MEMORANDUM OPINION
Plaintiff Rauf Diwan filed an amended complaint against
defendants Emerging Markets Partnership Global Administration,
LLC (“EMPG”), and Emerging Markets Partnership VI, LLC, alleging
he was wrongfully terminated as the CEO of Emerging Markets
Partnership Bahrain (“EMP Bahrain”) in violation of public
policy. The defendants moved to dismiss or to compel Diwan to
pursue his claims in arbitration, arguing that Diwan’s claim
relates to an arbitration agreement governed by the Convention on
the Recognition and Enforcement of Foreign Arbitral Awards of
June 10, 1958. Diwan moved for a preliminary injunction staying
the arbitration, and moved under the District of Columbia’s Anti-
Strategic Lawsuits Against Public Participation Act of 2010
(“anti-SLAPP Act”), D.C. Code § 16-5502, for an order striking or
denying the defendants’ motion to dismiss or to compel
-2-
arbitration.1 (Pl.’s Mem. in Supp. of Mot. for Preliminary
Injunction (“Pl.’s Mem.”) at 2.) Because Diwan did not show
irreparable harm or a likelihood of success on the merits,
Diwan’s motion for a preliminary injunction has been denied.2
BACKGROUND
Diwan worked as the Managing Director of EMPG’s “Second
Asian Fund” from 1997 until 2003, and as the CEO of EMPG’s “First
Asian Fund” from 2003 until 2007. (Am. Compl. ¶¶ 67, 74-75.) In
March 2007, Diwan resigned from EMPG and was immediately hired as
the CEO of the Asset Management Division of the Atlantic Capital
Group. (Id. ¶ 79.) However, in March 2008, Diwan agreed to
1
Under the anti-SLAPP Act, a party may file a special
motion to dismiss any claim arising from an act in furtherance of
the right of advocacy on issues of public interest within 45 days
after service of the claim. If a party filing a special motion
to dismiss under the anti-SLAPP Act makes a prima facie showing
that the claim arises from an act in furtherance of the right of
advocacy on issues of public interest, then the party’s motion to
dismiss under the anti-SLAPP statute should be granted unless the
other party is likely to succeed on the merits. See D.C. Code
§ 16-5502(b). Assuming without deciding that the claims asserted
by the defendants in arbitration are covered by the anti-SLAPP
statute, the court denied Diwan’s motion under the anti-SLAPP
statute to strike the defendants’ motion to compel arbitration
because the defendants are likely to succeed on the merits of
their motion to compel arbitration.
2
The parties did not present the type of factual disputes
that required a hearing. A court may deny a plaintiff's
application for a preliminary injunction without first providing
a hearing on the merits when the record demonstrates a lack of
right to relief. Cornish v. Dudas, 540 F. Supp. 2d 61, 64
(D.D.C. 2008) (citing Smith v. Harvey, Civil Action No. 06-1117
(RWR), 2006 WL2025026, at *2 (D.D.C. July 17, 2006)); Local Civil
Rule 65.1(d) (a court may decide a motion for preliminary
injunction on the papers before holding a hearing)).
-3-
return to become the CEO of EMP Bahrain, a subsidiary of EMPG
that is managed and controlled by EMPG. EMPG owns 60 percent of
EMP Bahrain, paid $350,000 of Diwan’s $400,000 annual base
compensation, and, according to Diwan, controls the compensation,
hiring and firing of personnel of EMP Bahrain. (Am. Compl. ¶¶ 6,
39-41, 47, 51, 96.)
In 2010, Diwan was given profit sharing (“conditional carry
interest” or “carry”) in one of the funds managed by EMP Bahrain
-- EMP VI, LLC -- and he signed a “Grant Letter” agreement that,
under Article 4.6 of the EMP VI, LLC Agreement (“LLC Agreement”),
granted him rights as a member of EMP IV, LLC. The LLC Agreement
required him to arbitrate all disputes “arising under” that
agreement before a panel of arbitrators selected by the
International Chamber of Commerce (the “ICC”) under the rules of
the United Nations Commission on International Trade Law
(“UNCITRAL”). (See Compl. ¶¶ 1, 28, 35, 178-183; Defs.’ Mem. in
Supp. of Mot. to Strike or to Compel (“Defs.’ Mem.”) at 6-8;
Defs.’ Notice of Removal, Ex. B.) Section 8.12 of the LLC
Agreement provides that “any dispute of the Members, the Manager
or the Company hereunder shall be settled by arbitration.”
