Affirmed; Opinion Filed August 28, 2015.
In The
Court of Appeals
Fifth District of Texas at Dallas
No. 05-14-01456-CV
SLOAN CREEK II, L.L.C., Appellant
V.
NORTH TEXAS TOLLWAY AUTHORITY and THE STATE OF TEXAS, Appellees
On Appeal from the County Court at Law No. 6
Collin County, Texas
Trial Court Cause No. 006-3356-2008
OPINION
Before Justices Fillmore, Myers, and Evans
Opinion by Justice Evans
This is an interlocutory appeal of the trial court’s orders granting two pleas to the
jurisdiction challenging an inverse condemnation counterclaim under article I, section 17 of the
Texas Constitution. In its counterclaim, Sloan Creek II, L.L.C. alleged the increased amount and
rate of erosion of creek banks on its property due to increased rainwater runoff from highway
improvements was an inverse condemnation in violation of the Texas Constitution. Because we
conclude Sloan Creek II failed to create a fact issue on whether the governmental entities
involved knew the highway improvements were substantially certain to increase the amount and
rate of erosion, we affirm the trial court’s orders dismissing the article I, section 17 counterclaim.
I. BACKGROUND
Sloan Creek lies south of the center of the interchange of SH 121 and US 75 on the east
side of US 75. The creek generally runs towards the southeast then more easterly across the
southern edge of approximately 219 acres owned by Sloan Creek II. Before 2008, the
surrounding watershed drained rainwater into Sloan Creek, including drainage from the
interchange of SH 121 and U.S. 75.1 Expanding SH 121, changing it into a tollway, and
constructing a new interchange of SH 121 and US 75 was part of section 4 of the Sam Rayburn
Tollway project of the Texas Department of Transportation. TxDOT awarded to the North
Texas Tollway Authority the Tollway project. The project was designed by, and the construction
overseen by, engineering firms under contract with NTTA. The Tollway improvement design
included additional acres of roadway surface and a drainage system that were designed to
discharge rainwater runoff into Sloan Creek.
Sloan Creek II was already in condemnation proceedings with NTTA regarding an
easement NTTA sought for the Tollway drainage system, when Sloan Creek II filed a
counterclaim against NTTA and TxDOT2 for inverse condemnation under article I, section 17 of
the Texas Constitution. The counterclaim sought compensation for damage resulting from the
Tollway improvement of the SH 121 interchange with US 75. NTTA and TxDOT filed pleas to
the jurisdiction addressing the counterclaim under article I, section 17 of the Texas Constitution.
Later, Sloan Creek II filed its fourth amended objections to the special commissioners’ award
reasserting its inverse condemnation claim under the Texas Constitution and also asserting
inverse condemnation under the Fifth and Fourteenth Amendments to the United States
Constitution and 42 United States Code section 1983.3
1
The two highways intersect on the boundary that separates the Town of Fairview and the City of McKinney
approximately in the center of Collin County, Texas.
2
Sloan Creek II named the State of Texas as a third-party defendant to its counterclaim. We will refer to the
State and the Department simply as TxDOT.
3
We note that neither plea to the jurisdiction was amended to address the claims under the United States
Constitution, nor does any party’s brief in the trial court or on appeal address those claims.
–2–
The trial court set the pleas to the jurisdiction for hearing on April 24, 2014. Discovery
was conducted and NTTA and TxDOT filed separate briefs with evidence supporting their pleas
to the jurisdiction. Sloan Creek II filed a response and attached evidence. NTTA and TxDOT
then filed replies with additional evidence, and objected to Sloan Creek II’s evidence. Sloan
Creek II filed a motion to present live testimony at the hearing and a response to motions filed by
NTTA and TxDOT to quash deposition notices4 for many of NTTA’s and TxDOT’s witnesses.
Further, Sloan Creek II moved for additional discovery and an order from the court compelling
the discovery.
The trial court conducted a hearing on the discovery and procedural issues in dispute. In
its order signed on June 3, 2014, the trial court denied further discovery sought by Sloan Creek II
except for the deposition of Christi Glendinning, denied Sloan Creek II’s objections and motion
to strike NTTA’s and TxDOT’s evidence filed with their reply briefs, denied all the motions to
quash depositions except for the deposition of Glendinning, set deadlines for additional briefing,
evidence, and objections to evidence, and set the hearing date. After a lengthy hearing on the
pleas, the trial court permitted post-argument responses to the evidentiary objections which both
sides filed.
The trial court granted the pleas to the jurisdiction dismissing with prejudice Sloan Creek
II’s inverse condemnation counterclaim under article I, section 17 of the Texas Constitution in
separate orders signed on October 31, 2014. In the orders, the trial court granted all of NTTA’s
and TxDOT’s objections to Sloan Creek II’s evidence and denied all of Sloan Creek II’s
objections to NTTA’s and TxDOT’s evidence. Sloan Creek II timely perfected this interlocutory
appeal.5 On appeal, Sloan Creek II raises three issues challenging the legal standard applicable
4
The motions to quash are not in our record on appeal.
5
Sloan Creek II perfected separate appeals from each order, which we consolidated.
–3–
to a governmental entity’s knowledge that its conduct will cause damage and contends the trial
court’s determination that there was not a factual dispute was erroneous under whichever legal
standard applies. In a fourth issue, Sloan Creek II challenges the trial court’s evidentiary rulings.
We affirm the trial court’s orders dismissing with prejudice Sloan Creek II’s counterclaim for
inverse condemnation under article I, section 17 of the Texas Constitution.
II. APPLICABLE LAW
A. Standard of Review
A plea to the jurisdiction is a challenge to subject matter jurisdiction which is a question
of law we review de novo. Klumb v. Hous. Mun. Emps. Pension Sys., 458 S.W.3d 1, 8 (Tex.
2015). We consider both pleadings and factual assertions, as well as any evidence in the record
regarding the jurisdictional issue. Id. (citing City of Elsa v. Gonzalez, 325 S.W.3d 622, 625
(Tex. 2010)). We construe pleadings liberally in favor of jurisdiction with a view to the
pleader’s intent to ascertain facts that have been alleged affirmatively demonstrating the court’s
jurisdiction to consider the subject matter. Id. Where, as here, “a plea to the jurisdiction
challenges the existence of jurisdictional facts, we consider whether evidence in the record raises
a fact issue, and if it does, the jurisdictional issue must be resolved by the trier of fact.” Id.
(citing Tex. Dep’t of Parks & Wildlife v. Miranda, 133 S.W.3d 217, 227–28 (Tex. 2004)). But if
the evidence is undisputed or does not involve a factual dispute, the court rules on the plea as a
matter of law. Id. (citing Miranda, 133 S.W.3d at 228).
We consider circumstantial evidence, but if the party’s position is supported “only by
meager circumstantial evidence, the evidence does not rise above a scintilla (and thus is legally
insufficient) if jurors would have to guess whether a vital fact exists.” City of Keller v. Wilson,
168 S.W.3d 802, 813 (Tex. 2005). We apply the equal inference rule: “‘[w]hen the
–4–
circumstances are equally consistent with either of two facts, neither fact may be inferred.’” Id.
(quoting Tubelite, a Div. of Indal, Inc. v. Risica & Sons, Inc., 819 S.W.2d 801, 805 (Tex. 1991)).
B. Damages Requiring Compensation under the Texas Constitution
The Texas Constitution provides that property owners may recover for a taking, damage,
or destruction of their property by governmental authority, as follows: “No person’s property
shall be taken, damaged, or destroyed for or applied to public use without adequate
compensation being made, unless by the consent of such person . . . .” TEX. CONST. art. I, §
17(a). “To establish a takings claim under Article I, section 17, the claimant must show that a
governmental actor acted intentionally to take or damage property for a public use.” State v.
Holland, 221 S.W.3d 639, 643 (Tex. 2007) (citing Gen. Servs. Comm’n v. Little–Tex Insulation
Co., 39 S.W.3d 591, 598 (Tex. 2001)). A governmental entity that physically damages private
property to confer a public benefit may be liable under article I, section 17 if it “(1) knows that a
specific act is causing identifiable harm; or (2) knows that the specific property damage is
substantially certain to result from an authorized government action—that is, that the damage is
‘necessarily an incident to, or necessarily a consequential result of’ the government’s action.”
City of Dall. v. Jennings, 142 S.W.3d 310, 314 (Tex. 2004) (quoting Tex. Highway Dep’t v.
Weber, 219 S.W.2d 70, 71 (Tex. 1949); favorably comparing to RESTATEMENT (SECOND) OF
TORTS § 8A (1965) (“Intent” means “that the actor desires to cause consequences of his act, or
that he believes that the consequences are substantially certain to result from it.”)).
