In re LYONDELL CHEMICAL COMPANY, et al., Debtors.
No. 09-10023 (REG).United States Bankruptcy Court, S.D. New York.
January 4, 2011.*238 Cadwalader, Wickersham & Taft, LLP, By: Christopher R. Mirick, Esq., New York, NY, By: David F. Williams, Esq. (argued), Douglas H. Fischer, Esq., Washington, D.C., Counsel to the Debtors.
Brown Rudnick, LLP, By: John C. Elstad, Esq. (argued), Steven D. Pohl, Esq., Boston, MA, Counsel to the Official Committee of Unsecured Creditors.
Perkins Coie, LLP, By: Mark. W. Schneider, Esq. (argued), Seattle, WA, Dorsey & Whitney, LLP, By: James V. Parravani, Esq., New York, NY, for Weyerhaeuser Company.
Latham & Watkins, LLP, By: Mark A. Broude, Esq. (argued), Sara Orr, Esq., New York, NY, for Georgia-Pacific, LLC.
Jones Day, By: Ross S. Barr, Esq., (argued), New York, NY, for Hamilton Beach Brands.
BENCH DECISION[1] ON DEBTORS' OBJECTIONS, UNDER BANKRUPTCY CODE SECTION 502(e)(1)(B), TO PRP ENVIRONMENTAL CONTRIBUTION CLAIMS
ROBERT E. GERBER, Bankruptcy Judge.
In this contested matter in the jointly administered chapter 11 cases of Lyondell Chemical Company and its affiliates, the Debtors object to private party claims (the "Private Party Claims") for future environmental remediation costs also sought by the federal government and certain state governmental entities, under section 502(e)(1)(B) of the Code, which generally disallows claims (1) for reimbursement or contribution (2) by those liable with the debtor (3) to the extent that such claims are contingent.
With one exception, I conclude that these claims are of the type for which disallowance is required under section 502(e)(1)(B) and its associated caselaw, and except insofar as the exception applies, the Debtors' objections are sustained. With respect to the exception (where remediation costs were already paid by the claimant), the Debtors' exceptions are overruled.
Findings of Fact[2]
1. Government Environmental Claims
In July and August 2009, the United States, on behalf of the U.S. Environmental Protection Agency, the U.S. Department of the Interior, and the National Oceanic and Atmospheric Administration (collectively, the "EPA"), filed proofs of claim (the "EPA Claims") against certain of the Debtors asserting claims for, among other things, unreimbursed past and estimated future response costs for environmental cleanup under section 107(a) of the Comprehensive Environmental Response, Compensation, and Liability Act, 42 U.S.C. §§ 9601 et seq. ("CERCLA").
*239 Various state governments, or their environmental regulatory agencies,[3] did likewise. The governmental claims totaled approximately $5.5 billion in identified amounts, in addition to contingent and unliquidated claims that were asserted in unstated amounts.[4] These environmental claims represented one of the largest, if not the largest, groups of unsecured claims asserted in the Lyondell bankruptcy cases.
2. Environmental Settlement Agreement with U.S. and Certain States
In April 2010, I approved a settlement agreement (the "Settlement Agreement") among the Debtors, the EPA, and ten state environmental agencies, resolving their environmental claims and providing for funds for future clean-up efforts. The Settlement Agreement, in relevant part, provided for:
(1) the allowance of over $1 billion in general unsecured claims for the benefit of the U.S. for unreimbursed past and future response costs incurred by the U.S. pursuant to CERCLA section 107(a);
(2) a cash payment to the U.S. to resolve alleged injunctive obligations at a number of environmental sites; and
(3) the formation and funding of an environmental custodial trust to take title to and to remediate certain Debtor-owned properties with known or suspected environmental contamination.
The Agreement also provided allowed claims in fixed amounts to various states' environmental authorities.
The Settlement Agreement granted Millennium Holdings, LLC ("MHLLC") contribution protection under CERCLA section 113(f)(2) for environmental liabilities resolved by the Settlement Agreement. The implication of that contribution protection was that other "potentially responsible parties" ("PRPs") with respect to those environmental liabilities would not be able to seek payment from MHLLC for cleanup costs, because MHLLC would have satisfied its liability on account of the sites addressed in the Settlement Agreement.
3. The Private Party Environmental Claims
Over 70 Private Party Claims associated with the properties covered by the EPA's and/or the state government entities' proofs of claimsrelying either implicitly or explicitly on CERCLA sections 107(a) and 113(f)(1), discussed belowsought an estimated $1.1 billion for both past and future cleanup costs. After having settled the EPA and state governmental claims, the Debtors objected to the Private Party Claims.
The Debtors don't object to the Private Party Claims to the extent they are for money spent by claimants in the past. But the Debtors argue that the Private Party Claims must be disallowed under section 502(e)(1)(B) of the Bankruptcy Code to the extent they seek payment of future cleanup costs.
Most of the Private Party claimants did not contest the Objections. But some did. Objections with respect to three Orally Arguing Claimants were orally argued at the hearing on April 16, 2010those with respect to responders Georgia-Pacific, LLC ("Georgia-Pacific"), Weyerhaeuser Company ("Weyerhaeuser"), and Hamilton *240 Beach Brands, Inc. ("Hamilton Beach," and collectively with Georgia-Pacific and Weyerhaeuser, the "Orally Arguing Claimants").[5]
4. Georgia-Pacific and Weyerhaeuser's Claims
Georgia-Pacific and Weyerhaeuser's claims relate to the Allied Paper/Portage Creek/Kalamazoo River Superfund Site (the "Kalamazoo Site") in Michigan. Paper mill operations once located on the Kalamazoo Site discharged paper residue into the environment, including the Kalamazoo River, and deposited massive amounts of polychlorinated biphenyls into waterways, surface water, soils, and sediments. On August 30, 1990, the EPA placed the Kalamazoo Site on the "National Priorities List"EPA's list of the most serious hazardous waste sites. MHLLC, Georgia-Pacific, and Weyerhaeuser (or their respective predecessors) were all former mill operators at the Kalamazoo Site. The Site is divided into 5 "operable units" ("OU" s), and the EPA has stated that it believes that the cleanup of OU-5, an 80-mile long stretch of the Kalamazoo River and Portage Creek, will be the main source of costs at the Site.
The EPA filed a proof of claim against MHLLC, alleging that MHLLC is liable to the U.S. under CERCLA section 107 for $2.6 billion for response costs at the Kalamazoo Site, including all five OUs, and that other parties along with MHLLC may also be jointly and severally liable. The EPA estimates future response costs for OU-5 to be $2.4 billionconstituting by far the largest portion of the total cost.
The EPA has not issued cleanup orders to MHLLC, Georgia-Pacific, or Weyerhaeuser at this time. The EPA has entered into administrative orders on consent ("AOCs") and consent decrees with Georgia-Pacific and Weyerhaeuser with respect to the Kalamazoo Site, and I'll discuss the specific orders and decrees with respect to each Respondent separately below.
A. Georgia-Pacific's Claim
The EPA has identified Georgia-Pacific and MHLLC as PRPs with respect to the Kalamazoo Site. While Georgia-Pacific and the EPA have entered into several AOCs and one Consent Decree, the agreements covering OU-5 did not specify a final remedy for that portion of the Kalamazoo Site.
(1) AOCs for OU-5
In February 2007, Georgia-Pacific, MHLLC, the state of Michigan, and the EPA entered into an AOC to perform a removal action at an area within OU-5 ("First AOC"). The same month, Georgia-Pacific, MHLLC, and the EPA entered into another AOC to perform a supplemental remedial investigation and feasibility study for OU-5 and a feasibility study of OU-1 (the "Second AOC"). In June 2009, Georgia-Pacific and the EPA entered into a third AOC to perform *241 a removal action at an area within OU-5 ("Third AOC," and collectively, with First AOC and the Second AOC, the "Georgia-Pacific AOCs").[6] Although the U.S. has unreimbursed response costs, investigations at the Kalamazoo Site are still pending, and the final remedy for OU-5 has not yet been selected.
