MEMORANDUM DECISION
{¶1} Plaintiff, Lawrence Roberts, filed this action against defendant, Ohio
Department of Transportation (ODOT), contending that his vehicle was damaged as a
proximate result of negligence on the part of ODOT in maintaining a hazardous
condition on Interstate 76. In his complaint, plaintiff described the particular damage
event noting that on March 5, 2011, at approximately 6:45 p.m. he was traveling in the
right lane on I-76 when he struck a pothole causing damage to the left front and rear
tires. Plaintiff stated that he “pulled over to the right side of the highway with the other
(9) vehicles that struck the pothole.” Plaintiff seeks recovery of damages in the amount
of $375.88, the stated total amount for replacement tires. The filing fee was paid.
{¶2} Defendant denied liability based on the contention that no ODOT
personnel had any knowledge of the particular damage-causing pothole prior to
plaintiff’s incident. Defendant related that plaintiff’s incident occurred “at milemarker 1.0
on I-76 in Medina County.” Defendant denied receiving any prior calls or complaints
about a pothole or potholes in the vicinity of that location despite the fact that “[t]his
section of roadway has an average daily traffic count” of over 17,000 vehicles.
Defendant asserted that plaintiff did not offer any evidence to establish the length of
time that any pothole existed in the vicinity of milepost 1.0 on I-76 prior to plaintiff’s
incident. Defendant suggested that “it is more likely than not that the pothole existed in
that location for only a relatively short amount of time before plaintiff’s incident.”
{¶3} Additionally, defendant contended that plaintiff did not offer any evidence
to prove that the roadway was negligently maintained. Defendant advised that the
ODOT “Medina County Manager conducts roadway inspections on all state roadways
within the county on a routine basis, at least one to two times a month.” Apparently, no
potholes were discovered in the vicinity of plaintiff’s incident the last time that section of
roadway was inspected prior to March 5, 2011. The claim file is devoid of any
inspection record. Defendant argued that plaintiff has failed to offer any evidence to
prove his property damage was attributable to any conduct on the part of ODOT
personnel. Defendant stated that, “[a] review of the six-month maintenance history
[record submitted] for the area in question reveals that three (3) pothole patching
operations were conducted within the incident location” on January 19, February 9, and
March 5, 2011.1 Defendant noted, “that if ODOT personnel had detected any defects
during these inspections they would have been promptly scheduled for repair.”
{¶4} For plaintiff to prevail on a claim of negligence, he must prove, by a
preponderance of the evidence, that defendant owed him a duty, that it breached that
duty, and that the breach proximately caused his injuries. Armstrong v. Best Buy
Company, Inc., 99 Ohio St. 3d 79, 2003-Ohio-2573,¶8 citing Menifee v. Ohio Welding
Products, Inc. (1984), 15 Ohio St. 3d 75, 77, 15 OBR 179, 472 N.E. 2d 707. However,
“[i]t is the duty of a party on whom the burden of proof rests to produce evidence which
furnishes a reasonable basis for sustaining his claim. If the evidence so produced
furnishes only a basis for a choice among different possibilities as to any issue in the
case, he fails to sustain such burden.” Paragraph three of the syllabus in Steven v.
Indus. Comm. (1945), 145 Ohio St. 198, 30 O.O. 415, 61 N.E. 2d 198, approved and
followed.
{¶5} Defendant has the duty to maintain its highways in a reasonably safe
condition for the motoring public. Knickel v. Ohio Department of Transportation (1976),
1
Based upon the statements made in the response filed in Claim No. 2011-03731-AD, the trier of
fact finds, in all likelihood, the pothole patching operation on March 5, 2011, occurred after and in
response to each plaintiff’s incidents.
49 Ohio App. 2d 335, 3 O.O. 3d 413, 361 N.E. 2d 486. However, defendant is not an
insurer of the safety of its highways. See Kniskern v. Township of Somerford (1996),
112 Ohio App. 3d 189, 678 N.E. 2d 273; Rhodus v. Ohio Dept. of Transp. (1990), 67
Ohio App. 3d 723, 588 N.E. 2d 864.