The governmental entity’s knowledge and intent must be determined as of the time it
acted, not later with the benefit of hindsight. City of San Antonio v. Pollock, 284 S.W.3d 809,
821 (Tex. 2009). And the government’s intent must be shown with some “objective indicia of
intent” demonstrating the government knew the identifiable harm was substantially certain to
result from the government’s conduct. Wilson, 168 S.W.3d at 830. As a result, not every notice
–5–
or claim to the government results in a fact issue about the government’s knowledge its conduct
was substantially certain to cause the complained of damage. Id. at 829–30 (demand letter from
lawyer for indemnification of client due to potential flooding insufficient to raise fact issue
whether government knew flooding was substantially certain to result from its conduct, stating
“This letter may have required the City to investigate, but again is no evidence it knew the advice
it received [from engineers] was wrong.”). Where, however, an owner contacts high-level
government officials involved in a government entity’s conduct alleged to be a taking and
communicates sufficient information explaining how the conduct is a taking, a fact issue can be
created. See City of Keller v. Hall, 433 S.W.3d 708, 724–27 (Tex. App.—Fort Worth 2014, pet.
denied) (detailing number of contacts with city manager, director of public works, and other city
officials and amount of information communicated when combined with other evidence
supported conclusion governmental entity knew its conduct was substantially certain to cause
damage alleged to be a taking).
III. ANALYSIS
In their pleas to the jurisdiction, NTTA and TxDOT sought to negate the knowledge
required for them to have the necessary intent that Sloan Creek II must establish in order to bring
an article I, section 17 takings or damages claim. On appeal, Sloan Creek II challenges the legal
standard required for an article I, section 17 claim and argues it produced evidence creating a
factual dispute. We will analyze the legal standards proposed by Sloan Creek II, then analyze
whether it brought forward evidence creating a factual dispute.
A. Standard of Intent Regarding Designed Discharge of Rainwater Runoff into
Sloan Creek and Resulting Erosion of Creek Banks
Sloan Creek II makes three arguments regarding the standard of intent that it asserts
defeat the pleas to the jurisdiction. First, Sloan Creek II argues mere designed discharge of
rainwater runoff onto Sloan Creek II’s land was “by itself” a taking. Second, Sloan Creek II
–6–
argues all it had to prove was that the design intentionally provided for discharge of rainwater
into Sloan Creek and that the erosion to the banks of Sloan Creek resulted from that intended
design. Third, Sloan Creek II argues the erosion of the banks of Sloan Creek was foreseeable to
NTTA and TxDOT from the designed discharge into Sloan Creek so they should have known the
erosion would result, which is sufficient to raise a fact issue regarding the knowledge component
of NTTA’s and TxDOT’s intent.
1. Mere Designed Discharge of Rainwater into Sloan Creek is not a Taking or
Damage “By Itself”
First, Sloan Creek II argues the mere designed discharge of the rainwater runoff into
Sloan Creek was “by itself” a taking or damage.6 For support, Sloan Creek II relies on four
cases. Three of the cases cited by Sloan Creek II involve a governmental entity’s use of
watercourses that caused flooding of property: Tarrant Regional Water District v. Gragg, 151
S.W.3d 546 (Tex. 2004) (governmental entity’s hundreds of releases of water from dam
increased severity of floods of downstream ranch); Brazos River Authority v. City of Graham,
354 S.W.2d 99 (Tex. 1961) (governmental entity’s construction, maintenance, and operation of
dam caused repeated flooding and damage to property); Jefferson County Drainage District v.
Langham, 76 S.W.2d 484, 488 (Tex. 1934) (governmental entity’s improvement of drainage
canals caused repeated flooding of downstream land). The fourth case, City of Amarillo v. Ware,
involved a governmental entity constructing and designing its new storm sewer system to
discharge rainwater onto private, agricultural land that was not a watercourse and resulted in
washing away soil and fences and ponding water in the field. City of Amarillo v. Ware, 40
6
Although obliquely pleaded, neither NTTA nor TxDOT challenge this argument as outside the pleadings.
Further, in the absence of special exceptions, a petition must be construed liberally in favor of the pleader such that
we “should uphold the petition as to a cause of action that may be reasonably inferred from what is specifically
stated . . . .” Boyles v. Kerr, 855 S.W.2d 593, 601 (Tex. 1993); see also Dall. Area Rapid Transit v. Morris, 434
S.W.3d 752, 761 (Tex. App.—Dallas 2014, pet. denied) (same).
–7–
S.W.2d 57 (Tex. 1931). Each of these cases involved flooding exceeding the capacity of a
watercourse or discharge of water not in a watercourse.
An owner of the bed of a watercourse is not entitled to compensation for a governmental
entity’s use of that watercourse to transport water across the property for a public purpose.
Edwards Aquifer Auth. v. Day, 274 S.W.3d 742, 759 (Tex. App.—San Antonio 2008) (citing
Domel v. City of Georgetown, 6 S.W.3d 349, 358 (Tex. App.—Austin 1999, pet. denied)), aff’d,
369 S.W.3d 814 (Tex. 2012). When a governmental entity does not damage downstream
properties, it is not a taking or damage for a governmental entity to significantly increase
discharge into a watercourse. See Domel, 6 S.W.3d at 358 (increase of discharge from 250,000
gallons per day to 2.5 million gallons per day not a taking or damage to downstream property
owner). But a governmental entity’s discharge of water into a watercourse that floods
downstream owners can give rise to a takings or damages claim under the Texas Constitution.
See id.; Langham, 76 S.W.2d at 487–88 (recognizing governmental entity’s right to collect
surface water and discharge it into stream accelerating stream’s flow but holding governmental
entity responsible for flooding downstream properties). Discharge of water that unnaturally
erodes a substantial amount of a downstream owner’s land can also be a taking or damage. See
infra n.13.
Sloan Creek II has not cited any authority supporting its argument that mere use of a
watercourse by a governmental entity to transport water across a creek bed is by itself a taking or
damage. There is no dispute Sloan Creek has been a watercourse at least since 1872 when it was
depicted as a watercourse on a map. There is also no dispute that Sloan Creek has not flooded
since the Tollway improvements and Sloan Creek II does not contend that flooding caused its
–8–
damage.7 Accordingly, we conclude NTTA’s and TxDOT’s designed discharge of rainwater
runoff into Sloan Creek is not “by itself” a taking or damage under the Texas Constitution. See
Day, 274 S.W.3d at 759; Domel, 6 S.W.3d at 358.
2. Intent to Cause Erosion to Sloan Creek Not Proven by Cause in Fact
Sloan Creek II next argues the intent evident in the design of the drainage system to
discharge rainwater runoff into Sloan Creek is all the intent Sloan Creek II must show to state a
claim for inverse condemnation if the result of the project is the erosion claimed as damages.
The first case Sloan Creek II relies upon is Gragg. The supreme court decided in Gragg that
“construction and operation” of a dam and reservoir caused a “significant change in flooding
characteristics” that damaged a downstream ranch. Gragg, 151 S.W.3d at 549. The supreme
court applied the Jennings test to the government’s conduct which included the operation of the
dam resulting in “releases from the dam.” Id. at 554. The trial record contained the
governmental entity’s recordation of “hundreds of [government] releases in an amount sufficient
to cause flooding” even if the river was otherwise empty. Id. at 552. The Gragg court reiterated
the longstanding principle that “mere negligence that eventually contributes to property damage
does not amount to a taking.” Id. at 554. Because the case involved recurrent government
activity of hundreds of releases of reservoir water resulting in recurrent floods, the supreme court
observed, “[i]n the case of flood-water impacts, recurrence is a probative factor in determining
the extent of the taking and whether it is necessarily incident to authorized government activity,
and therefore substantially certain to occur.” Id. at 555. The supreme court found “objective
7
In both its Fourth and Fifth Supplemental Objections to Award of Special Commissioners, Sloan Creek II did
not mention flooding when pleading damage caused by Tollway improvements: “The diversion of such storm water
runoff onto Sloan Creek’s property has caused erosion, water pollution, environmental contamination, and damage
to the value of Sloan Creek’s property and will continue to do so well into the future.” David Petefish, one of Sloan
Creek II’s owners and a retired geologist, testified to “flash flood conditions” in describing the rapid rise of the
depth of the flow in Sloan Creek caused by the Tollway designed discharge of rainwater runoff into Sloan Creek.
But the rise was significantly less than the height of the banks of Sloan Creek, and he did not testify the water
exceeded the height of the banks.
–9–
indicia of intent” in the ranch owner’s evidence that “the District’s releases actually resulted in
unnatural surges of water” that changed the character of the preexisting periodic flooding of the
ranch because “the water ‘arriv[ed] sooner, flow[ed] faster, and [was] more forceful, deeper, and
longer-lasting.’” Id. at 555. In addition, the district’s knowledge of these matters was reflected
in the record containing the government’s hydrologist’s modeling that predicted greater flooding
than would have occurred naturally and a government memorandum recognizing the need to
change the gate-release procedures to release more water earlier to avoid increasing the floods of
the river. Id. at 552.
Contrary to Sloan Creek II’s characterization of Gragg as not following the Jennings
standard of intent, the supreme court in Gragg embraced Jennings stating, “In City of Dallas v.
