NOT RECOMMENDED FOR FULL-TEXT PUBLICATION
File Name: 10a0102n.06
Nos. 07-1491, 08-1581 FILED
Feb 17, 2010
UNITED STATES COURT OF APPEALS LEONARD GREEN, Clerk
FOR THE SIXTH CIRCUIT
B.A. CONSTRUCTION AND MANAGEMENT, )
INC.; and B.A. REAL ESTATE, LLC, )
)
Plaintiffs-Appellees, )
)
v. )
)
KNIGHT ENTERPRISES, INC., )
)
Defendant-Appellant. ) ON APPEAL FROM THE
) UNITED STATES DISTRICT
) COURT FOR THE EASTERN
) DISTRICT OF MICHIGAN
B.A. CONSTRUCTION AND MANAGEMENT, )
INC.; and B.A. REAL ESTATE, LLC, )
)
Plaintiffs-Appellants, )
)
v. )
)
KNIGHT ENTERPRISES, INC., )
)
Defendant-Appellee. )
)
BEFORE: GRIFFIN and KETHLEDGE, Circuit Judges, and CARR, District Judge.*
GRIFFIN, Circuit Judge.
*
The Honorable James G. Carr, Chief Judge of the United States District Court for the
Northern District of Ohio, sitting by designation.
Nos. 07-1491, 08-1581
B.A. Constr. Mgmt., et al. v. Knight Enter., Inc.
Defendant Knight Enterprises, Inc. (“Knight”) appeals the district court’s April 11, 2006,
order granting plaintiff B.A. Construction and Management, Inc. (“BA Construction”) and plaintiff
B.A. Real Estate, LLC (“BA Real Estate”) (collectively “plaintiffs”) summary judgment on the issue
of liability.1 Knight challenges the district court’s finding that it breached the terms of the parties’
agreements without justification and violated the Petroleum Marketing Practices Act (“PMPA”), 15
U.S.C. § 2801 et seq. Plaintiffs challenge the district court’s order denying their motion for
exemplary damages and attorneys’ fees against Knight for its violation of the PMPA. For the
reasons set forth below, we reverse in part and affirm in part the district court’s order granting
plaintiffs’ motion for summary judgment. Because we reverse in part, we dismiss as moot plaintiffs’
appeal of the district court’s order denying their motion for exemplary damages and attorneys’ fees.
I.
In January 2004, plaintiffs and Belal Abdallah, President of BA Construction and BA Real
Estate, entered into an Improvement Agreement (the “Improvement Agreement”) and a Motor Fuel
Franchise Agreement (the “Franchise Agreement”), whereby Knight agreed to sell to plaintiffs, and
plaintiffs agreed to purchase from Knight, Citgo Petroleum Corporation (“Citgo”) branded petroleum
products. During negotiations, Knight maintains that Abdallah informed Knight that his gas station
historically sold 125,000 gallons of gasoline per month. Based on Abdallah’s representation, Knight
1
In addition to the April 11, 2006, opinion, Knight’s Notice of Appeal states that it also
appeals the district court’s July 12, 2006, order regarding Knight’s counterclaim, and the district
court’s November 20, 2006, order denying Knight’s motion for reconsideration of the April 11,
2006, opinion.
-2-
Nos. 07-1491, 08-1581
B.A. Constr. Mgmt., et al. v. Knight Enter., Inc.
worked out an arrangement with Citgo, whereby Citgo would reimburse Knight $130,000 over time
if plaintiffs purchased a minimum of 125,000 gallons of gasoline every month for a period of ten
years. In turn, Knight agreed to pay plaintiffs a $130,000 “up front” signing bonus upon: (1) formal
acceptance of plaintiffs’ retail outlet2 by Citgo; and (2) Knight’s approval of plaintiffs’ retail plans
and designs for the retail outlet. These terms were placed in the Franchise Agreement and the
Improvement Agreement.
The Franchise Agreement states, in pertinent part:
2. Term
The term of this Agreement shall be for Ten (10) years . . . . The Term of this
Agreement shall be automatically extended until DEALER purchases the
total gallons required in this Agreement.
