[EDITORS' NOTE: THIS PAGE CONTAINS HEADNOTES. HEADNOTES ARE NOT AN OFFICIAL PRODUCT OF THE COURT, THEREFORE THEY ARE NOT DISPLAYED.] *Page 220 This is an application by an association of those consumers of the Sutter Butte Canal Company, who were consumers prior to 1920, to annul an order of the Railroad Commission that, beginning with the year 1920, that company serve with water some fourteen thousand four hundred acres of land not theretofore served by it. The company was organized as, and has always been, a public utility company supplying water for irrigation, and its articles of incorporation empower it to sell and distribute water in the counties of Butte and Sutter. It takes its water from the Feather River near Oroville, in Butte County, and its water rights, which are appropriation rights, are all for water for public sale and distribution. From a comparatively small beginning the system of the company was extended and enlarged gradually as the market for its water grew until in 1919 it was supplying some fifty-five thousand, or slightly more, acres of land, mostly in Butte County. In September of that year the company contracted with the owners of fourteen thousand four hundred acres of land in Sutter County that it would extend its system to supply their lands, and pursuant to this contract the company made the necessary enlargements and extensions of its system, at a cost to it of between two hundred thousand dollars and two hundred and fifty thousand dollars. The making of this contract, the enlargement and extension of the company's system, and the purpose of the company to serve the fourteen thousand four hundred acres of additional lands were, the commission finds, a matter *Page 221 of common knowledge in the region served by the company. Nevertheless, no objection was made to the company so doing. The company's rules require that applications for water for the ensuing year be filed by the first of January, and by that date in 1920 the owners of the fourteen thousand four hundred acres had filed their applications and paid the company's regular charge. The three preceding winters had been winters of light rainfall, and the winter of 1919-20 was exceptionally dry, so that by spring it became evident that there was a serious danger of a water shortage. The company's old consumers, through the instrumentality of their association known as the Butte County Water Users' Association, thereupon filed a complaint with the commission against the company, alleging in brief that the company would not have water enough to irrigate both their lands and the fourteen thousand four hundred acres of additional lands, and asking for an order of the commission directing the company not to supply the latter. The company answered the complaint, and the owners of the fourteen thousand four hundred acres on their part organized themselves into an association known as the Sutter County Water Users' Association, and intervened in the proceeding, alleging that they had been accepted by the company as consumers, and in reliance thereon they had prepared their lands at large expense for the raising of rice by irrigation, and asking for an order from the commission directing the company to serve them. The owners of certain of the fourteen thousand four hundred acres also intervened in their individual capacities in opposition to the complaint of the old consumers.
The matter was promptly heard and decided by the commission, its order being handed down on April 21, 1920. At that time, of course, it was not possible to know with exactness just what water conditions during the summer to come would be. The commission's decision finds that the fourteen thousand four hundred acres were within the area which the water company was organized to serve and for serving which it had made its water appropriations; that in a normal year the company's supply of water was adequate for the needs of the fourteen thousand four hundred acres as well as for those of the lands theretofore served; that at the time the contract between the company *Page 222 and the owners of the fourteen thousand four hundred acres for the supply of those lands was made, and at the time the applications of those owners for service were presented and accepted, it was reasonable to expect that the company would have a sufficient supply for all during the ensuing year, and the company was justified in accepting the applications. The critical month in supplying water by the company's system, that is, the month when the demands for irrigation are most apt to approach or exceed the available supply, is the month of August. The commission found that at the time of hearing, that is, in April, it appeared that the company would, so far as could be determined, have in August sufficient water from its then existing supply to irrigate seventy thousand acres (all the land) for from eighty to ninety per cent of the time, and in addition could obtain a further substantial quantity under a water right which it had recently obtained for the diversion from the Feather River of some additional five hundred second-feet. Upon the facts so found, the commission held in effect that the owners of the fourteen thousand four hundred acres had the status of consumers of the company and were entitled to be served, and made its order that they be served on an equal basis with the company's other consumers. The reasons of public policy underlying its decision, the commission states as follows:
"It would be uneconomical, and would retard the development of this state if an irrigation company were restricted in its delivery of water to only that area for which it would have a sufficient supply in the driest years. A restriction such as this would prevent the cultivation of large areas of land which would otherwise be cultivated and produce a crop a very large proportion of the time. As a matter of fact, years of drought such as this do not ordinarily occur more frequently than from ten to twenty year periods, and it would be unjustly restricting the expansion of the agricultural pursuits of the state if a company were permitted to serve only the area for which it would have available water during years of extreme drought and consequent minimum water supply.
