FILED
United States Court of Appeals
Tenth Circuit
May 24, 2010
UNITED STATES COURT OF APPEALS
Elisabeth A. Shumaker
Clerk of Court
FOR THE TENTH CIRCUIT
JOSEPH R. FOX,
Petitioner,
v. No. 09-9529
(Petition for Review)
SURFACE TRANSPORTATION
BOARD; UNITED STATES OF
AMERICA,
Respondents.
___________________________
UNION PACIFIC RAILROAD
COMPANY,
Intervenor.
ORDER AND JUDGMENT *
Before MURPHY, McKAY, and BALDOCK, Circuit Judges.
*
After examining the briefs and appellate record, this panel has determined
unanimously that oral argument would not materially assist the determination of
this appeal. See Fed. R. App. P. 34(a)(2); 10th Cir. R. 34.1(G). The case is
therefore ordered submitted without oral argument. This order and judgment is
not binding precedent, except under the doctrines of law of the case, res judicata,
and collateral estoppel. It may be cited, however, for its persuasive value
consistent with Fed. R. App. P. 32.1 and 10th Cir. R. 32.1.
Joseph R. Fox appeals a ruling of the Surface Transportation Board (STB or
Board), holding that a rail line owned by Union Pacific Railroad Company (UP) is
subject to the STB’s jurisdiction and has not been abandoned by UP. Exercising
jurisdiction under 28 U.S.C. §§ 2321(a) and 2342(5), we affirm the Board’s
decision.
Background
In 1977, UP and related rail carriers applied to the Interstate Commerce
Commission (ICC) for authorization to abandon the Ironton Branch, a 1.87 mile
rail line located in Provo, Utah. Pre-authorization from the ICC was a statutory
requirement for abandonment of a rail line regulated by the ICC. See 49 U.S.C.
§ 1a (1976). In its notice of intent to abandon the Ironton Branch, UP indicated
that part of the track would be retired and removed, but a portion of the track
would remain in place and be reclassified as “yard track.” Resp. App. at 20. In
October 1977, the ICC issued a Certificate and Order authorizing UP to abandon
the Ironton Branch, acknowledging that some track would remain in place and be
reclassified as yard track. UP informed the ICC in December 1977 that a segment
of the track had been removed and “abandoned,” id. at 30, with the remaining
portion to remain in place and be reclassified.
Mr. Fox owns property that lies adjacent to one of the segments of the
Ironton Branch that UP reclassified as yard track in 1977. We will refer to this
-2-
segment of track as the Southern Segment. 1 In 2008, Mr. Fox petitioned the STB
for a declaratory order that the Board does not have jurisdiction over the Southern
Segment, as a result of its abandonment by UP.
Mr. Fox does not dispute that UP used the Southern Segment for various
auxiliary purposes in support of its railroad operations between 1977 and 2007,
including for staging and storage of rail equipment, as a car repair facility, and
for storage of cabooses. There is also no dispute that the Southern Segment
remained physically connected to UP’s main line until 2006, when a switch was
removed.
UP presented evidence to the Board of the potential for converting the
Southern Segment for use as a transload facility to handle new traffic from
shippers in the region. In a Verified Statement, a UP representative stated that an
increase in new manufacturing facilities in the area has resulted in an increase in
rail traffic. He explained how the Southern Segment could be configured to
handle up to fifty rail cars per day, while allowing room for trucks to serve the
facility, and he also described why the Southern Segment is ideally suited for this
kind of facility. He stated that UP has had discussions with six shippers about
possible movement of traffic using a Southern Segment transload facility. The
1
Although UP reclassified more than one segment of the Ironton Branch as
yard track in 1977, only the Southern Segment abuts Mr. Fox’s property. Thus,
the STB properly limited its decision to that segment. See STB Decision, Resp.
App. at 3 n.4.
-3-
UP representative estimated the cost of converting the Southern Segment at
roughly $2 million, which he indicated would be substantially lower than
purchasing land and constructing such a facility at an alternative site, assuming
that alternative were feasible.
