J. A21021/16
NON-PRECEDENTIAL DECISION - SEE SUPERIOR COURT I.O.P. 65.37
ROBERT AND MARYANN BERGER, : IN THE SUPERIOR COURT OF
: PENNSYLVANIA
Appellants :
:
v. :
:
PECO ENERGY COMPANY, :
:
Appellee : No. 3778 EDA 2015
Appeal from the Order Entered January 28, 2016
In the Court of Common Pleas of Chester County
Civil Division at No.: 2014-04507
BEFORE: BENDER, P.J.E., DUBOW, J., and MUSMANNO, J.
MEMORANDUM BY DUBOW, J.: FILED SEPTEMBER 22, 2016
Appellants Robert and MaryAnn Berger, plaintiffs below, appeal from
the Judgment entered January 28, 2016, after the entry of a compulsory
nonsuit in favor of Appellee PECO Energy Company following a bench trial.
We affirm.
The underlying facts, as summarized in the trial court’s Pa.R.A.P.
1925(a) Opinion filed on January 15, 2016, are as follows:
This trespass action was filed by Appellants, seeking relief for
PECO’s purported interference with their rights, as property
owners, to use and enjoy their property as they wish and their
ability to compel a trespasser to remove unwanted chattels from
above, on or below the property. [Appellants sought a
permanent mandatory injunction.]
Appellants reside at 46 Blenheim Hill Lane in Malvern,
Pennsylvania, a residence which they purchased in 2004.
Blenheim Hill Lane is characterized as a flag lot with a long
driveway serving two houses. In 2013, PECO entered
J. A21021/16
Appellants’ property for purposes of installing a new
underground electric cable located on the east side of the
driveway. The old cable located on the west side of the drive
was abandoned due to electric service reliability issues.
PECO’s placement of the underground electric facilities is
governed by an Easement entered into by PECO’s predecessor,
Philadelphia Energy Company, and the original property owners,
the Feehrers. The Easement granted PECO:
The uninterrupted right, liberty and privilege to
install, operate, maintain, inspect, renew, repair and
remove underground electric facilities required to
supply electric service to the premises and those
adjacent thereto.
Such rights were limited by three express conditions:
The aforesaid rights are granted under and subject
to the following conditions:
(1) The location of the electric facilities to be
installed hereunder shall be shown and delineated on
plans prepared by Company copies of which will be
in the possession of the parties hereto having first
been approved by them.
(2) The undersigned agree that the initial exercise of
any of the powers and rights herein granted shall not
be construed as fixing or limiting Company's rights
and privileges hereunder.
(3) The undersigned agree that no building or
permanent structure shall be erected over the
underground facilities.
The Easement was executed on behalf of the Feehrers, the
original landowners, and Philadelphia Electric Company on June
23, 1978.
Trial Court Opinion, filed 1/15/16, at 1-3.
-2-
J. A21021/16
During a bench trial on August 26, 2015, the trial court granted
PECO’s oral Motion for Compulsory Nonsuit.1 Appellants filed a Post-Trial
Motion, which the trial court denied on December 2, 2015.
Appellants filed a Notice of Appeal on December 18, 2015, prior to the
entry of final judgment on January 28, 2016.2 Both Appellants and the trial
court complied with Pa.R.A.P. 1925.
Appellants present three issues for our review:
1. Did the Court commit legal error in finding that the Easement
permitted PECO to install the New Cable anywhere it wanted on
the Bergers’ property?
2. Did the Court commit legal error in concluding that any
trespass committed by PECO would have been a permanent
trespass, as opposed to a continuing trespass?
3. Did the Court commit legal error in requiring the Bergers to
show actual harm in order to show a trespass and to show the
insufficiency of money damages [to] obtain a mandatory
injunction?
Appellants’ Brief at 4.
Appellants first challenge the trial court’s interpretation of PECO’s
easement. We review the trial court’s interpretation of the language in an
1
See Pa.R.C.P. No. 230.1 (entitled “Compulsory Nonsuit at Trial”).
