Filed
Washington State
Court of Appeals
Division Two
August 16, 2016
IN THE COURT OF APPEALS OF THE STATE OF WASHINGTON
DIVISION II
SPOKANE COUNTY; STATE OF No. 47158-2-II
WASHINGTON; DEPARTMENT OF
ECOLOGY,
Appellants,
v.
UNPUBLISHED OPINION
SIERRA CLUB, and CENTER FOR
ENVIRONMENTAL LAW & POLICY,
Respondents.
MELNICK, J. — This case arises out of a permit issued by the Department of Ecology
(Ecology) to Spokane County for the Spokane Regional Water Reclamation Facility (the Facility).
It centers on whether Ecology took the proper steps under the National Pollution Discharge
Elimination System (NPDES) permitting process to ensure the discharge from the Facility did not
contain unsafe Polychlorinated Biphenyls (PCB) levels. The Sierra Club and the Center for
Environmental Law and Policy (collectively Sierra Club) appealed the NPDES Permit. The
Pollution Control Hearing Board (PCHB) concluded that portions of the Permit were invalid and
remanded to Ecology. Spokane County and Ecology appealed the PCHB’s conclusions of law and
order of remand to Thurston County Superior Court. The superior court affirmed the PCHB.
Spokane County and Ecology now seek review.
47158-2-II
We hold that the PCHB properly decided Ecology should have conducted a reasonable
potential analysis. However, we also conclude that the PCHB acted contrary to the law by
performing its own reasonable potential analysis and determining the Facility had a reasonable
potential to cause or contribute to a violation of water quality standards for PCB levels in the
Spokane River. Independent of the PCHB’s own analysis, because Ecology should have
conducted a reasonable potential analysis, we conclude that remand was proper. We affirm in part,
reverse in part, and remand.1
FACTS
The Federal Clean Water Act establishes water quality goals for the United States’
navigable waters. 33 U.S.C. § 1251. The NPDES is one mechanism for achieving these goals.
33 U.S.C. § 1342. The Clean Water Act prohibits any discharge of pollutants into the nation’s
navigable waters, unless the discharge is made according to the terms of a permit issued under the
NPDES. 33 U.S.C. §§ 1311(a), 1342. The Environmental Protection Agency (EPA) authorized
Washington State to manage the NPDES permit program in the state. See RCW 43.21A.020;
WAC 173–226–030(5), –050(1). The Washington State Legislature delegated this authority to
Ecology. RCW 43.21A.020; ch. 90.48 RCW.
1
In addition to the issues we review in this opinion, Ecology also assigns error to the superior
court’s affirmation of the PCHB’s decision. However, we take the place of the superior court
when reviewing a PCHB order. Patterson v. Segale, 171 Wn. App. 251, 257-58 n.3, 289 P.3d 657
(2012). Furthermore, Ecology does not brief the issue. Therefore, we do not review this
assignment of error. RAP 3.3; Cowiche Canyon Conservancy v. Bosley, 118 Wn.2d 801, 809, 828
P.2d 549 (1992).
2
47158-2-II
I. THE FACILITY AND PERMIT
In 2011, Spokane County completed construction of the Facility, a state of the art
wastewater tertiary treatment plant.2 In phase 1, which began when the Facility opened, the
Facility was projected to process between 7 and 8 million gallons of water per day. The Facility
is projected to handle up to 12 million gallons of water per day by the year 2030 and 24 million
gallons of water per day at its maximum capacity. Prior to its construction, Riverside Park Water
Reclamation Facility processed wastewater in Spokane County. With the new technology utilized
by the Facility, it is expected to achieve higher PCB removal from the effluent discharges. 3 The
Facility’s treatment technology will “reduce the discharge of PCBs to the Spokane River at
potentially undetectable levels.” Clerk’s Papers (CP) at 24.
In September 2010, Spokane County applied for a NPDES permit for the Facility, and in
November 2011, Ecology issued the Permit. The Permit’s effective date is December 1, 2011, and
its expiration date is November 31, 2016. In December 2011, the Facility began discharging
treated effluent in compliance with the Permit. The Facility does not discharge to a part of the
Spokane River that is on the 303(d) list.4 Pub. L. No. 92-500, § 303(d), 86 Stat. 816, 848-49 (1972)
(codified as amended at 33 U.S.C. § 1313(d)).
2
A tertiary treatment process incorporates a “step-feed nitrification/denitrification membrane
bioreactor with chemical phosphorus removal” and several other key components. Administrative
Record (AR) at 272.
3
PCBs are “legacy pollutants that continue to persist in the environment.” Clerk’s Papers (CP) at
18. PCBs are in wastewater and are also introduced into the environment from other, sometimes
unidentified, sources.