The STB concluded that the Southern Segment falls within its exclusive
jurisdiction under 49 U.S.C. § 10501(b)(2) and that UP has not abandoned it.
Mr. Fox filed a timely appeal.
Standard of Review
Under the Administrative Procedure Act, we will “hold unlawful and set
aside agency action, findings, and conclusions found to be . . . arbitrary,
capricious, an abuse of discretion, or otherwise not in accordance with
law . . . [or] unsupported by substantial evidence.” 5 U.S.C. § 706(2)(A), (E);
see also Swonger v. STB, 265 F.3d 1135, 1140 (10th Cir. 2001) (applying
§ 706(2) standard in reviewing STB decision); State Corp. Comm’n v. United
States, 894 F.2d 1141, 1142 (10th Cir. 1989) (applying § 706(2) standard in
reviewing ICC decision). 2
2
Although State Corp. Comm’n predates the STB, “the ICC Termination Act
of 1995 . . . transferred the ICC’s railroad-related functions to the STB and
directed that the STB apply ICC precedent.” Swonger, 265 F.3d at 1137 n.1.
-4-
Discussion
Mr. Fox contends that, by reclassifying the Southern Segment as yard track
in 1977 pursuant to the ICC’s abandonment authority, UP took it out of the
national rail system and therefore “abandoned” it. He argues further that, as
previously abandoned track, the Southern Segment did not subsequently become
subject to the STB’s jurisdiction under the ICC Termination Act of 1995
(ICCTA). And he claims that, even if the Southern Segment became subject to
STB jurisdiction post-ICCTA, UP subsequently abandoned it. We conclude that
the Southern Segment falls within the STB’s exclusive jurisdiction under
49 U.S.C. § 10501(b)(2), and the Board’s determination that UP has not
abandoned it is supported by substantial evidence.
A.
As the STB explains in its brief, rail operations require both main lines,
over which a carrier provides point-to-point service to shippers, and auxiliary
lines, used for operations such as loading, reloading, classification, storage, and
switching. See Resp. Br. at 3-5. As yard track, the Southern Segment is auxiliary
track. It is also located entirely within one state.
The regulation of intrastate auxiliary track has changed over time. In 1977,
the ICC had no authority over “the construction, acquisition, or operation of spur,
industrial, team, switching, or side tracks if such tracks [were] located or intended
-5-
to be located entirely within one State.” 49 U.S.C. § 1(18)(d) (1976). 3 Therefore,
upon its reclassification from main line track to yard track in 1977, the Southern
Segment fell within this category of intrastate auxiliary track not regulated by the
ICC.
In 1995, Congress passed the ICCTA, Pub. L. No. 104-88, 109 Stat. 803
(1995), which did away with the ICC and transferred authority for railroad
regulation to the STB. Under the ICCTA, the Board has exclusive jurisdiction
over “the construction, acquisition, operation, abandonment, or discontinuance of
spur, industrial, team, switching, or side tracks, or facilities.” 49 U.S.C.
§ 10501(b)(2). And the STB’s exclusive jurisdiction over auxiliary tracks applies
“even if the tracks are located, or intended to be located, entirely in one State.”
Id. (emphasis added). Thus, Congress declared in the ICCTA that intrastate
auxiliary tracks—which were previously expressly outside of the ICC’s regulatory
authority—were thereafter exclusively under the jurisdiction of the newly created
STB. See Port City Props. v. UP R.R. Co., 518 F.3d 1186, 1188 (10th Cir. 2008)
(“[J]urisdiction over ‘spur, industrial, team, switching or side tracks, or facilities’
rests solely with the STB.” (quoting § 10501(b)(2))). This court has characterized
3
Such intrastate auxiliary tracks were regulated by the states. See Ill.
Commerce Comm’n v. I.C.C., 879 F.2d 917, 922 (D.C. Cir. 1989) (confirming
“uniform view” that states had authority to regulate intrastate spurs); see also City
of Yonkers v. United States, 320 U.S. 685, 690 (1944) (exemptions from ICC
authority reflected “Congressional policy of reserving exclusively to the states
control over that group of essentially local activities”).