Jennings . . . , which we also decide today, we hold that the requisite intent is present when a
governmental entity knows that a specific act is causing identifiable harm or knows that the harm
is substantially certain to result.” Id. at 555 (citing Jennings, 142 S.W.3d at 314). The Gragg
court relied on the governmental entity’s own documentation of its hundreds of releases of water
in amounts that exceeded the flood capacity of the river even if the river was empty, the
modeling by the government’s engineer during design that predicted flooding, the recurrent
flooding of the ranch following the releases of water, and the internal government memorandum
stating there was a need to release water in different ways to avoid flooding. Id. at 552. Because
Gragg involved the governmental entity’s repeated conduct (hundreds of releases of water), what
the governmental entity knew and when it knew it was appropriately measured with each
successive flood. See id. at 555; Pollock, 284 S.W.3d at 821 (“The government’s knowledge
must be determined as of the time it acted, not with benefit of hindsight.”). Gragg does not
support Sloan Creek II’s positions that (1) it need only prove NTTA’S and TxDOT’s design was
intended to discharge rainwater runoff into Sloan Creek to establish NTTA and TxDOT are
–10–
liable for the erosion resulting from that, or (2) the erosion subsequent to the design and
construction of the Tollway improvements is probative of NTTA’s and TxDOT’s knowledge at
the time of design. See Pollock, 284 S.W.3d at 821.
Sloan Creek II also relies on three opinions from the 1930s to support its argument that a
public project that results in property damages is sufficient proof of a governmental entity’s
culpability for a takings or damages claim: Langham, 76 S.W.2d at 487–88 (governmental entity
that improved drainage liable for downstream flooding without any showing of negligent or
intentional conduct by the governmental entity); Ware, 40 S.W.2d at 60 (“[T]he language used in
section 17 of article 1 of the Constitution . . . . is a plain, pointed, definite statement of a rule
which prevails in this state, and the liability for compensation of property damaged or taken is
not predicated upon the theory that the tortious act was done negligently or intentionally.”); and
City of Waco v. Rook, 55 S.W.2d 649 (Tex. Civ. App.—Waco 1932, writ dism’d) (new dam and
reservoir changed the direction, volume, and velocity of water discharged into a river flooding
and eroding downstream owner; not even negligence required to be shown). The culpability
standards in these opinions have been overruled implicitly by the supreme court starting with its
1949 opinion in Texas Highway Department v. Weber, 219 S.W.2d 70, 70–71 (Tex. 1949). The
supreme court reasoned a government’s conduct must be more than “simply one sounding in
tort” otherwise government would be “responsible for all injuries or damages occasioned by its
agents in the negligent performance of their official duties.” Id. at 71. More recently, in
Jennings, the supreme court set forth the standard under the Texas Constitution necessary to
prove a governmental entity’s culpability for its conduct:
We therefore hold that when a governmental entity physically damages private
property in order to confer a public benefit, that entity may be liable under Article
I, Section 17 if it (1) knows that a specific act is causing identifiable harm; or
(2) knows that the specific property damage is substantially certain to result from
an authorized government action — that is, that the damage is ‘necessarily an
incident to, or necessarily a consequential result of’ the government’s action.
–11–
Jennings, 142 S.W.3d at 314 (citing Weber, 219 S.W.2d at 71). It is certainly necessary for an
owner to establish cause in fact as a prerequisite to a claim for inverse condemnation. Pollock,
284 S.W.3d at 821 (“A governmental entity is substantially certain that its actions will damage
property only when the damage is ‘necessarily an incident to, or necessarily a consequential
result of the [entity’s] action.’”) (quoting Jennings, 142 S.W.3d at 314). But cause in fact
without meeting the Jennings standard of knowledge is not enough to prove a governmental
entity’s intent as demonstrated by each of the supreme court’s opinions after Jennings where the
standard of culpability of a governmental entity’s article I, section 17, taking or damage
involving physical damage to property has been at issue. See Harris Cty. Flood Control Dist. v.
Kerr, No. 13-0303, 2015 WL 3641517, at *3 (Tex. June 12, 2015) (flooded owners prevailed on
Jennings standard by showing government adopted Corps of Engineer findings of necessary
mitigation then did less mitigation which caused flooding); Kopplow Dev., Inc. v. City of San
Antonio, 399 S.W.3d 532, 537 (Tex. 2013) (reaffirming Jennings standard); Pollock, 284 S.W.3d
at 821 (same); State v. Holland, 221 S.W.3d 639, 643 (Tex. 2007) (articulating Jennings standard
not met “[w]hen the government acts pursuant to colorable contract rights, it lacks the necessary
intent to take under its eminent-domain powers and thus retains its immunity from suit.”); City of
Keller v. Wilson, 168 S.W.3d at 829–30; City of Arlington v. State Farm Lloyds, 145 S.W.3d
165, 168 (Tex. 2004) (articulating Jennings standard); Gragg, 151 S.W.3d at 555 (same).
We conclude Sloan Creek II’s reliance on its evidence that the erosion necessarily
resulted from NTTA’S and TxDOT’s intended design to discharge rainwater runoff into Sloan
Creek is not enough to meet the Jennings standard of the knowledge component of intent.
–12–
3. Foreseeability or ‘Should Have Known’ Erosion Would Result from
Discharging Rainwater into Sloan Creek Is Insufficient Knowledge for
Intent
Sloan Creek II argues NTTA and TxDOT are culpable for eroding the banks of Sloan
Creek if erosion of the creek generally was “clearly foreseeable” as a matter of “engineering,”
quoting Brazos River Authority, 354 S.W.2d at 106. Sloan Creek II makes oblique reference to
its expert witnesses’ testimony that NTTA’s and TxDOT’s engineers designed the drainage
system to discharge rainwater into Sloan Creek and should have known the impact of the design
on Sloan Creek.
Sloan Creek II also relies on Gragg, asserting the supreme court used an “inevitability of
the outcome” standard: that if the damages are shown to be an inevitable result of a
governmental entity’s design or construction of a project, then that governmental entity is
subjected to liability for a taking or damage under the Texas Constitution. In Gragg, the
supreme court observed that “the reservoir’s physical characteristics . . . were also significant
and inevitably altered the characteristics of floods at the Ranch.” 151 S.W.3d at 555. The court
concluded, “We hold that the evidence in this case supports the trial court’s findings that the
extensive damage the Gragg Ranch experienced was the inevitable result of the reservoir’s
construction and of its operation as intended.” Id. These statements are the Gragg court’s
characterization of the causal relationship between the governmental entity’s operation of the
dam and the flooding of the downstream property. The supreme court, however, did not
substitute inevitability of outcome for the Jennings standard. Instead, the Gragg court applied
the Jennings standard as we explained above. Id. (citing Jennings, 142 S.W.3d at 314).
The supreme court made this explicit the year after it decided Gragg when it considered
an owner’s argument that flooding was the inevitable result of a design. In City of Keller v.
Wilson, the city approved a developer’s drainage ditch ending at one edge of a privately owned
–13–
property not connected to a culvert the city built at the opposite edge of the property to receive
rainwater runoff. 168 S.W.3d at 808. The supreme court distilled what the property owners had
to prove: “The critical question in this case was the City’s state of mind—the Wilsons had to
prove the City knew (not should have known) that flooding was substantially certain.” Id. at
829. The supreme court explained why the record failed to show there was evidence the city
knew that flooding the private property was substantially certain from the storm water
discharged through the drainage system:
Moreover, when a case involves scientific or technical issues requiring
expert advice (as this one does), jurors cannot disregard a party’s reliance on
experts hired for that very purpose without some evidence supplying a reasonable
basis for doing so. Here, it was uncontroverted that three sets of engineers
certified that the revised plans met the City’s codes and regulations—and thus
would not increase downstream flooding. The same firm that drew up the original
Master Plan certified the revised one; unless the City had some reason to know
the first certification was true and the second one was false (of which there was
no evidence), there was only one logical inference jurors could draw.
Id. (footnote omitted). Even though the property owners presented expert testimony that the
flooding was inevitable, the court still required evidence that the governmental entity knew this
fact, stating, “None of the evidence cited by the court of appeals showed the City knew more
than it was told by the engineers. The Wilsons’ expert testified that flooding was (in his opinion)
inevitable, but not that the City knew it was inevitable.” Id. According to Wilson, inevitability
of damage may satisfy the requirement that the damage be substantially certain to result from the
governmental entity’s conduct, but it is not enough to establish a governmental entity’s intent
without evidence the governmental entity knew of the inevitability of the damage.
This Court’s opinion in Dalon v. City of DeSoto, 852 S.W.2d 530 (Tex. App.—Dallas
1992, writ denied) is consistent with Jennings and its progeny. In Dalon, homeowners
complained the city caused excessive erosion of the bank of a creek abutting their property
thereby eroding about ten feet of their yard. Id. at 532. The homeowners claimed the city had
–14–
approved upstream development and routed storm sewers into the creek discharging storm water
there when the city should have built other storm sewers to divert the water elsewhere. Id. The
city’s director of public works testified that a fifty-year rain event caused the erosion and that the
erosion was a natural occurrence. Id. at 532–33. The homeowners’ expert testified “It is not
normal erosion however, which has caused the loss of 10 feet of the Dalon’s [sic] backyard, but
rather, the extreme, rapid erosion . . . .” Id. at 533. The homeowners asserted inverse
condemnation8 alleging the failure to maintain the creek bank “as well as approval of upstream
development result[ed] in increased drainage along” the creek resulting in the increased erosion.
