F I L E D
United States Court of Appeals
Tenth Circuit
PUBLISH
SEP 8 1999
UNITED STATES COURT OF APPEALS
PATRICK FISHER
Clerk
TENTH CIRCUIT
UNITED STATES OF AMERICA,
Plaintiff-Appellee,
v.
POWER ENGINEERING COMPANY;
REDOUBT, LTD.; and RICHARD J.
LILIENTHAL,
No. 98-1273
Defendants-Third-Party
Plaintiffs-Appellants,
v.
JACK LILIENTHAL,
Third-Party-Defendant.
Appeal from the United States District Court
for the District of Colorado
(D.C. No. 97-B-1654)
John F. McBride (John J. Zodrow with him on the briefs), Zodrow et al. P.C.,
Denver, Colorado, for Defendants-Appellants.
Greer Goldman, Department of Justice, Washington, D.C. (Lois J. Schiffer,
Assistant Attorney General, Henry L. Solano, United States Attorney, Stephen D.
Taylor, Assistant United States Attorney, Denver, Colorado; John A. Bryson, John
N. Moscato, Lisa E. Jones, Attorneys, Department of Justice, Washington, D.C.;
and Thomas Sitz, General Counsel for Office of Enforcement, Compliance and
Environmental Justice, Environmental Protection Agency, Denver, Colorado, with
him on the briefs), for Plaintiff-Appellee.
Before EBEL, MAGILL * and LUCERO, Circuit Judges.
EBEL, Circuit Judge.
Plaintiff-Appellee United States, acting on behalf of the Environmental
Protection Agency (“EPA”), sought a mandatory preliminary injunction directing
Defendant-Appellants Power Engineering Company (“PEC”), Redoubt, Ltd., and
Richard J. Lilienthal (collectively, “Defendants”), to comply with the financial
assurance regulations adopted by the Colorado Department of Public Health and
Environment (“CDPHE”) under authority delegated to Colorado by the EPA
pursuant to the Resource Conservation and Recovery Act of 1976 (“RCRA”). The
district court granted the mandatory preliminary injunction, requiring Defendants
to provide financial assurances in the amount of $3,500,000 to ensure remediation
of ground and water contamination caused by chromium and other by-products of
PEC’s metal refinishing business. Defendants appeal the grant of the preliminary
injunction. We affirm.
*
Honorable Frank Magill, Senior United States Circuit Judge for the Eighth
Circuit, sitting by designation.
-2-
I. BACKGROUND 1
Statutory and Regulatory Background
In 1976, Congress enacted RCRA, a comprehensive statutory scheme
providing cradle-to-grave oversight of solid and hazardous waste. See 42 U.S.C.
§ 6902; United States v. Colorado, 990 F.2d 1565, 1570 (10th Cir. 1993); United
States v. Power Engineering Co., 10 F. Supp.2d 1145, 1147 (D. Colo. 1998)
(“PEC”). RCRA’s Subtitle C, 42 U.S.C. §§ 6921-39, governs the generation,
transportation, storage, disposal, and treatment of hazardous wastes to minimize
present and future threats to human health and the environment. See 42 U.S.C.
§ 6924(a); United Technologies Corp. v. EPA, 821 F.2d 714, 716 (D.C. Cir.
1987). To that end, section 3004 of RCRA, 42 U.S.C. § 6924, directs the EPA to
promulgate regulations establishing standards for owners and operators of
hazardous waste facilities, such as standards for “financial responsibility
(including financial responsibility for corrective action) as may be necessary or
desirable.” 42 U.S.C. § 6924(a)(6). Section 3004 also permits the EPA to
promulgate regulations establishing standards for compliance with section 3005 of
RCRA. See 42 U.S.C. § 6924(a)(7). Section 3005 of RCRA, 42 U.S.C. § 6925,
1
A more detailed background of RCRA and the facts can be found in the
district court’s memorandum order and opinion, United States v. Power
Engineering Co., 10 F. Supp.2d 1145 (D. Colo. 1998).