2
Although Appellants filed their Notice of Appeal prematurely, we will treat it
as properly filed. See Pa.R.A.P. 905 (“A [N]otice of [A]ppeal filed after the
announcement of a determination but before the entry of an appealable
order shall be treated as filed after such entry and on the day thereof.”).
We further note that the entry of final judgment is the proper appealable
Order following the entry of a compulsory nonsuit. See Rachlin v.
Edmison, 813 A.2d 862, 864 n.1 (Pa. Super. 2002) (en banc) (final
judgment is proper appealable order following the entry of nonsuit).
-3-
J. A21021/16
easement as a question of law; as such, our scope of review is plenary.
PARC Holdings, Inc. v. Killian, 785 A.2d 106, 112 (Pa. Super. 2001).
“[T]he same rules of construction that apply to contracts are applicable in
the construction of easements[.]” McNaughton Properties, LP v. Barr,
981 A.2d 222, 227 (Pa. Super. 2009) (citation omitted).
As with any contract the rights conferred by the grant of an
express easement must be ascertained solely from the language
of the deed, provided that the deed language is unambiguous.
When the language is ambiguous, however, a court may resort
to evidence of extrinsic circumstances as an aid to
interpretation. When the purposes of an express easement are
not specifically stated, the court must ascertain the objectively
manifested intention of the parties in light of the circumstances
in existence at the time of conveyance. Whether an ambiguity
exists is a question of law subject to plenary review. However,
resolution of conflicting parol evidence relevant to what the
parties intended by an ambiguous provision is for the trier of
fact.
PARC Holdings, supra at 112 (citations omitted).
The Honorable Jeffrey R. Sommer, sitting as the trial court, has
authored a comprehensive, thorough, and well-reasoned opinion, citing to
the record and relevant case law in addressing Appellants’ challenge to his
interpretation of the easement. After a careful review of the parties’
arguments and the record, we affirm on the basis of the trial court’s Opinion.
See Trial Court Opinion at 5-8, 14 (concluding that it properly granted
compulsory nonsuit because: “(1) the Easement was unambiguous, allowing
PECO to place the new electrical cable on the Appellants’ property without
-4-
J. A21021/16
first submitting written plans and obtaining permission from Appellants, and
(2) the Appellants did not show the existence of any injury or damages.”).
Appellants next challenge the trial court’s legal conclusion that any
trespass by PECO would constitute a permanent rather than a continuing
trespass, which would alter the availability of equitable remedies to
Appellants. Appellants argue that if PECO’s trespass is properly classified as
a continuing trespass, they would be entitled to a mandatory injunction
forcing PECO to remove the offending cable without a showing of harm; if
the trespass is classified as a permanent trespass, as the trial court
concluded, Appellants would be entitled to seek money damages after
demonstrating harm.
“In reviewing a question of law, our standard of review is de novo and
our scope is plenary.” WellSpan Health v. Bayliss, 869 A.2d 990, 996
(Pa. Super. 2005). The Second Restatement of Torts explains the difference
between a continuing and a permanent trespass as follows:
A continuing trespass must be distinguished from a trespass
which permanently changes the physical condition of the land.
Thus, if one, without a privilege to do so, enters land of which
another is in possession and destroys or removes a structure
standing upon the land, or digs a well or makes some other
excavation, or removes earth or some other substance from the
land, the fact that the harm thus occasioned on the land is a
continuing harm does not subject the actor to liability for a
continuing trespass. Since his conduct has once for all produced
a permanent injury to the land, the possessor’s right is to full
redress in a single action for the trespass, and a subsequent
transferee of the land, as such, acquires no cause of action for
the alteration of the condition of the land.
-5-
J. A21021/16
Restatement (Second) of Torts § 162 cmt. e (1965).
