IN THE COMMONWEALTH COURT OF PENNSYLVANIA
National Fuel Gas Midstream :
Corporation and NFG Midstream :
Trout Run, LLC, :
Petitioners :
:
v. : No. 116 C.D. 2016
:
Pennsylvania Department of :
Environmental Protection, :
Respondent :
:
Seneca Resources Corporation, :
Petitioner :
:
v. : No. 195 C.D. 2016
: Argued: November 15, 2016
Pennsylvania Department of :
Environmental Protection, :
Respondent :
BEFORE: HONORABLE RENÉE COHN JUBELIRER, Judge
HONORABLE ROBERT SIMPSON, Judge
HONORABLE P. KEVIN BROBSON, Judge
OPINION NOT REPORTED
MEMORANDUM OPINION BY
JUDGE COHN JUBELIRER FILED: June 2, 2017
National Fuel Gas Midstream Corporation (NFG Midstream), NFG
Midstream Trout Run, LLC (Trout Run) (together, Midstream), and Seneca
Resources Corporation (Seneca) (collectively, Petitioners) petition for review of
the December 29, 2015 Order of the Environmental Hearing Board (EHB),
affirming the Department of Environmental Protection’s (DEP) Single Source
Determination that aggregated Trout Run’s Bodine Compressor Station and
Seneca’s Well Pad E for purposes of permitting. This case concerns DEP’s air
quality permitting requirements in the context of an integrated corporate ownership
model used by some companies engaged in natural gas extraction and production.
Specifically at issue is under what circumstances two facilities owned by two
separate business entities that ultimately derive from a common company may be
aggregated for air pollution control permitting purposes when one of the two
entities is otherwise exempt from permitting requirements. Seneca, which owns
and operates Well Pad E, a natural gas well pad, is an oil and gas exploration and
production company that is a wholly-owned subsidiary of National Fuel Gas
Company (NFGC). (EHB Adjudication, Findings of Fact (FOF) ¶¶ 42-43; R.R. at
68a.) Seneca was incorporated in 1913 and operates in the Appalachian area, as
well as California and Kansas. (FOF ¶ 41; NFGC Form 10-K, R.R. at 802a.) It is
undisputed that Seneca is exempt from the permitting requirements at issue here.
(R.R. at 42a, 290a-94a; EHB Adjudication at 43 (Labuskes, J., concurring).) Trout
Run, which owns and operates the Bodine Compressor Station, a compressor and
processing facility, is a wholly-owned subsidiary of NFG Midstream, which is a
wholly-owned subsidiary of NFGC. (FOF ¶¶ 1, 46, 49.) Both NFG Midstream
and Trout Run were established more recently, 2008 and 2010, respectively, and
their operations are limited to the Appalachian area. (FOF ¶¶ 44-45; R.R. at 802a.)
NFG Midstream and its subsidiaries, including Trout Run, manage the midstream
portion of NFGC’s natural gas operations by gathering natural gas from upstream
2
producers like Seneca and processing it for delivery into interstate gas pipelines.
(FOF ¶¶ 48, 50.)
Petitioners challenge the aggregation of the emissions of their two facilities
as a “single source” for permitting purposes under applicable federal and state
environmental statutes and regulations. To fully understand the specific issues
raised by Petitioners, it is necessary to first review those statutes and regulations.
I. Air Pollution Control in the Natural Gas Sector
Air pollution from natural gas operations is regulated in Pennsylvania
through the federal Clean Air Act1 and the Pennsylvania Air Pollution Control Act
(APCA).2 The Clean Air Act and the APCA require new stationary sources of air
pollution and major modifications at existing sources to obtain an air pollution
permit prior to commencing construction. Section 6.1(a) of the APCA, 35 P.S. §
4006.1(a); Section 165(a) of the Clean Air Act, 42 U.S.C. § 7475(a). The permit
review process, called New Source Review, allows DEP to set a specific emission
rate for each regulated facility. 25 Pa. Code § 127.1. The requirements of a new
source permit differ depending on whether the air quality at the location under
review meets federal National Ambient Air Quality Standards (NAAQS).