3. Supply of Motor Vehicle Fuel
3.1. Purchase of Supply. DEALER agrees to purchase from KNIGHT . . .
one hundred percent (100%) of DEALER’S requirements of motor
fuels sold . . . . DEALER further agrees that one hundred percent
(100%) of its total requirements shall not be less than One Hundred
Twenty Five Thousand (125,000) gallons of motor fuels for each
month during the term hereof. The total gallons of Motor Fuel
required under this Agreement will be [12,000,000].
***
25. No rebate on fuel will be paid during the term of the contract, however an up
front cash signing bonus will be paid by Knight Enterprises, Inc. to the dealer
of an amount of One Hundred Thirty Thousand ($130,000.00) dollars issued
upon the formal acceptance of the branded station by the major oil company.
2
The term “retail outlet” is defined in the Improvement Agreement as “the real property
located at . . . 1727 Southfield Road, Lincoln Park, MI 48146,” the location of plaintiffs’ gas station.
-3-
Nos. 07-1491, 08-1581
B.A. Constr. Mgmt., et al. v. Knight Enter., Inc.
(Emphasis added.)
The Improvement Agreement states, in pertinent part:
2. IMPROVEMENTS. KNIGHT agrees to provide the following described
equipment and improvements or cash to be used to purchase improvements
(collectively the “Improvements”) on the Property at an agreed upon value of
[$152,000].
Detail of Improvements
KNIGHT will provide an ID Price Sign, Image Dispensers & Canopy and
paint poles and curbs = Twenty Two Thousand Dollars ($22,000) [and a]
Signing Bonus of One Hundred Thirty Thousand Dollars ($130,000).
***
3. PAYMENT. Subject to the terms hereof, DEALER shall reimburse
KNIGHT for the Value of the Improvements; provided, however, DEALER
shall not be obligated to reimburse KNIGHT for the Value of the
Improvements so long as during the Term, DEALER purchased for and
delivered to the Retail Outlet the total requirement of [12,000,000 gallons]
of KNIGHT supplied motor fuel (the “Volume”).
***
7. APPROVALS.
A. KNIGHT’S obligations and performance hereunder are subject to its
approval of the plans and designs for the Retail Outlet . . . .
DEALER and KNIGHT acknowledge and agree that KNIGHT’S
review and approval of plans and designs are primarily for the
purpose of ensuring that the appearance of the Retail Outlet at which
KNIGHT’S petroleum products will be sold and It’s [sic] Supplier’s
trademark and brand names displayed will maintain the integrity and
value of such trademark or brand names.
(Emphasis added.)
-4-
Nos. 07-1491, 08-1581
B.A. Constr. Mgmt., et al. v. Knight Enter., Inc.
Plaintiffs and Knight also executed a Line of Credit Agreement (“Credit Agreement”) and
mortgage for the property on which the gas station was located in order to secure plaintiffs’
obligations under the Credit Agreement. The line of credit was in the amount of two loads of
gasoline (“back loads”).3 Knight maintains that plaintiffs were required to pay it for the first back
load of gasoline upon delivery of the third load of gasoline. Plaintiffs never had more than two
unpaid loads of gasoline outstanding at any one time. Knight alleges, however, that plaintiffs
violated the “payment terms contained in the [Franchise] Agreement” on February 13, 2004,
February 26, 2004, and March 9, 2004, when they wrote checks to Knight that were returned due to
insufficient funds.
Between March 13, 2004, and May 17, 2004, plaintiffs did not purchase gasoline from
Knight. During this time period, Knight alleges that plaintiffs bought gasoline from other suppliers.4
According to Carroll Knight, Knight again sold motor fuel to plaintiffs on May 17, 21, and 26, 2004.
After May 26, 2004, plaintiffs stopped ordering fuel and allegedly continued to buy fuel from other
suppliers.5 On April 6, 2004, Charles Roehl, an attorney for Knight, sent plaintiffs a letter
3
Knight also maintains that it agreed to advance plaintiffs $30,000 with the “understanding
and agreement” that plaintiffs would reimburse Knight “in the event Citgo did not formally accept
plaintiffs’ premises as a branded station.”