4
The 303(d) list includes those waters not meeting Washington State human health water quality
criteria for PCBs in edible fish tissue. 33 U.S.C. § 1313(d)(1)-(2). Classification under the 303(d)
list triggers different requirements, such as a Total Maximum Daily Load assessment. 33 U.S.C.
§ 1313(a)(l); see 40 C.F.R. § 122.44(a), (l).
3
47158-2-II
A water quality specialist for Ecology, Richard Koch, reviewed the application, prepared
a Fact Sheet,5 and prepared the Permit. The Fact Sheet stated that Ecology evaluated the Facility’s
potential to violate the water quality standards as required by 40 C.F.R. § 122.44(d). It followed
the procedures published in two guidance documents6 to make a reasonable potential
determination.
Koch did not estimate a specific PCB concentration for the Facility discharge. According
to Koch, insufficient data on PCBs existed to conduct a reasonable potential analysis 7 and to
determine if a reasonable potential existed for the effluent discharge to contribute to violations of
5
A Fact Sheet is a document prepared by Ecology and includes information about the type of
facility, the geographical area, the criteria for which coverage under the general permit will be
approved, effluent characteristics, effluent standards and limitations applied, and other
information. WAC 173-226-110.
6
The Office of Water, U.S. Envtl. Prot. Agency, Technical Support Document for Water Quality-
Based Toxics Control (Mar. 1991) (EPA/505/2-90-001),
https://www3.epa.gov/npdes/pubs/owm0264.pdf, (TSD), and Ecology’s Wash. Dep’t of Ecology,
Water Quality Program Permit Writer’s Manual (rev. Dec. 2011) (Pub. No. 92-109) (Permit
Writer’s Manual).
7
According to Koch a “reasonable potential analysis” is
a tool to provide first an estimate of the concentrations of a pollutant at the edge of
the mixing zone. It’s basically using the dilution provided by the river of the
effluent discharged from the treatment plant. Numbers you need, obviously, the
flow in the river, the concentration upstream, and the concentration coming out of
the treatment facility. They both meet in the mixing zone, they combine, they mix,
and the model is designed to project what that combined concentration would be
downstream at the edge of the mixing zone.
RP (March 25, 2013) at 120-21.
4
47158-2-II
the PCB criteria. The Permit did not include numeric permit limitations for PCBs. 8 Koch drafted
permit conditions utilizing best management practices and narrative effluent limitations, or
narrative criteria.9
One condition of the Permit required Spokane County to prepare an “Annual Toxics
Management Report” that Ecology would review and approve. CP at 27-28. As a part of the
condition, Ecology also required Spokane County to prepare a “Quality Assurance Project Plan”
that detailed water quality sampling and analyzed protocols. CP at 30. Samples were to be
analyzed using EPA Method 1668, a method that was not approved for compliance purposes, but
was approved for monitoring purposes.10
The Permit provided that in the next permitting period, Ecology would conduct a
reasonable potential analysis from the data collected during the first permit. It would then establish
a numeric effluent limit. Koch asserted that similar permit conditions had been used in the NPDES
8
According to the Clean Water Act, an “effluent limitation” is “any restriction established by a
State or the Administrator on quantities, rates, and concentrations of chemical, physical, biological,
and other constituents which are discharged from point sources into navigable waters, the waters
of the contiguous zone, or the ocean, including schedules of compliance.” 33 U.S.C. § 1362(11).
The federal regulation specifies that an “[e]ffluent limitation means any restriction imposed by the
Director on quantities, discharge rates, and concentrations of ‘pollutants’ which are ‘discharged’
from ‘point sources’ into ‘waters of the United States,’ the waters of the ‘contiguous zone,’ or the
ocean.” 40 C.F.R. § 122.2.
9
Best management practices are to control or abate the discharge of pollutants when numeric
effluent limitations are infeasible. 40 C.F.R. § 122.44(k). According to the TSD, “[N]arrative
criteria are statements that describe the desired water quality goal, such as the following: ‘All State
waters must, at all times and flows, be free from substances that are toxic to humans or aquatic
life.’” AR at 2638.
10
EPA Method 1668 is a means of assessing compliance and offers lower detection and
quantification levels for surface water monitoring of PCBs than other methods. However, the
approved analytical method for surface water monitoring of PCBs at the time this Permit was
challenged was EPA Method 608, not Method 1668. EPA Method 1668 was only approved for
monitoring.
5
47158-2-II
permits for other dischargers into the Spokane River. The permits for each NPDES discharger in
Washington’s section of the Spokane River have narrative effluent limitations.
The Fact Sheet stated, “The Task Force and Ecology’s ‘Spokane River Toxics Reduction
Strategy’ are intended to avoid the need for a PCB [Total Maximum Daily Load assessment] and
initiate source reduction and clean up actions sooner than if a [Total Maximum Daily Load
assessment] came first.” Administrative Record (AR) at 1532. Further, it stated, “If the proposed
Task Force approach is not successful, other means and methods will be employed including the
option of a PCB [Total Maximum Daily Load assessment].” AR at 1532.