"Applicants applying to a utility for an extension of service, whose applications are accepted in good faith by the utility at a time when it could reasonably expect to *Page 223 have available a sufficient supply of water in addition to that needed for the lands theretofore served, should in justice receive their ratable proportion of the available supply if a shortage occurs, even though that shortage may occur prior to the actual delivery of any water to them."
After the decision, the old consumers petitioned the commission for a rehearing, and, being refused, commenced the present proceeding before this court for the annulment of the commission's order. The contentions of the petitioner are three in number. The first, as stated by its counsel, is as follows:
"The orders of the Railroad Commission do not make any provision for the supplying of prior consumers before the fourteen thousand four hundred acres are taken care of. On the contrary, said orders specifically direct the Sutter Butte Canal Company to prorate the available supply in the event of a shortage. The effect of this order is to deprive petitioners of property without due process of law and without compensation."
Assuming that the owners of the fourteen thousand four hundred acres had entered into relationship with the company as consumers, the ground so stated is not so much an attack on the commission's order as it is on the validity of a statute adopted by the legislature. It may well be that in advancing this ground of attack petitioner's counsel do not make the assumption stated, but their position on the point is not entirely clear, and it will make clearer what we believe to be the real point in the case, if we make the assumption. Assuming, then, that the owners of the fourteen thousand four hundred acres had entered into relationship with the company as consumers, the contention of the petitioner is that the old consumers of a public utility water company have a vested right to water in preference to new consumers, so that in case of a shortage the water is not to be prorated, but the old consumers take all they require and the new consumers get only what is left. But the act of April 25, 1913 (Stats. 1913, p. 84, Deering's Gen. Laws, Act 4348a), which places water companies under the jurisdiction of the Railroad Commission, provides in section 6 that "as between consumers who have been voluntarily admitted to participate by the corporation in its supply of water or been required to be supplied by an order *Page 224 of the Railroad Commission, in times of shortage there shall be no priority or preference, and such corporation in times of shortage shall be required to apportion such supply ratably among its consumers."
[1] If the foregoing provision of the statute is valid, manifestly the order of the commission in this case is valid, so far as the ground of attack under consideration is concerned, for the order is merely in accord with the explicit direction of the statute. The statute is attacked only through the attack upon the order of the commission, that is, inferentially, but the only ground upon which it can be attacked, and the only ground upon which it is attacked, even inferentially, is that the consumer of a public water company has a vested right, not merely to service from the company, but to service in full in preference to later consumers, so that the respective rights of the company's consumers are ranked, as it were, in the order of time in which they have become consumers. This is rather a novel doctrine and one whose statement alone is well-nigh sufficient for its rejection. In fact, it is not stated by petitioner's counsel as we have stated it. It is said merely that the right of a consumer, particularly of a consumer taking water for irrigation of his lands, is a vested right of which he cannot be deprived by the diversion of water to others. This proposition is undoubtedly correct, so far as a diversion to other objects or to persons not consumers goes, but it does not support the contention that as between consumers one has a vested preference over another in times of a water shortage. No authority supporting that contention is cited, and we doubt if any can be found. It is a contention directly contrary to the principle upon whichLeavitt v. Lassen Irr. Dist., 157 Cal. 82, [29 L.R.A. (N.S.) 213, 106 P. 404], was decided, and wholly opposed to the fundamental principle that a public utility must hold itself out as ready to serve and must serve the public or its portion of the public without discrimination or preference other than such as corresponds to differences in the value or cost of the service rendered. It has taken years of struggle in this country to establish this principle and to compel its general observance, as witness the long struggle against discrimination by transportation companies. But it is now thoroughly established and its value recognized, and every reason of public *Page 225 policy supports it. In particular, in connection with a water company supplying water for irrigation, it would be most unjust and very injurious to the state to hold that in times of shortage the older consumers could have a full supply and the later none. In many instances, such a rule would mean, as to the later consumers, not only that their crops for the year would be lost, but that their orchards or plantings would be destroyed, when by prorating the water the orchards and plantings of all would be preserved with some impairment of crops for the time, but no serious permanent injury. The rule would operate directly to limit, in many parts of the state, the land available for orchard and similar plantings to such as could be certain of a full supply even in times of extreme drought. There is no occasion for any such extreme limitation, and it would be directly contrary to the economic welfare of the state. As between the consumers of a water company, even one supplying water for irrigation, the rule must be that in times of a shortage of supply, the water available must be prorated.