(Defs.’ Notice of Removal, Ex. C.) That section also provides
that disputes must be “submitted for arbitration to a panel of
arbitrators in New York and resolved by final decision pursuant
to the provisions of the rules of UNCITRAL,” that Delaware law
-4-
would be the substantive law governing disputes, and that
arbitration should be concluded within 45 days of its submission,
unless extended for justifiable cause by the arbitrators.
(Defs.’ Notice of Removal, Ex. C.)
On November 1, 2010, EMPG issued to Diwan a notice that it
was terminating his employment with EMP Bahrain for cause. (Am.
Compl. ¶ 171, Ex. E.) Diwan filed his original complaint in the
Superior Court of the District of Columbia on October 24, 2011,
alleging wrongful termination in violation of public policy and
breach of the LLC Agreement. The defendants removed the case to
this court in November 2011 under the Federal Arbitration Act
(“FAA”), 9 U.S.C. §§ 201-208, and then moved to dismiss or to
stay this case and to compel arbitration. On November 21, 2011,
the defendants submitted a notice of arbitration to the
International Chamber of Commerce (“ICC”). The ICC International
Court of Arbitration determined that it was “satisfied that an
agreement authorizing it to act as appointing authority may
exist,” selected a panel of three arbitrators, and set an initial
scheduling conference for January 4, 2011. (Defs.’ Opp’n to
Pl.’s Mot. for Prelim. Injunction, at 13.) Diwan moved for a
preliminary injunction to stay the beginning of the arbitration.
The motion was denied by minute order and this opinion explains
why.
-5-
DISCUSSION
A preliminary injunction is an “extraordinary” remedy.
Mazurek v. Armstrong, 520 U.S. 968, 972 (1997). A plaintiff
carries the burden of persuasion by a clear showing 1) of a
substantial likelihood of success on the merits, 2) of
irreparable injury if the injunction is not issued, 3) that the
injunction would not substantially injure other interested
parties, and 4) that the injunction is in the public interest.
Cobell v. Norton, 391 F.3d 251, 258 (D.C. Cir. 2004). “The four
factors should be balanced on a sliding scale, and a party can
compensate for a lesser showing on one factor by making a very
strong showing on another factor.” In re: Navy Chaplaincy, 516
F. Supp. 2d 119, 122 (D.D.C. 2007) (citing CSX Transp., Inc. v.
Williams, 406 F.3d 667 (D.C. Cir. 2005)); see Davis v. Pension
Ben. Guar. Corp., 571 F.3d 1288, 1291-92 (D.C. Cir. 2009).3
3
Two judges on the Davis panel, see id. at 1295-96
(Kavanaugh, J. and Henderson, J., concurring), though, questioned
the continuing vitality of, but did not squarely jettison, this
sliding scale approach in light of dictum in Winter v. Nat’l
Resources Def. Council, Inc., 555 U.S. 7, 20 (2008) (listing the
four factors a plaintiff must establish, but neither invoking nor
rejecting the sliding scale method). The most that can be said
with any certainty about what Winter decided regarding standards
for securing injunctive relief is that a plaintiff must
demonstrate that irreparable injury is “likely,” not just
“possible,” 555 U.S. at 22, and that the balance of equities and
the public interest were sufficient in that case to weigh against
injunctive relief. 555 U.S. at 32; see also Sherley v. Sebelius,
644 F.3d 388, 392-393 (D.C. Cir. 2011) (opinion by Ginsburg, J.,
joined by Griffith, J.) (stating that “[l]ike our colleagues [in
Davis], we read Winter at least to suggest if not to hold ‘that a
likelihood of success is an independent, free-standing
-6-
I. IRREPARABLE INJURY
Some showing of irreparable injury “is a threshold
requirement for a preliminary injunction.” City of Moundridge v.
Exxon Mobil Corp., 429 F. Supp. 2d 117, 127 (D.D.C. 2006).