4
Carroll Knight, President of Knight, maintains that he observed plaintiffs unloading
unauthorized gasoline into their tanks.
5
Plaintiffs informed Knight in a March 26, 2004, letter that they would “procure product from
other sources.”
-5-
Nos. 07-1491, 08-1581
B.A. Constr. Mgmt., et al. v. Knight Enter., Inc.
terminating the Franchise Agreement. On September 2, 2004, Knight foreclosed on the property that
is the subject of this lawsuit.
On October 5, 2004, plaintiffs brought an eight count complaint, requesting injunctive relief
and alleging a violation of the PMPA, breach of contract, and promissory estoppel.6 On October 14,
2005, plaintiffs moved for partial summary judgment against Knight for liability and sought to have
the foreclosure sale set aside in its entirety. Plaintiffs argued that Knight breached the Franchise
Agreement and Improvement Agreement by failing to pay the signing bonus. Moreover, plaintiffs
contended that Knight did not comply with §§ 2802 and 2804 of the PMPA, because Knight did not
give proper notice of cancellation, termination, and/or non-renewal of the Franchise Agreement and
Improvement Agreement when they refused to sell motor fuel to plaintiffs. Finally, plaintiffs averred
that the mortgage was void.
On April 11, 2006, the district court granted plaintiffs’ motion for summary judgment as to
liability, set aside the foreclosure sale, and scheduled a trial date for the issue of damages. In
granting the motion for summary judgment, the district court found that Knight was liable to
plaintiffs for violating the PMPA and for breach of contract. Additionally, the district court found
6
Count I: Violation of the Federal Petroleum Marketing Practices Act
Count II: Breach of Contract of the Improvement Agreement
Count III: Breach of Contract of the Motor Fuel Franchise Agreement
Count IV: Injunctive Relief
Count V: Injunctive Relief
Count VI: Injunctive Relief
Count VII: Injunctive Relief
Count VIII: Promissory Estoppel
-6-
Nos. 07-1491, 08-1581
B.A. Constr. Mgmt., et al. v. Knight Enter., Inc.
that plaintiffs had no liability to Knight, which rendered the mortgage void. The district court
subsequently issued an order dated July 12, 2006, ruling that it would not consider any motions
regarding Knight’s counterclaim.7
The district court conducted a jury trial on March 13, 2007, and March 14, 2007. Prior to
trial, the parties held a telephone conference with the district court in which it was determined that
the trial would be limited to determining any additional monetary damages that plaintiffs suffered
as a result of Knight’s breach of contract and violation of the PMPA, and that plaintiffs’ claims for
exemplary damages and reasonable attorneys’ fees under the PMPA would be brought in a post-trial
motion. At the trial, the jury found that plaintiffs had not suffered any additional damages as a result
of Knight’s actions, and therefore, despite Knight’s liability, the jury did not award damages.
On May 22, 2007, plaintiffs filed their motion for exemplary damages and attorneys’ fees.
On July 30, 2007, Magistrate Judge Virginia Morgan conducted a hearing on plaintiffs’ motion.
Magistrate Judge Morgan subsequently issued an October 2, 2007, report and recommendation
(“R&R”) that plaintiffs’ motion for exemplary damages and attorneys’ fees be denied as untimely,
or alternatively, on the merits. On April 1, 2008, the district court issued an opinion adopting in part
Magistrate Morgan’s recommendation and denying plaintiffs’ request for exemplary damages and
attorneys’ fees.
7
After reviewing Knight’s counterclaim, the district court concluded that the issues included
in the counterclaim related to damages, “the same damage issues to be presented at a jury trial on
[plaintiffs’] claims, and [were] thus intertwined with Plaintiff’s [sic] damages request, and
[Knight’s] responses to those damage claims.”
-7-
Nos. 07-1491, 08-1581
B.A. Constr. Mgmt., et al. v. Knight Enter., Inc.
Knight filed a timely notice of appeal on April 10, 2007, appealing the district court’s grant
of summary judgment in favor of plaintiffs on the issue of liability. On April 29, 2008, plaintiffs
filed a timely notice of appeal regarding the district court’s April 1, 2008, order denying their motion
for exemplary damages and attorneys’ fees.