Id. at 538. We analyzed the homeowners’ inverse condemnation claim stating it required a
showing that “the State intentionally performed certain acts.” Id. We concluded the
homeowners’ claim that the storm sewer system’s designed discharge of rainwater runoff into
the creek merely stated a claim of negligence against the city and did not raise a fact issue
regarding “an intentional action by a city official” to take the creek bank. Id. Thus, our opinion
in Dalon used an intent standard in anticipation of and consistent with Jennings and its progeny
based on the same basic concept that erosion damages are not a constitutional taking or damage
unless there is evidence of intentional conduct on the part of the governmental entity with
reference to the erosion for which compensation is sought.
The supreme court has rejected the standards suggested by Sloan Creek II. See Pollock,
284 S.W.3d at 821 (“The governmental entity’s awareness of the mere possibility of damage is
no evidence of intent.”); City of Keller v. Wilson, 168 S.W.3d at 829 (“The critical question in
this case was the City’s state of mind—the Wilsons had to prove the City knew (not should have
8
The homeowners also asserted a negligence claim which the Dalon court analyzed separately. Supporting
their negligence claim the homeowners presented expert testimony that the city had not “‘properly maintained or
repaired [the creek bank] with slope protection, retaining wall or other erosion protection measures to hold the land
in place.’” Id. at 533.
–15–
known) that flooding was substantially certain.”); id. at 830 (“the Wilsons had to prove—not that
the City might have disbelieved the engineers’ reports, but that it did”). Instead, for a
governmental entity to be culpable for a taking or damage under article I, section 17 there must
be evidence of objective indicia that the governmental entity whose conduct is under scrutiny
knew its conduct was causing the damages complained of or knew the specific property damage
was substantially certain to result from its conduct. See Kerr, 2015 WL 3641517, at *3;
Kopplow Dev., Inc., 399 S.W.3d at 537; Pollock, 284 S.W.3d at 821; Holland, 221 S.W.3d at
643; Wilson, 168 S.W.3d at 829–30; State Farm Lloyds, 145 S.W.3d at 168; Gragg, 151 S.W.3d
at 555; Jennings, 142 S.W.3d at 314. This is the standard by which we will measure the
evidence of intent in the case before us.
B. The Record Regarding NTTA’s and TxDOT’s Knowledge
In addition to the challenges to the legal standard of intent discussed above, Sloan Creek
II challenges the trial court’s granting of the pleas to the jurisdiction on the basis that even if the
Jennings standard applies to this case, the record reveals a factual dispute about NTTA’s and
TxDOT’s knowledge regarding whether the design to discharge rainwater runoff into Sloan
Creek was substantially certain to erode the bank to a greater extent and at a greater rate than
would otherwise have occurred. We will first consider an evidentiary matter, then analyze the
parties’ arguments regarding the evidence in the record.
1. Admissibility of Petefish’s and Walton’s Testimony
In order to analyze this evidence, we consider here Sloan Creek II’s complaint in its
fourth issue that the trial court abused its discretion when it sustained NTTA’s and TxDOT’s
objections to certain testimony.9
9
In its fourth issue, Sloan Creek II challenges several evidentiary rulings, but it does not complain about the
limitations on its discovery efforts set by the trial court in the June 3, 2014 order.
–16–
At trial and summary judgment, evidentiary rulings are committed to the trial court’s
sound discretion. Bay Area Healthcare Grp., Ltd. v. McShane, 239 S.W.3d 231, 234 (Tex. 2007)
(per curiam) (trial); Scruggs Mgmt. Servs., Inc. v. Panasonic Comm’ns & Sys. Co., No. 05-99-
00518-CV, 2000 WL 1093230, at *3 (Tex. App.—Dallas Aug. 7, 2000, pet. denied) (not
designated for publication) (“The same standards and principles of evidence applicable in a trial
on the merits apply equally in a summary judgment proceeding.”) (citing United Blood Servs. v.
Longoria, 938 S.W.2d 29, 30 (Tex. 1997)). The standards of review of a plea to the jurisdiction
are the same as a traditional motion for summary judgment. Miranda, 133 S.W.3d at 228.
Therefore, in this appeal of a plea to the jurisdiction we review the trial court’s decision to admit
or exclude evidence for an abuse of discretion. In re J.P.B., 180 S.W.3d 570, 575 (Tex. 2005)
(trial). A trial court abuses its discretion when it acts without reference to any guiding rules or
principles. Carpenter v. Cimarron Hydrocarbons Corp., 98 S.W.3d 682, 687 (Tex. 2002);
Garcia v. Martinez, 988 S.W.2d 219, 222 (Tex. 1999).
Sloan Creek II presented evidence regarding NTTA’s and TxDOT’s knowledge primarily
from Petefish, the retired geologist owner of Sloan Creek II, and Dr. Raymond Walton, Sloan
Creek II’s expert in hydrology. Among other matters, NTTA and TxDOT objected to numerous
portions of Petefish’s and Walton’s testimony as being conclusory, speculative, and lacking a
proper factual predicate citing Pollock. Conclusory or speculative opinion testimony, which
includes expert opinion evidence that does not have an adequate basis, is not relevant evidence.
Id.10 Sloan Creek II contends NTTA’s and TxDOT’s objections are too global because by the
10
The Pollock court stated,
[A]lthough expert opinion testimony often provides valuable evidence in a case, “it is the basis of
the witness’s opinion, and not the witness’s qualifications or his bare opinions alone, that can
settle an issue as a matter of law; a claim will not stand or fall on the mere ipse dixit of a
credentialed witness.” Burrow v. Arce, 997 S.W.2d 229, 235 (Tex. 1999). Opinion testimony that
is conclusory or speculative is not relevant evidence, because it does not tend to make the
existence of a material fact “more probable or less probable.” See TEX. R. EVID. 401. This Court
–17–
end of the specific objections they challenged the entirety of Petefish’s and Walton’s testimony
about what NTTA and TxDOT knew or should have known.
NTTA and TxDOT made specific objections to specific portions of Petefish’s and
Walton’s testimony, even though it is true in the aggregate the objections address almost all of
Petefish’s and Walton’s testimony regarding NTTA’s and TxDOT’s knowledge. The objections
are, nevertheless, specific and the trial court could not have misunderstood what testimony
NTTA and TxDOT challenged and why. Sloan Creek II further responds by arguing specific
ways that there were adequate bases for Petefish and Walton to render their opinions as a
geologist and hydrologist, respectively, based on the facts they had.
NTTA and TxDOT complain Petefish’s and Walton’s testimony attributing to NTTA and
TxDOT whatever the outside consultants—the consulting engineers and the appraiser—knew is
speculative and conclusory because there is no evidence in the record that such information was
communicated or transmitted to any of NTTA’s and TxDOT’s employees including their
engineers. Additionally, NTTA and TxDOT object that Petefish and Walton provide no factual
basis for the conclusion from the existence of certain bridge inspection reports11 that a TxDOT
geologist or geotechnical engineer ever saw the bridge reports. We have reviewed in detail
Petefish’s and Walton’s testimony and the parties’ arguments. Petefish and Walton do not
demonstrate a factual basis to opine about what highway design engineers know or should know,
has labeled such testimony as “incompetent evidence,” and has often held that such conclusory
testimony cannot support a judgment.
Pollock, 284 S.W.3d at 816 (quoting Coastal Transp. Co. v. Crown Cent. Petrol. Corp., 136 S.W.3d 227, 232 (Tex.
2004)).
11
The bridge inspection reports contain notes of conditions of the structure and the soil where the structure
contacted the soil.
–18–
what government entities in the abstract know or should know, or even what every lay person
knows or should know about hydrology and erosion.12
Petefish and Walton do not provide a basis in this record demonstrating they know what
highway design engineers should know given a certain set of facts; they did not provide evidence
the consulting engineers and NTTA’s and TxDOT’s employee-engineers actually knew the
information that formed the basis for Petefish’s and Walton’s conclusions; they did not set out a
standard demonstrating those engineers were likely to or should have acquired the information or
should have run the computer modeling of the rainwater flow for one-month, two-month, one-
year, and two-year rain events; and they did not relate this information to explain how and why
those engineers should have known or drawn the same analysis and conclusions as Petefish and
Walton. Similarly, Petefish and Walton did not provide a factual basis for attributing to NTTA
and TxDOT knowledge they stated the consulting engineers and appraiser possessed. For the
same reasons, to the extent Petefish and Walton meant by their testimony that NTTA’s and
TxDOT’s employee-engineers directly knew or should have known the information forming the
basis for Petefish’s and Walton’s testimony, Petefish and Walton did not provide a factual basis
for such opinions. Finally, Petefish and Walton did not provide a factual basis to conclude a
TxDOT geologist or geotechnical engineer had or should have reviewed the bridge inspection
reports.