(2) Consent Decree
In May 2009, Georgia-Pacific entered into a proposed consent decree with the EPA (the "Georgia-Pacific Consent Decree"), which at the time of Georgia-Pacific's filing of its proof of claim, had not yet been approved by the District Court. In the Consent Decree, Georgia-Pacific agreed to perform and implement the EPA's remedial plan for OU-2, and to pay the related past and future response costs incurred by the EPA. MHLLC is not a party to the Consent Decree.
(3) Allocation Agreement
In August 1991, Georgia-Pacific and MHLLC entered into an agreement with ARCADIS of New York, Inc. ("ARCADIS"), under which ARCADIS would perform services including environmental investigation and remediation at the Kalamazoo Site. Under a cost sharing agreement (the "Allocation Agreement"), Georgia-Pacific and MHLLC agreed to share costs relating to the Kalamazoo Sitewith MHLLC paying 55% and Georgia-Pacific paying 45% of the costs. ARCADIS used the Allocation Agreement when billing Georgia-Pacific and MHLLC for services performed in connection with the Kalamazoo Site. Georgia-Pacific maintains that MHLLC has failed to pay Georgia-Pacific the amounts required under the Allocation Agreement, and has failed to pay ARCADIS for its services.
Much later, in June 2009, Georgia-Pacific and ARCADIS entered into an assignment agreement ("Assignment Agreement") under which ARCADIS assigned to Georgia-Pacific all of the ARCADIS rights against MHLLC for services ARCADIS performed at the Kalamazoo Site. Georgia-Pacific maintains that MHLLC has not paid Georgia-Pacific the amounts due under the Assignment Agreement.
Georgia-Pacific filed a proof of claim against MHLLC seeking primarily to recover:
(1) past and future response costs and natural resource damages incurred in connection with the Kalamazoo Site,
(2) amounts paid by Georgia-Pacific to satisfy the obligations of MHLLC to ARCADIS, and
(3) amounts owed by MHLLC to ARCADIS and transferred to Georgia-Pacific pursuant to the Assignment Agreement.[7]
*242 Georgia-Pacific asserts its claim under CERCLA section 113, stating that the EPA's commencement of the suit that led to the Consent Decree provides the basis for a section 113(f)(1) contribution claim. Georgia-Pacific doesn't dispute that its claim is for contribution and that it is based on co-liability with MHLLC.[8] Georgia-Pacific argues only that its claim is not contingent.
B. Weyerhaeuser's Claim
From 1963 to 1970, Weyerhaeuser operated a mill and landfill next to the Kalamazoo River, about ten miles downstream from MHLLC's facilities. Remediation is still ongoing, and is in its early stages. The EPA has listed MHLLC, Weyerhaeuser, and others as PRPs at the Kalamazoo Site. In November 2004, Weyerhaeuser entered into a consent decree (the "Weyerhaeuser Consent Decree") with the EPA with respect to OU-4. Weyerhaeuser filed a proof of claim against MHLLC in the amount of $9 million for past response costs, and also seeks payment on account of MHLLC's liability for future costs and liabilities.
Weyerhaeuser argues that it is not co-liable with MHLLC for the amounts sought in its proof of claim because it is seeking only to recover response costs under CERCLA section 107 that it has already incurred and will incur itself. Weyerhaeuser also argues that its claim is not contingent, or for "reimbursement or contribution" under section 502(e)(1)(B).
5. Hamilton Beach's Claims
Debtors MHLLC and Millenium America, Inc. ("Millenium America") are also the subjects of claims by the State of North Carolina for environmental cleanup of the Mt. Airy and Southern Pines sites in North Carolina (the "Mt. Airy Site" and the "Southern Pines Site"). Unlike the Kalamazoo Site, the Mt. Airy and Southern Pines sites are not covered by the Settlement Agreement with EPA.
North Carolina filed a proof of claim against MHLLC and all other Debtors for over $6 million for environmental assessment and cleanup costs of the Mt. Airy Site, asserting its claim on the basis of:
(1) state environmental law and
(2) an October 2004 administrative agreement (the "Mt. Airy Administrative Agreement") among Hamilton Beach, MHLLC, and North Carolina to conduct remediation at the Mr. Airy Site.
North Carolina also filed a proof of claim against Millennium America and all other Debtors for assessment and remedial costs for environmental contaminations at the Southern Pines Site. North Carolina asserts its claim on the basis of:
(1) a memorandum of understanding between North Carolina and the EPA which provides that the Southern Pines Site is to be remediated pursuant to applicable state law; and
(2) a January 1999 AOC between North Carolina, Hamilton Beach, and Millennium America, Inc. (the "Southern Pines Order") to investigate and remediate the Southern Pines Site.
Hamilton Beach filed substantially identical proofs of claim against MHLLC and another Debtor, seeking future costs for environmental cleanup at the Mt. Airy and Southern Pines Sites. Hamilton Beach predicates its claim on:
*243 (1) the Mt. Airy Administrative Agreement;
(2) the Southern Pines Order; and
(3) a December 2003 settlement agreement ("2003 Settlement Agreement") between Hamilton Beach and MHLLC, under which they agreed to assess and remediate the Mt. Airy and the Southern Pines Sites and allocated the costs between the two parties.
Hamilton Beach adopts the legal arguments of the other Orally Arguing Claimants, and asserts that its claim is not contingent, as the environmental damage has already been done and liability has already been apportioned under the 2003 Settlement Agreement. Hamilton Beach also asserts that its claim is not based on co-liability with the Debtorsalthough (as the Debtors point out) in its proof of claim Hamilton Beach seemed to claim that it was jointly and severally liable with MHLLC under the 2003 Settlement Agreement and applicable non-bankruptcy law. Finally, by incorporation of the others' arguments, Hamilton Beach argues that its claim is not for reimbursement or contribution.
Discussion
All parties agree that section 502(e)(1)(B) of the Bankruptcy Code determines whether the Private Party Claims should be disallowed. As noted above, the Orally Arguing Claimants argue, for various reasons, that their claims should not be disallowed because they fail to satisfy one or more of the elements of section 502(e)(1)(B), as laid out in the statute or the interpretive caselawthat the claims be for reimbursement or contribution, that they be contingent, or be based on co-liability with the Debtors.
I.
The Statutory Environment
Though the Code doesn't define all of the terms that ultimately are important here, and many of the gaps have been filled by caselaw, I nevertheless start with textual analysis.[9] Section 502(e) provides, in relevant part, that notwithstanding provisions of section 502 under which claims would otherwise be allowable:
(e)(1) ... the court shall disallow any claim for reimbursement or contribution of an entity that is liable with the debtor on ... the claim of a creditor, to the extent that
. . .
(B) such claim for reimbursement or contribution is contingent as of the time of allowance or disallowance of such claim for reimbursement or contribution....
Thus, by section 502(e)(1)(B)'s terms, three elements must be met for a claim to be disallowed under section 502(e)(1)(B):
(1) the party asserting the claim must be liable with the debtor on the claim of a third party;
(2) the claim must be contingent at the time of its allowance or disallowance; and
(3) the claim must be for reimbursement or contribution.
But textual analysis here is of limited utility. None of the terms or expressions *244 "reimbursement," "contribution," "contingent" or "liable with the debtor" is defined in the Bankruptcy Code, nor does the Code articulate standards for their application.[10] Thus a court construes section 502(e)(1)(B)'s requirements based on caselaw. Section 502(e)(1)(B)'s requirements have been interpreted in a fair body of relevant caselaw, most of which has disallowed claims for contribution and indemnification by those who are liable, along with a debtor, to others for amounts to be determined only in the futureincluding a decision of mine a few months ago, where I sustained objections, on 502(e)(1)(B) grounds, to claims for contribution and/or indemnification for liability in connection with pending or threatened lawsuits by plaintiffs alleging injuries from exposure to the chemical Diacetyl, where the claimants, along with Chemtura, might be liable for the plaintiffs' Diacetyl injury.[11] The issue here, whether a different rule should apply to claims by PRPs who, along with a Debtor, are liable for environmental remediation costs, requires consideration of the relevant environmental statutes most significantly provisions in CERCLA.