-3-
prohibits any person from treating, storing, or disposing of hazardous waste or
constructing any hazardous waste facility for such treatment, storage, or disposal
without (1) a permit issued pursuant to Section 3005; or (2) designation of
“interim status,” obtained by notifying the EPA of the person’s hazardous waste
activities and submitting an application for a permit. 42 U.S.C. § 6925(a) & (e).
If authorized by the EPA, a state may “carry out [its own hazardous waste]
program in lieu of the Federal program” under Subtitle C and “issue and enforce
permits for the storage, treatment, or disposal of hazardous waste.” 42 U.S.C.
§ 6926(b); see Colorado, 990 F.2d at 1569. Action taken by a state pursuant to its
federally authorized program has “the same force and effect as action taken by the
[EPA].” 42 U.S.C. § 6926(d); see Colorado, 990 F.2d at 1569.
Pursuant to EPA authorization, Colorado implemented its own hazardous
waste program, and promulgated regulations governing generators of hazardous
waste and the operation and maintenance of hazardous waste treatment, storage,
and disposal facilities. See generally, 6 Colo. Code Regs. 1007-3 (“C.C.R.”)
§§ 262, 264-68; Colorado, 990 F.2d at 1571; PEC, 10 F. Supp.2d at 1148.
Colorado’s regulations are substantially identical to the EPA’s regulations, such
that analysis of the federal scheme can “overlay[] and define[] that of Colorado.”
See Sierra Club v. United States Dept. of Energy, 734 F. Supp. 946, 947 (D. Colo.
1990). Among the state’s regulations are the so-called financial assurance
-4-
requirements, located in C.C.R. § 266, which require owners and operators of all
hazardous waste facilities to document that they have secured the financial
resources required for closure and, if necessary, post-closure of their facilities in
an appropriate and safe manner, and to pay third-party claims that may arise from
their operations. See C.C.R. §§ 266.14 & 266.16; PEC, 10 F. Supp.2d at 1146. 2
The specifics of Colorado’s regulatory scheme will be discussed further in the
relevant context.
For present purposes, however, it is useful to identify two propositions
which the district court stated, and which neither party challenges on appeal.
First, according to the district court, the EPA “retains the right to bring
enforcement actions compelling compliance with Colorado’s hazardous waste
regulations.” PEC, 10 F. Supp.2d at 1148 (citing 42 U.S.C. §§ 6928, 6934, &
6973; 49 Fed. Reg. 41036 (1984); 51 Fed. Reg. 37729 (1986); 54 Fed. Reg. 20847
2
According to the C.C.R. § 265.111,
The owner or operator [of a hazardous waste facility] must close the
facility in a manner that:
(a) Minimizes the need for further maintenance, and
(b) Controls, minimizes or eliminates, to the extent necessary to
protect human health and the environment, post-closure escape of
hazardous waste, hazardous constituents, leachate, contaminated
runoff, or hazardous waste decomposition products to the ground or
surface waters or to the atmosphere . . . .
-5-
(1989); 56 Fed. Reg. 21601 (1991); 59 Fed. Reg. 16568 (1994)). 3 Second, even
though the state resolved its enforcement proceedings against Defendants in this
case through an administrative order, the district court assumed the EPA had
“overfile” power under RCRA to bring its own subsequent enforcement action.
See PEC, 10 F. Supp.2d at 1146; see also Bryan S. Miller, Harmonizing RCRA’s
Enforcement Provisions: RCRA Overfiling in Light of Harmon Industries v.
Browner, 5 Envtl. Law. 585, 586 (1999) (“Overfiling occurs when EPA initiates
an enforcement action after a state begins an action on the same matter.”).
3
42 U.S.C. § 6928 provides that the EPA may issue an order assessing a
civil penalty, bring suit in federal court “for appropriate relief, including a
temporary or permanent injunction,” or both, when it determines that a violation
of “any requirement” of Subtitle C has occurred. Id. at § 6928(a)(1). It further
provides that when a violation of Subtitle C occurs in a state which is authorized
to carry out a hazardous waste program, the EPA shall give notice to the state
prior to issuing an order or commencing an action. See id. at § 6928(a)(2).