{¶6} In order to prove a breach of the duty to maintain the highways, plaintiff
must prove, by a preponderance of the evidence, that defendant had actual or
constructive notice of the precise conditions or defects alleged to have caused the
accident. McClellan v. ODOT (1986), 34 Ohio App. 3d 247, 517 N.E. 2d 1388.
Defendant is only liable for roadway conditions of which it has notice, but fails to
reasonably correct. Bussard v. Dept. of Transp. (1986), 31 Ohio Misc. 2d 1, 31 OBR
64, 507 N.E. 2d 1179. There is no evidence that defendant had actual notice of the
pothole on I-76 prior to March 5, 2011.
{¶7} Therefore, to find liability, plaintiff must prove that ODOT had constructive
notice of the defect. The trier of fact is precluded from making an inference of
defendant’s constructive notice, unless evidence is presented in respect to the time that
the defective condition developed. Spires v. Ohio Highway Department (1988), 61 Ohio
Misc. 2d 262, 577 N.E. 2d 458.
{¶8} In order for there to be constructive notice, plaintiff must show that
sufficient time has elapsed after the dangerous condition appears, so that under the
circumstances defendant should have acquired knowledge of its existence. Guiher v.
Dept. of Transportation (1978), 78-0126-AD . Size of the defect is insufficient to show
notice or duration of existence. O’Neil v. Department of Transportation (1988), 61 Ohio
Misc. 2d 287, 587 N.E. 2d 891. “A finding of constructive notice is a determination the
court must make on the facts of each case not simply by applying a pre-set time
standard for the discovery of certain road hazards.” Bussard at 4. “Obviously, the
requisite length of time sufficient to constitute constructive notice varies with each
specific situation.” Danko v. Ohio Dept. of Transp. (Feb. 4, 1993), Franklin App. 92AP-
1183. No evidence has shown that ODOT had constructive notice of the pothole.
{¶9} Generally, in order to recover in a suit involving damage proximately
caused by roadway conditions including potholes, plaintiff must prove that either: 1)
defendant had actual or constructive notice of the potholes and failed to respond in a
reasonable time or responded in a negligent manner, or 2) that defendant, in a general
sense, maintains its highways negligently. Denis v. Department of Transportation
(1976), 75-0287-AD. Plaintiff has not produced any evidence to infer that defendant, in
a general sense, maintains its highways negligently or that defendant’s acts caused the
defective conditions. Herlihy v. Ohio Department of Transportation (1999), 99-07011-
AD. Therefore, defendant is not liable for any damage plaintiff may have suffered from
the pothole.
{¶10} In the instant claim, plaintiff has failed to introduce sufficient evidence to
prove that defendant maintained known hazardous roadway conditions. Plaintiff failed
to prove that his property damage was connected to any conduct under the control of
defendant, or that defendant was negligent in maintaining the roadway area, or that
there was any actionable negligence on the part of defendant. Taylor v. Transportation
Dept. (1998), 97-10898-AD; Weininger v. Department of Transportation (1999), 99-
10909-AD; Witherell v. Ohio Dept. of Transportation (2000), 2000-04758-AD.
Consequently, plaintiff’s claim is denied.
Court of Claims of Ohio
The Ohio Judicial Center
65 South Front Street, Third Floor
Columbus, OH 43215
614.387.9800 or 1.800.824.8263
www.cco.state.oh.us
LAWRENCE ROBERTS
Plaintiff
v.
OHIO DEPARTMENT OF TRANSPORTATION
Defendant
Case No. 2011-05629-AD
Acting Clerk Daniel R. Borchert
ENTRY OF ADMINISTRATIVE DETERMINATION
Having considered all the evidence in the claim file and, for the reasons set forth
in the memorandum decision filed concurrently herewith, judgment is rendered in favor
of defendant. Court costs are assessed against plaintiff.
________________________________
DANIEL R. BORCHERT
Acting Clerk
Entry cc:
Lawrence Roberts Jerry Wray, Director
3183 Bickleigh Circle Department of Transportation
Akron, Ohio 44312 1980 West Broad Street
Columbus, Ohio 43223
8/2
Filed 8/9/11
Sent to S.C. reporter 1/3/12