On this record we overrule the portion of Sloan Creek II’s fourth issue complaining of the
trial court’s rulings on Petefish’s and Walton’s testimony regarding what NTTA’s and TxDOT’s
employee-engineers and consulting engineers knew or should have known. This does not
exclude Petefish’s and Walton’s testimony regarding causation of erosion.
12
In some instances in his deposition, Walton conceded he had not formed an opinion about what highway
design engineers should know. But NTTA’s and TxDOT’s objections cover each aspect of both witnesses’
testimony about what the highway design engineers knew or should have known.
–19–
2. No Evidence in This Record NTTA and TxDOT Knew with Substantial
Certainty Their Conduct Would Increase the Amount and Rate of Erosion
of Sloan Creek
Causing damage is what a governmental entity must know is substantially certain under
Jennings and its progeny, so we will recite in detail Petefish’s and Walton’s testimony about
causation and how they claim NTTA and TxDOT knew their design of the Tollway
improvements would result in erosion of Sloan Creek on Sloan Creek II’s property. Because
Sloan Creek II makes an alternative argument that its experts’ opinions are inferences that should
be drawn from the evidence, we will include the knew-or-should-have-known testimony to
which we have affirmed the trial court’s ruling sustaining NTTA’s and TxDOT’s objections in
order to resolve all of Sloan Creek II’s arguments. In addition, Petefish’s and Walton’s
testimony about what NTTA and TxDOT knew is intermingled with their causation testimony,
so reciting the excluded testimony is part of the context for their entire testimony.
a. Design Mitigated Flooding Potential, not Erosion Potential
Fundamental to this case is the undisputed fact that although NTTA and TxDOT contract
for their consulting engineers to study a project’s flooding impact off of a right-of-way as they
build highways, they do not contract for studies and analysis of a project’s erosion impact off of
the right-of-way. Sloan Creek II accused NTTA and TxDOT of willful ignorance about its
highway designs’ erosion effects off of the rights-of-way, but there is no evidence of that in this
record.13 It is also undisputed in this record that the Tollway improvements did not cause Sloan
13
There is indication in the record from NTTA’s and TxDOT’s engineers and arguments of counsel that
NTTA’s and TxDOT’s reason for not obtaining and evaluating data pertaining to erosion off the right-of-way is they
understand the law to not hold them liable for erosion damages. However, Texas authorities have treated erosion as
recoverable damages under Article I, section 17, of the Texas Constitution. See Ware, 40 S.W.2d at 58–59
(discharge from storm water drainage system that “washed” away soil, crops, and fence compensable damages under
Texas Constitution); Rook, 55 S.W.2d at 650 (four acres “washed away” into river and crops and fence washed away
were compensable takings or damages under Texas Constitution). When we denied recovery for erosion of ten feet
of a residential yard in Dalon it was not because erosion as a type of damages was not recoverable, but because there
was no evidence of the governmental entity’s intent. See Dalon, 852 S.W.2d at 537–38. Further, even if NTTA and
TxDOT were not liable for erosion under the Texas Constitution, erosion can serve as the basis for an inverse
–20–
Creek to flood outside of its banks and no evidence controverts NTTA’s and TxDOT’s evidence
of their consulting engineers’ modeling that the design did not exceed one-half the flood capacity
of Sloan Creek. For the following reasons, there is no evidence in this record that the consulting
engineers, NTTA’s and TxDOT’s employee-engineers, or anyone else employed by NTTA and
TxDOT knew their conduct would increase the amount and rate of erosion of the banks of Sloan
Creek.
b. NTTA’s and TxDOT’s Testimony of Lack of Knowledge of Erosion
Potential
NTTA and TxDOT presented testimony from its employee-engineers that they did not
design the Tollway improvements and that the consulting engineers who were contracted to do
so never discussed with NTTA and TxDOT the potential for the design of the Tollway
improvements to result in erosion of Sloan Creek, including the soil characteristics or erosion
potential of the banks of Sloan Creek. The consulting engineers used computer software that
models complex water flow through culverts and streams to analyze fifty-year and one hundred-
year rain events in order to design the Tollway improvements to mitigate flooding on the right-
of-way so the post-project flooding potential off the right-of-way would not exceed the pre-
project conditions. There were no similar erosion standards used, and erosion potential off right-
of-way was not analyzed.
condemnation claim under the Fifth Amendment to the United States Constitution. See Boling v. United States, 220
F.3d 1365 (Fed. Cir. 2000) (reasonably foreseeable erosion caused by government that substantially encroaches on
private property can constitute compensable taking); Owen v. United States, 851 F.2d 1404 (Fed. Cir. 1988)
(government dredging that increased flow of river eroding property causing house to collapse into river could
constitute compensable taking); Banks v. United States, 88 Fed. Cl. 665 (2009) (as a result of construction and
maintenance of jetty that caused erosion to shoreline properties, government was liable to owners for part of
erosion). Although it may be appropriate for the supreme court to set a standard for the threshold at which erosion
becomes a takings under the Texas Constitution such as “substantial encroachment” (as opposed to “mere inches”)
that exceeds natural erosion—see Boling, 220 F.3d at 1372–73—we see nothing inherent in erosion that makes it a
damage for which recovery should not be allowed under article I, section 17.
–21–
NTTA’s lead employee-engineer on this project, Mark Bouma, testified to the lack of any
information about erosion provided by the consulting engineers, as follows:
Based upon the recommendations of our consultants, the NTTA did not believe
that the SRT project would cause flooding or other adverse downstream impacts
on the Sloan Creek II, LLC property. I do not recall receiving any inquiry or
being involved in any discussion about impact on Sloan Creek downstream of
US 75 from water runoff until after learning of the claims of damage made by
Sloan Creek II, LLC in this case. I have reviewed my files and did not see any
communication on this topic. I further consulted other NTTA employees who
might have been involved in any such communication. No other employees recall
discussion about impact to Sloan Creek downstream of US 75. The NTTA was
not aware that the SRT project would cause the type of damage to Sloan Creek
that is now being alleged by Sloan Creek II, LLC. Similarly, the NTTA was not
aware that the type of damage to Sloan Creek that is now being alleged by Sloan
Creek II, LLC was substantially certain to result from the SRT project.
TxDOT’s employee-engineers testified in similar fashion. One of TxDOT’s engineers
explained why TxDOT studies water surface profiles and velocities within the right-of-way but
not off the right-of-way, testifying, “We cannot model the entire world. And downstream is a
long way. . . . [It] [g]oes to the Gulf of Mexico.”
c. Walton’s Testimony Regarding Engineering Knowledge NTTA and
TxDOT Should Have Had from Rain Water Flows
To controvert NTTA’s and TxDOT’s evidence, Sloan Creek II supplied Walton’s
affidavits in which he testified the changes created by the Tollway improvements added more
than forty acres of impervious concrete to the watershed that drained into Sloan Creek, so there
were forty acres less ground to absorb the rainfall. In addition, the concrete drainage system
delivered the rainfall much more quickly to the point of discharge into Sloan Creek than natural
flow of water across the pasture land. He criticized the detention pond in the drainage system
immediately before the discharge point into Sloan Creek because it had a large outflow pipe at
the bottom so it would reduce water flow only in large rain storms and not impede the flow of
more frequent, lesser rains.
–22–
Walton testified that he ran computer modeling of flows for storms that occur on average
once every two or three months (50 to 120 percent increased peak flow) as well as less common
storm events that occur on average once a year (69 to 147 percent increased peak flow). He
criticized the hydraulic report for the project as measuring only 50-year and 100-year rainfall
events because there would not be a significant increase in volumes, velocities, and peak flows
from such events because those measurements “would have been high both before and after this
project was constructed.” Walton then opined that if the engineers had run computer models of
the more frequent rain events, “assuming they were run correctly with readily available
information, [the models] would have told the engineers working for NTTA/TxDOT that the
project would cause a significant increase in volumes, velocities, and peak flows in Sloan Creek
during any of the more common storm events” occurring every two years or less and “even more
significant increase in the peak flows during each of the most common storm events” occurring
every month or two. Walton concludes NTTA’s and TxDOT’s engineers had all the data
available to run the calculations he did and could have known their design would substantially
increase the volume, velocity, and depth of peak flows for the more frequent rainfall events,
stating:
For these reasons, it is my opinion that TxDOT’s and NTTA’s engineers who
designed the roadways and drainage and culvert systems for SH121 and US75 had
all of the data available to them in order to know that their design would increase
the peak flows, depths and velocities of flows in Sloan Creek and the frequency
with which those larger flows occur, or know that such larger flows and higher
frequency were the substantially certain result of their design. Such larger flows
and higher frequency of large flows were and are the inevitable result of
TxDOT’s and NTTA’s design, are permanent and have been recurring in the past
and will continue to recur in the future.
