By consent, the issue: "What damages has the plaintiffs sustained?" was submitted to a jury, and as to all other issues and facts a jury trial was waived, and it was agreed that they might be passed upon by the court.
The response to the issue submitted to the jury was "$700," and the court found the following facts, to wit:
The plaintiff's testator owned the land and lead ditch described in the complaint. The defendant in locating and constructing its roadbed, cut across said ditch and also cut ditches by the side of its roadbed to get dirt for the roadbed, and also to drain the roadbed. In constructing its roadbed the defendant cut across the embankment or dirt on the side of the lead ditch. By means of the locating and constructing of said roadbed more water was drained into plaintiffs' ditch than it could carry off, and the plaintiffs' land was flooded and injured thereby. The *Page 52 water thus carried by the defendant's ditches was surface water, except occasionally after heavy rains the water from the Dismal Swamp (22) would spread out over the surface from the ditch. There was no natural or artificial drain for these waters.
The "lead ditch" was sufficient to drain plaintiffs' land till defendant constructed its road.
The lands of plaintiffs' testator, over which the defendant constructed its roadbed and ditches, and also a section or part of the lead ditch had been condemned by regular proceedings under the statute and damages for the land taken, and the legal incidental damages to the lands not taken had been assessed and paid to him by the defendant.
The defendant did not locate and construct its roadbed or dig any ditch outside or off the lands which had been condemned and paid for.
The ditches cut by defendant were necessary for the purpose of the roadbed, for the road and for the safety of travel over the road, and the roadbed could not have been drained in any other way.
The plaintiff could have obviated the difficulty or relieved his land of this increased volume of water, drained into his lead ditch, by cutting the same deeper.
The plaintiff, upon the above facts and issue, moved for judgment for $700 and costs.
The court refused the motion, and upon defendant's motion, granted judgment for defendant. The plaintiff excepted, and from the rulings and judgment appealed. There is no error. It is found as a fact that the ditches, of which the plaintiffs complain, were necessary for the purposes of the roadbed; that the roadbed could not have been drained in any other way, and they were not outside or off of (23) the land which had been condemned and paid for by the defendant, including "the legal and incidental damages to the land not taken."
Every one has the right properly to use his own, and without this drainage for the surface water, the defendant's right of way, for which the plaintiff has been paid, would have been of no value, and if, as an incidental consequence of the lawful and rightful use of its easement by the defendant company, the surface water damages the land of the plaintiffs' testator it is damnum absque injuria, and for which he cannot recover as for a tort. R. A. Air Line R. R: v. Wicker and others,74 N.C. 220. *Page 53
It is no infringement of the maxim, "Sic utere tuo ut alienum nonlaedas." Washburn's Easements and Servitude, 453.
It was said in Willey v. R. R., 98 N.C. 263, speaking of the condemnation of the right of way: "Everything necessary and incident, to the original making and subsequent operating the road, must be intended to have passed as against the owner of the condemned land," and the right to cut such ditches on the condemned land as will protect the roadbed against accumulating surface water is a necessary incident.
The water drained by the defendant's ditches was all surface water, except occasionally, after heavy rains, the water from the Dismal Swamp would spread over the surface of the ditch. There was no natural or artificial drain to the Dismal Swamp and the ditches were not designed to drain it, and the overflow was none the less of surface water, which, we apprehend, could not have been caused or prevented by the ditches. In R. R.v. Wicker, supra, a distinction is taken between diverting or obstructing a natural or artificial drainway, and one by which surface water is drained.
In the latter, in measuring the compensation to the landowner, the resulting damage should be estimated, and this was one of "the legal incidental damages," which has been assessed and paid for (24) as found by the court.
In the former, it is the duty of the company, in constructing its roadbed, to provide for the discharge of the waters through its ascertained drainway, whether natural or artificial.
Affirmed.
Cited: Parks v. R. R., 143 N.C. 295; Bell v. R. R., 163 N.C. 180.