Section 106 (captioned "Abatement Actions") provides, its subsection (a):
In addition to any other action taken by a State or local government, when the President determines that there may be an imminent and substantial endangerment to the public health or welfare or the environment because of an actual or threatened release of a hazardous substance from a facility, he may require the Attorney General of the United States to secure such relief as may be necessary to abate such danger or threat, and the district court of the United States in the district in which the threat occurs shall have jurisdiction to grant such relief as the public interest and the equities of the case may require. The President may also, after notice to the affected State, take other action under this section including, but not limited to, issuing such orders as may be necessary to protect public health and welfare and the environment.[12]
Section 106's subsection (b) then provides for fines for failure to comply with an order issued under subsection (a), and, for those who have received and complied with an order issued under subsection (a), reimbursement from the Hazardous Substance Superfund for the reasonable costs of such action.[13]
Then, CERCLA Section 107 (captioned "Liability") provides, in relevant part:
(a) ... Notwithstanding any other provision or rule of law, and subject only to the defenses set forth in subsection (b) of this section
(1) the owner and operator of a vessel or a facility,
(2) any person who at the time of disposal of any hazardous substance owned or operated any facility at which such hazardous substances were disposed of,
*245 (3) any person who by contract, agreement, or otherwise arranged for disposal or treatment, or arranged with a transporter for transport for disposal or treatment, of hazardous substances owned or possessed by such person, by any other party or entity, at any facility or incineration vessel owned or operated by another party or entity and containing such hazardous substances, and
(4) any person who accepts or accepted any hazardous substances for transport to disposal or treatment facilities, incineration vessels or sites selected by such person, from which there is a release, or a threatened release which causes the incurrence of response costs, of a hazardous substance, shall be liable for
(A) all costs of removal or remedial action incurred by the United States Government or a State or an Indian tribe not inconsistent with the national contingency plan;
(B) any other necessary costs of response incurred by any other person consistent with the national contingency plan;
(C) damages for injury to, destruction of, or loss of natural resources, including the reasonable costs of assessing such injury, destruction, or loss resulting from such a release; and
(D) the costs of any health assessment or health effects study carried out under [CERCLA section 104].[14]
Thus, CERCLA section 107(a) imposes liability for environmental cleanup costs, natural resource damages, and certain other categories of recovery on PRPsincluding, as relevant here, (1) the current "owner or operator" of a site contaminated with hazardous substances, and (2) any person who previously owned or operated a contaminated site at the time of a hazardous waste disposal.
Then, CERCLA Section 113 (captioned "Civil Proceedings") provides in its subsection (f) (captioned "Contribution"), in relevant part:
(1) Contribution
Any person may seek contribution from any other person who is liable or potentially liable under [section 107(a)], during or following any civil action under [section 106] or under [section 107(a)]. Such claims shall be brought in accordance with this section and the Federal Rules of Civil Procedure, and shall be governed by Federal law. In resolving contribution claims, the court may allocate response costs among liable parties using such equitable factors as the court determines are appropriate. Nothing in this subsection shall diminish the right of any person to bring an action for contribution in the absence of a civil action under [section 106] or [section 107].
(2) Settlement
A person who has resolved its liability to the United States or a State in an administrative or judicially approved settlement shall not be liable for claims for contribution regarding matters addressed in the settlement. Such settlement does not discharge any of the other potentially liable persons unless its terms so provide, but it reduces the potential liability of the others by the amount of the settlement.
(3) Persons not party to settlement
(A) If the United States or a State has obtained less than complete relief from a person who has resolved its liability to the United States or the *246 State in an administrative or judicially approved settlement, the United States or the State may bring an action against any person who has not so resolved its liability.
(B) A person who has resolved its liability to the United States or a State for some or all of a response action or for some or all of the costs of such action in an administrative or judicially approved settlement may seek contribution from any person who is not party to a settlement referred to in paragraph (2).
(C) In any action under this paragraph, the rights of any person who has resolved its liability to the United States or a State shall be subordinate to the rights of the United States or the State. Any contribution action brought under this paragraph shall be governed by Federal law.[15]
Thus 113(f)(1) provides that PRPs who fund response actions can seek contribution from other PRPs "during or following any civil action" instituted under CERCLA section 106 or 107. And CERCLA section 113(f)(3)(B) permits private parties to seek contribution after they settle their liability with the EPA or a state in an administrative or judicially approved settlement. Conversely, section 113(f)(2) protects PRPs who have settled from contribution claims by other PRPs.
II.
Satisfaction of Section 502(e)(1)(B) Elements
While acknowledging that its claim is for contribution and that it is based on co-liability with MHLLC, Georgia-Pacific argues that its claim is not contingent. Weyerhaeuser and Hamilton Beach, like Georgia-Pacific, argue that their claims are not contingent, and further contend that they are not co-liable with MHLLC for the amounts sought in their proofs of claim, and that their claims are not for "reimbursement or contribution."
Because the three Orally Arguing Claimants' positions overlap to such significant degrees, and because they assert, in many respects, similar deficiencies with respect to 502(e)(1)(B)'s three elements, for purposes of analysis I group the objections by the 502(e)(1)(B) elements.
A.
"Contingency" Element
Each of Georgia-Pacific, Weyerhaeuser[16] and Hamilton Beach contends that its claim is not contingent. I must disagree.
In my recent decision in Chemtura,[17] I ruled, among other things, that the claims then before me were contingent. There, as I've noted, five corporate entities had filed claims against Chemtura for contribution and/or indemnification with respect to amounts they might pay in the future in litigation against them. I found that except to the extent they sought contribution for amounts already paid to tort litigants, their claims were contingent.[18] While in some instances the potential for payment by any of the Orally Arguing Claimants is *247 more advanced than it was in Chemtura, similar principles apply, and key facts remain the same. The most significant of these is that except for remedial action accomplished in the past, for which the right to reimbursement or contribution is unchallenged (or should be), Georgia-Pacific, Weyerhaeuser, and Hamilton Beach are similarly seeking reimbursement for amounts that have not yet been paid.