[2] Certainly this is true as to every consumer in the present case who became such after the passage in 1913 of the act referred to. He could get no right greater than was permitted by the law in effect at the time he entered upon the relationship. There is no allegation in the present case that any of the water company's present consumers became such prior to 1914, and no right is claimed by reason of any of them having been consumers prior to the passage of the statute. This being the case, it must be held that the order of the commission requiring a prorating is valid so far as the petitioner's first ground of attack is concerned.
[3] What we have just said has, of course, application only to the company's regular consumers, that is, to those who have entered into relationship with it and whom it has undertaken to serve on the basis of its having an adequate supply for that purpose. It has no application as between such consumers and what we may call surplus consumers, that is, consumers whom the company undertakes to serve only when and as it has a surplus over and above the needs of its regular consumers. As between these two classes, and very possibly even as between individuals *Page 226 in the second class, a preferential right can properly exist. In no other way can use be made of the surplus water which any irrigation company is apt to have at times.
But in the case now before the court, the new consumers of the water company, if they properly became consumers at all, became such as regular and not as surplus consumers. They were admitted upon the basis of the company having an adequate supply and engaging regularly to supply them. They were, therefore, on an equal footing with the company's older consumers, provided the assumption with which we started is true, that they had properly been admitted as consumers. Whether they had been so admitted is, we believe, the real question in the case. It is directly involved in the second contention of the petitioner.
The petitioner's second contention is stated as follows:
"Concededly the only authority which the Railroad Commission has to make an order in a matter of this kind is that contained in sections 5 and 6 of chapter 80 of the Statutes of 1913. The latter part of section 5 reads as follows:
" 'The commission shall likewise have the power after hearing upon its own motion or upon complaint, to require any such water company to allow additional consumers to be servedwhen it shall appear that to supply such additional consumerswill not injuriously withdraw the supply wholly or in part fromthose who theretofore had been supplied by such publicutility.'
"This, and this alone, constitutes the authority and the power of the Railroad Commission to make the orders which petitioners ask to have set aside. It is respectfully submitted that there is nowhere in the opinion or the orders under review, in the evidence at the hearing, or in any part of the record a determination, a finding or a statement of any kind that the supply of water available to the Sutter Butte Canal Company during the year 1920 and thereafter will be sufficient to allow additional consumers to be served without injuriouslywithdrawing the supply in part from those who theretofore havebeen served by said utility. On the contrary, it affirmatively appears in the evidence and upon the face of the Railroad Commission's opinion, that the old consumers will beinjuriously affected by the delivery of water to the fourteen thousand four hundred acres which has not heretofore been supplied with water. In fact, the commission *Page 227 recognizing from the evidence that this result will undoubtedly follow makes explicit provision for a prorating of the short supply."
Epitomizing this, it is that the commission's only authority in this case was to make an order allowing additional consumers to be served only when it appeared that the former consumers would not be injuriously affected thereby, and that it affirmatively appeared, and the commission found, that there was going to be a shortage of the company's supply during the coming summer, so that it of necessity appeared that the former consumers would be injured by admitting others to share in the supply.