II.
We review de novo the district court’s order granting or denying summary judgment.
Daugherty v. Sajar Plastics, Inc., 544 F.3d 696, 702 (6th Cir. 2008). Summary judgment is proper
“if the pleadings, the discovery and disclosure materials on file, and any affidavits show that there
is no genuine issue as to any material fact and that the movant is entitled to judgment as a matter of
law.” FED . R. CIV . P. 56(c)(2). The moving party has the burden of proving the absence of genuine
issues of material fact and its entitlement to judgment as a matter of law. Celotex Corp. v. Catrett,
477 U.S. 317, 323 (1986). When determining whether the movant has met this burden, we must
view the evidence in the light most favorable to the nonmoving party. Smith Wholesale Co., Inc. v.
R.J. Reynolds Tobacco Co., 477 F.3d 854, 861 (6th Cir. 2007).
III.
The law is clearly settled in Michigan that a “condition precedent is a fact or event which the
parties intend to exist or take place before there is a right to performance.” MacDonald v. Perry, 70
N.W.2d 721, 725 (Mich. 1955) (internal citations and quotations marks omitted); see also Archambo
v. Lawyers Title Ins. Corp., 646 N.W.2d 170, 176 (Mich. 2002) (“A ‘condition precedent’ is a
condition that must be met by one party before the other party is obligated to perform[.]”). “When
-8-
Nos. 07-1491, 08-1581
B.A. Constr. Mgmt., et al. v. Knight Enter., Inc.
attempting to discern the parties’ intent, we construe together contemporaneous documents relating
to the same transaction.” Tomecek v. Bavas, 759 N.W.2d 178, 184 (Mich. 2008) (footnote omitted).
Here, both the Improvement Agreement and the Franchise Agreement reference the signing bonus,
and both were executed on January 13, 2004. Therefore, the district court should have construed the
terms regarding the signing bonus in each document as one contract.
In so doing, the district court would have correctly found that there were two conditions
precedent that had to be satisfied before Knight was obligated to tender the $130,000 signing bonus:
(1) plaintiffs’ station needed to be formally approved by a major oil supplier; and (2) plaintiffs’
station’s plans and designs needed Knight’s approval. Indeed, the parties do not dispute that both
conditions needed to be satisfied in order for plaintiffs to receive the signing bonus. In plaintiffs’
appellate brief, they expressly “acknowledge that pursuant to the Improvement Agreement, in
addition to CITGO’s formal acceptance of the Retail Outlet, there was a second condition precedent
to the payment of the signing bonus, Knight had to approve the ‘plans and designs’ for the Retail
Outlet[.]”
Here, the district court examined the first condition precedent, and properly concluded that
plaintiffs had received Citgo approval on March 16, 2004.8 Relying on this determination alone, the
district court found that plaintiffs had satisfied all necessary requirements for receiving the signing
bonus. Accordingly, the district court held that Knight’s refusal to tender the remaining amount of
8
The affidavit of Robert Franczkowski, a Citgo Sales Manager, and a letter from
Franczkowski stating that the branding has been completed, support the district court’s finding that
the station was branded on March 16, 2004.
-9-
Nos. 07-1491, 08-1581
B.A. Constr. Mgmt., et al. v. Knight Enter., Inc.
the signing bonus owed to plaintiffs on March 16, 2004, was a breach of the agreements between the
parties. It is not clear, however, that Knight violated the parties’ agreements on March 16, 2004,
because the district court failed to analyze the second condition precedent, i.e., that Knight had to
approve the “plans and designs” for the retail outlet.
