of review, we affirm the EPA’s denial of the petition on this ground.
Finally, Petitioner argues the EPA erred in concluding that CDPHE adequately
responded to Petitioner’s comments during the public comment period. For support,
Petitioner relies mainly on a prior EPA order where the EPA held that a state agency had
failed to adequately respond to a petitioner’s comments. However, the state agency’s
response in the previous case contained only two sentences referring vaguely to “the rules
that existed at the time of each modification.” (J.A. at 229.) Here, the state agency gave
a much more thorough explanation in its response, and we are not persuaded that the EPA
acted arbitrarily or capriciously in concluding this response was adequate. We therefore
affirm the EPA’s denial of the petition on this ground as well.
III.
For the foregoing reasons, we AFFIRM the EPA’s order denying in part the
petition to object.