We are not certain that the commission's finding was really that the company's supply would not be adequate during the summer to follow for both the new lands and the old. Its finding is that at the intake of the company's canal there would be enough water available in the critical month of August for from eighty to ninety per cent of the time to irrigate all the lands, and that in addition the company had a permit from the State Water Commission for the diversion of five hundred second-feet from the Feather River at a point about twelve miles below, where a substantial quantity could be obtained. Nor are we certain that if this finding be one that, with the additional right of diversion mentioned, there would be no shortage, it is without support in the evidence. It was a case where the supply in normal years was more than adequate, and where it was sought to foretell, as well as possible the extent to which that supply would fail during the particular summer because of an exceptionally dry winter just coming to an end. It was largely a matter of guessing, and it would be difficult to say that the commission's guess that the company would have an adequate supply with what it could get by the further diversion it was authorized to make was so unreasonable as to be without support in the evidence. But however this may be, we may grant for purposes of discussion the contention that it did appear at the time the commission made its order that because of the drought the company's supply would not be fully adequate during the summer for both the new and the old consumers, and that the commission so found. Even so, it does not follow that the commission's order was without authority. *Page 228
The argument for petitioner assumes as its basis that the owners of the fourteen thousand four hundred acres of land were not consumers at the time of the application to the commission, and that therefore the commission's order directing that they be served was in effect an order that they be admitted as consumers, made under the authority of the provision of the statute quoted in the statement of petitioner's position. But the order of the commission was not in fact that. It was not made on the basis of the owners of the new lands not yet being consumers, but on the basis that they were already consumers, and was not an order that new consumers be admitted, but that consumers already admitted, but at a later date than the company's other consumers, be served without preference against them. In its opinion denying the petitioner's request for a rehearing, the commission placed its order explicitly upon this ground. If it be true that the owners of the new lands had already been admitted as consumers, then in accordance with our discussion of the petitioner's first contention it would follow that they were entitled to be served without preference, and the commission's order was not only correct but the only one which it could legally make. The order must be upheld, therefore, unless it appear that the owners of the new lands were not consumers at the time of petitioner's application to the commission.
The facts in the matter are, as we have said, that in September, 1919, the company and the owners of the new lands contracted for service for those lands; that the company thereupon extended its system and the owners prepared their land, both at very considerable expense; and that prior to January 1, 1920, pursuant to the company's rules, the respective owners had made application to it for water for the ensuing year, and those applications had been accepted, and the owners had paid the company's charges. [4] These facts are not disputed, and upon them certainly the owners had become consumers, provided only the company had authority to admit them as such. It was not necessary that water be actually delivered upon the lands, to make the owners consumers in the legal sense, that is, persons whom the company was obligated to serve. The relation of public utility company and consumers was established as soon as the company came under obligation to *Page 229 serve and the owners came under obligation to take. Both these obligations had been assumed by the respective parties by January 1, 1920, so far as they could assume them. The actual delivery and receipt of the water thereafter would follow as a mere incident of the relation that had been entered upon. Unless, then, the company did not have the right to enter into this relation with the owners of the new land, the relation was in existence and those owners were consumers of the company prior to the petitioner's application to the commission, and were entitled to water on an equal footing with the company's other consumers. The question, then, reduces itself to one as to the authority of the company, not of the commission, to admit these new consumers.
[5] It is evident, we think, that on the one hand a public water company has authority to take on new consumers without, though not against, an order of the commission, and, on the other hand, its authority is not without limitation, even in the absence of any order of the commission. Certainly, in the absence of some prohibition upon it, either by statute or by order of the commission, a water company, like any other utility, has the general power to take on new consumers. There was no prohibition by order of the commission, nor was there any prohibition by statute, unless it be that the act of 1913 referred to provides that a water company may not take on new consumers without an order of the commission. But the act does not in fact so provide. It provides merely that the commission may forbid the taking on of more consumers, or may order their taking on, but it does not purport to limit or change the usual authority of the company in the absence of any order by the commission. This is evident from a reading of the entire section (section 5) of the act which is pertinent to the point. It reads:
"Whenever the railroad commission, after a hearing had upon its own motion or upon complaint, shall find that any water company which is a public utility operating within this state has reached the limit of its capacity to supply water and that no further consumers of water can be supplied from the system of such utility without injuriously withdrawing the supply wholly or in part from those who have theretofore been supplied by such corporation, *Page 230 the railroad commission may order and require that no such corporation shall furnish water to any new or additional consumers until such order is vacated or modified by the said commission. The commission shall likewise have the power after hearing upon its own motion or upon complaint, to require any such water company to allow additional consumers to be served when it shall appear that to supply such additional consumers will not injuriously withdraw the supply wholly or in part from those who theretofore had been supplied by such public utility."