II. THE PCHB HEARING
Sierra Club appealed the Permit to the PCHB on December 28, 2011, arguing that the
Permit authorized PCB discharges that would cause or contribute to a violation of water quality
standards, including violations of 40 C.F.R. § 122.44.
In March 2013, the PCHB held a hearing on Sierra Club’s appeal of the Permit. During
the hearing, Sierra Club, Spokane County, and Ecology presented testimony from several experts
and interested parties. The expert witnesses included Koch, Peter deFur, and Bruce Rawls called
by Sierra Club, as well as Jim Bellatty and Khalil Abusaba called by Spokane County and Ecology.
The parties also introduced two reports at the hearing upon which the expert witnesses
relied. The first was a draft report that resulted from Ecology’s Total Maximum Daily Load
assessment for PCBs in the Spokane River in 2003-2004. The second report, entitled the
“Spokane River PCB Source Assessment 2003-2007” (Source Assessment), issued in April 2011.
In that report, Ecology estimated that PCB load reduction in excess of 99 percent by municipal,
industrial, and stormwater discharges would be needed for compliance with human health criterion
6
47158-2-II
for PCBs. The Source Assessment relied in part on the 2003-2004 data collection from the first
report.
Koch testified that at the time of the hearing, based on recent reports, he understood the
Facility was achieving 99 percent removal of PCBs. deFur testified that lab results from tests of
the Facility showed how many PCBs were in the influent and one assessment showed the
percentage removal of PCBs was about 98 percent. He stated, “It’s remarkable. I know that in
other areas where technical committees have been looking to see what can be done about that, they
would have said it’s not possible.” Report of Proceedings (RP) (March 26, 2013) at 277. Abusaba
testified that “we can’t tell the difference between effluent and ultra purified laboratory water.”
RP (March 27, 2013) at 576.
Abusaba also stated, “Koch was right, the discharge of effluent from the membrane
bioreactor system will not cause a measurable change in PCB concentrations of the river.” RP
(March 27, 2013) at 577. He clarified that while the discharge might actually be diluting the
concentration of PCBs in the water, “I would not want to make a statement [in] either direction
because we are beyond the limits of quantitation, and since we are below the limits of quantitation,
how can we say that there is a measurable change in concentrations or loads?” RP (March 27,
2013) at 616. He went on to state, “We are not at a level in these measurements we’re making that
we can make quantitative statements about the concentrations of PCBs.” RP (March 27, 2013) at
616. He stated the data was sufficient to show Koch’s judgment call that the PCB level would be
extraordinarily low was correct.
Koch testified that he did not perform a reasonable potential analysis for PCBs because
insufficient data existed to perform the analysis. Specifically, no monitoring of PCBs through the
kind of filter used by the Facility had occurred previously. When asked whether he was aware of
7
47158-2-II
and considered the Department of Health’s fish advisory for Spokane County while drafting, he
stated that he did not because fish migrate and therefore, “may or may not demonstrate” reasonable
potential. RP (March 25, 2013) at 73. He stated he looked at existing toxic pollutants but did not
consider the assessment’s conclusion in conducting a reasonable potential analysis. According to
Koch, the two data points acquired by the time of the PCHB hearing were not adequate to conduct
an analysis.
During his testimony, Koch also referred to a recent decision of the EPA in Idaho in a
comparable situation.11 In response to a comment during the open comment period, the EPA in
Idaho stated it had determined that “it is currently infeasible to calculate numeric water quality-
based effluent limits for PCBs . . . due to lack of data.” AR at 1536. It also stated, “The lack of
data also prevents the EPA from determining whether the Idaho publicly owned treatment works
[] have the reasonable potential to cause or contribute to excursions above any of the affected
jurisdictions’ water quality standards for PCBs.” AR at 1536. Finally, the EPA stated, “None of
the [NPDES] permits for [publicly owned treatment works] discharging to the Spokane River in
Idaho or Washington have numeric effluent limits for PCBs. . . . [BMPs] may be required in lieu
of numeric effluent limits when numeric effluent limits are infeasible or when they are reasonably
necessary to carry out the purposes and intent of the Clean Water Act.” AR at 1536.
Koch was asked to explain why in the Fact Sheet, he wrote, “The evaluation showed that
the discharge has no reasonable potential other than PCBs to cause a violation of water quality
standards.” AR at 1530. Koch explained that this statement did not mean he found a reasonable
potential for PCBs; instead, it meant “there is insufficient data on PCBs to make that determination.
11
The EPA is the regulatory agency in Idaho.
8
47158-2-II
So [he] [couldn]’t say there’s reasonable potential, no reasonable potential, if [he] d[i]dn’t have
data to make that determination.” RP (March 25, 2013) at 71.