Though neither is squarely on point, two decisions from the Second Circuit have discussed contingency in deciding whether or not a creditor held a "claim."[19] In Chateaugay, the EPA argued that "it does not have a `claim' within the meaning of the Bankruptcy Code . . . for reimbursement of CERCLA response costs until those costs have been incurred."[20] Therefore, the EPA argued, any future response costs that the EPA might incur would pass though the bankruptcy organization as non-discharged liabilities. The Second Circuit rejected this argument, holding that the future costs were pre-petition "claims." The Circuit stated, as part of its rationale, that:
[T]he location of these sites, the determination of their coverage by CERCLA, and the incurring of response costs by the EPA are all steps that may fairly be viewed, in the regulatory context, as rendering the EPA's claim "contingent," rather than as placing it outside the Code's definition of "claim."[21]
Similarly, in Manville Forest, the Second Circuit decided that a party's liability constitutes a "claim" against the debtor, albeit contingent. It stated:
the fact that [claimant] Olin did not know the specific parameters of its liability does not place that liability outside of the definition of "claim" but rather is precisely what made the claim contingent. Under this specific combination of circumstances, we find that future environmental liability was actually or presumedly contemplated by the parties upon their signing of the indemnification agreements and constitutes a valid contingent claim.[22]
The Debtors cite Chateaugay for the proposition that claims are contingent until costs for remediation work are actually expended or paid.[23] I don't read Chateaugay, *248 which of course is not a 502(e)(1)(B) case, to go that farto hold that a claim for reimbursement or contribution is contingent until an underlying payment (here, costs for remediation) is actually made.[24] But I do find it instructive that in both Chateaugay and Manville Forest, it was undisputed that the debtors faced some environmental liability, but the Second Circuit nevertheless described those claims as contingent because the scope, amount, and form of that liability was undetermined.[25]
But other authority, including three decisions by other bankruptcy judges in this very district,[26] another by a district judge in this district,[27] and another a thoughtful decision from Delaware[28]all 502(e)(1)(B) determinationssupports the conclusion that until and unless amounts are actually paid, the claims for reimbursement or contribution with respect to those amounts remain contingent for 502(e)(1)(B) purposes.[29] For instance, in Alper Holdings, in this district, Judge Lifland disallowed claims for indemnification for future liability in environmental contamination litigation, finding that they were properly categorized as "contingent as of the time of allowance or disallowance" *249 as the amounts and ultimate liability are presently unknown.[30]
Likewise, in Drexel Burnham, in this district, it was observed that "[t]he Claimants' claim is contingent until their liability is established and the co-debtor has paid the creditor. . . . One who is secondarily liable may only secure distribution rights by paying the amount owed the creditor."[31]
Similarly, in APCO, Judge Shannon disallowed a claim for the costs of remedial activities filed by the City of Wichita, which like the debtor there, was a PRP with respect to a site with groundwater contamination. Significantly, the City had agreed not just to perform a remedial investigation and feasibility study of the contaminated site; it had agreed to undertake the remedial activities identified in the study to clean up the site,[32] and had prevailed in a trial at which the APCO debtors were determined to be responsible for 1.72% of the City's past and future costs for the remediation, and for 100% of the City future source control costs to be incurred at a different site,[33] securing a judgment for the future cleanup costs of which a portion was unpaid.[34]
Among other things, Judge Shannon ruled that "because the City has not yet incurred any future source control costs" at one of the sites,[35] the claim was contingent, even though "the parties' liability has been established."[36] Quoting, among other decisions, Drexel Burnham, he observed that
The law is clear that "[t]he contingency contemplated by [section] 502(e)(1)(B) relates to both payment and liability."... Therefore, a claimant's "claim is contingent until their liability is established... and the co-debtor has paid the creditor."[37]
I've stated many times that the interests of predictability in this district are of great importance, and that where there is no controlling Second Circuit authority, I follow the decisions of other bankruptcy judges in this district in the absence of clear error.[38] But to say that these decisions, in this district and elsewhere, should be followed under that standard would be faint praise here. In my view, the conclusions in those cases were plainly correct. That is so because even though the need for remediation of the underlying environmental site might be obvious, the EPA or state environmental agency might have a multitude of different ways of getting the remediation done, and any one of those means might or might not call foror result inpayment by the separate PRP that is asserting the claim against the debtor. And the PRP might or might not wind up actually making the payment for *250 which it then would be seeking reimbursement or contribution.
Thus, in my view, the fact that an EPA claim may have accrued against any of Georgia-Pacific, Weyerhaeuser, or Hamilton Beach does not mean that any of their separate claims against the Debtor are no longer contingent. We don't know whether either of them will lay out the funds necessary to engage in the curative action, and, if so, to what extent.
In arguing that its claim for future response costs is not contingent, Georgia-Pacific contends that a claim is contingent only when it has not yet accrued (in contrast to paid), and Georgia-Pacific maintains that its claim for contribution under section 113 has accrued. As support, Georgia-Pacific cites the Supreme Court's Aviall Services decision,[39] a case that did not involve section 502(e)(1)(B), wherein the Supreme Court held that a private party can bring a CERCLA section 113(f)(1) action for contribution only after it has been sued under CERCLA section 106 or 107(a).
However, Aviall Services can properly be read as going only to the requirements for bringing a claim under CERCLA section 113(f); it cannot be extended to deciding whether a claim by a PRP is or is not "contingent" within the meaning of section 502(e)(1)(B), which Aviall Services quite obviously did not address. Georgia-Pacific incorrectly assumes that the requirements for bringing a section 113(f)(1) contribution claim under CERCLA are the same as the requirements for having non-contingent 113(f)(1) claim under section 502(e)(1)(B) of the Code.
Additionally, Georgia-Pacific and Weyerhaeuser argue that the Debtors are conflating contingency and liquidation. While I fully understand that "unliquidated" and "contingent" are not the same thing[40] (and suspect that the Debtors do too), here I find that the claims of each of Georgia-Pacific, Weyerhaeuser, and Hamilton Beach are both. The claims at issue here are for future cleanup costs that might or might not actually be incurred, and then might or might not actually be paid, by any of them.[41]
Though I ultimately decide the issue on the statutory language and the caselaw, I note, to the extent it matters, that this *251 ruling advances not just bankruptcy policy, but environmental policy as well. Disallowance of Georgia-Pacific's claims here advances CERCLA's policy goal of encouraging expeditious cleanup, because claimants are encouraged to remediate promptly by the threat of disallowance of claims that have not been fixed.[42] As Judge Shannon observed in APCO:
It may appear that the Court's ruling is a harsh result for the City, and that may be true. Nevertheless, the Court's decision is mandated by the express language of the Code and is entirely consistent with the principles animating CERCLA. At bottom, CERCLA and similar state and federal environmental statutes create a scheme whereby parties are incentivized to promptly clean up contaminated sites. The prospect of the potential disallowance of contingent contribution claims under section 502(e)(1)(B) offers a further incentive to undertake the cleanup: if the work is done (or at least underway), the contribution claim is not contingent as to amounts incurred by the contribution claimant. Thus, if the City had commenced or completed source control remediation at 1001 E. Lincoln in connection with its work on the G & M Site as a whole, the City's claim would be allowed to the extent of the amounts incurred.[43]
Similarly, Hamilton Beach relies on the fact that the environmental damage at the Mt. Airy and Southern Pines Sites has already occurred to support its argument that its claim is not contingent. I explained above that the establishment of some liability alone is insufficient to render a claim non-contingent. Similarly, the fact that Hamilton Beach is liable for environmental damage is also by itself insufficient to render a claim non-contingent, as APCO makes quite clear. Although Hamilton Beach has entered into a settlement agreement in which the parties allocated the liability with respect to the two sites, there is no indication that money has been spent. For the same reasons that I determined that Georgia-Pacific's claim is contingent, I determine that Hamilton Beach's claim is contingent as well.
Finally, Weyerhaeuser argues that it has already incurred over $11 million in response costs, in addition to amounts it may have to pay in the future. I believe that with respect to these past response costs, the Debtors have now acknowledged that they are non-contingent. To the extent the Debtors haven't conceded the point, I agree with Weyerhaeuser. But with respect to payments Weyerhaeuser hasn't made yet, I must find that the amounts are contingent, for the reasons stated above.
B.
"Co-Liability" Element
Making three principal arguments, Weyerhaeuser and Hamilton Beach[44] also contend that the co-liability element has not been satisfied. Once more I cannot agree.
*252 1. The Atlantic Research Contentions
Weyerhaeuser's first argument is that its claim is not premised on co-liability because its claim is based on cost recovery under CERCLA section 107(a), and not contribution under section 113(f).[45] In that connection, Weyerhaeuser notes that in U.S. v. Atlantic Research Corp.,[46] the Supreme Court held that a private party may recover under CERCLA section 107(a) without any establishment of liability to a third party. Because it is asserting a section 107(a) claim, therefore, Weyerhaeuser argues, the basis for finding co-liability is lacking.
But Weyerhaeuser's reliance on Atlantic Research is flawed. The issue in Atlantic Research, a non-bankruptcy case, was whether a PRP could sue to recover voluntarily incurred cleanup costs under section 107(a), rather than relying solely on section 113(f).[47] Section 107(a)(4)(A) expressly authorizes the federal government, the states, and Indian tribes to sue for cost recovery under section 107(a), and section 107(a)(4)(B) gives the same right to sue to "any other person." Specifically, the Court was asked to determine whether a PRP is included in the phrase "any other person" in 107(a)(4)(B).