[6] On the other hand, a water company supplying water for irrigation has not the power to take on new consumers without limit. Its power to supply water is, of course, limited by the amount of its supply, and when the demands of its consumers upon it have reached this limit, it has no right to take on new consumers to the necessary injury of those it has. But it is not always easy to determine just when the limit of supply is reached, and the factor of safety which should be allowed against exceptional seasons may vary from locality to locality. In those localities where the crops are wholly dependent upon irrigation and perish if deprived of it for any considerable period, the factor of safety which should be allowed is of necessity greater than in those localities where this is not true. [7] The matter is one of judgment, a judgment which it may well be should be exercised conservatively, but a matter of judgment nevertheless. The exercise of this judgment is left to the water company in the absence of any regulatory order of the commission, and if the judgment is reasonably exercised, the action of the company in admitting new consumers is valid. Upon this point the commission found in the present case that the company had acted reasonably in admitting the owners of the fourteen thousand four hundred acres as consumers, and if this finding is sustained by the evidence, it is decisive of the case.
It may be claimed with some truth that the commission based this finding in part upon the fact that the normal flow of the Feather River available to the water company, that is, the flow in the critical month of August, averaged over a period of years, is sufficient to supply both the company's old and its new consumers. It may also be claimed, and is in fact claimed, that such an average is not the true *Page 231 limit of the extent to which a water company may take on new consumers, that in effect there must be a factor of safety allowed against seasons of less than average flow. This claim has great force, which is hardly affected by the casual remarks in some decisions that the limit is the normal available supply (Blakeley v. Ft. Lyon Canal Co., 31 Colo. 224, [73 P. 249];First etc. Bank v. Bitter Root etc. Co., 251 Fed. 320). It has also, we believe, been the practice of the Railroad Commission in this state to allow some such factor of safety against the normal supply. On the other hand, it is evident that the permissible limit should not be held to the available supply in years of drought. There is no occasion for any such extreme rule. It would virtually destroy the irrigability for anything but annual crops of large amounts of land, when by a temporary prorated diminution in deliveries of water in years of drought such years could be endured without permanent injury or too great loss. (See, also, the opinion of the commission inSecurity Inv. Co. v. Palermo Land Water Co., 7 Ops. R. R. Com. 180.)
[8] But it is not necessary to make the present case turn on whether it is the normal, in the sense of average, supply, or the normal supply less a reasonable factor of safety for years of less than average supply, which should be taken as the limit to which an irrigation company may take on requirements against its system. What we have said on the point has been largely for the purpose of making clear the utmost position that the old consumers here can reasonably take, and then ascertaining if in view of that position the order of the commission can be upheld. If there was evidence before the commission which justified the conclusion that the company by taking on the new consumers would not increase the demands upon its system beyond the amount of its average supply less a reasonable factor of safety, it is evident that the order must stand; and this, although there may be a conflict in evidence, for it is the function of the commission alone to resolve any conflict, and we can disturb its ruling only when there is no evidence whatever to support it.
The testimony of the engineer for the commission was that the average flow of the Feather River in August for the period from 1902 to 1913 was 1,681 second-feet. The *Page 232 years subsequent to 1913 showed a very much higher average, but the flow for those years was not considered, since the natural flow was augmented by water stored in the mountain reservoir of the Great Western Power Company and released for power purposes during the summer with the right, or assumed right, at least, on the part of that company to retake it. The lowest flow of the years from 1902 to 1913 was that of August, 1913, when it was only 969 second-feet. The next lowest August flow was 1,350 second-feet.
As to the other side of the balance sheet, the demands upon the company's system which it had assumed by January 1, 1920, the testimony was that they would aggregate 930 second-feet delivered on the lands, and that about one-third should be allowed for loss in transportation, making the amount required to be diverted 1,395 second-feet. Between this amount and the average flow of the river of 1,681 second-feet, there was then a margin or factor of safety of 286 second-feet. In percentages, there was a margin of twenty per cent of the demands upon the system and of seventeen per cent of the average flow. Comparing the amount of demands, 1,395 second-feet, with the flow in the particular years in the period taken to ascertain the average, it appears that with the exception of one year the lowest flow was 1,350 second-feet, or but 36 second-feet below the demands for 1920. This difference could undoubtedly easily be made up by reduction of wastage and by economies. In other words, the situation when the water company accepted the applications of the new consumers was that the demands upon the company's system could be met from the natural flow of the river for every year but one in the period of eight years prior to the time when the natural flow was augmented by the power company's storage.