The parties’ arguments regarding liability are dependant on which party was first to
substantially breach their agreements. “The rule in Michigan is that one who first breaches a contract
cannot maintain an action against the other contracting party for his subsequent breach or failure to
perform.” Michaels v. Amway Corp., 522 N.W.2d 703, 706 (Mich. Ct. App. 1994) (internal citation
and quotation marks omitted). “However, that rule only applies when the initial breach is
substantial.” Id. at 707. “[A] ‘substantial breach’ is one ‘where the breach has effected such a
change in essential operative elements of the contract that further performance by the other party is
thereby rendered ineffective or impossible, such as the causing of a complete failure of consideration
or the prevention of further performance by the other party.’” Chrysler Int’l Corp. v. Cherokee
Export Co., 134 F.3d 738, 742 (6th Cir. 1998) (quoting McCarty v. Mercury Metalcraft Co., 127
N.W.2d 340, 343 (1964)).
Here, Knight argues that plaintiffs were the first to substantially breach the parties’
agreements when they allegedly: (1) failed to purchase their monthly minimums of 125,000 gallons
of motor fuel; (2) failed to exclusively purchase motor fuel from Knight; and (3) failed to pay for
delivered shipments of motor fuel beyond the initial two back loads extended on credit. Plaintiffs,
relying on the district court’s ruling, argue that Knight was the first party to commit a substantial
- 10 -
Nos. 07-1491, 08-1581
B.A. Constr. Mgmt., et al. v. Knight Enter., Inc.
breach when it failed to tender the remaining amount of the signing bonus owed to plaintiffs on
March 16, 2004.
On appeal, plaintiffs ask this court to review the record and determine that either the second
condition precedent was satisfied on or before March 16, 2004, when Citgo formally accepted the
retail outlet, or decide that Knight acted unreasonably in not approving plaintiffs’ plans and designs.
Plaintiffs argue that Knight’s approval of the plans and designs was conditioned solely on Citgo’s
formal acceptance of the gas station. They note that paragraph 7(A) of the Improvement Agreement
states:
KNIGHT’S review and approval of plans and designs are primarily for the purpose
of ensuring that the appearance of the Retail Outlet at which KNIGHT’S petroleum
products will be sold and It’s [sic] Supplier’s trademark and brand names displayed
will maintain the integrity and value of such trademark or brand names.
Paragraph 7(A), however, specifically states that Knight’s review and approval is “primarily,” not
exclusively, to ensure that its supplier’s (presumably, but not necessarily, Citgo’s) trademarks and
brand names are properly displayed. The use of “primarily” instead of exclusively implies that there
may be other reasons, beyond satisfying Citgo, that explain why Knight wanted to review and
approve plaintiffs’ plans.
Plaintiffs did not provide the district court or this court with any document, affidavit, or other
evidence indicating that Knight received or approved its plans and designs. Instead, plaintiffs ask
this court to review the record and make a factual determination in its favor based on their arguments
and conjecture. In deciding a motion for summary judgment, however, we view the factual evidence
and draw all reasonable inferences in favor of the nonmoving party, here, Knight. Keweenaw Bay
- 11 -
Nos. 07-1491, 08-1581
B.A. Constr. Mgmt., et al. v. Knight Enter., Inc.
Indian Cmty. v. Rising, 477 F.3d 881, 886 (6th Cir. 2007). Viewing the facts in a light most
favorable to Knight, there are genuine issues of material fact regarding: (1) whether plaintiffs
satisfied the second condition precedent; and (2) which party was first to substantially breach the
parties’ agreements. As such, these issues must be resolved by the trier of fact, and not by this court
reviewing plaintiffs’ motion for summary judgment. Accordingly, we reverse in part the district
court’s order granting plaintiffs’ motion for summary judgment on the issue of liability, and remand
for further proceedings consistent with this opinion.
IV.
Knight next argues that plaintiffs were not entitled to summary judgment because the
Franchise Agreement was voidable due to plaintiffs’ fraudulent representation that they had
historically sold 125,000 gallons of motor fuel each month. Fraud can occur when a party makes
open, false assertions. Hord v. Envtl. Research Inst., 617 N.W.2d 543, 550 (Mich. 2000). To prove
fraud, Knight must demonstrate the following:
(1) that the charged party made a material representation; (2) that it was false; (3) that
when he or she made it he or she knew it was false, or made it recklessly, without any
knowledge of its truth and as a positive assertion; (4) that he or she made it with the
intention that it should be acted upon by the other party; (5) that the other party acted
in reliance upon it; and (6) that the other party thereby suffered injury.