Congress developed two air pollution control programs based on air quality. “For
areas with unclean air – called ‘nonattainment’ areas because they are not attaining
the NAAQS – the Nonattainment New Source Review [(NNSR)] program ensures
that new emissions will not significantly hinder the area’s progress towards
meeting the NAAQS.” United States v. EME Homer City Generation, L.P., 727
1
42 U.S.C. §§ 7401 – 7671q.
2
Act of January 8, 1960, P.L. 2119, as amended, 35 P.S. §§ 4001-4015.
3
F.3d 274, 279 (3d Cir. 2013). The Prevention of Significant Deterioration (PSD)
program addresses areas with clean air and “ensures that any new emissions will
not significantly degrade existing air quality.” Id. Pennsylvania has adopted the
federal regulations on the PSD program standards in their entirety. 25 Pa. Code §
127.83. For those areas falling under the NNSR program, DEP has promulgated
its own regulations. 25 Pa. Code §§ 127.201-127.218. The area at issue in this
appeal meets federal air quality standards and is governed by the federal PSD
regulations in effect at the time of the EHB Order, which are found at 40 C.F.R. §
52.21 (2015).
Pursuant to Section 6.1(f) of the APCA, 35 P.S. § 4006.1(f),3 DEP
promulgated by regulation a general permit for natural gas processing facilities,
such as the Bodine Compressor Station, known as General Permit 5 (GP-5).4 The
GP-5 Permit may only be used for facilities that emit below a certain threshold,
referred to as “major source thresholds.” “Major sources”5 of air pollution cannot
3
Added by Section 6 of the Act of October 26, 1972, P.L. 989, as amended.
4
Although Trout Run is subject to these permitting requirements, Seneca’s well pad
operations are subject to an exemption from permitting requirements under the APCA. (R.R. at
42a.)
5
A “major source” for Title V purposes is defined as a
stationary source (or any group of stationary sources that are located on one or
more contiguous or adjacent properties, and are under common control of the
same person (or persons under common control)) belonging to a single major
industrial grouping . . . that directly emits, or has the potential to emit, 100 t[ons
]p[er ]y[ear] or more of any air pollutant subject to regulation . . . .
40 C.F.R. § 70.2 (2015); see also 40 C.F.R. § 52.21(b)(1)(i) (2015) (defining major stationary
source for PSD purposes and the associated thresholds of different types of facilities).
4
obtain a GP-5 permit but must obtain a Title V6 permit to operate. (DEP’s GP-5
Permit at 2, R.R. at 214a); 25 Pa. Code §§ 127.501-127.543.
When developing the specific requirements of a GP-5 permit, DEP must first
define the source of the air pollutants regulated by the permit. Section 111(a)(3) of
the Clean Air Act defines a stationary source as “any building, structure,
facility, or installation which emits or may emit an air pollutant.” 42 U.S.C. §
7411(a)(3)7 (emphasis added). The federal regulations adopted by Pennsylvania in
effect at the time of the EHB’s Order defines “[b]uilding, structure, facility, or
installation” as “all of the pollutant-emitting activities which belong to the same
industrial grouping, are located on one or more contiguous or adjacent
properties, and are under the control of the same person (or persons under
common control) except the activities of any vessel.” 40 C.F.R. § 52.21(b)(6)
(2015) (emphasis added).
In addition, the federal Environmental Protection Agency (EPA), in 1980,
viewed the decision in Alabama Power Co. v. Costle, 636 F.2d 323 (D.C. Cir.
1979), as setting certain boundaries on the “component terms of ‘source,’” i.e.
“building, structure, facility, and installation,” namely: “(1) it must carry out
reasonably the purposes of PSD; (2) it must approximate a common sense notion
of ‘plant’[8]; and (3) it must avoid aggregating pollutant-emitting activities that as a
6
42 U.S.C. §§ 7671-7671q. Title V is named after the portion of the Clean Air Act
added in the Clean Air Act Amendments of 1990. The Title V program “generally does not
impose new substantive air quality control requirements.” Sierra Club v. Johnson, 436 F.3d
1269, 1272 (11th Cir. 2006). Instead, the intent of Title V is to “ensure compliance with existing
requirements” by requiring permits that “contain monitoring, record keeping, reporting, and
other conditions.” Id.