“Irreparable harm is an imminent injury that is both great and
certain, and that legal remedies cannot repair.” Id. (citing
Wis. Gas Co. v. Fed. Energy Regulatory Comm’n, 758 F.2d 669, 674
(D.C. Cir. 1985)).
The key word in this consideration is irreparable.
Mere injuries, however substantial, in terms of money,
time and energy necessarily expended in the absence of
a stay, are not enough. The possibility that adequate
compensatory or other corrective relief will be
available at a later date, in the ordinary course of
litigation, weighs heavily against a claim of
irreparable harm.
City of Moundridge, 429 F. Supp. 2d at 127-128 (quoting Va.
Petroleum Jobbers Ass’n v. Fed. Power Comm’n, 259 F.2d 921, 925
(D.C. Cir. 1958); Davenport v. Int’l Bhd. of Teamsters, 166 F.3d
356, 367 (D.C. Cir. 1999)).
Diwan claimed that he would be irreparably harmed by paying
$74,000 to the arbitration panel, and that allowing arbitration
proceedings to begin before determining arbitrability would
constitute “per se” irreparable injury. (Pl.’s Reply at 18.)
However, compensable monetary injuries, even if they are
substantial, do not constitute irreparable harm. See Nat’l
requirement for a preliminary injunction’”) .
-7-
Propane Gas Ass’n v. United States Dep’t of Homeland Sec., 534 F.
Supp. 2d 16, 19 (D.D.C. 2008) (citing Wis. Gas Co., 758 F.2d at
674). The defendants asserted, and the plaintiff did not
dispute, that the $74,000 is merely a deposit, and thus that
Diwan may receive a portion of it back. (Defs.’ Opp’n at 23.)
“The possibility that adequate compensatory or other corrective
relief will be available at a later date, in the ordinary course
of litigation, weighs heavily against a claim of irreparable
harm.” Bill Barrett Corp. v. U.S. Dep’t of Interior, 601 F.
Supp. 2d 331, 335 (D.D.C. 2009) (citing Wis. Gas Co., 758 F.2d at
674).
Diwan did not cite any case from this circuit establishing
that allowing a matter to proceed to arbitration constitutes
irreparable injury. Instead, Diwan cited PaineWebber, Inc. v.
Hartmann, 921 F.2d 507, 515 (3d Cir. 1990), for the proposition
that allowing arbitration to continue could constitute
irreparable injury. In PaineWebber, the Third Circuit held that
a district court’s decision to grant the plaintiff’s motion for a
preliminary injunction preventing arbitration from occurring was
not an abuse of discretion, where the applicable rules governing
the arbitration excluded claims more than six years old from
arbitration and the claim was indisputably filed more than six
years after the last event involving PaineWebber. Id. at 509-
510.
-8-
PaineWebber is not persuasive here for two reasons. First,
the opinion in PaineWebber was predicated on the principle that
“a party cannot be required to arbitrate the threshold ‘dispute,’
as it were, of whether the underlying dispute is itself
arbitrable. Hence, the question of arbitrability . . . is
undeniably an issue for judicial determination.” PaineWebber,
921 F.2d at 514. That principle conflicts with Howsam v. Dean
Witter Reynolds, 537 U.S. 79, 85 (2002) which held that there are
numerous situations where the question of arbitrability is
determined by an arbitrator, not a court. Second, in
PaineWebber, the district court determined that compelling a
party to attend arbitration could be irreparable injury where the
dispute that potentially would be arbitrated is clearly and
indisputably outside of the boundaries of the arbitration
agreement. To the contrary, as is discussed below, Diwan was a
party to an LLC Agreement that clearly called for arbitration of
disputes between the members and the company. Diwan did not make
a sufficient showing of irreparable injury to justify a
preliminary injunction.
II. SUCCESS ON THE MERITS
It is important for one seeking injunctive relief to
demonstrate that he is likely to succeed on the merits, in order
to justify the “‘intrusion into the ordinary processes of
administration and judicial review.’” Konarski v. Donovan, 763
-9-
F. Supp. 2d 128, 132 (D.D.C. 2011) (quoting Am. Bankers Ass’n v.
Nat’l Credit Union Admin., 38 F. Supp. 2d 114, 140 (D.D.C.