The PCHB issued findings of fact and conclusions of law in July 2013. The PCHB found
that Ecology had access to information that a regulatory authority could consider when performing
a reasonable potential analysis. It found that Ecology had information about the type of facility,
the available dilution for the effluent, the existing data on toxic pollutants, the State’s list of waters
not meeting water quality standards, and fish advisories or bans. The PCHB also found that Koch
testified he was aware of the fish advisory but did not consider the information pertinent because
fish migrate and that Koch testified he did not use information already collected about Spokane
River because he wanted more recent data. Further, the PCHB found that Koch testified he did
not rely on the existing data on toxic pollutants because he did not have monitoring data on PCB
removal from a tertiary treatment process and “it would be too speculative to include load
reduction in the Fact Sheet.” CP at 27.
The PCHB concluded “Ecology should have used this data to conduct a reasonable
potential analysis for PCBs.” CP at 36. It also concluded that “the evidence presented support[ed]
the conclusion that there is a reasonable potential for the discharge from the Facility to cause or
contribute to a violation of water quality standards.” CP at 37.
The PCHB concurred with Koch and concluded that inadequate data existed to prepare a
numeric effluent limit for PCBs. It wrote, “The [PCHB] defers to the technical expertise of
Ecology on this matter and accepts [Koch’s] conclusion that calculation of a numeric effluent limit
for PCBs was not feasible.” CP at 37. It also concluded that one permit condition failed as a
narrative effluent limitation for lack of defined and mandatory language, as well as deadlines.
9
47158-2-II
The PCHB remanded the Permit to Ecology with directions to incorporate deadlines,
mandatory requirements, expected reductions, and additional sampling rounds. The PCHB
directed Ecology to set numeric effluent limitations at the “earliest possible time, including during
the term of the current permit.” CP at 41.
Sierra Club filed a motion for reconsideration seeking modification of the Permit to
“expressly prohibit discharges that cause or contribute to violations of all applicable water quality
standards related to PCBs.” AR at 2248. The PCHB denied the motion, and in August 2013,
entered a final order.
III. SUPERIOR COURT REVIEW
Ecology and Spokane County petitioned Thurston County Superior Court for review of the
PCHB’s findings of fact and conclusions of law and final order. Both Ecology and Spokane
County argued the PCHB erred by concluding that Ecology should have conducted a reasonable
potential analysis and by concluding that the evidence demonstrated that the Facility had a
reasonable potential to cause or contribute to a violation of water quality standards.
The superior court heard argument in October 2014. It concluded that “the PCHB did not
erroneously interpret and apply the law” and affirmed the PCHB. CP at 47. On January 9, 2015,
the superior court issued an order affirming the PCHB.
Ecology and Spokane County appeal.
ANALYSIS
I. STANDARDS OF REVIEW
We review a PCHB decision under the Washington Administrative Procedures Act, chapter
34.05 RCW. Cornelius v. Dep’t of Ecology, 182 Wn.2d 574, 584-85, 344 P.3d 199 (2015). We
sit in the same position as the superior court. Patterson v. Segale, 171 Wn. App. 251, 257-58 n.3,
10
47158-2-II
289 P.3d 657 (2012); see also RCW 34.05.526 (“An aggrieved party may secure appellate review
of any final judgment of the superior court under this chapter by the supreme court or the court of
appeals.”). Review of the facts is confined to the record before the PCHB, and we apply the
Washington Administrative Procedures Act standards directly to that record. Port of Seattle v.
Pollution Control Hr’gs Bd., 151 Wn.2d 568, 587, 90 P.3d 659 (2004). The burden to demonstrate
invalid agency action is on the party asserting the challenge, here Spokane County and Ecology.
RCW 34.05.570(1)(a); Port of Seattle, 151 Wn.2d at 587.
The legislature designated Ecology to regulate the state’s water resources. RCW
43.21A.020. Ecology is the state’s water pollution control agency, and it reviews NPDES permit
applications, prepares Fact Sheets, and issues NPDES permits. RCW 90.48.260(1); WAC 173-
220-010, -040, -060; Cmty. Ass’n for Restoration of Env’t v. Dep’t of Ecology, 149 Wn. App. 830,
835, 205 P.3d 950 (2009). “The scope and standard of the PCHB review is de novo.” Port of
Seattle, 151 Wn.2d at 592. The PCHB reviews NPDES permits to determine if Ecology issued a
permit that is “invalid in any respect.” RCW 43.21B.110.
If the PCHB makes this determination, it “shall order the department to reissue the permit
as directed by the [PCHB] and consistent with all applicable statutes and guidelines of the state
and federal governments.” WAC 371-08-540(2). In this case, we may grant relief on review of
the PCHB (1) if PCHB’s order is contrary to the law, (2) if the order is not supported by substantial
evidence, and (3) if the order is arbitrary and capricious. Cmty Ass’n for Restoration of Env’t, 149
Wn. App. at 840-41. In their appeal, Spokane County and Ecology rely on the first and third
prongs.