After a careful review of the parties’ arguments and the record, we
affirm on the basis of the trial court’s Opinion. See Trial Court Opinion at 8-
11 (concluding PECO did not commit a trespass because PECO’s entry was
privileged pursuant to its rights under the easement; moreover, any
trespass would have constituted a permanent trespass because PECO
excavated land to place the cable and permanently changed the condition of
the land).
In their third issue, Appellants aver that the trial court erred as a
matter of law “in requiring the [Appellants] to show actual harm in order to
show a trespass and to show the insufficiency of money damages [to] obtain
a mandatory injunction[.]” Appellants’ Brief at 4.
“Appellate review of the grant or denial of a permanent injunction is
limited to determining whether the trial court committed an error of law.”
WellSpan Health, supra at 995-96.
A mandatory injunction is an extraordinary remedy that should be
granted only in the “rarest of cases.” Summit Towne Centre, Inc. v.
Shoe Show, 828 A.2d 995, 1005 n.13 (Pa. 2003). Appellate courts exercise
greater scrutiny over mandatory injunctions, which should be issued more
sparingly than injunctions which are merely prohibitory in nature. Id.
“Thus, in reviewing the grant of a mandatory injunction, we have insisted
that a clear right to relief in the plaintiff be established.” Overland
-6-
J. A21021/16
Enterprise, Inc. v. Gladstone Partners, LP, 950 A.2d 1015, 1020 (Pa.
Super. 2008) (citation omitted).
After a careful review of the parties’ arguments and the record, we
affirm on the basis of the trial court’s Opinion. See Trial Court Opinion at
11-14 (concluding Appellants failed to satisfy any of the prerequisites for a
permanent mandatory injunction, and failed to demonstrate any damages,
injury, or “urgent necessity” for a mandatory injunction).
The parties are instructed to attach a copy of the trial court’s January
15, 2016 Opinion to all future filings.
Order affirmed.
Judgment Entered.
Joseph D. Seletyn, Esq.
Prothonotary
Date: 9/22/2016
-7-
Circulated 09/08/2016 03:12 PM
672a
ROBERT BERGER and IN THE COURT OF COMMON PLEAS
MARYANN BERGER CHESTER COUNTY, PENNSYLVANIA
Plaintiffs
VS. NO. 2014-04507
PECO ENERGY COMPANY
Defendant CIVIL ACTION - LAW
Stuart D. Laurie, Esquire, on behalf of Plaintiffs
,,
Jared Todd Hay, Esquire, on behalf of Defendant
Sommer, J. January ,2016
OPINION PURSUANT TO RULE 1925
I. PROCEDURAL SETTING
This matter comes before this Court as a result of an appeal filed by Robert
Berger and MaryAnn Berger (hereinafter "Appellants") on December 18, 2015, from
the Order dated December 2, 2015, denying Appellants' post-trial motions following
oral argument held on November 30, 2015. A non-jury trial in this matter was held on
August 26, 2015, during which I granted Appellee PECO Energy Company's
(hereinafter, "PECO") oral motion for compulsory nonsuit. On December 18, 2015, I
issued an Order directing Appellants to file a Concise Statement of Matters
Complained Of on Appeal. Appellants submitted a timely Concise Statement on
January 7, 2015. The matter is now ready for determination.
II. FACTS
This trespass action was filed by Appellants, seeking relief for PECO's
purported interference with their rights, as property owners, to use and enjoy their
property as they wish and their ability to compel a trespasser to remove unwanted
673a
chattels from above, on or below the property.
Appellants reside at 46 Blenheim Hill Lane in Malvern, Pennsylvania, a
residence which they purchased in 2004. Blenheim Hill Lane is characterized as a flag
lot with a long driveway serving two houses. In 2013, PECO entered Appellants'
property for purposes of installing a new underground electric cable located on the
east side of the driveway. The old cable located on the west side of the drive was
abandoned due to electric service reliability issues.
PECO's placement of the underground electric facilities is governed by an
Easement entered into by PECO's predecessor, Philadelphia Energy Company, and
the original property owners, the Feehrers. The Easement granted PECO:
The uninterrupted right, liberty and privilege to install,
operate, maintain, inspect, renew, repair and remove
underground electric facilities required to supply electric
service to the premises and those adjacent thereto.