-6-
§ 10501(b)(2) as a “broad jurisdictional grant,” which Congress “added in light of
the exclusive Federal authority over auxiliary tracks and facilities,” thus
preempting state jurisdiction over spur and industrial tracks. Port City Props.,
518 F.3d at 1188 (quotation and brackets omitted). 4
The Board found that UP continued to use the Southern Segment for
various auxiliary purposes in support of its railroad operations as of the passage
of the ICCTA. Therefore, the Board held that it became subject to the STB’s
jurisdiction under the plain meaning of § 10501(b)(2).
B.
Mr. Fox argues that this court should set aside the Board’s decision as not
in accordance with the law. He asserts that UP abandoned the Southern Segment
by reclassifying it as yard track in 1977. See Preseault v. ICC, 494 U.S. 1, 5 n.3
(1990) (“Once a carrier ‘abandons’ a rail line pursuant to authority granted by the
Interstate Commerce Commission, the line is no longer part of the national
transportation system, and although the Commission is empowered to impose
4
The STB refers to the § 10501(b)(2) category of tracks as “excepted
auxiliary track,” Resp. Br. at 5, because a separate statutory provision excepts
these tracks from the regulatory requirements set forth in Chapter 109 of Title 49
with respect to construction, acquisition, operation, abandonment or
discontinuation of railroad lines. See 49 U.S.C. § 10906; see also Port City
Props., 518 F.3d at 1188 (holding that the combined effect of §§ 10501(b)(2) and
10906 is to preempt state jurisdiction over these tracks and to remove STB
authority over their entry and exit). Because § 10906 is not at issue in this case,
we will continue to refer simply to auxiliary track.
-7-
conditions on abandonments, as a general proposition ICC jurisdiction
terminates.” (citation omitted)). And he asserts that, because a railroad carrier
cannot undo an abandonment once it is consummated, UP cannot now invoke STB
jurisdiction over the Southern Segment based upon § 10501(b)(2). For this
proposition, Mr. Fox cites Fritsch v. ICC, 59 F.3d 248, 253 (D.C. Cir. 1995);
RLTD Ry. Corp. v. STB, 166 F.3d 808, 812 (6th Cir. 1999).
We agree with Mr. Fox that the ICC’s authority over the Southern Segment
terminated upon its reclassification as yard track in 1977 because, under the
regulatory scheme in place at that time, the ICC had no authority over “the
construction, acquisition, or operation of [intrastate auxiliary tracks].” 49 U.S.C.
§ 1(18)(d) (1976). But in the ICCTA, Congress changed the regulatory scheme,
creating new, exclusive federal jurisdiction over intrastate auxiliary tracks under
the newly created STB. And while the cases Mr. Fox relies on do stand for the
general proposition that the Board has no jurisdiction over a rail line after its
abandonment has been fully consummated, neither Fritsch nor RLTD Ry. Corp.
dealt with the factual and legal issues presented here. In these cases the carriers
were attempting to assert ICC or STB jurisdiction over lines they had physically
abandoned. 5 Unlike this case, Fritsch and RLTD Ry. Corp. did not involve main
5
In Fritsch, the court concluded that a carrier had fully consummated
abandonment of a line, noting that the carrier’s “intent could not have been
clearer . . . based on the letters it sent to the ICC, as well as its removal of
(continued...)
-8-
line track that a carrier had reclassified as intrastate auxiliary track under the
ICC’s abandonment authority. Nor had the tracks that were alleged to be
abandoned in these cases been used for auxiliary purposes in support of the
carriers’ main line operations. And neither case addressed a carrier’s assertion of
federal jurisdiction after a major legislative change to the regulatory scheme.