Walton’s testimony provides no evidence that at the time of the design and construction
of the Tollway improvements anyone associated with the design knew the modest rainfall flow
data about which Walton testified. Walton testified that the software utilized by the consulting
–23–
engineers was capable of modeling the flow of Sloan Creek for one-month, two-month, and one-
year rainfall events and that Walton actually performed that function with the same software.
But the record reflects NTTA’s and TxDOT’s consulting engineers did not model those rain
events but instead modeled fifty-year and one hundred-year rain events (because they were
analyzing for floods, not erosion). Walton acknowledged that is all the highway design
engineers studied. So there is no factual dispute that neither NTTA’s and TxDOT’s employee-
engineers nor the consulting engineers knew the modest rain flow data about which Walton
testified.
d. Petefish’s Testimony Regarding Knowledge NTTA and TxDOT Should
Have Had from Engineering Regarding Erosion Potential
Petefish testified that the increased erosion to the bank of Sloan Creek was a “direct and
inevitable result of the increased volume, velocity and peak flows” due to the Tollway drainage
system. He opined that it is a well-known principle that “increasing the volume and speed of
water flowing across a piece of land will increase the rate at which the water erodes a channel
through that land.”14 He then opined as to NTTA’s and TxDOT’s knowledge that the Tollway
would substantially increase the erosion of Sloan Creek:
NTTA and TxDOT were aware of this principle; they knew that the project would
increase the flows in Sloan Creek and were aware that these flows would
substantially increase erosion of that creek. NTTA and TxDOT’s own
documents, deposition testimony, and actions confirm their awareness that the
project, as designed and constructed, would increase the erosion of Sloan Creek.
Besides, noticeable erosion was easily visible in Sloan Creek on the existing
TxDOT right of way prior to construction of the project. And I personally warned
NTTA’s appraiser, in 2008 prior to construction beginning, that if the project was
not constructed in a way to prevent erosion, it would erode the creek and damage
a natural spring and black walnut tree on my property.
14
Petefish provided his data on which he and Walton relied. He characterized several measured rapid rises in
the water level less than three feet “as flash flood conditions that did not occur before the construction of the
project” but his photographs depict the creek banks as twelve to fifteen feet high. He explained his opinion of the
mechanics of the erosion as the “rapidly rising volume, velocity and peak flows in the creek erode the lower banks
of the creek, causing undercutting and causing trees and large chunks of the banks to collapse and wash away.”
–24–
Petefish testified that NTTA and TxDOT had constructed projects in the soil types that comprise
Sloan Creek and so were “thoroughly familiar” with that “very same soil.”
As to NTTA’s and TxDOT’s knowledge, Petefish opined that NTTA and TxDOT “knew
or were substantially certain that the banks of Sloan Creek were erodible and that the depth,
velocity, and time of concentration of the additional surface water the project would pipe from
SH121 and US75 into Sloan Creek from the design and construction of the project would cause
Sloan Creek to erode at a much greater rate.” He supported that conclusion with an opinion that
the mere existence of Sloan Creek “is evidence that would tell any geologist, engineer, or even
layman that the material in and around Sloan Creek is erodible when water flows over it.” He
also opined that creeks stabilize at the natural conditions to which they are subjected, but begin
to erode again when subjected to higher volumes and velocities of water. Petefish traced the
history of geology to demonstrate the principal of geology that water runoff in streams will result
in stream systems “with just the size and spacing required to move the water” with maximum
efficiency so additional water added to an existing stream will increase the erosion of the ground
to adapt to the additional volume and velocity of water. Petefish opined these concepts “have
been well-known, particularly in the geologic and engineering communities, for at least the last
600+ years.”
According to Petefish, NTTA and TxDOT knew these concepts, so they knew Sloan
Creek’s geological composition was susceptible to erosion, and knew increasing the volume and
velocity of rainwater discharged into Sloan Creek would increase the erosion of it. Petefish
expressed this as actual knowledge, stating, “It is therefore my opinion that, like the rest of
modern civilization, both NTTA and TxDOT knew these concepts as well and knew that
changing the volume, velocity, and peak flows of the water in Sloan Creek would significantly
–25–
increase the rate of erosion of that creek.” He also stated his opinion in terms of what NTTA and
TxDOT could have known from the information in their possession:
The information in their possession before construction began told NTTA and
TxDOT that the surface water the project was going to collect and divert into
Sloan Creek would cause greatly increased erosion. Any engineer familiar with
the basics of hydraulics and hydrology, such as those who designed and
constructed this project on behalf of NTTA and TxDOT, would know that such an
increase in peak flows, depths, and velocities of flows in Sloan Creek during the
area’s most common storm events would cause significantly-increased [sic]
erosion of the creek.
TxDOT’s geotechnical engineer, John Delphia, testified that TxDOT does not usually,
and did not in this instance, sample and analyze stream bank materials outside of its right of way.
According to Delphia, obtaining and analyzing soil data off the right-of-way would have been
necessary for TxDOT to know or be substantially certain of the conditions of Sloan Creek to
which Petefish testified. Delphia testified Petefish was wrong when he testified that the mere
existence of a creek informs anyone that the soil in that area is “highly erodible.” Delphia
testified,
Even the hardest of rock materials are erodible, and erosion of those materials can
form creeks and rivers, given proper conditions, such as time of exposure.
Without knowing the allegedly “highly erodible” nature of the creek banks,
TxDOT could not have known, or even been substantially certain, of the erosion
Mr. Petefish alleges.
There are several gaps in Petefish’s testimony between what Sloan Creek II contends are
facts and what Sloan Creek II argues NTTA’s and TxDOT’s employee-engineers and consulting
engineers knew or should have known from those facts. Because of these gaps, we cannot agree
with Petefish’s conclusion that NTTA and TxDOT knew the erosion potential the design might
have on Sloan Creek or know the design was substantially certain to cause greater erosion than
would naturally occur.
We measure a governmental entity’s knowledge of an alleged taking at the time of the
government’s conduct that caused the alleged taking. Pollock, 284 S.W.3d at 821. When the
–26–
conduct includes operation of a structure in addition to its design, the supreme court has included
what a governmental entity learned as it operated the structure. See Gragg, 151 S.W.3d at 552,
555 (governmental entity’s knowledge included documentation of its recurrent releases of water
from dam it constructed where each release was sufficient to exceed the flood capacity of the
river). Here there is neither allegation nor evidence NTTA and TxDOT operate the Tollway
improvements with recurring conduct that causes the erosion the way in Gragg a dam was
operated to cause flooding. Accordingly, the conduct at issue is NTTA’s and TxDOT’s design
and construction of the Tollway improvements alleged to have caused the unnatural erosion of
Sloan Creek.
The first gap in Petefish’s testimony is the lack of any evidence that at the time of the
design and construction of the Tollway improvements anyone associated with the design knew
the modest rainfall flow data about which Walton testified. Our discussion of Walton’s
testimony applies equally to Petefish’s testimony that the highway design engineers did not
utilize the flow-modeling software to model the flow through the drainage system and the
resulting flow of Sloan Creek for one-month, two-month, and one-year rainfall events. Petefish
testified it was the one-month, two-month, and one-year rainfall events that are causing the
erosion that exceeds the natural erosion of Sloan Creek. It is undisputed in this record NTTA’s
and TxDOT’s consulting engineers did not model those rain events. So there is no factual
dispute in this record that neither NTTA’s and TxDOT’s employee-engineers nor the consulting
engineers knew the modest rainfall flow data on which Petefish’s testimony depends.
The second gap in Petefish’s testimony is the lack of any evidence that at the time of the
design and construction of the Tollway improvements that anyone associated with the design
knew the composition of the banks of Sloan Creek. The undisputed testimony was that the off
the right-of-way soils were not tested. According to Petefish, knowledge of the geology of Sloan
–27–
Creek was necessary information for the engineers to have if they should have known the
discharge would unnaturally erode Sloan Creek. Further, even Petefish testified in his deposition
to a significant difference of the composition of Sloan Creek just between the bottom of the
channel (“the bottom of the channel was virtually nonerosive”) and the banks (highly erodible
marley chalk).15 As for Petefish’s testimony that the soil was the same for miles around, if that
was known to NTTA’s and TxDOT’s employee-engineers or consulting engineers, at most it
would result in the conclusion the engineers should have investigated the situation. But
Petefish’s assertion the engineers should have investigated off right-of-way soil composition
does not constitute evidence NTTA and TxDOT knew the composition of the soil that should
have been investigated. See Wilson, 168 S.W.3d at 830 (notice of information “may have
required the City to investigate, but again is no evidence it knew” the truth of the matter asserted
in the letter).
e. NTTA’s and TxDOT’s Knowledge from Bridge Inspection Reports, Pre-
existing Erosion of Detention Pond, and Riprap at Discharge into
Sloan Creek
Petefish further supported his opinion with several facts to show NTTA and TxDOT
knew the soil conditions of Sloan Creek on the right-of-way so they should have known the soil
conditions of Sloan Creek off the right-of-way. Petefish relied on pre-project TxDOT bridge
inspection reports noting in more than one location there was “white colored efflorescence, a rust
colored efflorescence, and heavy efflorescence in and around cracks on barrel walls, abutment
walls, headwalls, wingwalls, and concrete top slabs.” Petefish opined that NTTA’s and
TxDOT’s geologists and geotechnical engineers should have known from these observations that
a chemical reaction was producing sulfuric acid breaking down the material comprising the creek
15
There is no evidence in this record whether the impermeable bottom of the channel which prevented vertical
erosion contributed to the lateral erosion of the banks of Sloan Creek.