The Supreme Court held that the operator's status as a PRP did not preclude the operator from suing under section 107(a), as section 107(a)(4)(B) covers any person not identified in subparagraph (A), and that a PRP was not limited to relief under section 113(f).[48] Nevertheless, the Supreme Court highlighted the "complementary yet distinct" nature of the rights established under section 107(a) and 113(f)specifically, that a private party may sue under section 107(a) without any establishment of liability to a third party, something it could not do under section 113(f).[49] The Supreme Court allowed the claimant to recover from other PRPs costs that it had incurred by voluntary cleanupor in other words, by cleanup or payments not prompted by a government action under sections 106 or 107.
On the issue of co-liability, Weyerhaeuser erroneously assumes that only claims under section 113(f) are premised on co-liability with the defendant (in this case, the Debtor), and that cost recovery claims under section 107(a) are all direct claims, and not claims for either reimbursement or contribution. The Atlantic Research court held that a claim under section 107(a) need not be based on co-liability to a third-party (e.g. a governmental entity). But it did not hold that a claim under 107(a) cannot be based on co-liability. If a PRP undertakes "voluntary" clean up (as opposed to cleanup pursuant to government action under section 106 or 107)and sues under 107(a) to seek recovery for that cleanup from another PRPthat has no effect on, and certainly does not nullify, *253 the fact that the two may still be co-liable to the Government.
Weyerhaeuser and MHLLC, who have both been designated as PRPs by the EPA, have a shared statutory obligation, under CERCLA, to provide for the cleanup of the Kalamazoo Site, by one means or another. That Weyerhaeuser might satisfy its own obligations by voluntary cleanup, rather than by waiting for a government action, is laudable, but not relevant to the 502(e)(1)(B) determination. Weyerhaeuser's claims rely on the theory that if the Debtors pay less than their share of cleanup costs, Weyerhaeuser will have to pay more. That is the essence of co-liability.
2. The Allegheny Contentions
Weyerhaeuser further asserts that co-liability is lacking based on a district court decision in the Allegheny bankruptcy case.[50] In Allegheny, the owner of the site filed a claim for past and future response costs against a debtor that had sold the site to the claimant prior to filing for bankruptcy. Applying the three-part test described on page 10 above, the Allegheny court ruled that section 502(e)(1)(B) did not exclude the claimant's direct claims for future response costs under CERCLA section 107(a).[51] While the Allegheny debtor argued that there was a possibility that the creditor might never be required to expend any funds if the EPA were subsequently to order the debtor to perform the remediation, the Allegheny court reasoned that this risk of double liability could be avoided by having the creditor's claim paid into a trust to be expended on remediation of the waste sites.[52]
I find the claims at issue in Allegheny to be distinguishable from Weyerhaeuser's claims,[53] but more fundamentally, I must join the other courts that have disagreed with the Allegheny decision.[54]
As we all know, section 502(e)(1)(B) serves the important purpose of avoiding redundant recoveries.[55] The situation here, where both Weyerhaeuser and MHLLC were named as PRPs, presents precisely the danger of double recovery from the Debtors on account of the same liability, ultimately to the EPA.[56] Because the EPA already has an allowed claim against the Debtors for the Kalamazoo site, allowing Weyerhaeuser's claim would be setting up precisely the redundant recoveries section 502(e)(1)(B) was created to prevent.
*254 The Allegheny court acknowledged that its decision not to disallow the claimant's claim under section 502(e)(1)(B) left the debtors vulnerable to multiple recoveries. What the Allegheny court failed to realized, however, is that this risk of duplicative recoveries arose because the debtors and claimant were co-liable. For that reason, several cases have rejected Allegheny's logic.[57]
In Cottonwood Canyon, for instance, the court stated that the fact that the Allegheny court found it necessary to establish a trust shows that the debtor and the claimant share a common liability against which the claimant sought to protect itself.[58] The Cottonwood Canyon court stated:
CSI argues that it is asserting a direct claim against Kaiser under Section [107(a)] and not a claim for reimbursement or contribution. It would clearly appear that a claim for reimbursement or contribution under either the California statute, CERCLA or the indemnification provisions of the contract is, by definition, a claim to recover costs incurred by reason of CSI's liability for cleanup as the "owner" of the site, which is the same liability Kaiser has for cleanup as the party which deposited the hazardous substances in the first instance. Such a claim would necessarily be one for liability for which both Kaiser and CSI are responsible and would fall within the ambit of 11 U.S.C. § 502(e).[59]
Similarly, in Eagle Picher,[60] the court rejected Allegheny's logic for similar reasons, *255 and disallowed the creditors' reimbursement claims (which were under section 113(f)) for future response costs under CERCLA. The Eagle Picher court stated that "[d]ouble liability could occur under the circumstances of this case since EPA remains free to pursue [the debtor] for remediation costs should the claimants fail to fulfill their cleanup obligations."[61]
Here, we have a situation similar to Eagle Picher. The Debtors here do not dispute Weyerhaeuser's claims for costs it already incurred from voluntary remediation; the claims at issue are for future remediation costs. Both the Debtors and Weyerhaeuser are liable for cleanup at the Kalamazoo Site. Here, in fact, the EPA has already entered into the Settlement Agreement with the Debtors for remediation of the Kalamazoo Site. Allowing Weyerhaeuser's claim would not only expose the Debtors tobut would actually result inpaying multiple recoveries on account of the same liability.[62]
3. The Burlington Northern Contentions
Finally, Weyerhaeuser asserts that even if I should find that there is no difference, for the purpose of co-liability, between recovery under section 107 or 113(f), Weyerhaeuser should still prevail on this element because CERCLA does not always require joint and several liability for superfund sites. Weyerhaeuser cites the Supreme Court's decision in Burlington Northern and Santa Fe Railway Co. v. U.S.[63] for the point that "in the superfund context, liability will not be joint and several if there's a reasonable basis for apportionment."[64] In Burlington Northern, the Supreme Court decided that joint and several liability would not apply because the defendant in that case owned some, but not all, of the property at issue. Weyerhaeuser then makes an argument by analogy, asserting that apportionment is also appropriate in this case because, based on the laws of gravity, Weyerhaeuser cannot be held liable for any damage upstream of where it owned or used property. Therefore, Weyerhaeuser argues, any cleanup costs that it will incur in the future over and above those for its own liability are costs for which it is not co-liable with MHLLC.
But there is a fundamental flaw in Weyerhaeuser's argument on this point. If the Debtors and Weyerhaeuser are not jointly and severally liable, then Weyerhaeuser would have not a claim against the Debtors in the first place, as Weyerhaeuser would never be required to pay more than its fair share.[65] This issue arose at the hearing:
THE COURT: If there is no joint liability, either joint and several or in some other proportion, then what's the basis for your client filing a claim in the first place? What's the nexus between your guys writing out a check and the debtors reimbursing you?
MR. SCHNEIDER: We've spent money that's attributable to them and not to *256 us. And that happens all the time in superfund cases where you have parties who will undertake environmental investigations or cleanups because the contamination is not attributable to your activities. And that's the situation here.[66]
The problem with Weyerhaeuser's response to the Court's question is that it addressed expenses that it had incurred in the past, not future expenses. Claims for past expenses, not disputed by the Debtors, are not at issue here. If, by means of technology or techniques described by Weyerhaeuser's counsel during the Hearing[67] (or by some other means), Weyerhaeuser can establish that it is liable to the EPA for less than had previously been assumed, that merely underscores why its claim should be limited to amounts it actually pays.
C.
"Reimbursement or Contribution" Element
Weyerhaeuser also relies on its contention that it seeks a claim for cost recovery under section 107(a), rather than a claim for contribution under section 113(f), to argue that its claim is not one for "reimbursement or contribution" under section 502(e)(1)(B). But whether the Weyerhaeuser claim is one for cost recovery under section 107(a), or contribution under 113(f)(1), I must find that it still is covered by section 502(e)(1)(B).