Here, Mr. Fox does not contend that UP is attempting to assert STB
jurisdiction over track that UP physically removed and retired pursuant to the
ICC’s abandonment authority. Rather, he bases his abandonment claim on UP’s
reclassification of the Southern Segment as yard track, which had the legal effect
of terminating the ICC’s regulatory authority over it. But there is no dispute that
UP continued to use the Southern Segment as intrastate auxiliary track in support
of its main line railroad operations as of the passage of the ICCTA. Therefore,
under the plain meaning of § 10501(b)(2), the STB has jurisdiction over the
Southern Segment. 6
5
(...continued)
equipment.” 59 F.3d at 253. Consequently, the court held, the ICC “had no
jurisdiction to undo the abandonment.” Id. In RLTD Ry. Corp., the court found
substantial evidence supporting the STB’s determination that a segment of track
had been abandoned where some of the track had been salvaged, portions of the
line were paved over, and the only working connection between the line and the
interstate rail system had long before been abandoned by a different carrier. See
166 F.3d at 812, 814. Therefore, the court affirmed the STB’s determination that
it did not have jurisdiction over the line, due to its abandonment. See id. at 814.
6
Mr. Fox contends that a savings provision in the ICCTA prevents the
revival of federal jurisdiction over the Southern Segment under § 10501(b)(2).
(continued...)
-9-
C.
Mr. Fox argues that, even if the STB attained jurisdiction over the Southern
Segment post-ICCTA, UP has since abandoned the line. Exercising its
jurisdiction under § 10501(b)(2), the STB concluded that UP has not abandoned
the Southern Segment. 7
6
(...continued)
The ICCTA provided that:
All orders, determinations, rules, regulations, permits, grants, loans,
contracts, agreements, certificates, licenses, and privileges . . . that
have been issued, made, granted, or allowed to become effective by
the Interstate Commerce Commission . . . in the performance of
any function that is transferred by this Act or the amendments
made by this Act . . . that are in effect on the effective date of such
transfer . . . shall continue in effect according to their terms until
modified, terminated, superseded, set aside, or revoked in accordance
with law by the Board, any other authorized official, a court of
competent jurisdiction, or operation of law.
Pub. L. No. 104-88, 109 Stat. 803, § 204(a) (1995). Based on this language,
Mr. Fox reasons that the ICC’s 1977 abandonment determination remains in
effect, thereby preventing the STB from exercising jurisdiction over the track.
But Mr. Fox ignores that the ICC’s determination permitted UP to reclassify the
Southern Segment as yard track. That classification has not been modified and is
consistent with the STB’s exercise of jurisdiction over the Southern Segment.
7
As noted above, see n.4, under 49 U.S.C. § 10906 the abandonment of
auxiliary track is excepted from the STB’s pre-approval authority. In its brief,
the Board explains that, because it doesn’t license abandonment of auxiliary
tracks, “there is no administrative precedent on what constitutes ‘abandonment’ of
such track.” Resp. Br. at 16. n.27. Therefore, Mr. Fox, UP, and the STB applied
precedent under 49 U.S.C. § 10903 regarding consummation of abandonment.
Mr. Fox does not contend that the Board applied an incorrect legal standard.
-10-
In determining whether a carrier has consummated abandonment of a rail
line, the focus is on the carrier’s intent. See Birt v. STB, 90 F.3d 580, 585
(D.C. Cir. 1996). “[S]everal concrete actions . . . may indicate an intent to
abandon: cessation of operations, cancellation of tariffs, salvage of the track and
track materials, and relinquishment of control over the right-of-way.” Id.;
see also 49 C.F.R. § 1152.29(e)(2) (listing attributes of a fully abandoned line as
“discontinued operations, salvaged . . . track, canceled tariffs, and inten[t] that the
property be removed from the interstate rail network”). The Board made the
following findings:
It is undisputed that between 1977 and 2000, UP used the [S]outhern
[S]egment for staging and storing rail equipment for customers and,
for 3 years in the mid-1990s, as a car repair site. UP also stored
cabooses on the line until it removed them in 2007. And Fox
acknowledges UP’s efforts to market the [S]outhern [S]egment for
use as a team or as a transload facility to serve growing markets in
Provo, UT.