42 U.S.C. § 6934 provides that the EPA may order an owner or operator of
a hazardous waste facility to conduct monitoring, testing, analysis, and reporting
under certain conditions. See id. at § 6934(a).
42 U.S.C. § 6973 provides that the EPA may bring suit against a person
who has contributed or is contributing to the past or present handling, storage,
treatment, transportation, or disposal of hazardous waste that presents an
imminent and substantial endangerment to health or the environment. See id. at §
6973(a).
The Federal Registers cited contain the EPA’s approval of Colorado’s
hazardous waste program or revisions thereto. In them, the EPA states that
“Colorado also has primary enforcement responsibility, although EPA retains the
right to conduct inspections under Section 3007 of RCRA and to take enforcement
actions” under 42 U.S.C. §§ 6928, 6934, & 6973. 49 Fed. Reg. 41036, 41037
(1984); see 51 Fed. Reg. 37729, 37730 (1986); 54 Fed. Reg. 20847, 20848
(1989); 56 Fed. Reg. 21601, 21602 (1991); 59 Fed. Reg. 16568, 16569 (1994).
-6-
On appeal, the parties focus their argument only on whether the EPA may
enforce the financial assurance provisions of the state regulations independently
of compelling compliance with the entire permitting scheme. Therefore, because
the propositions set forth above are not in dispute in this appeal, we assume
without deciding for purposes of this appeal (1) that the EPA may enforce the
state’s hazardous waste regulations, see United States v. Marine Shale Processors,
81 F.3d 1361, 1367 (5th Cir. 1996) (“42 U.S.C. § 6928(a) gave EPA the power to
enforce the substance of an approved state’s program against private parties in
that state.”); and (2) that the EPA may do so even after the state has taken its own
enforcement actions, but see Harmon Indus., Inc. v. Browner, 19 F. Supp.2d 988,
994, 996 (W.D. Mo. 1998) (recognizing that EPA could withdraw state authority
or enforce a violation of RCRA “when the state remains inactive, after giving
notice” pursuant to 42 U.S.C. § 6928(a)(2), but holding that EPA may not overfile
under RCRA after state concludes enforcement action on same matter); see also
Miller, supra, at 593 (“Harmon Industries, Inc. v. Browner is the first federal
court decision that directly addresses the issue of whether EPA may overfile
under RCRA after a state concludes an enforcement action.”). 4
4
Unlike Harmon, Marine Shale did not arise in an overfile context. That is,
while the EPA attempted to override a state enforcement action in Harmon, the
EPA proceeded in Marine Shale in the absence of any clear state enforcement
proceedings. Thus, while Marine Shale spoke to whether the EPA can enforce
(continued...)
-7-
Parties
The United States is the plaintiff acting on behalf of the EPA. PEC is a
Colorado corporation located in Denver. From approximately 1968, PEC has
operated a business of refinishing metal crankshafts, connecting rods, and rod
journals for large diesel engines used in heavy equipment. Redoubt owns the land
and buildings leased to PEC, and thus is the owner of PEC’s facility under
Colorado regulations. Lilienthal is the president of PEC and owns 51% of the
outstanding stock of both PEC and Redoubt. For purposes of the preliminary
injunction motion, Lilienthal agreed that he is an “owner” and “operator” of PEC
and as such subject to any order entered by the district court directing Defendants
to secure financial assurances.
Nature of the Case
PEC’s refurbishing operations produce more than 1,000 kilograms of
hazardous waste per month, and the facility stores more than 6,000 kilograms per
4
(...continued)
state regulations promulgated pursuant to RCRA, it did not address the issue of
whether the EPA can do so once a state has initiated its own enforcement action.