Such rights were limited by three express conditions:
The aforesaid rights are granted under and subject to the
following conditions:
(1) The location of the electric facilities to be installed
hereunder shall be shown and delineated on plans
prepared by Company copies of which will be in the
possession of the parties hereto having first been
approved by them.
(2) The undersigned agree that the initial exercise of any of
the powers and rights herein granted shall not be
construed as fixing or limiting Company's rights and
privileges hereunder.
(3) The undersigned agree that no building or permanent
structure shall be erected over the underground
facilities.
2
674a
The Easement was executed on behalf of the Feehrers, the original landowners, and
Philadelphia Electric Company on June 23, 1978.
Appellants' Concise Statement claims that the court erred in six ways,
summarized as follows:
1. The Court erred by not granting Plaintiff's Motion for Summary
Judgment.
2. The Court erred by excluding testimony, evidence and admissions from
PECO representative, Debra Morgan, whose testimony purportedly contradicted
PECO's central litigation position that it was under no obligation to seek homeowner
approval for relocating an electric cable from one side of the driveway to the other.
3. The Court erred by granting Defendant PECO's oral motion for nonsuit
and entering a verdict for Defendant for the following reasons:
a. The Court erred in its legal interpretation of the Easement when it
found that the Easement's Condition #1 applied only to the
original property owners, not Appellants, thereby permitting PECO
to relocate the electric cable without obtaining homeowner
approval.
b. The Court erred by requiring Appellants to demonstrate monetary
damages as a result of PECO's alleged trespass or that monetary
damages would not be sufficient to remedy PECO's alleged
conduct.
4. The Court erred in finding no trespass was committed by PECO.
5. The Court erred in finding that PECO's conduct constituted a continuing
trespass.
3
675a
6. The Court erred in disregarding the controlling authority of Jones v.
Wagner, 624 A.2d 166 (Pa. Super. Ct. 1992).
Several of these issues will be combined and addressed together.
Ill. ISSUE
Whether the Court's granting of PECO's motion for compulsory nonsuit should
be affirmed.
IV. HOLDING
Yes, the entry of compulsory nonsuit entered on behalf of PECO should be
affirmed because Appellants failed to meet their burdens establishing a right to the
relief requested.
V. RATIONALE
A. This Court did not Err in Denying Appellants' Motion for Summarv
,Judgment
Appellants moved for summary judgment on July 14, 2015, requesting that this
Court enter judgment in their favor as a matter of law as to the interpretation of
Appellants' rights under the Easement. Finding the arguments to be lacking merit,
Appellants' motion for summary judgment was denied. Appellants then raised the
same issues at trial and, for the reasons discussed herein, the Court granted PECO's
motion for compulsory nonsuit after determining that Appellants failed to establish a
right to relief. Thus, the Court's analysis regarding denial of Appellants' motion for
summary judgment is addressed below.
8. This Court did not Err in excluding testimony, evidence, and admissions
from Debra Morgan
This issue was not raised and/or briefed in Appellants' Post-Trial Motion and,
therefore, it is deemed waived for purposes of appeal and need not be addressed
4
676a
herein. See, Diamond Rea Truck Co. v. Mid-Pacific Industries, Inc., 806 A.2d 423,
428 (Pa.Super.2002) (quoting L.B. Foster Co. v. Lane Enterprises, Inc., 710 A.2d 55,
55 (Pa.1998)).
C. This Court did not Err in Granting PECO's Oral Motion for Nonsuit
In granting PECO's oral motion for nonsuit at the conclusion of Appellants' case
at trial, the Court found that (1) the Easement was unambiguous, allowing PECO to
place the new electrical cable on the Appellants' property without first submitting
written plans and obtaining permission from Appellants, and (2) the Appellants did not
show the existence of any injury or damages. Appellants contend that I erred in
granting PECO's nonsuit as a matter of law.