–28–
bank making the creek more erodible and that rainwater discharge from this the project would
erode Sloan Creek. Petefish’s opinion about this is as follows:
The white efflorescence of salt being deposited on the bridge structures is
evidence of dissolved salts in the groundwater and reaction with the materials in
the concrete. The rust colored efflorescence is evidence of salts in the seepage
and reaction with the rebar in the concrete. The presence of large amounts of salt
is easily identifiable evidence that a chemical reaction is occurring within the
bank material and is producing sulfuric acid, which breaks down the bank
material and makes it more erodible than it already was. Knowing the
composition of the material (clay/wacke) in the stream banks, strength of
material, orientation of bedding, direction of channel flow, grade of the channel,
velocities and depth of flow, degree of fracturing (Rock Quality Designation),
joint widths, and joint roughness, tells NTTA and TxDOT’s geologists and
geotechnical engineers that the banks of Sloan Creek are highly erodible and will
erode with the depth, velocity and time of concentration of the water being piped
from SH121 and US75 (the project) into Sloan Creek or that this would be the
substantially certain result of NTTA and TxDOT’s design, construction, and
operation of the project and its accompanying drainage and culvert systems. The
white efflorescent salt appearing on the bridge and associated outcrops is
evidence of the sulfide breakdown in the outcrop with the formation of gypsum.
The sulfide oxidizes to form sulfuric acid that attacks the carbonate cement in the
outcrop and the concrete culverts. The removal of the carbonate and later
dissolution of the gypsum lowers the shear strength and increases the erodibility
of the material in the outcrop, as noted at the inlets and outlets of the culverts. As
the outcrop breaks down, the clays (montmorillonite) tend to shrink on drying and
swell on hydration. The differential shrink/swell completely breaks up the
exposed outcrop. NTTA and TxDOT’s geologists or geotechnical engineers had
to know upon seeing the efflorescence on the bridge structures that the creek bank
material was highly erodible and would erode when water from SH121/US75 (the
project) was piped into the creek.
Petefish also based his opinion of NTTA’s and TxDOT’s knowledge on provisions in the
design to protect the Tollway structures and easement from erosion. Petefish noted that NTTA’s
in-house engineer’s testimony that concrete slope protection, called riprap, at the end of certain
box culverts was to prevent erosion where water exited the box culvert was proof that NTTA
knew the volume and velocity of water its design would discharge would erode Sloan Creek
further down the creek on Sloan Creek II’s property. Petefish testified,
If NTTA and TxDOT knew that, without a concrete apron, erosion would occur
as water flows out of their culvert, it is my opinion that they also knew that very
same water flow would also cause erosion after it left the culvert and entered a
–29–
narrower channel that was not lined with concrete. In order to prevent erosion for
a few feet outside their culvert, they concrete-lined a small portion of the very
same stream channel they now claim they did not know would erode. It is my
opinion both NTTA and TxDOT did know Sloan Creek would erode after
completion of the project, evidenced in part by the fact that they felt the need to
install a concrete apron to prevent erosion within their easement.
Petefish also relied on construction photographs depicting the condition of features after
previous construction that had eroded: an eroded hole and erosion of a certain pool upstream of a
culvert leading to Sloan Creek II’s property. From the existence of these conditions he
concluded, “NTTA and TxDOT knew, at least as early as 2008 when construction began, that
Sloan Creek was a highly erodible creek and that piping additional water at faster speeds into the
creek would greatly increase the rate of further erosion.”
TxDOT’s geotechnical engineer, Delphia, testified no TxDOT geologist or geotechnical
engineer reviewed any bridge inspection reports relied upon by Walton and Petefish. In addition,
Delphia disputed Petefish’s analysis and conclusions from what was noted in the bridge
inspection reports summarizing his conflicting conclusions that the reports contain nothing
unusual and do not provide information that with certainty indicates the composition of the banks
of Sloan Creek as opposed to the composition of the concrete structures and the fill material
placed around them during construction. TxDOT provided excerpts of Stan Hopfe’s deposition,
a TxDOT engineer, who, similar to Delphia, disputed Petefish’s conclusions from the bridge
inspection reports. Hopfe testified that the bridge reports regarding the pre-existing structure
demonstrate only that a forty-year-old structure with a fifty-year life was coming to the end of its
life with cracks in the concrete members allowing water to infiltrate and react with the steel rebar
and composition of the concrete resulting in the discoloration and deposits on which Petefish
based his conclusions.
Petefish’s testimony about soil conditions on the right-of-way do not provide evidence
NTTA and TxDOT knew what the soil conditions were off the right-of-way downstream in
–30–
Sloan Creek. TxDOT’s geotechnical engineer testified TxDOT’s geologists and geotechnical
engineers did not review the bridge inspection reports. So even if there was information in the
bridge inspection reports that could form a basis for Petefish’s opinions about the soil
composition of the banks of Sloan Creek, there is no factual basis in this record to conclude
TxDOT’s geologists and geotechnical engineers knew it. Even if Petefish’s testimony was
admissible regarding what the highway design engineers should have known from the pre-
construction erosion of a detention pond and the significance of the design of the riprap at the
discharge point of certain box culverts, those were soil conditions on the right-of-way. Delphia
testified that obtaining and analyzing soil data off the right-of-way would have been necessary
for TxDOT to know or be substantially certain of the conditions of Sloan Creek asserted by
Petefish to exist. Delphia’s testimony in that regard is not controverted. The testimony of
Delphia and Hopfe demonstrates there was more than one possible conclusion to draw from the
information regarding material in the right-of-way if they had known it. All three of these
matters, therefore, raise at most notice to NTTA and TxDOT to investigate soil conditions of
Sloan Creek off the right-of-way, but do not constitute evidence they knew those soil conditions.
See City of Keller v. Wilson, 168 S.W.3d at 830 (notice from a lawyer’s letter to a city “may have
required the City to investigate, but again is no evidence it knew” the truth of the matter asserted
in the letter). There is, therefore, no basis in the record supporting Petefish’s testimony, and
therefore no evidence that NTTA and TxDOT knew, let alone should have known, from the
bridge reports, pre-construction erosion of a detention pond, or the design of concrete riprap at
the discharge point what Sloan Creek’s soil composition was where it eroded or that the volumes
of water discharged through the drainage system would cause that erosion.
–31–
f. NTTA’s and TxDOT’s Knowledge from What Petefish Told Glendinning
Petefish testified to a conversation he had with Christie Glendinning, who appraised
Sloan Creek II’s property for the easement condemnation. Petefish testified he told Glendinning
he was concerned about the impact of the Tollway project on the erosion of the creek and
damage to a natural spring; that he did not want to lose a black walnut tree on the bank of the
creek or the spring. Petefish testified Glendinning was an NTTA appraiser and that, “[h]aving
told NTTA’s appraiser about the erosion problems in Sloan Creek, NTTA knew or was
substantially certain that Sloan Creek would experience significant erosion during, upon, and
after completion of construction of the SH121/US75 project.”
NTTA provided Glendinning’s affidavit in which she testified that she was subcontracted
through Pyles Whatley Corporation to provide independent fee appraiser service regarding
NTTA as a potential buyer and Sloan Creek II as a potential seller. She testified, “As an
independent fee appraiser, I had no financial or other interest in the property and was not
associated with either the potential buyer (NTTA) or the potential seller (Sloan Creek).”
Glendinning recalled Petefish’s concern expressed to her being whether the Tollway project
might cause a natural spring that fed Sloan Creek to cease flowing. She did not walk down into
the creek bed and did not recall any discussion with Petefish regarding flooding or erosion.
Glendinning did not recall discussing flooding or erosion with anyone at NTTA. NTTA also
provided Bouma’s affidavit, its lead engineer, in which he testified he did not recall any
conversation with Glendinning regarding potential flooding or erosion of Sloan Creek and he
was Glendinning’s primary point of contact at NTTA.
There is no evidence in this record that what Petefish testified he told Glendinning about
erosion was ever reported to NTTA and, if it had been, that it would have been enough.
Glendinning and Bouma testified Glendinning never mentioned Petefish’s “concerns” about
–32–
erosion of Sloan Creek, and there is no evidence to controvert their testimony. Glendinning
testified that as an independent fee appraiser, she “was not associated with either the potential
buyer (NTTA) or the potential seller (Sloan Creek),” which Sloan Creek II does not challenge
with controverting facts. Nor does Sloan Creek II argue with record cites and supporting
authorities that Glendinning’s knowledge should be imputed to NTTA or TxDOT.16 And even if
Glendinning informed NTTA of Petefish’s concerns about erosion, that at most would have been
information NTTA should have investigated, but does not constitute evidence NTTA knew there
was any erosion potential from the design of the Tollway. See Wilson, 168 S.W.3d at 830.