11
47158-2-II
An order is contrary to the law if it is outside of PCHB’s statutory authority or jurisdiction,
is an erroneous interpretation or application of the law, or is inconsistent with agency rule. Cmty
Ass’n for Restoration of Env’t, 149 Wn. App. at 840. The courts are the “‘final arbiter[s]’” of
conclusions of state law and are not bound by agency interpretation of these laws. City of Redmond
v. Cent. Puget Sound Growth Mgmt. Hr’gs Bd., 136 Wn.2d 38, 46, 959 P.2d 1091 (1998) (quoting
Leschi Improvement Council v. Highway Comm’n, 84 Wn.2d 271, 286, 525 P.2d 774, 804 P.2d 1
(1974)). We review the PCHB’s legal conclusions de novo. Fort v. Dep’t of Ecology, 133 Wn.
App. 90, 95, 135 P.3d 515 (2006).
An agency acts in an arbitrary or capricious manner when its action is “‘willful and
unreasoning and taken without regard to the attending facts or circumstances.’” Cmty. Ass’n for
Restoration of Env’t, 149 Wn. App. at 841 (quoting Hillis v. Dep’t of Ecology, 131 Wn.2d 373,
383, 932 P.2d 139 (1997)). Under this prong, even if reasonable opinions vary, we will not disrupt
the PCHB’s decision “[w]here there is room for two opinions, and the agency acted honestly and
upon due consideration.” Port of Seattle, 151 Wn.2d at 589.
A. Reasonable Potential Analysis
Spokane County and Ecology argue the PCHB improperly applied the law by concluding
Ecology “should have” conducted a reasonable potential analysis to determine whether PCBs from
the Facility had a reasonable potential to cause or contribute to contamination of the Spokane
River. Br. of Appellant (SC) at 18; Br. of Appellant (E) at 12. They contend that under the
guidance provided by the EPA, Ecology had discretion to decide whether to conduct a reasonable
potential analysis prior to issuing a NPDES permit without facility-specific data. Further, Spokane
12
47158-2-II
County opines that the exercise of discretion here involved Ecology’s expertise in administering
water quality laws and involves scientific issues.12 We disagree.
In reviewing a NPDES permit, the PCHB first assesses whether the permit provides
reasonable assurances to protect water quality. Port of Seattle, 151 Wn.2d at 595. It may create
additional conditions only after it concludes the permit is inadequate for this purpose. Port of
Seattle, 151 Wn.2d at 595. The legislature empowered Ecology to oversee permit regulation.
RCW 43.21A.020. Ecology’s interpretations of water resource statutes and regulations are entitled
to great weight, as long as the interpretation does not conflict with the plain language of the statutes
and regulations. Pub. Util. Dist. No. 1 of Clark County v. Pollution Control Hr’gs Bd., 137 Wn.
App. 150, 157, 151 P.3d 1067 (2007). However, even if a PCHB order is found to be inconsistent
with an agency rule, no relief should be granted if the ‘“[PCHB] provides facts and reasons to
demonstrate a rational basis for the inconsistency.”’ Cmty. Ass’n for Restoration of Env’t, 149
Wn. App. at 840 (quoting Port of Seattle, 151 Wn.2d at 587-88).
Here, Ecology interpreted several state and federal statutes and concluded that it did not
need to conduct a reasonable potential analysis before it issued the initial permit because Koch
determined insufficient data existed. The main regulation in question is contained in 40 C.F.R. §
122.44(d)(1), which provides,
(i) Limitations must control all pollutants or pollutant parameters (either
conventional, nonconventional, or toxic pollutants) which the Director determines
are or may be discharged at a level which will cause, have the reasonable potential
to cause, or contribute to an excursion above any State water quality standard,
including State narrative criteria for water quality.
12
Sierra Club argues that the majority of Spokane County’s and Ecology’s assertions revolve
around substantial evidence for the PCHB’s findings of fact. However, Spokane County and
Ecology do not challenge any of the PCHB’s findings of fact. They challenge only PCHB’s
conclusions of law and the resulting order. Applying the law to facts is a question of law and
therefore, we review de novo. Port of Seattle, 151 Wn.2d at 588.
13
47158-2-II
(ii) When determining whether a discharge causes, has the reasonable potential to
cause, or contributes to an in-stream excursion above a narrative or numeric criteria
within a State water quality standard, the permitting authority shall use procedures
which account for existing controls on point and nonpoint sources of pollution, the
variability of the pollutant or pollutant parameter in the effluent, the sensitivity of
the species to toxicity testing (when evaluating whole effluent toxicity), and where
appropriate, the dilution of the effluent in the receiving water.