Pennsylvania Rule 230.1 of Civil Procedure governs compulsory nonsuits at
trial. A motion for compulsory nonsuit allows a defendant to test the sufficiency of a
plaintiff's evidence. See, Francioni v. Gibsonia Truck Corp., 372 A.2d 736 (Pa. 1977).
A trial court may enter a compulsory nonsuit on any and all causes of action if, at the
close of the plaintiff's case against all defendants on liability, the court finds that the
plaintiff has failed to establish a right to relief. Pa.R.C.P. No. 230.1(a), (c): see also,
Biddle v. Johnsonbaugh, 664 A.2d 159 (Pa. Super. 1995) and Orner v. Mallick, 639
A.2d 491, 492 (Pa. Super. 1994). On appeal, entry of a compulsory nonsuit is affirmed
only if no liability exists based on the relevant facts and circumstances, with appellant
receiving "the benefit of every reasonable inference and resolving all evidentiary
conflicts in [appellant's] favor." See, Agnew v. Dupler, 717 A.2d 519, 523 (Pa. 1998).
At the outset of this analysis, it is highlighted that the parties agreed that the
Easement is an unambiguous document which speaks for itself. As an unambiguous
document, it is subject to the Court's interpretation as a matter of law. See, Banks
5
677a
Engineering Co., Inc., v. Polons, 697 A.2d 1020, 1022 (Pa.Super.1997)(citations
omitted), appeal granted, 706 A.2d 121 O (Pa. 1998). Appellants were not signatories
to the Easement at issue. The document does not contain any grant of rights to the
successors or assigns of the original landowners; in contrast, however, the Easement
does include a grant of rights to the then existing company, but also to PECO, which is
the successor to its prior company. Thus, I gave consideration to the fact that the
drafters and negotiators of this document specifically granted successor rights to
PECO and did not do the same for any successors or assigns of the original
landowners. See, Meeting House Lane, Ltd. v. Melso, 628 A.2d 854, 857 (Pa. Super.
1993)("1ndetermining the intent of the parties to a written agreement, the court looks
to what they have clearly expressed, for the law does not assume that the language in
the document was chosen carelessly."). When the terms in an agreement are not
defined, the Court should construe its terms "in accordance with their natural, plain
and ordinary meaning." See, Cordero v. Potomac Ins. Co. of Illinois, 794 A.2d 897,
900 (Pa. Super. 2002).
Pursuant to the Easement, PECO's right to install the electric facilities in the
first place was subject to the express condition that the location of the facilities to be
installed had to be depicted on plans and approved by the original homeowners, and
signatories of the Easement, in advance of installation. This is established by
Condition #1. The Court pays particular attention to the words "parties hereto" and
"having been approved by them" as unambiguously stating that Condition #1 granted
the right of approval for the location of the electric facilities to the original homeowners,
the Feehrers, as parties to the Easement. However, Condition #2 limits these rights to
the initial exercise of the rights therein granted. Therefore, when Conditions #1 and #2
6
678a
are read together, the effect is that, in its initial exercise of placing electric facilities on
the property, PECO was obligated to submit plans to and obtain approval from the
original landowners, the Feehrers. However, following the initial exercise of its rights
regarding the placement of the electric facilities, PECO is not required to seek the
same landowner approval. Indeed, I read Condition #2 to mean that PECO's rights
were not restricted after the initial approval process was completed. Neither the
Feehrers nor subsequent landowners, e.g. the Appellants, had further "prior approval"
rights. Only PECO maintained the powers and rights originally granted. Appellants
desire that I read Condition #1 in isolation, ignoring Condition #2 and the remaining
provisions of the document. This I cannot do.