Harmon, on the other hand, spoke to whether the EPA can overfile extant state
enforcement proceedings, but Harmon does not address whether the EPA may
enforce state implementing regulations in the absence of any state enforcement
effort. In fact, the EPA brought its complaint in Harmon under federal
regulations. See Harmon, 19 F. Supp.2d at 992 n.4.
-8-
month. The facility generates approximately thirteen different waste streams,
including arsenic, lead, mercury, and hexavalent chromium contaminated media.
In 1992, Denver Health and Hospitals (“DHH”) contacted the CDPHE concerning
a discharge into the Platte River of high levels of hexavalent chromium. After
investigation, DHH determined that PEC was the likely sources of the discharge.
The CDPHE then conducted compliance review inspections at PEC in August and
September of 1992, and reported numerous violations of federal and state
regulations governing the treatment, storage, and disposal of hazardous waste,
which the district court set out at length. In addition, PEC never applied for a
permit or obtained interim status.
Although PEC notified the CDPHE in 1986 that it was a generator of
certain hazardous waste, PEC failed to assess adequately its generation, treatment,
storage, and disposal of hazardous waste, and the CDPHE did not know the
severity and extent of PEC’s noncompliance with the state hazardous waste
program until the August 1992 inspection. As a result of PEC’s illegal storage
and disposal of hazardous waste, groundwater at and under the facility, as well as
groundwater under areas outside the facility, is contaminated with levels of
hexavalent chromium greatly exceeding established toxicity levels. 5 A plume of
The district court noted that PEC currently is managing hazardous wastes
5
in compliance with applicable storage regulations. See PEC, 10 F. Supp.2d at
-9-
chrome contamination extends from the facility approximately 3,310 feet into the
South Platte Valley Fill Aquifer, which is connected to the South Platte River.
After inspecting PEC’s facility again in 1993 and 1994, the CDPHE issued
an Initial Compliance Order on June 28, 1994. That order was stayed at PEC’s
request, while PEC and the CDPHE held conferences between 1994 and 1996.
The CDPHE then issued a Final Administrative Compliance Order on June 13,
1996 (“Order”). While complying with certain requirements of the Order, PEC
failed to meet others. Accordingly, on December 26, 1996, the CDPHE issued an
Administrative Penalty Order assessing civil penalties of approximately
$1,875,000. Defendants did not appeal the penalty, but neither have they paid any
portion of it.
The EPA was displeased with the manner in which the CDPHE sought to
enforce the RCRA regulations. At the EPA’s request, the United States exercised
its authority to seek Defendant’s compliance with the state regulations. As part of
its suit, the United States sought a mandatory preliminary injunction directing
Defendants to comply with the regulations for financial assurances. After a
hearing, the district court granted the preliminary injunction pursuant to § 3008(a)
of RCRA, 42 U.S.C. § 6928(a), and Fed. R. Civ. P. 65. Defendants now appeal.
5
(...continued)
1151.
- 10 -
II. DISCUSSION
Standard of Review
We review the grant of a preliminary injunction for abuse of discretion.
See Elam Constr., Inc. v. Regional Trans. Dist., 129 F.3d 1343, 1346 (10th Cir.
1997), cert. denied, 118 S. Ct. 1363 (1998). Granting a preliminary injunction is
proper where the moving party shows: (1) a substantial likelihood of success on
the merits; (2) irreparable harm in the absence of an injunction; (3) the threatened
harm outweighs injury which the injunction may cause the opposing party; and (4)
the injunction will not be adverse to the public interest. See Kansas Health Care
Assoc., Inc. v. Kansas Dep’t of Soc. & Rehab. Servs., 31 F.3d 1536, 1542 (10th
Cir. 1994). A mandatory preliminary injunction (i.e., one that directs a party to
act) imposes “an even heavier burden on [the movant] of showing that the four
factors listed above weigh heavily and compellingly in movant’s favor.” Id. at
1543. We review the underlying issues of law decided by the district court de
novo. See Equifax Servs., Inc. v. Hitz, 905 F.2d 1355, 1357 (10th Cir. 1990);
Tefel v. Reno, No. 98-4616, 1999 WL 496227, at *8 (11th Cir. July 14, 1999).