City of Novi v. Robert Adell Children’s Funded Trust, 701 N.W.2d 144, 152 n.8 (Mich. 2005); see
also Belle Isle Grill Corp. v. City of Detroit, 666 N.W.2d 271, 280 (Mich. Ct. App. 2003). “Each
of these facts must be proved with a reasonable degree of certainty, and all of them must be found
to exist; the absence of any one of them is fatal to a recovery.” Nernberg v. Pearce, 35 F.3d 247,
- 12 -
Nos. 07-1491, 08-1581
B.A. Constr. Mgmt., et al. v. Knight Enter., Inc.
249-50 (6th Cir. 1994) (citing Hi-Way Motor Co. v. Int’l Harvester Co., 247 N.W.2d 813, 815-16
(Mich. 1976). Contracts induced by fraud are voidable at the option of the defrauded party.
Samuel D. Begola Servs., Inc. v. Wild Bros., 534 N.W.2d 217, 219 (Mich. Ct. App. 1995).
The district court considered Knight’s allegation of fraud and dismissed it. However, the
reasoning behind its decision is flawed. The district court stated:
The requirement that Plaintiffs purchase 125,000 gallons of gas per month, the
requirement that Plaintiff [sic] purchase [twelve] million gallons of fuel over ten
years, and Defendant’s agreement to pay the signing bonus, were all based on
Plaintiffs’ representation. However, Defendant’s failure to pay entire [sic] signing
bonus adversely impacted Plaintiff’s [sic] ability to buy the necessary monthly
amount of gas and adequately market itself to increase consumer consumption.
Therefore, viewing the facts in a light most favorable to Defendant, there is no
genuine issue of material fact whether the contracts were voidable due to Plaintiffs’
fraudulent misrepresentations.
Yet, Carroll Knight stated in his affidavit that plaintiffs represented that they had “historically sold
125,000 gallons per month[.]” (Emphasis added.) Clearly, the amount of gas plaintiffs may be able
to sell in the future from receiving the entire signing bonus would not affect the amount of gas they
historically sold before the Franchise Agreement was signed.
Nevertheless, Knight has failed to establish a prima facie case of fraud. Knight supports its
allegation of fraud solely with the affidavit and testimony of Carroll Knight, who states that plaintiffs
represented to him “that the gas station that is the subject matter of this lawsuit historically sold
125,000 gallons per month[.]” No evidence was presented by Knight to the district court that
showed plaintiffs’ alleged representation was false, i.e., that the gas station did not historically sell
125,000 gallons of motor fuel.
- 13 -
Nos. 07-1491, 08-1581
B.A. Constr. Mgmt., et al. v. Knight Enter., Inc.
“[F]raud must be pleaded with particularity, and is not to be lightly presumed, but must be
clearly proved, by clear, satisfactory and convincing evidence[.]” Cooper v. Auto Club Ins. Ass’n,
751 N.W.2d 443, 451 (Mich. 2008) (internal citations and quotation marks omitted). Here, Knight
was required to present facts to support all elements of its fraud claim and has failed to do so by not
showing that plaintiffs presented false information. Accordingly, the district court correctly
determined that plaintiffs were entitled to summary judgment on Knight’s fraud claim.
V.
For these reasons, we affirm in part, and reverse in part, the judgment of the district court and
remand for further proceedings consistent with this opinion. In view of our disposition, we dismiss
as moot plaintiffs’ appeal of the order denying their motion for exemplary damages and attorneys’
fees.
- 14 -
Nos. 07-1491, 08-1581
B.A. Constr. Mgmt., et al. v. Knight Enter., Inc.
KETHLEDGE, Circuit Judge, concurring in the judgment. As the court observes, BA
Construction concedes on appeal that Knight’s obligation to pay the $130,000 signing bonus had two
conditions precedent rather than one. But for that concession, I would have read the contract the
same way the district court did.