Appellants argue that my interpretation of the Easement grants PECO greater
rights as against Appellants than it would have had against the original property
owners. I disagree. To the contrary, Appellants maintain the same rights as those
possessed by the original property owners. Where my interpretation differs from
Appellants' is the understanding of the rights conferred upon the original property
owners. The language of the Easement grants the right of approval to the property
owners regarding the initial location of the electrical facilities. Such right was
extinguished upon PECO's initial exercise of its powers and rights under the
Easement, i.e. the original installation of the electric service and facilities. The
Easement does not grant either the original property owners or subsequent property
owners the right to prior approval for any future placement of electrical facilities.
Plaintiffs reduce the argument ad absurdum, claiming that under the Court's
construction of the Easement, PECO is permitted the unfettered right to place any
number of cables in any location PECO desires on the Appellants' 11 acre property,
7
679a
including "under the shed, under the house, and under the swimming pool," or perhaps
all of the above, without any consultation or approval from Appellants. These are
simply not the facts at issue. Rather, PECO placed the cable on the opposite side of
the driveway (from the old cable) following a determination that it was the only feasible
location. Based upon this interpretation of the Easement and the rights granted
thereunder, it was not incumbent on PECO to obtain Appellants' approval prior to
placing the electric cable on the other side of the driveway. I did not err in so finding.
Appellants additionally argue that the Court erred in its finding that injunctive
relief was not available to Appellants in the absence of proof of damages. In support
of this claim, Appellants cite to Jones v. Wagner for the proposition that Pennsylvania
law does not require the showing of physical harm or damage to the land before a
landowner can enforce his right to freely enjoy his property. 624 A.2d, 166, 171. I do
not dispute that this principle of law is set forth in Jones, but I disagree with its
applicability here.
In Jones, a property owner brought a suit for compensatory damages against
the adjoining landowner after the adjoining landowner trimmed owner's tree limbs to
the extent they encroached upon his property. The trial court dismissed the complaint
with prejudice upon preliminary objections and the Superior Court affirmed, holding
that the law required no showing of physical harm or damage to land before the
adjoining landowner could enforce his right to self help. See, Id. at 166. The plaintiffs
in Jones sought monetary relief for the damage done to their trees and the trial court
determined that such damages did not establish a cause of action. Id.
In its discussion, the Jones Court analyzed the continuing nature of the
trespass at issue, branches overhanging the property lines. This was considered a
8
680a
"continuing" trespass because tree limbs tend to grow back when trimmed and the
encroachment is bound to recur. See, Id. at 170; see also, Graybill v. Providence
Twp., 593 A.2d 1314 (Pa. Commw. 1991)(recurring flooding on plaintiff's land caused
by defendant's conduct is a continuing trespass). In so finding, the Superior Court
determined that Pennsylvania law does not require the showing of harm in order for a
property owner to state a cause of action based upon a continuing trespass. Id.
Here, however, I was not dealing with a continuing trespass and, therefore, I do
not find Jones v. Wagner controlling as Appellants demand. Appellants are incorrect
on several levels. First, Appellants contend that this Court erred in finding that
PECO's conduct constituted a continuing trespass. To the contrary, however, for the
reasons discussed above, I determined that PECO committed no trespass. To prevail
on a cause of action for trespass, the plaintiff must demonstrate that the defendant (1)
intentionally, (2) entered the property of another, (3) without the privilege to do so.
See, Kopka v. Bell Telephone Co. of Pa., 91 A.2d 232 (Pa. 1952). At trial, it was
conceded that PECO intentionally entered the property of Appellants; however, under
the Easement, it maintained a privilege to do so. Thus, no matter the nature of the
alleged trespass by PECO, either continuing or permanent, such a trespass is not a
trespass at all if the actor has obtained an Easement, thereby making its conduct
privileged. Because Appellants could not satisfy their burden of proof in demonstrating
that PECO committed a trespass, the entry of nonsuit was proper.
To the extent that the trespass must be characterized, I did not conclude that
PECO's placement of the electrical cable constituted a continuing trespass as claimed
by Appellants, but rather a permanent trespass. The concept of a "continuing
trespass" is defined under the Restatement (Second) of Torts § 161, comment b.