Accordingly, Petefish’s testimony about his statements to Glendinning does not create a factual
dispute about NTTA’s knowledge of erosion potential from the design of the Tollway.
g. Sloan Creek II’s Counsel’s Notice to NTTA of Erosion
Sloan Creek II relied on its counsel’s affidavit that at an unidentified time before January
7, 2011, he informed counsel for NTTA that Petefish “had observed significant erosion in Sloan
Creek since the SH121/US75 project,” that Petefish’s “expert opinion was that the project had
caused the erosion he had observed in Sloan Creek,” and that Walton “had determined that the
flash-flood conditions present in Sloan Creek during moderate rain events was a direct result of
the project.” Counsel testified the conversations occurred at least two months prior to NTTA’s
stated completion date of March, 2011, for the project. NTTA provided aerial photographs and
testimony from Bouma as evidence that all new underground drainage components were
installed and operational and the construction plans for the project were completed no later than
July 15, 2010. Bouma further testified that the southwest detention pond was completed or
substantially completed by December 14, 2010.
16
We have already decided the trial court did not abuse its discretion in sustaining NTTA’s and TxDOT’s
objections to Petefish’s speculative and conclusory testimony that simply assumed or treated Glendinning as an
employee of either NTTA or TxDOT.
–33–
Sloan Creek II’s counsel’s communication to NTTA’s counsel in January 2011 occurred
after the design and construction of the project was completed, at least as to those aspects that
allegedly caused the erosion of which Sloan Creek II complains. Sloan Creek II’s counsel’s
communication to NTTA’s counsel stated the client’s complaint about erosion in the past tense;
that the Tollway improvements “had” caused erosion to occur. This is corroborated by NTTA’s
and TxDOT’s evidence that the design and construction of the roadways comprising the
interchange were completed in July 2010 and the last item to be constructed that Sloan Creek II
complains contributed to the erosion, the detention pond, was completed at least by early
December 2010. Sloan Creek II provided no evidence there was any design or construction that
occurred after its counsel’s communication to NTTA’s counsel that caused or contributed to the
erosion of which Sloan Creek II complains.
A mere demand from a lawyer may require a governmental entity to investigate, but is
not itself evidence the governmental entity knew the facts asserted were substantially certain to
be the case. See Wilson, 168 S.W.3d at 829–30 (lawyer’s letter insufficient to create a fact issue
governmental entity knew its conduct was substantially certain to damage owner’s property); cf.
Hall, 433 S.W.3d at 724–27 (property owner conveyed detailed information to city manager,
director of public works, and other city officials that supported conclusion governmental entity
knew its conduct was substantially certain to cause damage alleged to be a taking). So counsel’s
notice to NTTA at most provided information NTTA should have investigated. But even if
Sloan Creek II’s counsel’s communication to NTTA’s counsel was sufficient to create
knowledge that NTTA’s and TxDOT’s conduct was substantially certain to cause the erosion of
Sloan Creek, it could be effective only for conduct thereafter of which there is no allegation or
evidence. See Pollock, 284 S.W.3d at 821 (governmental entity’s knowledge measured at time
of conduct alleged to cause taking or damage).
–34–
h. Argument from Circumstantial Evidence Does Not Close Gaps in
Petefish’s and Walton’s Testimony About NTTA’s and TxDOT’s
Knowledge
Sloan Creek II argues that circumstantial evidence supports inferences in its favor.17
Petefish’s and Walton’s opinions that are speculative and conclusory cannot be made legitimate
by treating the speculative statements as legitimate inferences. As discussed in detail above, the
record is devoid of evidence that NTTA’s and TxDOT’s employee-engineers or the consulting
engineers had knowledge of the underlying facts on which Walton and Petefish base their
opinions. Sloan Creek II does not provide argument regarding what facts the engineers knew
from which favorable inferences should be drawn. There must be more than “meager
circumstantial evidence” or “evidence [that] does not rise above a scintilla” otherwise “jurors
would have to guess whether a vital fact exists.” Wilson, 168 S.W.3d at 813. As indicated by
the conflict between the inferences Petefish drew from the soil data on the right-of-way and the
inferences Delphia and Hopfe drew, “‘[w]hen the circumstances are equally consistent with
either of two facts, neither fact may be inferred.’” Id. (quoting Tubelite, 819 S.W.2d at 805). So
even if we assumed Petefish and Walton provided an adequate basis for opining about what the
consulting engineers and NTTA’s and TxDOT’s employee-engineers should have known from a
given set of facts, for the reasons stated above the record still lacks a factual basis that the
engineers actually had or actually knew the necessary information in order to draw the inferences
favorable to Sloan Creek II’s view of the facts. A factfinder could only guess at any inference to
draw from the evidence Sloan Creek II presented; it is too meager; it is legally insufficient. Id.
17
Sloan Creek II also argues intent must always be submitted to a jury because intent is often proven by
circumstantial evidence from which intent is inferred. Where no evidence supports a finding of intent, the supreme
court has concluded intent can be decided as a matter of law. See Pollock, 284 S.W.3d at 821 (no evidence of intent
supported jury verdict, so supreme court rendered judgment); Holland, 221 S.W.3d at 643 (no intent as matter of
law required dismissal of case on plea to jurisdiction); Wilson, 168 S.W.3d at 831 (no evidence of intent required
reversal of jury verdict and rendition of judgment); State Farm Lloyds, 145 S.W.3d at 168 (same); Jennings, 142
S.W.3d at 314–15 (summary judgment correctly granted because no evidence of intent).
–35–
Accordingly, there is no evidence in this record from which inferences can be drawn in favor of
Sloan Creek II’s position that NTTA and TxDOT knew the designed discharge of rainwater
runoff into Sloan Creek would unnaturally erode the banks of Sloan Creek.
CONCLUSION
We conclude NTTA and TxDOT established they did not know the Tollway project was
substantially certain to erode the banks of Sloan Creek at all, or that any erosion would be greater
than the natural erosion or occur at a greater rate as Sloan Creek II claims. Further, Sloan Creek
II has not shown on this record a factual controversy exists regarding NTTA’s and TxDOT’s
knowledge.18 Because such knowledge is necessary to establish NTTA’s or TxDOT’s liability
under article I, section 17, of the Texas Constitution, NTTA and TxDOT established Sloan Creek
II does not have a state law takings or damages claim. Accordingly, the trial court did not err
when it dismissed Sloan Creek II’s counterclaim for inverse condemnation under article I,
section 17, of the Texas Constitution.19
18
We, therefore, express no opinion here on the proper outcome under Jennings and its progeny of a case
containing record evidence that the governmental entity willfully disregarded a risk of damage to private property
resulting from a public project.
19
Sloan Creek II does not challenge NTTA’s and TxDOT’s assertion that if Sloan Creek II’s counterclaim does
not state an inverse condemnation claim then its claim is subject to TxDOT’s sovereign immunity and NTTA’s
governmental immunity. See Pollock, 284 S.W.3d at 821 (“Since there was no evidence of a compensable taking,
the City is immune from the Pollocks’ property damage claims.”); see also Wichita Falls State Hosp. v. Taylor, 106
S.W.3d 692, 702 n.3 (Tex. 2003) (distinction between sovereign and governmental immunity).
–36–
For the reasons stated above, we overrule Sloan Creek II’s first, second, and third issues
and part of its fourth issue. On this record, we need not reach the remainder of Sloan Creek II’s
arguments or NTTA’s and TxDOT’s arguments. We affirm the trial court’s dismissal of Sloan
Creek II’s counterclaim against NTTA and TxDOT for inverse condemnation under article I,
section 17, of the Texas Constitution.20
/ David Evans/
DAVID EVANS
JUSTICE
Fillmore, J., concurring
141456F.P05
20
Because the pleas to the jurisdiction did not address Sloan Creek II’s claims for inverse condemnation under
the Fifth and Fourteenth Amendments to the United States Constitution and 42 U.S.C. § 1983 and the trial court’s
order did not address those claims, those claims are not before us and we leave them undisturbed.
–37–
Court of Appeals
Fifth District of Texas at Dallas
JUDGMENT
SLOAN CREEK II, L.L.C., Appellant On Appeal from the County Court at Law
No. 6, Collin County, Texas
No. 05-14-01456-CV V. Trial Court Cause No. 006-3356-2008
Opinion delivered by Justice Evans, Justices
NORTH TEXAS TOLLWAY Fillmore and Myers participating.
AUTHORITY and THE STATE OF
TEXAS, Appellees
In accordance with this Court’s opinion of this date, we AFFIRM the trial court’s orders
granting appellees’ pleas to the jurisdiction and dismissing appellant’s counterclaim under article
I, section 17 of the Texas Constitution.
It is ORDERED that appellees North Texas Tollway Authority and the State of Texas
recover their costs of this appeal from appellant Sloan Creek II, L.L.C.
Judgment entered this 28th day of August, 2015.
–38–