1999)). “Assessing the likelihood of success on the merits ‘does
not involve a final determination of the merits, but rather the
exercise of sound judicial discretion on the need for interim
relief.’” Beattie v. Barnhart, 663 F. Supp. 2d 5, 9 (D.D.C.
2009) (quoting Nat’l Org. for Women v. Dep’t of Health and Human
Servs., 736 F.2d 727, 733 (D.C. Cir. 1984)).
When considering “a motion to stay proceedings and/or
compel arbitration, the appropriate standard of review
for the district court is the same standard used in
resolving summary judgment motions” pursuant to Federal
Rule of Civil Procedure 56(a). Brown v. Dorsey &
Whitney, LLP, 267 F. Supp. 2d 61, 67 (D.D.C. 2003)
(internal quotation marks omitted); see also Par-Knit
Mills, Inc. v. Stockbridge Fabrics Co., 636 F.2d 51, 54
& n.9 (3d Cir. 1980). Thus, it is appropriate to grant
a motion to stay proceedings when the pleadings and the
evidence demonstrate that “there is no genuine dispute
as to any material fact and the movant is entitled to
judgment as a matter of law.” Fed. R. Civ. P. 56(a).
The party seeking summary judgment (i.e., arbitration)
bears the initial responsibility of demonstrating the
absence of a genuine dispute of material fact. See
Celotex Corp. v. Catrett, 477 U.S. 317, 323 (1986).
Sheet Metal Workers’ Int’l Ass’n v. United Transp. Union, 767 F.
Supp. 2d 161, 167 (D.D.C. 2011).
Once it has been determined that an arbitration agreement is
valid - - i.e. that the parties have a contract that provides for
arbitration of some issues between them - - all doubts regarding
the scope of the arbitration clause are resolved in favor of
arbitration. “In determining the scope of arbitability, there is
-10-
a presumption of arbitrability in the sense that an order to
arbitrate the particular grievance should not be denied unless it
may be said with positive assurance that the arbitration clause
is not susceptible of an interpretation that covers the asserted
dispute. Doubts should be resolved in favor of coverage.”
Granite Rock Co. v. Int’l Brotherhood of Teamsters, 130 S. Ct.
2847, 2866 (2010) (Sotomayor, J., concurring/dissenting) (quoting
AT&T Technologies, Inc. v. Communications Workers, 475 U.S. 643,
650 (1986)); see also Wolff v. Westwood Management, LLC, 558 F.3d
517, 520 (D.C. Cir. 2009)(“the [FAA] establishes that, as a
matter of federal law, any doubts concerning the scope of
arbitrable issues should be resolved in favor of arbitration,
whether the problem at hand is the construction of the contract
language itself or an allegation of waiver, delay or a like
defense to arbitrability.”)(quoting Moses H. Cone Memorial Hosp.
v. Mercury Constr. Corp., 460 U.S. 1, 24-25 (1983)).
Here, the arbitration provision of the LLC Agreement appears
to provide that the questions of arbitrability should be resolved
by the arbitrators. The LLC Agreement clearly provides that
arbitration disputes would be subject to the rules of UNCITRAL.
-11-
The Article 23 of UNCITRAL in effect in November 20104, when the
dispute became arbitrable, provided that:
The arbitral tribunal shall have the power to rule on
its own jurisdiction, including any objections with
respect to the existence or validity of the arbitration
agreement. For that purpose, an arbitration clause
that forms part of a contract shall be treated as an
agreement independent of the other terms of the
contract. A decision by the arbitral tribunal that the
contract is null shall not entail automatically the
invalidity of the arbitration clause.
UNCITRAL Arbitration Rules, Art. 23,¶ 1, G.A Res. 65/22 (Dec. 6,
2010); see also Republic of Argentina v. BG Group PLC, No. 11-
7021, 2012 WL 119558, at *6 (D.C. Cir. Jan. 17, 2012) (stating
that the 1976 version of the UNCITRAL arbitration rules “grant
the arbitrator the power to determine issues of arbitrability”).