9
681a
(1965) which provides:
The actor's failure to remove from land in the possession of
another a structure, chattel or other thing which he has
tortiously erected or placed on the land constitutes a
continuing trespass for the entire time during which the
thing is wrongfully on the land and .. . confers on the
possessor of the land an option to maintain a succession of
actions based on the theory of continuing trespass or to
treat the continuance of the thing on the land as an
aggravation of the original trespass.
A "permanent trespass" is defined by the Restatement (Second) of Torts§ 162,
comment e. (1965) as follows:
A continuing trespass must be distinguished from a
trespass which permanently changes the physical condition
of the land. Thus, if one, without a privilege to do so, enters
land of which another is in possession and destroys or
removes a structure standing upon the land, or digs a well
or makes some other excavation or removes earth or some
other substance from the land, the fact that the harm thus
occasioned on the land is a continuing harm does not
subject the actor to liability for a continuing trespass. Since
his conduct has once [and] for all produced a permanent
injury to the land, the possessor's right is to [a] full redress
in a single action for the trespass, and a subsequent
transferee of the land, as such, acquires no cause of action
for the alteration of the condition of the land (emphasis
added).
Pennsylvania courts have adopted the above definitions. See, Mancia v. Department
of Transportation, 517 A.2d 1381 (Pa. Cmwlth. 1986); see also, County of Allegheny v.
Merrit Construction Co., 454 A.2d 1051 (Pa. Super. 1982).
To determine whether a trespass is of a continuing or permanent nature, the
court is to consider the following factors: "( 1) the character of the structure or thing
which produces the injury; (2) whether 'the consequences of the trespass will continue
indefinitely'; and (3) whether the 'past and future damages may be predictably
10
682a
ascertained."' See, Cassell-Hess v. Hoffer, 44 A.3d 80, 87 (Pa. Super. 2012).
Considering the above factors, I determined that the alleged trespass constitutes a
permanent trespass as it involved PECO performing an affirmative act, excavating a
portion of the land, and permanently placing a new electrical cable underground. The
placement of such cable occurred once and has permanently changed the physical
condition of the land. Any claimed consequences of the placement of the electrical
cable will purportedly continue indefinitely due to the permanent nature of the cable
and any such damages, be they past or future, may be predictably ascertained. The
above-cited examples demonstrate that "continuing" is synonymous with "recurring"; in
contrast, "permanent" represents an enduring alteration to the land itself. Thus, if a
trespass at all, the placement of an underground electrical cable constitutes a
permanent trespass.
Jones v. Wagner analyzed the remedies available for a continuing trespass and
determined that no showing of physical harm or damage to the land was required. 624
A.2d 166. The Jones Court reasoned that equitable remedies are available to a
property owner who suffers a continuing trespass because he is forced to repeatedly
endure the trespass due to its recurring nature. The same is not necessarily true
where an aggrieved landowner seeks a mandatory injunction regarding a permanent
trespass, the nature of which has caused an enduring alteration to the land. Jones
neither addressed the issues presented by a permanent trespass nor the high burden
required for a mandatory injunction.
Appellants were thus required to demonstrate the prerequisites of a permanent
mandatory injunction. To prevail on a claim for a permanent mandatory injunction, the
plaintiff must establish (1) a clear right to relief, (2) that there is an urgent necessity to
11
683a
, avoid an injury which cannot be compensated for by damages, and (3) that greater
injury will result from refusing rather than granting the relief requested. See, Big Bass
Lake Cmty. Ass'n v. Warren, 950 A.2d 1137 (Pa. Cmwlth. 2008).
At trial, I found that Appellants failed to establish a single prerequisite for a
mandatory injunction, let alone all three. First, Appellants clearly failed to demonstrate
a clear right to relief. Indeed, I concluded just the opposite. As a matter of law, I
interpreted the Easement in a manner which did not convey to Appellants the right of
prior approval of PECO's placement of the electrical cable on Appellants' property. As
a result, PECO maintained a privilege to enter the property and place the cable where
it deemed feasible and appropriate. No trespass occurred and, accordingly,
Appellants were not entitled to relief.