(iii) When the permitting authority determines, using the procedures in paragraph
(d)(1)(ii) of this section, that a discharge causes, has the reasonable potential to
cause, or contributes to an in-stream excursion above the allowable ambient
concentration of a State numeric criteria within a State water quality standard for
an individual pollutant, the permit must contain effluent limits for that pollutant.
(Emphasis added).
The Wash. Dep't of Ecology, Water Quality Program Permit Writer’s Manual (rev. Dec.
2011) (Pub. No. 92-109) (Permit Writer’s Manual), relied on by Koch in preparing the Permit,
interpreted this federal regulation, and stated, “Federal regulations require the permit manager to
determine whether a discharge has a reasonable potential to violate water quality standards and if
so to place a water quality-based effluent limit in the permit.” AR at 2495. Further it stated, “To
determine this, the permit manager must know the criteria, the background concentration, the point
of compliance, design flows for the receiving water and effluent flow, how to deal with multiple
pollutants and effluent variability and the process of developing an effluent limit.” AR at 2495.
The Permit Writer’s Manual stated that “Ecology has adopted EPA’s (1991) process of
determining reasonable potential.” AR at 2500. It also stated that it relies on the Office of Water,
U.S. Envtl. Prot. Agency, Technical Support Document for Water Quality-Based Toxics Control
(Mar. 1991) (EPA/505/2-90-001), https://www3.epa.gov/npdes/pubs/owm0264.pdf (TSD).
The TSD, also relied on by Koch, “is intended to support the implementation of the [Clean
Water Act] water quality-based approach to toxics control” and qualifies this support by stating,
14
47158-2-II
“As such, the recommendations and guidance found in [the TSD] are not binding and should be
used by regulatory authorities with discretion.” AR at 2606. The TSD provided very specific
guidance for determining permit limits when no effluent monitoring data for the specific facility
existed. It stated that “effluent must be characterized and the permitting authority must determine
the need for permit limits to control the discharge. The purpose of effluent characterization is to
determine whether the discharge causes, has the reasonable potential to cause or contributes to an
excursion of numeric or narrative water quality criteria.” AR at 2653 (emphasis added).
Further, it in part paraphrased and in part quoted 40 C.F.R. § 122.44(d)(1)(ii) stating,
“[T]he regulatory authority is required to consider, at a minimum, existing controls on point and
nonpoint sources of pollution, the variability of the pollutant or pollutant parameter in the effluent,
the sensitivity of the involved species to toxicity testing (for whole effluent), and, where
appropriate, the dilution of the effluent in the receiving water.” AR at 2655. In the context of
providing two options—setting a permit limit (1) without effluent monitoring data or (2) after
effluent monitoring data—the TSD stated,
If the regulatory authority so chooses, or if the circumstances dictate, the
authority may decide to develop and impose a permit limit . . . prior to the
generation of effluent data. Water quality-based permit limits can be set . . . based
on the available dilution and the water quality criterion or the State standard in the
absence of facility specific effluent monitoring data.
AR at 2656. It went on to state that “the regulatory authority can use a variety of factors and
information where facility-specific effluent monitoring data are unavailable,” which include but
are not limited to dilution, type of industry, type of publicly owned treatment works, existing data
on toxic pollutants, history of compliance problems and toxic impact, and type of receiving water
and designated use. AR at 2656.
Finally, the TSD stated,
15
47158-2-II
Regardless, the regulatory authority, if it chooses to impose an effluent limit
after conducting an effluent assessment without facility-specific monitoring data,
will need to provide adequate justification for the limit in its permit development
rationale or in its permit fact sheet. A clear and logical rationale for the need for
the limit covering all of the regulatory points will be necessary to defend the limit
should it be challenged. In justification of a limit, EPA recommends that the
more information the authority can acquire to support the limit, the better a
position the authority will be in to defend the limit if necessary. In such a case,
the regulatory authority may well benefit from the collection of effluent monitoring
data prior to establishing the limit.
If the regulatory authority, after evaluating all available information on the
effluent, in the absence of effluent monitoring data, is not able to decide whether
the discharge causes, has the reasonable potential to cause, or contributes to, an
excursion above a numeric or narrative criterion for whole effluent toxicity or for
individual toxicants, the authority should require whole effluent toxicity or
chemical-specific testing to gather further evidence. In such a case, the regulatory
authority can require the monitoring prior to permit issuance, if sufficient time
exists, or it may require the testing as a condition of the issued/reissued permit.
AR at 2657.
Ecology contends that the interpretation of federal regulations in the Permit Writer’s
Manual and the TSD gave it the choice to either conduct a reasonable potential analysis without
facility specific data, or to wait and collect PCB data. While Ecology’s interpretation of water
resource statutes and regulations is afforded great deference, the interpretation cannot go against
the plain language of the statutes and regulations. Pub. Util. Dist. No. 1 of Clark County, 137 Wn.
App. at 157.