The district court found all four factors supporting a preliminary injunction.
See PEC, 10 F. Supp.2d at 1162-65. As the government notes, Defendants on
appeal do not appear to challenge the finding of the latter three factors. Rather,
- 11 -
Defendants challenge the applicability of RCRA and state implementing
regulations, an attack that goes to the government’s likelihood of success on the
merits. Additionally, Defendants raise questions about the appropriateness of a
preliminary injunction ordering financial assurances. We address Defendant’s
arguments in turn.
A.
Defendants challenge the district court’s holding that PEC currently
disposes of hazardous waste, an activity which would subject it to Colorado’s
regulations for facilities treating, storing, or disposing of hazardous waste (“TSD
facilities”). We agree with the district court.
Colorado regulations define a TSD facility as “a location at which
hazardous waste is subjected to treatment, storage, or disposal and may include a
facility where hazardous waste is generated.” C.C.R. § 260.10. Under the
regulations, “[a] generator [of hazardous waste] who treats, stores, or disposes of
hazardous waste on-site must comply with the applicable standards and permit
requirements set forth in Parts 264, 265, 266, and Part 100 of these regulations.”
C.C.R. § 262.10 n.2. 6 C.C.R. § 266 further provides that its financial assurance
6
C.C.R. § 264 sets out the standards for owners and operators of hazardous
waste treatment, storage, and disposal facilities with permits. C.C.R. § 265 sets
(continued...)
- 12 -
requirements “apply to owners and operators of all hazardous waste facilities.”
C.C.R. § 266.10(a). RCRA and the state regulations define “disposal” as
the discharge, deposit, injection, dumping, spilling, leaking, or
placing of any solid or hazardous waste into or on any land or water
so that such solid waste or hazardous waste or any constituent thereof
may enter the environment or be emitted into the air or discharged
into any waters, including ground waters.
42 U.S.C. § 6903(3); C.C.R. § 260.10.
For substantially the same reasons discussed thoroughly in the district
court’s opinion, we find that Defendants currently are disposing of hazardous
wastes illegally in three ways:
(1) the Facility’s air scrubbers dispose a mist of hexavalent
chromium onto Facility soil; (2) the Facility failed to remediate the
soil contaminated by a yellow/orange liquid that leaked from air
scrubbers down the west side of the Facility’s main building; and (3)
the Facility failed to remediate the three open waste piles of
contaminated soil excavated from beneath the chrome-plating tanks
and the remaining contaminated soil located beneath the chrome-
plating tanks.
PEC, 10 F. Supp.2d at 1157, 1157-60.
Furthermore, we conclude that PEC is subject to Colorado’s financial
6
(...continued)
out interim status standards applicable to owners and operators of hazardous
waste treatment, storage, and disposal facilities who have obtained interim status
as well as those who have failed to do so. See C.C.R. § 265.1(b); United States v.
Ekco Housewares, Inc., 62 F.3d 806, 809 (6th Cir. 1995); PEC, 10 F. Supp.2d at
1150. C.C.R. § 266 sets out financial assurance requirements. C.C.R. § 100 sets
out the regulations for permit applications.
- 13 -
assurance requirements. By stipulation before the district court for purposes of
the preliminary injunction motion, the parties agreed that PEC “is and was a
‘generator’” of hazardous waste as defined by RCRA and Colorado regulations.
Thus, PEC “must comply with the applicable standards and permit requirements”
of the Colorado regulations for generators of hazardous waste who are TSD
facilities, including the financial assurance requirements of § 266. C.C.R.
§ 262.10 n.2. Additionally, those financial assurance requirements “apply to”
Redoubt and Lilienthal as “owners and operators of [a] hazardous waste
facilit[y].” C.C.R. § 266.10(a).
We do not find Defendants’ argument to the contrary persuasive.