CERCLA section 113(f), by its terms, directly provides for "contribution"; therefore, quite indisputably, any recovery under section 113 must be considered contribution for the purposes of 502(e)(1)(B).[68] Section 107(a), under which Weyerhaeuser asserts that its claims are brought, provides for "recoverable costs," but does not contain the words "contribution" or "reimbursement." But I do not find this distinction to be dispositive, and I find that the claims of Weyerhaeuser,[69] even if premised on section 107(a), are in substance still claims for "reimbursement" for the purposes of 502(e)(1)(B).
Section 502(e)(1)(B) states that "the court shall disallow any claim for reimbursement or contribution ..."[70] As I noted above,[71] section 502(e)(1)(B) imposes no requirements as to the means or reason by which co-liability exists. Although "reimbursement" is not defined in the Bankruptcy Code, Black's Law Dictionary defines "reimbursement" as "1. Repayment. 2. Indemnification."[72] In Wedtech II, Chief Judge Brozman, in this district, explained that "[t]he use of the word `reimbursement' in the statute cannot be viewed as accidental. It is a broad word which encompasses whatever claims a co-debtor has which entitle him to be made whole for monies he has expended on account of a debt for which he and the debtor are both liable."[73]
Similarly, in Chemtura, wherein I rejected the notion that the "liable with" *257 prong requires that the Debtors establish that "the successful prosecution of a claim of [a Tort Plaintiff] against [a Corporate Claimant] would automatically result in the Debtors being liable to such underlying tort plaintiff as well,"[74] I noted that Congress clearly meant to include all situations wherein indemnitors or contributors could be liable with the debtor within the scope of § 502(e)(1)(B).[75]
Other courts similarly focused on substance over form when addressing this issue, and I find their reasoning and conclusions to be persuasive. In Cottonwood Canyon, discussed above, the court disallowed, as "contribution or reimbursement," claims asserted under CERCLA 107(a). The risk, both there and in Allegheny, that the Debtors would make duplicative payments for the same liability, revealed that "the clear character of the claim" was that "debtor was not being asked to satisfy a [direct] claim for injury to the claimants property" but rather was being sought for reimbursement.[76]
Looking at substance over form here, the claims at issue plainly are for "reimbursement" as that term is used in section 502(e)(1)(B). Weyerhaeuser seeks repayment of money that it alleges it will spend on environmental remediation, and the Debtors and Weyerhaeuser, all PRPs, are co-liable for environmental cleanup. There is a substantial risk that if these private party claims are allowed, the Debtors will pay twice for the same liability. In light of these facts, Weyerhaeuser's claims, even if brought for cost recovery under section 107(a), are claims for reimbursement under 501(e)(1)(B).
Weyerhaeuser's reliance on the distinctions between sections 107(a) and 113(f) noted in Atlantic Research and Aviall Services is misplaced. As explained above, Atlantic Research merely holds that co-liability is not required for cost recovery under 107(a). Weyerhaeuser's claim may not be one for contribution, and may in fact be "cost recovery" under 107(a). But Atlantic Research and Aviall do not address section 502(e)(1)(B) (or, more specifically "reimbursement") at all, and do not affect earlier decisions, such as Cottonwood Canyon, which found that direct claims for cost recovery under CERCLA section 107 are claims for "reimbursement" under 502(e)(1)(B).
Weyerhaeuser also argues that if this Court were to create a trust account for payment of future costs like in Allegheny, the payment of funds into the trust account could be considered something other than reimbursement, because the money wouldn't be spent until the future.[77] I find this argument unpersuasive. The money would be paid to return money expended by Weyerhaeuser. That is reimbursement.
In its one unique contention, Hamilton Beach also maintains that its claim is a direct contractual claim, and not one for contribution. Contractual claims are similarly disallowed under 502(e)(1)(B) when they are, in substance, claims for reimbursement.[78] Like Weyerhaeuser, Hamilton Beach seeks payment from the Debtors *258 for money it might spend in the future. That is a claim for reimbursement.
Conclusion
For the foregoing reasons, I conclude that the Orally Arguing Claimants' claims, to the extent they are on account of future costs, are contingent claims for reimbursement or contribution of an entity that is liable with the debtor to a third party creditor. Except for the amounts that the Orally Arguing Claimants already actually paid, the Objections to the Orally Arguing Claimants' claims are sustained.
NOTES
[1] I use bench decisions to lay out in writing decisions that are too long, or too important, to dictate in open court, but where the circumstances do not permit more leisurely drafting or more extensive or polished discussion. Because they often start as scripts for decisions to be dictated in open court, they typically have a more conversational tone.
[2] Pursuant to the parties' agreement and the provisions of Case Management Order # 1, all of the facts (but not necessarily arguments and conclusions) in the declarations submitted to me have been taken as true. To shorten this Decision, I've limited factual citations and detail to the most significant matters.
[3] For simplicity, I ignore this distinction going forward, and refer to such claims simply as being asserted by the respective states.
[4] The proofs of claim filed by the U.S. and state governmental agencies totaled approximately $5.5 billion, with the federal claims totaling approximately $5 billion, and the state claims representing the remainder.
[5] Other claimants (the "Other Claimants") filed timely responses but did not orally argue: Arkema Incorporated, Certain Teed Corporation, Marvin Jonas Transfer Station Site Orally Arguing Claimants Group, Ashland, Inc., Givaudan Fragrances Corporation, ISP Environmental Services Inc., LPRSA Site Cooperating Parties, Mallinckrodt, Inc., Teval Corp., The Dial Corporation, The Stanley Works, and Wolff & Sampson Group/Wolff & Sampson PC. Based on the papers and on the oral arguments from those who sought to orally argue, I believe that the analysis that follows requires disallowing the Other Claimants' claims as well, and to avoid lengthening this decision further, I won't discuss their particular facts. But if any of them believes that I overlooked circumstances that might make its situation distinguishable, I will permit any such entity to move for reargument, based on matters not addressed here.
[6] Under the AOCs, Georgia-Pacific and MHLLC are obligated to pay the costs necessary to performas well as the future response costs incurred by EPA in connection withthe First and Second AOCs. Georgia-Pacific alone is also obligated to pay the costs necessary to performas well as the future response costs incurred by EPA in connection withthe Third AOC.
[7] Georgia-Pacific maintains that as of the time of the filing, it had incurred approximately $7 million in response costs at the Kalamazoo Site, and that MHLLC owes Georgia-Pacific approximately $3.87 million of this amount under the Allocation Agreement. Georgia-Pacific further states that MHLLC owes Georgia-Pacific an additional $3.12 million by reason of MHLLC's obligations to pay for ARCADIS's prior services at the Kalamazoo Site. It is worth noting that these are past costs, or costs that have already been incurred by Georgia-Pacific. As noted above, Georgia-Pacific's claim also seeks future costs.
[8] See 4/16/2010 Hr'g Tr. at 118:7-12 ("Georgia-Pacific is asserting only a 113 claim. So issues of contribution or reimbursement . . . we're not arguing that thesethat we don't have claims for contribution or reimbursement. We're simply arguing that our claims are not contingent.").
[9] See, e.g., The Global Crossing v. Alta Partners Holdings LDC ("In re Global Crossing Ltd."), 385 B.R. 52, 66 (Bankr.S.D.N.Y.2008); In re General Motors Corp., 407 B.R. 463, 486 (Bankr.S.D.N.Y.2009) ("GM-Sale Decision"), appeal dismissed and aff'd, 428 B.R. 43 (S.D.N.Y.2010), and 430 B.R. 65 (S.D.N.Y. 2010); In re Motors Liquidation Co., No. 09-50026, 2010 WL 3219506, *5 (Bankr.S.D.N.Y. Jul.16, 2010); In re Adelphia Communications Corp., No. 02-41729, 441 B.R. 6, 2010 WL 4791795, *3 & n. 17 (Bankr.S.D.N.Y. Nov.18, 2010).