Even if Appellants did establish a trespass, the right to a mandatory injunction is
not automatic. At trial, I further found that Appellants failed to demonstrate any "urgent
necessity" for an injunction so as to avoid an injury which cannot be compensated for
by damages. Appellants suffered no damages, monetarily or otherwise, and such fact
was admitted at trial by Appellants. They were given the opportunity to demonstrate to
this Court how the placement of the new cable interfered with their use and enjoyment
of their property and/or any diminution in value of the property. They failed to do so.
Consideration of this evidence, or lack thereof, was part and parcel of the analysis of
whether the Appellants established an "urgent necessity" as required for a mandatory
injunction. Under the facts presented and Appellants' concession at trial that they
suffered no damages, there was clearly no "urgent necessity" for the requested relief.
Further, the fact that Appellants sustained no compensable damages or any loss of
the use and enjoyment of their property means that they were not able to demonstrate
12
684a
to this Court that they were entitled to a mandatory injunction, an extraordinary remedy
issued in only the rarest of cases. See, 15 Standard Pennsylvania Practice 20, §83:9
(2005).
In a similar vein, Appellants failed to demonstrate that greater injury will occur
from denial of the mandatory injunction than by granting it. Plain and simple, I
concluded that Appellants suffered no injury, in any form, whatsoever. I deemed this
action brought by Appellants to be the height of frivolity, where Appellants simply
desired the new cable to be dug up and placed on the other side of the road, requiring
excavation of the abandoned cable, for no other purpose than their own edification.
The testimony at trial indicated that the current placement of the cable in no manner ,
interfered with Appellants' use and enjoyment of the property other than the fact that
the cable's placement without approval may have annoyed them. No trees, shrubs, or
landscaping were disturbed. No fence was removed. No structure or landmark was
relocated. It is difficult to conceive that greater injury would result from denial of the
mandatory injunction when Appellants have suffered no injury in the first place.
Further, the remedy sought - forcing PECO to dig up and remove the operating
underground cable from its current location and move it to an undetermined location -
would serve to disrupt the electrical service to Appellants' neighbors for no
ascertainable benefit. Appellants provided no testimony at trial, expert or otherwise,
that would tend to suggest that the cable be moved for any engineering or utilitarian
purpose. This demand for relief is neither reasonable nor equitable. Thus, I
determined that greater injury would result from granting the requested injunction,
particularly from a public policy standpoint as it would serve to encourage such
frivolous lawsuits for the sake of one's ego, a fight, or whatever is motivating
13
685a
Appellants here.
In light of the above, I did not err in denying Appellants' request for injunctive
relief or in requiring some evidence of injury in support of any injunction. Indeed, the
entry of nonsuit was proper as Appellants failed to meet their burdens in proving the
necessary elements for injunctive relief. The case for a mandatory injunction must be
made by a very strong showing, which Appellants failed to do at trial. My focus on the
damages element (not necessarily monetary damages, in contrast to Appellants'
claim) was clearly relevant in evaluating the elements necessary to establish a right to
injunctive relief, including whether Appellants demonstrated an "urgent necessity" for
said injunction or whether Appellants established that greater injury would result from
denial of the injunction than by granting the relief requested. Appellants' contention
that Jones v. Wagner is controlling precedent that I failed to consider is simply
erroneous. Each of the cases cited by Appellants in support of the proposition that no
damages must be proven in order to establish a right to injunctive relief concerns a
continuing trespass and is, therefore, not applicable here. See, Jones, supra; Olexa v.
DeSa/es Univ., 78 Pa.D.& C.4th 171, 181 (Leh. Cty. 2005); America Energy
Resources, LLC v. Moore, 2008 Tex. App. LEXIS 7644.
Upon consideration of the foregoing reasons, respectfully request that the
entry of nonsuit in favor of PECO be affirmed.
All of which is respectfully submitted.
BY THE COURT:
J.
14