Defendants contend that, even if they are disposers of hazardous waste, they are
not a disposal facility and therefore not a TSD facility. Defendants rely on
C.C.R. § 260.10, which defines a “disposal facility” as a facility “at which
hazardous waste is intentionally placed into or on any land or water, and at which
waste will remain after closure.” Defendants argue that because they intend “to
remedy the contamination of the site while PEC is still a going concern,” no waste
will remain after closure, thereby precluding them from being a disposal facility
by definition.
We find no merit to this argument. Defendants essentially contend that any
generator currently disposing of hazardous waste on their facility does not have to
- 14 -
comply with regulations for TSD facilities so long as they intend to clean up the
waste before closure. There is no basis in the provision cited for such a sweeping
subjective loophole. As an initial matter, the intent element in the definition of
“disposal facility” pertains to whether hazardous waste was “intentionally placed”
on land or water, not whether the polluter intends the hazardous waste to remain.
Cf. United States v. Allegan Metal Finishing Co., 696 F. Supp. 275, 287 (W.D.
Mich. 1988) (refusing to read into 42 U.S.C. § 6925(e), interim status provision
for “land disposal facility,” “a state of mind requirement,” based on the regulatory
definition of “disposal facility,” as to “whether the defendant intended the waste
to remain [after closure]” (quotations omitted)). As the EPA has indicated, the
purpose of the intent element in the definition of “disposal facility” is “to indicate
the [EPA’s] intent that the term does not apply to activities involving truly
accidental discharge of hazardous waste,” because the EPA posits that “permits
logically can only be required for intentional disposal of hazardous waste.” 45
Fed. Reg. 33066, 33068 (1980).
Moreover, we need not decide whether PEC is a “disposal facility.” Unlike
“disposal facility,” the definition of “disposal” does not limit its reference only to
those facilities at which hazardous waste will remain after closure. Rather, as
noted, “disposal” encompasses “the discharge, deposit, injection, dumping,
spilling, leaking, or placing of any solid or hazardous waste into or on any land or
- 15 -
water so that such solid waste or hazardous waste or any constituent thereof may
enter the environment or be emitted into the air or discharged into any waters.”
C.C.R. § 260.10. As a generator of hazardous waste that engages in its disposal,
PEC is a TSD facility. See C.C.R. § 260.10. Furthermore, as a TSD facility, PEC
must comply with the requirements of C.C.R. §§ 264, 265, 266, and 100; and as
PEC’s owner and operator, Redoubt and Lilienthal must meet the financial
assurance requirements of C.C.R. § 266. See C.C.R. § 260.10 (defining TSD
facility to include generators of hazardous waste “at which hazardous waste is
subjected to treatment, storage, or disposal”); C.C.R. § 262.10 n.2 (generator
disposing of hazardous waste is subject to C.C.R. §§ 264-66 & 100); C.C.R.
§ 266.10(a) (financial assurance provisions of C.C.R. § 266 apply to owners and
operators of all hazardous waste facilities). The definition of “disposal facility”
on its face does not negate these regulatory mandates, and Defendants’ argument
does not convince us otherwise.
B.
Defendants argue that “financial assurances are part and parcel of an
integrated regulatory scheme governing pre-operational permitting of a
TSD[ facility] which cannot be severed and applied separately from the balance of
the regulatory scheme.” Since the amount of financial assurances depends on the
- 16 -
cost estimates of closure and post-closure of the TSD facility, and since closure
and post-closure plans are required for a person to obtain a permit, Defendants
argue that the financial assurance requirements come into play only at the tail end
of the regulatory scheme for permitting. Thus, Defendants assert that the district
court at most could only require Defendants to (1) secure a permit covering
treatment, storage, or disposal of hazardous waste; or (2) cease its illegal
activities. Defendants conclude that the district court therefore erred in enjoining
compliance with the financial assurance provisions.