[10] It should be noted, however, while focusing on textual analysis, that section 502(e)(1)(B) imposes no requirements as to how or why the party asserting the claim potentially subject to section 502(e)(1)(B) must be liable with the debtor on the claim of the third party. There is no statutory requirement, for example, that the debtor and the party asserting the claim be liable on the claim of the third party in the same action, under a common statute, or on the same legal theory.
[11] See In re Chemtura Corp., 436 B.R. 286 (Bankr.S.D.N.Y.2010) ("Chemtura").
[12] CERCLA § 106(a), 42 U.S.C. § 9606(a) (emphasis added).
[13] See CERCLA § 106(b), 42 U.S.C. § 9606(b).
[14] CERCLA § 107, 42 U.S.C. § 9607.
[15] CERCLA § 113(f), 42 U.S.C. § 9613(f).
[16] Weyerhaeuser addresses contingency with respect to both past costs it incurred, and future costs. I think the Debtors have now acknowledged that past costs incurred by Weyerhaeuser are not contingent, and cannot be disallowed for that reason, but to the extent the Debtors continue to argue otherwise, I reject their position in that regard.
[17] See n. 11 above, 436 B.R. at 286.
[18] See Chemtura, 436 B.R. at 297.
[19] See In re Chateaugay Corp., 944 F.2d 997 (2d Cir.1991) ("Chateaugay"); Olin Corp. v. Riverwood Int'l Corp. ("In re Manville Forest Products Corp."), 209 F.3d 125 (2d Cir.2000) ("Manville Forest").
[20] Chateaugay.
[21] Id. at 1005.
[22] Manville Forest, 209 F.3d at 129 (emphasis added).
Other caselawagain in the context of determining the existence of a claim, rather than in deciding whether or not it was "contingent"likewise describes a situation where the need for remediation is known, but the amount, if any, to be paid for the remediation is not, as giving rise to a "contingent claim." See Cal. Dep't of Health Services v. Jensen ("In re Jensen"), 995 F.2d 925, 930-31 (9th Cir. 1993) (per curiam) ("We conclude that the state had sufficient knowledge of the Jensens' potential liability to give rise to a contingent claim for cleanup costs before the Jensens filed their personal bankruptcy petition on February 13, 1984"); In re Chicago, Milwaukee, St. Paul & Pacific Railroad Co., 974 F.2d 775, 786 (7th Cir. 1992) (in context of a former Bankruptcy Act § 77 railroad reorganization, to same effect: "when a potential CERCLA claimant can tie the bankruptcy debtor to a known release of a hazardous substance which this potential claimant knows will lead to CERCLA response costs, and when this potential claimant has, in fact, conducted tests with regard to this contamination problem, then this potential claimant has, at least, a contingent CERCLA claim for purposes of Section 77.").
[23] See Debtors Reply Br. at ¶ 8.
[24] Somewhat earlier in the Chateaugay decision, also as part of its analysis as to whether the EPA had a claim at all, the Circuit dealt with the easy case. It stated, with respect to the EPA's incurrence of CERCLA response costs:
When such costs are incurred, EPA will unquestionably have what can fairly be called a "right to payment." That right is currently unmatured and will not mature until the response costs are incurred.
944 F.2d at 1004.
[25] See Chateaugay, 944 F.2d at 1005.
[26] See In re Alper Holdings USA, No. 07-12148, 2008 WL 4186333,*6-*7 (Bankr. S.D.N.Y. Sept. 10, 2008) (Lifland, C.J.) ("Alper Holdings") (disallowing future environmental indemnification costs "as the amounts and ultimate liability are presently unknown," and finding contingency on the ground that amounts for which indemnification was sought were undetermined and unpaid); In re Drexel Burnham Lambert Group, Inc., 148 B.R. 982, 986-90 (Bankr.S.D.N.Y.1992) (Conrad, J.) ("Drexel Burnham") (disallowing indemnity claims of co-underwriters for potential liability in pending fraud suits, because claimants had not yet paid judgments or settlements); In re Wedtech Corp., 85 B.R. 285, 290 (Bankr.S.D.N.Y.1988) (Buschman, J.) ("Wedtech I") (disallowing debtor's officers' contingent indemnification claims).
[27] See Aetna Casualty and Surety Company v. Georgia Tubing Corp. ("In re Georgia Tubing Corp."), No. 93 Civ. 3659, 1995 WL 429018,*3-*4 (S.D.N.Y. July 20, 1995) (Preska, C.J.), aff'd, 93 F.3d 56 (2d Cir.1996) (disallowing an insurance company's claim regarding hazardous waste bonds where primary creditor was a state environmental agency, stating that a surety claim was contingent until the claimant "pays the principal creditor and fixes his own right to payment from the debtor" (quoting 3 Collier on Bankruptcy ¶ 502.05 at 502-88 (15th edition 1995)).
[28] See In re APCO Liquidating Trust, 370 B.R. 625 (Bankr.D.Del.2007) (Shannon, J.) ("APCO").
[29] Similarly, Collier expressly identifies claims for contribution arising under CERCLA as examples of claims that are contingent. See 4 Collier ¶ 502.06[2][d] (16th ed.). Collier provides:
In addition to codebtor situations created by contract, section 502(e)(1)(B) applies to disallow contingent reimbursement or contribution claims created by statute. For example, a claim for contribution arising under the Comprehensive Environmental Response, Compensation and Liability Act may be a contingent claim subject to disallowance under section 502(e)(1)(B). . . . In such a case, the government is the primary obligee that may seek satisfaction of its claim against the debtor from third parties who, under the statute, are obligated with the debtor to the government on the same debt. The statute under which the third-party liability is created, however, must provide for a reimbursement or contribution claim against the debtor.
(footnote omitted).
[30] 2008 WL 4186333 at *6.
[31] 148 B.R. at 987 (emphasis added; internal citations omitted).
[32] See 370 B.R. at 629.
[33] Id.
[34] Id. at 630.
[35] Id. at 636.
[36] Id.
[37] Id. (emphasis in original; internal citations omitted).
[38] See, e.g., In re Adelphia Communications Corp., 359 B.R. 65, 72 n. 13 (Bankr.S.D.N.Y. 2007) ("This Court has been on record for many years as having held that the interests of predictability in this District are of great importance, and that where there is no controlling Second Circuit authority, it follows the decisions of other bankruptcy judges in this district in the absence of clear error."); GM-Sale Decision, 407 B.R. at 487 & n. 19 (same).
[39] Cooper Industries, Inc. v. Aviall Services, Inc., 543 U.S. 157, 125 S. Ct. 577, 160 L. Ed. 2d 548 (2004) ("Aviall Services").
[40] See, e.g., Chemtura, 436 B.R. at 297 ("Thus, while we all understand and agree that there is a distinction between `contingent' and unliquidated, that distinction isn't material here. The unliquidated but non-contingent costs of defense here still result in a potentially allowable claim, but the claims for contribution in the event that a Tort Claimant succeeds against Corporate Claimants are still contingent, and satisfy this prong of the 3-part test for establishing 502(e)(1)(B) disallowance.").
[41] Weyerhaeuser cites Judge Sontchi's decision in In re RNI Wind Down Corp., 369 B.R. 174 (Bankr.D.Del.2007) ("RNI") in support of this contention. But as I noted in Chemtura, see 436 B.R. at 296-97, the claimant in RNI waived any claims he might have for amounts he might have to pay on the underlying claims (there, by the SEC). The right to payment that Judge Sontchi found to be "unliquidated but not contingent" was the right to the advancement of those costs of defense, and not the right to contribution or indemnity for amounts ultimately paid to a third partythe circumstance that was relevant there and here. Judge Sontchi merely found (understandably, given appropriate analysis) that the right to advancement was a then-existing right (under the certificate of incorporation, bylaws, and Delaware law), subject only to uncertainty at the time as to just how much the defense costs would turn out to be. I observed, in fact, that Judge Sontchi had actually used claims for contribution as an example of what would satisfy the contingency elements. See Chemtura, 436 B.R. at 297.