The federal regulation mandates that “[l]imitations must control all pollutants . . . which
the [agency] determines are or may be discharged at a level which will cause, have the reasonable
potential to cause, or contribute to an excursion above any State water quality standard.” 40 C.F.R.
§ 122.44(d)(1)(i) (emphasis added). To make the determination, the agency “shall use procedures
which account for existing controls on point and nonpoint sources of pollution, the variability of
the pollutant or pollutant parameter in the effluent, the sensitivity of the species to toxicity testing
16
47158-2-II
(when evaluating whole effluent toxicity), and where appropriate, the dilution of the effluent in
the receiving water.” 40 C.F.R. § 122.44(d)(1)(ii) (emphasis added). The plain language of the
regulation does not grant Ecology discretion to delay a reasonable potential analysis entirely.
Further, the section of the TSD Ecology relied on, when read in full, did not provide
Ecology discretion on whether to conduct the analysis, but instead afforded Ecology discretion in
how it conducted the analysis. In context, the TSD stated that if the agency decided to conduct a
reasonable potential analysis before it had collected facility-specific data, and after relying on the
available information to conduct the analysis it could not reach a conclusion, the agency could
issue a permit that required testing and data collection.
Spokane County argues that the TSD “cautions Ecology in [making a determination by
reference to other information], and allows instead the course Ecology choose.” Br. of Appellant
(SC) at 20. However, this argument again takes the TSD language out of context. The TSD
generally cautions against creating a permit limit before collecting facility-specific data, not
against relying on the suggested factors. It recommends that the permitting authority be prepared
to defend the limit and that it “may well benefit from the collection of effluent monitoring data
prior to establishing the limit.” AR at 2657 (emphasis added). Following Spokane County’s
argument to its natural conclusion reveals its tenuousness. The permitting authority would be
encouraged to avoid and defer analyses meant to protect water quality, so as to not trigger other
regulation requirements. For these reasons, we reject Spokane County’s argument.
Ecology compares the decision to delay a reasonable potential analysis to the EPA’s similar
decision in Idaho on nearly identical facts. In response to comments from the Spokane Tribe of
Indians, the EPA in Idaho wrote, “Numeric toxics control remains an option once we have better
data, an appropriate test method approved for use in NPDES permits, and in the event that the
17
47158-2-II
[Spokane River Regional Toxics Task Force] fails to achieve measurable reductions in PCB
loads.” AR at 3751. The EPA also responded, “[I]t is currently infeasible to calculate numeric
water quality-based effluent limits for PCBs . . . due to the lack of data.” AR at 1536. It further
stated, “The lack of data also prevents the EPA from determining whether the Idaho publicly
owned treatment works (PTOWs) have the reasonable potential to cause or contribute to
excursions above any of the affected jurisdictions’ water quality standards for PCBs.” AR at 1536.
These responses do not demonstrate that the EPA believed a reasonable potential analysis
prior to issuing a permit was discretionary. Instead, the responses show that the EPA agreed that
there was insufficient data to create a numeric permit limit and that a reasonable potential analysis
was inconclusive. This construal is in line with our above interpretation of the federal regulation.
We conclude that federal regulations required Ecology to conduct a reasonable potential
analysis before issuing the Facility a permit but that it has discretion in how to perform the analysis.
Because Ecology declared it did not conduct such an analysis, we do not consider whether
Ecology’s discretion to exercise scientific expertise was usurped by the PCHB in this context. The
PCHB did not err by concluding Ecology “should have” conducted a reasonable potential analysis.
Spokane County and Ecology also argue that the PCHB should not have ordered Ecology
to modify a Permit condition because Ecology was not required to include a water quality based
effluent limitation for PCBs. Spokane County argues the PCHB lacked authority to direct Ecology
to modify the permit because the PCHB did not make the conclusion that the Permit was invalid.
We do not reach this issue.
18
47158-2-II
“In those cases where the board determines that the department issued a permit that is
invalid in any respect, the board shall order the department to reissue the permit as directed by the
board and consistent with all applicable statutes and guidelines of the state and federal
governments.” WAC 371-08-540(2) (emphasis added). Here, the Permit was invalid because
Ecology failed to conduct a reasonable potential analysis. Therefore, when the PCHB arrived at
this conclusion, remand was the proper remedy. For this reason, we do not decide whether the
PCHB properly concluded the Permit conditions flowing from Ecology’s failure to conduct a
reasonable potential analysis were inadequate. We remand to Ecology to conduct a reasonable
potential analysis.13
B. Reasonable Potential Conclusion
Spokane County and Ecology argue the PCHB compounded its first error by making its
own determination about the reasonable potential analysis. Ecology contends that even if we
conclude the PCHB did not err by deciding Ecology should have conducted a reasonable potential
analysis, we should reverse the PCHB’s order to remand the Permit because the PCHB erred by
determining there was a reasonable potential PCB discharges would cause or contribute to a
violation of water quality standards. We agree with Ecology that the PCHB should not have
conducted its own reasonable potential analysis.