We find Defendants’ argument unsupportable. As an initial matter, § 3008
of RCRA, 42 U.S.C. § 6928, authorizes the EPA to commence an action “for
appropriate relief, including a temporary or permanent injunction,” for “any
requirement” of Subtitle C, and to do so in states that have authorized hazardous
waste programs as long as the EPA gives prior notice to the state. See 42 U.S.C.
§ 6928(a)(1)-(2). As noted, the district court stated, and neither party challenges,
that the EPA may bring an overfile action under RCRA to enforce state
implementing regulations. Thus, we turn to whether the EPA may require
Defendants to comply only with Colorado’s financial assurance requirements
independent of requiring compliance with the entire permitting scheme.
Colorado’s financial assurance requirements “apply to owners and
operators of all hazardous waste facilities,” and inter alia require “[a]n owner or
- 17 -
operator of each facility . . . [to] establish financial assurances for closure, and if
applicable, post-closure of the facility.” C.C.R. §§ 266.10(a) & 266.14 (emphasis
added). By their terms, these regulations apply to all owners and operators of
hazardous waste facilities; they are not limited to permit holders or applicants. In
light of these clear provisions, we do not believe that the mere fact that the permit
application requires a showing of compliance with the financial assurance
provisions somehow renders these provisions applicable only in the context of
permitting. See C.C.R. § 100.41. Based on the plain language of the Colorado
financial assurance requirements, we conclude that the EPA’s power to enforce
Colorado’s regulations includes the power to enforce the financial assurance
requirements independent of requiring a permit. See United States v. Ekco
Housewares, Inc., 62 F.2d 806, 809, 812 (6th Cir. 1995) (finding defendant
subject to EPA regulations for financial assurance until final closure is certified
even though defendant never obtained interim status by applying for permit).
Defendants’ remaining arguments on this issue do not dissuade us from our
conclusion. Defendants attempt to buttress their position by arguing that the
CDPHE shares their view that the financial assurance requirements cannot be
enforced separately from the entire permitting scheme. As support, Defendants
state that the “CDPHE has never required a generator of hazardous waste, such as
PEC, who is illegally treating, storing or disposing of hazardous waste to provide
- 18 -
financial assurances.” In a related point, Defendants contend that the CDPHE has
only considered PEC to be a generator of hazardous waste, and has never
considered it also to be a TSD facility “subject to the permit regulations,
including the financial assurance requirements.”
The record belies Defendants’ argument, because PEC’s own environmental
manager testified that the CDPHE told PEC that it was a storage and disposal
facility that needed to obtain a permit pursuant to state regulations. Additionally,
while the CDPHE did not choose to require Defendants to comply with the
financial assurance requirements in its Final Compliance Order, it believed it
“[had] that option.”
Rejecting Defendants’ arguments, we hold that the EPA can enforce the
state financial assurance requirements independent of requiring compliance with
permitting.
C.
Defendants assert that the district court’s grant of a preliminary injunction
directing them to provide financial assurances in the amount of $3,500,000 was
“not directed towards requiring Defendants to obtain financial assurances for the
operation of a TSD[ facility], but was a thinly disguised attempt to obtain
prejudgment security to enforce any future judgment of the District Court.” In
- 19 -
particular, Defendants assert that the preliminary injunction was “for costs
associated with remediation of existing contamination, not for remediation of any
contamination that may exist if and when PEC closes its business.” Defendants
argue that the preliminary injunction was actually prejudgment security, and
therefore it should be governed by Fed. R. Civ. P. 64. Defendants conclude that
the preliminary injunction exceeds the scope of Rule 64 because “the prejudgment
remedies available to the United States [under Rule 64] are limited to attachment,
receivership, garnishment and sequestration.” Additionally, Defendants contend
that the district court erred in granting the preliminary injunction because “RCRA
does not have a provision providing prejudgment remedies to secure a future
judgment in an enforcement action under § 3008.” 7
We reject Defendants’ arguments at the outset, because we do not interpret
the district court’s preliminary injunction for financial assurances to be an order
for prejudgment security for pre-closure remediation. We recognize that the
district court ordered financial assurances based upon the costs of remediating the
present contamination around the PEC facility. However, we believe the district
court associated these remediation costs with closure and post-closure of the
facility. First, as a legal matter, the district court directed Defendants “to provide
7
The United States contends that Defendants did not properly raise this
objection before the district court. We have examined the record and conclude
that Defendants sufficiently raised the issue below.