There was also evidence justifying the conclusion that instead of 935 second-feet delivered being required to meet the demands for 1920, the amount as called for by the company's contracts and accepted applications was but 884 second-feet. Allowing a loss of one-third in transportation, this would require a diversion of but 1,326 second-feet, and leave a margin of 355 second-feet between the necessary diversion and the average flow of 1,681 second-feet. There *Page 233 was also evidence that the figure of 884 second-feet delivered should be somewhat reduced for August, owing to the slackening in irrigation after July.
It is not possible, in view of these figures and this evidence, to say that the commission was not justified in finding that the action of the company in taking on new consumers prior to January 1st, and before the dry character of the winter had become apparent, was reasonable and proper, even assuming that a factor of safety below the average flow of the river should have been allowed. The evidence showed that such a factor existed and in a substantial amount. What the factor should be was a matter of judgment for the company in the first instance, and for the commission in the second. It is a factor that must vary from locality to locality and from system to system. It is necessarily higher in extremely arid localities and in localities where the normal fluctuations in rainfall are high, and it is to be noted that Sutter and Butte Counties are not of this character, and that in both crops can be grown and even orchards maintained without irrigation. It is not possible for us to say that the factor in this case was too small.
It should be said that in computing the water company's available supply counsel for the petitioner deduct from the figures we have stated six hundred second-feet diverted by the Western Canal Company, or which that company claims the right to divert. But we do not follow them in making such deduction. There is nothing to show that the right of the Sutter Butte Canal Company is not a prior right so far as the natural flow of the river is concerned, and it does appear that it was diverting water long before the Western Company. It also appears, inferentially at least, that the water claimed by the latter is water the Great Western Power Company stores in the mountains and releases in the summer; in other words, is water which is not a part of the natural flow in summer. It is for this reason, as we have said, that the high average flow in the years subsequent to 1913, when the reservoir of the power company was completed, was disregarded by the commission's engineer in computing the average natural flow.
It should also be said, even at the expense of repetition, that the case was presented to the commission and has been presented to us almost entirely as if the question involved *Page 234 were one as to the right of the commission to permit the taking on of new consumers at the time of the hearing, in face of the coming shortage then apparent. The commission did not so view the real question in the case, nor do we, and we express no opinion as to the right of the commission to permit the taking on of new consumers in a year of known shortage, even though their being taken on would be amply justified under normal conditions. The vital point in the case is that the new consumers had already been taken on and at a time when there was no reason to anticipate a drought, and when, according to evidence upon which the commission had a right to rely, the company could reasonably anticipate that it would have an adequate supply for both the new and the old consumers. This being the situation, it is worthy of note again that, while the result would be the same in the absence of any statute, the case comes directly within the provision of the act of 1913 that "as between consumers who have been voluntarily admitted to participate by the corporation in its supply of water or been required to be supplied by an order of the Railroad Commission, in times of shortage there shall be no priority or preference, and such corporation in times of shortage shall be required to apportion such supply ratably among its consumers."
We have discussed the case upon the assumption that the company had the right under the appropriation under which it was diverting water and supplying it to the old consumers to divert the further amount required to supply the new consumers, if the water were there to divert. This right is questioned in argument, but the facts, if they exist, which would negative the right were not shown. It does appear that the appropriation right claimed by the company was for one thousand five hundred second-feet. This was more than enough for both the old and new consumers. If the company did not in fact have the right to this amount or the right to divert a greater amount than it had previously been diverting, that fact should have been shown. The case as presented to the commission by the old consumers was practically one where relief was sought against the company supplying the new consumers on the ground solely that a shortage in the natural supply due to a season of extreme drought was threatened. The commission's order *Page 235 denying relief upon this ground was supported by the evidence presented to it.
The conclusion so reached is decisive of the case, and renders unnecessary the consideration of the petitioner's third contention. It is really a contention by way of reply to one made by the company and the Sutter County consumers. The latter claimed that there had been a previous dedication of water for use on the Sutter County lands because water had in a preceding year been delivered to a small portion of them. The commission found that water had been so delivered, and the third contention of the Butte County consumers was that such delivery was not a dedication of water to those lands. But it is evident, in view of what we have said, that it is wholly immaterial whether this contention be correct or not. The owners of the Sutter County lands had nevertheless been properly admitted as consumers by the water company, and this fact required that they be served without preference against them.
Order affirmed.
Lennon, J., Wilbur, J., Sloane, J., Angellotti, C. J., and Lawlor, J., concurred.