At least one court has held that substantially similar language
in an arbitration agreement reserved the issue of arbitrability
for the arbitrators. See Contec Corp. v. Remote Solution Co.,
Ltd., 398 F.3d 205, 208 (2d Cir. 2005) (holding that language
stating that “[t]he arbitrator shall have the power to rule on
his or her own jurisdiction, including any objections with
respect to the existence, scope or validity of the arbitration
agreement” reserved the question of arbitrability for the
4
While Diwan argued that an earlier version of the rules of
UNCITRAL should be applied, the provision of the LLC Agreement at
issue states that arbitration would be resolved “pursuant to the
rules of UNCITRAL” (Defs.’ Notice of Removal, Ex. C), not
pursuant to the rules of UNCITRAL as they existed on the date
Diwan signed the LLC Agreement.
-12-
arbitrator). While Diwan argued that the language found in
UNCITRAL’s Article 23 is distinguishable because it does not
include the word “scope,” Diwan cited no authority holding that
the absence of the word “scope” implies that questions of
arbitrability should not be resolved by arbitrators where an
agreement provides that the arbitrator has the power to rule on
his or her own jurisdiction or the validity of applying the
arbitration agreement to the dispute at issue. Diwan argued that
he should not be bound by the arbitration provision of the LLC
Agreement because the agreement is “unconscionable,” because he
did not read the LLC Agreement, and because he claims the
defendants engaged in a material misrepresentation by failing to
inform him that signing the grant letter made him a member of the
EMP VI, LLC that was bound by the LLC Agreement. However, the
grant letter clearly states that Diwan was becoming a member of
the LLC, bound by the LLC Agreement:
Pursuant to Article 4.6 of that certain Emerging
Markets Partnership VI L.L.C. Limited Liability Company
Agreement, dated February 14, 2005, as amended (the
“Agreement”), EMP Global LLC, as Manager, hereby
consents to your admission as a new Member of Emerging
Markets Partnership VI, L.L.C. (The “Company”) and the
granting of a 0.573% interest in the Company’s Class B
Interests.
(Defs.’ Notice of Removal, Ex. B.) Furthermore, Diwan accepted
benefits under that Agreement as a member of EMP VI, LLC, and any
assertion that he was unaware of that Agreement’s contents seems
inconsistent with his claim in his initial complaint that his
-13-
“contractual relationship with EMP VI governed and controlled
many aspects of his job, including the process for, and his
rights regarding, termination.” (Compl. ¶ 36.) In addition, the
defendants pointed out that under the law governing the LLC
Agreement, “[a] member . . . of a limited liability company . . .
is bound by the limited liability company agreement whether or
not the member . . . executes the limited liability company
agreement.” Del. Code Ann. § 18-101(7). Diwan did not show that
he was likely to succeed on the merits.
III. BALANCE OF EQUITIES; PUBLIC INTEREST
Because Diwan sought injunctive relief, he also had to
demonstrate that the balance of the equities tipped in his favor
and that the public interest favored granting injunctive relief.
See Beattie v. Barnhart, 663 F. Supp. 2d 5, 9 (D.D.C. 2009).
Diwan argued that the balance of the equities tilted in his favor
because the defendants waited approximately one year to initiate
the arbitration proceedings. He also argued that the public
interest would be furthered by enjoining the arbitration because
his employment was allegedly terminated for refusing to violate
the Foreign Corrupt Practices Act, and litigating that claim in a
court would be more likely to result in an “open, fair, and
transparent” resolution. (Pl.’s Mem. at 20-21.) However, the
defendants countered that if they were enjoined from arbitrating
they could lose the ability to raise their claims in arbitration,
-14-
and that the public interest would be furthered by letting this
case proceed to arbitration because doing so would enhance the
certainty of arbitration agreements in international contracts.
(Defs.’ Opp’n at 24-25.) While both parties’ arguments had some
merit, none was compelling enough to tip these factors in favor
of one party or the other.
CONCLUSION
Because Diwan did not show that he is likely to suffer
irreparable harm or that he is likely to succeed on the merits,
his motion [14] for a preliminary injunction and for an order
denying the defendants’ motion to compel arbitration has been
denied.
SIGNED this 27th day of January, 2012.
/s/
RICHARD W. ROBERTS
United States District Judge