“‘“[I]n reviewing matters within agency discretion, the court shall limit its function to
assuring that the agency has exercised its discretion in accordance with law, and shall not itself
undertake to exercise the discretion that the legislature has placed in the agency.”’” Puget Sound
13
We do note that Ecology cannot avoid setting limits by simply not conducting the reasonable
potential analysis. Instead, the language Spokane County and Ecology rely on to justify the permit
conditions is triggered when a reasonable potential analysis is conducted and it is determined there
is no reasonable potential for contaminating the water, not when Ecology declines to conduct any
analysis .
19
47158-2-II
Harvesters Ass’n v. Dep’t of Fish & Wildlife, 182 Wn. App. 857, 867, 332 P.3d 1046 (2014)
(quoting Rios v. Dep’t of Labor & Indus., 145 Wn.2d 483, 502 n.12, 39 P.3d 961 (2002) (quoting
RCW 34.05.574(1))). ‘“[S]ubstantial judicial deference to agency views [is] appropriate when an
agency determination is based heavily on factual matters, especially factual matters which are
complex, technical, and close to the heart of the agency’s expertise.’” Puget Sound Harvesters
Ass’n, 182 Wn. App. at 867 (quoting Hillis, 131 Wn.2d at 396).
However, our Supreme Court has previously highlighted the special relationship Ecology
shares with the PCHB as contrasted with other agency and board relationships. See Port of Seattle,
151 Wn.2d at 594. This relationship results from the EPA’s specific delegation of authority to
Ecology. Port of Seattle, 151 Wn.2d at 594. The PCHB’s role is to review permits and if it finds
them “invalid in any respect” to remand to Ecology. WAC 371-08-540(2). Ecology, not the
PCHB, is the agency empowered by the EPA to issue, manage, and regulate permits in Washington
State. RCW 43.21A.020; see also RCW 90.48.520 (“In order to improve water quality by
controlling toxicants in wastewater, [Ecology] shall in issuing and renewing state and federal
wastewater discharge permits review the applicant’s operations and incorporate permit conditions
which require all known, available, and reasonable methods to control toxicants in the applicant’s
wastewater.” (Emphasis added.)). “Rule making, interpretive, and enforcement functions remain
with Ecology, the agency ‘charged with administration’ of water quality statutes and rules.” Port
of Seattle, 151 Wn.2d at 592 (quoting Dep’t of Ecology v. Theodoratus, 135 Wn.2d 582, 589, 957
P.2d 1241 (1998)).
The PCHB concluded that “the evidence presented support[ed] the conclusion that there is
a reasonable potential for the discharge from the Facility to cause or contribute to a violation of
water quality standards.” CP at 36-37. Ecology argues that the PCHB improperly applied the law
20
47158-2-II
by using five factors from the EPA’s guidance to conduct a reasonable potential analysis without
facility-specific data and from those factors, concluding there was a reasonable potential that
discharge from the Facility would cause or contribute to a violation of water quality standards.14
We agree.
In Port of Seattle, the PCHB imposed 16 new conditions on a Clean Water Act certification
after Ecology performed a “reasonable assurance” analysis. 151 Wn.2d at 600-01. The PCHB
determined that without the new conditions, reasonable assurance would not be met. Port of
Seattle, 151 Wn.2d at 600-01. The appellants argued that the PCHB should have remanded to
Ecology rather than “‘repairing’ [the Clean Water Act] certification with new conditions.” Port
of Seattle, 151 Wn.2d at 601. The Washington Supreme Court held that “[g]iven the PCHB’s
statutory role requiring it to provide uniform and independent review of Ecology’s actions, it is
well within the PCHB’s authority to add conditions in order to bring a [Clean Water Act]
certification into the realm of reasonable assurance.” Port of Seattle, 151 Wn.2d at 601.
In contrast, here, the PCHB was not reviewing Ecology’s reasonable potential analysis but
was conducting its own initial analysis. It could not conduct a de novo review of Ecology’s
analysis because Ecology acknowledged it did not perform one. The PCHB was not empowered
to conduct a reasonable potential analysis. See RCW 43.21A.020; see also Port of Seattle, 151
Wn.2d at 592 (“Rule making, interpretive, and enforcement functions remain with Ecology, the
agency ‘charged with administration’ of water quality statutes and rules.”). In doing so, we
conclude the PCHB acted outside its statutory authority.
14
Spokane County does not assert these arguments in its brief.
21
47158-2-II
We affirm the PCHB in part, reverse in part, and remand to Ecology.
A majority of the panel having determined that this opinion will not be printed in the
Washington Appellate Reports, but will be filed for public record in accordance with RCW 2.06.040,
it is so ordered.
Melnick, J.
We concur:
Worswick, P.J.
Lee, J.
22