Additionally, although the court does not decide the issue, I would hold that BA Construction
did not substantially breach the contract until March 26, 2004. That is the date when BA
Construction informed Knight that it would no longer purchase fuel from Knight. This was a total
repudiation of BA Construction’s obligation to purchase fuel form Knight, and therefore constitutes
a complete failure of consideration. See Chrysler Int’l Corp. v. Cherokee Export Co., 134 F.3d 738,
743 (6th Cir. 1998) (finding a substantial breach when a party’s conduct frustrated the “essential
purpose of the contract”).
The other alleged breaches were not substantial. Instead, they were slight deviations from
the contract’s terms, for which the parties provided specific remedies in the contract. See
Improvement Agreement ¶5(A) (Knight was owed roughly 2 cents per gallon for each gallon below
the minimum that BA Construction did not purchase); Franchise Agreement ¶3.2(D) (imposing a 1%
fee on all checks returned for insufficient funds); Franchise Agreement ¶3.3 (imposing a 2 cents per
gallon penalty for gas purchased from a different supplier). A party cannot argue that a relatively
minor breach warrants rescission, particularly when it can invoke alternative remedies that it
previously agreed were sufficient. See Harris v. Chain Store Realty Bond & Mortg. Corp., 45
- 15 -
Nos. 07-1491, 08-1581
B.A. Constr. Mgmt., et al. v. Knight Enter., Inc.
N.W.2d 5, 9 (Mich. 1950) (“When two competent parties, through a process of give and take, reach
an agreement it can be presumed that the mutual promises were considered adequate”).
I would therefore find that BA Construction’s only substantial breach occurred on March 26,
2004. On remand, the sole issue for determining liability would be whether Knight approved the
plans and designs for the station before that date. If so, then Knight was the first to substantially
breach by failing to pay the signing bonus, and is therefore not entitled to recover. If not, then BA
Construction was the first to substantially breach, and Knight may proceed on its counterclaim.
Finally, I would reach the merits of BA Construction’s motion for exemplary damages and
attorneys’ fees. That motion is based on BA Construction’s Petroleum Marketing Practices Act
(PMPA) claim, on which the district court entered summary judgment in favor of BA Construction.
Knight does not appeal the resolution of the PMPA claim, so nothing in our decision today
affects—and future proceedings in this case will not affect—BA Construction’s entitlement to relief
on that claim. I believe that the issues are therefore ripe for our review.
As to the merits, I would affirm the district court’s denial of the motion because it was
untimely. Regarding exemplary damages, the district court properly construed the motion as one to
alter or amend the judgment. See Osterneck v. Ernst & Whinney, 489 U.S. 169, 175-76 (1989) (a
postjudgment motion for discretionary relief that depends on the merits of plaintiff’s claim is
considered a motion to alter or amend the judgment). The deadline for such a motion is 10 days after
judgment, Fed. R. Civ. P. 59(e), and this is a deadline courts lack authority to extend. Fed. R. Civ.
-16-
Nos. 07-1491, 08-1581
B.A. Constr. Mgmt., et al. v. Knight Enter., Inc.
P. 6(b)(2). Here, judgment was entered on March 14, 2007, but BA Construction did not file its
motion until May 21, 2007. The request for exemplary damages was therefore untimely.
The deadline for filing a motion for attorneys’ fees is within 14 days of the entry of judgment.
Fed. R. Civ. P. 54(d)(2)(B)(i). May 21, 2007 was well after this deadline, but BA Construction
argues that the time should have been extended due to “excusable neglect.” Fed. R. Civ.
P. 6(b)(1)(B). The district court did not find excusable neglect, a decision we review for an abuse
of discretion. See Allen v. Murph, 194 F.3d 722, 724 (6th Cir. 1999).
BA Construction asserts that there was excusable neglect because it was improper for the
district court to issue judgment and close the case. But regardless of the propriety of closing the
case, BA Construction was on notice that the court had done so; and BA Construction could have
filed a motion within the proper time. The district court did not abuse its discretion in finding that
BA Construction’s carelessness was not excusable. See id. at 724 (upholding the denial of excusable
neglect based on “the carelessness of the[] attorneys in allowing the 14-day period to run”). I would
therefore affirm the district court’s denial of BA Construction’s motion for exemplary damages and
attorneys’ fees.
-17-