[42] See In re Eagle Picher Indus. Inc., 164 B.R. 265, 272 (S.D.Ohio 1994) ("Eagle-Picher") ("502(e)(1)(B) fosters the primary objective of CERCLA by requiring those who seek contribution to incur the expenses relating to cleanup before stating an allowable claim."); APCO, 370 B.R. at 636 (same, quoting Eagle Picher).
[43] 370 B.R. at 636-37.
[44] Having incorporated all of the others' arguments, Hamilton Beach also argues that its claim is not based on co-liability. But with only one exception (discussed at page 33 below), Hamilton Beach doesn't articulate any theories or authority distinct from those asserted by Weyerhaeuser, and its situation is governed by the analysis that follows.
[45] Weyerhaeuser makes a secondary argument that joint and several liability is not required by CERCLA for all superfund sites. See sub-section 3.
[46] U.S. v. Atlantic Research Corp., 551 U.S. 128, 127 S. Ct. 2331, 168 L. Ed. 2d 28 (2007) ("Atlantic Research"). Contrasting CERCLA section 107(a) with section 113(f), the Supreme Court stated the following: "§ 107(a) permits recovery of cleanup costs but does not create a right to contribution. A private party may recover under § 107(a) without any establishment of liability to a third party." Atlantic Research, 551 U.S. at 139, 127 S. Ct. 2331.
[47] The PRP was the owner of the facility and filed a suit against the U.S. under CERCLA section 107 to recover cleanup costs.
[48] Atlantic Research, 551 U.S. at 135, 127 S. Ct. 2331.
[49] Id. at 139, 127 S. Ct. 2331.
[50] In re Allegheny Int'l, Inc., 126 B.R. 919 (W.D.Pa.1991), aff'd without opinion, 950 F.2d 721 (3d Cir. 1991) ("Allegheny").
[51] See Allegheny, 126 B.R. at 923.
[52] See id. at 924.
[53] In Allegheny, the claimant's cleanup was entirely voluntary; no environmental government agency had taken any action with regard to the claimant's property. Here, however, the EPA has listed Weyerhaeuser as a PRP at the Kalamazoo Site and Weyerhaeuser has entered into a Consent Decree with the EPA with regard to a portion of the Site.
[54] See Eagle Picher, 164 B.R. at 271; Drexel Burnham, 148 B.R. at 988; In re Cottonwood Canyon Land Co., 146 B.R. 992, 996 (Bankr. D.Colo. 1992) ("Cottonwood Canyon").
[55] See APCO, 370 B.R. at 634 ("[T]he sole purpose served by section 502(e)(1)(B) is to preclude redundant recoveries...."); Wedtech I, 85 B.R. at 289 & n. 4 (noting that Congress enacted the provision, in part, to prevent competition between primary and secondary creditors for the "limited proceeds of the estate" (quoting H.R.Rep. No. 95 595, 95th Cong., 1st Sess. 354 (1977))).
[56] It is not possible to maintain that the cost recovery claim does not involve an obligation that both the Debtor and Weyerhaeuser owe to a third party, given that the EPA has specified that both parties are PRPs at the Kalamazoo Site.
[57] Weyerhaeuser also cites In re Harvard Indus., Inc., 138 B.R. 10 (Bankr.D.Del.1992) (Balick, J.) ("Harvard Industries"), which follows Allegheny's logic. In Harvard Industries, Judge Balick distinguished between claims by a PRP for a cleanup performed by the PRP and claims for where the EPA performed the cleanup, and ruled, inter alia, that where the party sought to recover funds it would expend in the future, section 502(e)(1)(B) does not apply. She acknowledged that double liability could occur if the PRP recovered for personal expenditures but then failed to cleanup the site and the EPA brought an action against the debtor, and, as in Allegheny, set up a trust to resolve that potential problem. But since, as in Allegheny, Harvard Industries subjects debtors to the risks of duplicative recoveries, I believe that Harvard Industries is subject to the same criticism that has been raised with respect to Allegheny.
[58] Cottonwood Canyon, 146 B.R. at 996. See also Drexel Burnham, 148 B.R. at 989 ("The Cottonwood court insisted that this is demonstrated by the solution devised by the Allegheny court in response to the concern that the allowance of the claim might lead to multiple recoveries against the debtor. The debtor would be subject to multiple recovery if the claimant failed to take remedial action to remove the hazard after it had received a distribution from the debtor, leaving the debtor liable to a claim by the Government for remediation of the plants."). The Allegheny court even noted that "both debtor and [claimant] are liable for the waste remediation...." Allegheny, 126 B.R. at 923.
[59] Cottonwood Canyon, 146 B.R. at 996.
[60] Weyerhaeuser criticizes the Debtors for relying on Eagle Picher and Cottonwood Canyon, which are pre-Atlantic Research cases, and argues that they were overruled by Atlantic Research. The Eagle Picher court, citing circuit court decisions, had found that the claims asserted there (a PRP against another PRP) could only be brought under CERCLA § 113, and not § 107, and Weyerhaeuser is correct that Atlantic overruled Eagle Picher in this respectsince Atlantic Research now allows a PRP to seek recovery from another PRP under § 107. But that distinction does not matter here. I rely on Eagle Picher for its narrower (and I believe undisputable) finding that the Debtor and claimant were co-liable. Because the Atlantic Research decision did not reach that issue, the portion of Eagle Picher upon which I rely was not overruled. And because Atlantic Research did not decide issues under Bankruptcy Code section 502(e)(1)(B), it had no effect on Cottonwood Canyon. Thus I find Weyerhaeuser's criticism unpersuasive.
[61] Eagle Picher, 164 B.R. at 271.
[62] The fact that Debtors settled their claims with the EPA is not necessary to my decision here, though, it is worth noting that the contribution protection in the Settlement Agreement protects the Debtors from duplicative payments on account of the same liabilities, a risk that exists because the Debtors are co-liable with the Private Party Claimants. As the Debtors correctly explained, that provision "plays into the central purpose of 502(e)(1)(b), which is to avoid double dipping for duplicate claims asserted by more than one creditor." 4/16/2010 Hr'g Tr. at 63.
[63] ___ U.S. ___, 129 S. Ct. 1870, 173 L. Ed. 2d 812 (2009) ("Burlington Northern").
[64] 4/16/2010 Hr'g Tr. at 92.
[65] Or if it was required, Weyerhaeuser could make this same argument in the appropriate forum to avoid having to pay a full judgment.
[66] 4/16/2010 Hr'g Tr. at 92.
[67] See 4/16/2010 Hr'g Tr. at 91-92.
[68] Georgia-Pacific, who asserts that it has an allowable claim under section 113(f), does not dispute that its claim is for "contribution or reimbursement" under 502(e)(1)(B).
[69] And other similarly situated private party claimants, such as Hamilton Beach
[70] 11 U.S.C. § 502(e)(1)(B) (emphasis added).
[71] See n. 10 above.
[72] Black's Law Dictionary 1399 (9th ed. 2009).
[73] In re Wedtech, 87 B.R. 279, 287 (Bankr. S.D.N.Y. 1988) (Brozman, C.J.) ("Wedtech II").
[74] Chemtura, 436 B.R. at 293.
[75] See id. at 295-96.
[76] Cottonwood Canyon, 146 B.R. at 996.
[77] See 4/16/2010 Hr'g Tr., at 106:5-10.
[78] See Fine Organics Corp. v. Hexcel Corp. ("In re Hexcel Corp."), 174 B.R. 807, 810 (Bankr.N.D.Cal.1994) (Tchaikovsky, J.) (disallowing as reimbursement claims arising out of asset purchase agreement between debtors and claimant in which debtor promised to perform remediation, even though claimant was not jointly liable with debtor).