These actions contradict any intent to take this track segment
out of the national rail system. UP’s action removing the switch
connecting the [Southern Segment] to its Provo Subdivision does not
dictate a different conclusion; the switch can be easily replaced and
therefore its removal did not sever the [Southern Segment] from the
national rail network. In short, because UP has continued to use the
[S]outhern [S]egment as part of the national rail network, and is
seeking new customers to use it in the future, that segment remains
within the Board’s jurisdiction.
Resp. App. at 6-7 (citation omitted).
-11-
Mr. Fox contends the Board’s findings are not supported by substantial
evidence. Our review under the substantial evidence standard is “quite narrow.”
Zoltanski v. FAA, 372 F.3d 1195, 1200 (10th Cir. 2004) (quotation omitted).
Substantial evidence is such evidence that a reasonable mind might
accept as adequate to support the conclusion reached by the decisionmaker.
Substantial evidence requires more than a scintilla but less than a preponderance.
The possibility of drawing two inconsistent conclusions from the evidence does
not prevent an administrative agency’s findings from being supported by
substantial evidence.
Id. (quotation omitted). Mr. Fox challenges the sufficiency of the evidence
supporting the Board’s finding that UP did not intend to permanently disconnect
the Southern Segment from its main line, as well as its finding that the switch
could easily be replaced. Having reviewed the record, we conclude there is
substantial evidence to support the Board’s decision.
We agree with Mr. Fox that UP’s unverified statements in its brief before
the STB that the switch can be “readily” restored, see Resp. App. at 44, 49, do not
qualify as evidence supporting the Board’s findings. But the record is
nonetheless sufficient to support the STB’s conclusions, regarding both the
intended temporary nature of the disconnection of the line from UP’s main line
and the relative ease of replacing the switch. UP’s Verified Statement provided
details about its marketing of the Southern Segment as a transload facility,
including its discussions with six potential customers. It asserted that the
Southern Segment is particularly well-suited for this purpose and that an influx of
-12-
new manufacturing industries into the area would make it a viable use. UP
estimated it would cost approximately $2 million to convert the Southern Segment
into a transload facility. The Board could reasonably infer from this evidence
that UP did not intend the disconnection of the line to be permanent, and that, in
the event UP moves forward with converting the Southern Segment to a transload
facility, replacement of the switch would be feasible in relation to the investment
UP is willing to make to convert the tracks for that purpose. See, e.g., St. Louis
Sw. Ry. Co.--Abandonment--In Smith and Cherokee Counties, 9 I.C.C.2d 406, 411
(I.C.C. 1992) (rejecting claim that limited track removal indicated carrier’s intent
to abandon and stating that “line could easily be restored to operations”),
vacated in part on other grounds, 2002 WL 383570 (S.T.B. Mar. 6, 2002);
Norfolk S. Ry. Co.--Adverse Abandonment--St. Joseph County, No. AB-290
(SUB-286), 2008 WL 391303, at *3 (S.T.B. Feb. 13, 2008) (rejecting claim that
rail service was no longer feasible due to degradation of lines and removal of
switch and noting acquiring carrier’s willingness to invest money to rehabilitate
track).
Notwithstanding Mr. Fox’s contention that it is more reasonable to
conclude that UP intended to permanently disconnect the line from its main line,
the Board’s decision that UP has not abandoned the Southern Segment is
supported by substantial evidence. We decline Mr. Fox’s invitation to reweigh
the evidence. “Where there is substantial support in the record for the [Board’s]
-13-
findings, it is not the court’s function to substitute its own conclusions for those
which the [Board] had fairly drawn from such findings.” State Corp. Comm’n,
894 F.2d at 1144 (quotation omitted).
Conclusion
The STB’s decision is supported by substantial evidence, and is not
arbitrary, capricious, an abuse of discretion or otherwise not in accordance with
the law. Therefore, the decision of the Surface Transportation Board is
AFFIRMED.
Entered for the Court
Michael R. Murphy
Circuit Judge
-14-