- 20 -
financial assurances in accordance with 6 C OLO . C ODE R EGS . 1007-3 § 266.” See
PEC, 10 F. Supp.2d at 1165. That the court ordered financial assurances “in
accordance with” C.C.R. § 266 indicates that the requested assurances will be
used for closure and post-closure costs. Second, as a factual matter, the district
court appeared to assume that closure and post-closure costs for the facility would
include costs for remediating the site in its current condition because Defendants
have (1) violated hazardous waste regulations for decades; (2) failed to comply
with the Final Compliance Order of the CDPHE respecting remediation of its
open piles of hazardous waste; (3) failed to pay the civil penalty assessed by the
CDPHE; (4) recently engaged in a pattern of debt reduction and asset forfeiture;
and (5) threatened bankruptcy or abandonment of the facility if the federal or
state government continues seeking the facility’s compliance with applicable
hazardous waste regulations. See PEC, 10 F. Supp.2d at 1157, 1163, 1165.
Therefore, given Defendants’ history of unwillingness to comply with RCRA and
state implementing regulations, we believe that the district court properly
considered remediation costs for the present contamination in calculating costs
associated with financial assurances necessary for the facility’s closure or post-
closure. Accordingly, we hold that the district court properly ordered financial
assurances for closure and post-closure of the facility.
- 21 -
D.
Finally, Defendants contend that the district court’s calculation of the
$3,500,000 figure for financial assurances was based on “nothing more than gross
and speculative approximation.” Because Defendants never have complied with
applicable RCRA regulations by providing closure and post-closure plans,
Defendants contend that the absence of those plans “is fatal to the United States’
request for financial assurances,” as such financial assurances “cannot be
calculated without the detailed closure cost estimates required by the regulations.”
We disagree with Defendants’ argument. Even though PEC does not have
closure and post-closure plans pursuant to C.C.R. § 265, the district court
properly based its estimate of financial assurances on the costs of remediating
present contamination at the site, under the assumption that the contamination
will remain at closure. See supra Part II.C. Furthermore, the district court based
its figure on estimates from the CDPHE and PEC itself. The CDPHE estimated
the cost to remediate the contaminated soil and groundwater at between
$3,000,000 and $6,000,000. PEC’s counsel estimated that remediation of the site
for contaminated soil would cost $2,300,000, and PEC’s hydrologist estimated
that remediation of the groundwater would cost $1,200,000. From these figures,
the district court concluded that the government’s request for financial assurances
in the amount $3,500,000 was a “fair estimate of the costs of remediation,” and
- 22 -
ordered financial assurances in that amount. PEC, 10 F. Supp.2d at 1154.
We believe the district court’s figure was supported by the evidence, given
that the amount of financial assurances equaled the sum of PEC’s own
remediation estimates ($2,300,000 for site remediation and $1,200,000 for
groundwater remediation), and was within the remediation estimated provided by
the CDPHE ($3,000,000 to $6,000,000). While Defendants and the government
both admit that the estimates were rough rather than exacting, Defendants in large
part were responsible for the inexact nature of the estimates because of their
failure to develop closure and post-closure cost estimates pursuant to state
regulations. The district court did its best to estimate fairly closure costs under
non-ideal circumstances of Defendants’ creation, and we find the evidence
supported the estimate.
CONCLUSION
The district court did not abuse its discretion in issuing the mandatory
preliminary injunction ordering Defendants to provide financial assurances in the
amount of $3,500,000 pursuant to C.C.R. § 266. The district court’s order is
AFFIRMED.
- 23 -