7
Added by Section 4(a) of the Act of December 31, 1970, as amended.
8
The term “common sense notion of plant” was referenced in the regulatory preamble
but does not appear in the regulations themselves. As discussed, infra, whether “common sense
(Footnote continued on next page…)
5
group would not fit within the ordinary meaning of ‘building,’ ‘structure,’
‘facility,’ or ‘installation.’” 45 Fed. Reg. 52,676, 52,694-95 (Aug. 7, 1980)
(emphasis added).
Because the regulations define “building, structure, facility, or installation”
as including one or more properties, two or more related natural gas operations
may be aggregated by DEP into a single source for purposes of permitting.
Alabama Power, 636 F.2d at 410. This aggregation process determines whether
the two operations work together to form a major source of pollution and are
subject to the reporting requirements of Title V. Natural gas companies have an
incentive to design their activities in a manner that prevents emissions from
reaching major source thresholds, and permitting authorities utilize the single
source aggregation process to ensure that actual emissions are properly accounted
for. 45 Fed. Reg. 52,676, 52,694-95.
To aid with determining when two facilities should be treated as a single
source, DEP has provided guidance to its permitting officers.9 (See Guidance for
Performing Single Stationary Source Determinations for Oil and Gas Industries
(DEP Guidance), R.R. at 205a-12a.) The DEP Guidance states that the
determination should be conducted on a case-by-case basis and judged against a
three-part test based on the EPA’s definition of a “building, structure, facility, or
installation.” (Id. at 1, 3, R.R. at 205a, 207a.) Specifically, DEP Guidance
_____________________________
(continued…)
notion of plant” is an independent requirement or an overarching principle in the aggregation
analysis is at issue in this case.
9
Despite the existence of the DEP Guidance document, DEP’s Chief of the Division of
Permits testified via deposition and repeatedly refers to the single-source analysis as a “judgment
call” on no less than a dozen occasions. (See, e.g., R.R. at 303a, 307a-11a, 314a-16a, 318a,
325a-26a.)
6
provides that if two or more facilities: (1) “belong to the same industrial grouping”
(defined as having the same first two digits of the Standard Industrial
Classification (SIC) code); (2) are on “one or more contiguous or adjacent
properties”; and (3) “are under the control of the same person (or persons
under common control),” they should be treated as a single facility for permitting
purposes. (Id. at 4, R.R. at 208a (emphasis added).)
Whereas the EPA has historically considered adjacency as including the
functional interdependence of the facilities being aggregated, not simply the
physical distance between them, when discussing the common sense notion of a
plant concept in its Guidance document, DEP finds the terms “contiguous” or
“adjacent” are clear on their face and adopts a “quarter-mile or less rule,”
meaning “properties located a quarter mile or less apart are considered contiguous
or adjacent,” whereas “properties located beyond this quarter-mile range may only
be considered contiguous or adjacent on a case-by-case basis.” (DEP Guidance at
6, R.R. at 210a.) DEP reasoned that “application of the quarter-mile or less rule of
thumb takes a ‘common sense approach’ to determining if the sources are located
on adjacent or contiguous properties and does not aggregate pollutant-emitting
activities that as a group would not fit within the ordinary meaning of ‘building,’
‘structure,’ ‘facility,’ or ‘installation.’” (Id. at 7, R.R. at 211a.) As an aside, we
note that, because of the nature of the natural gas industry, the EPA promulgated
a revised rule for determining emission sources in the oil and gas sector. 81 Fed.
Reg. 35,622 (June 3, 2016). Thus, if this case had been brought under the
revised regulation, which became effective on August 2, 2016, the analysis
would require a finding that the facilities be located within one-quarter mile of
one another, as measured from the center of the equipment on the surface site, and
7
that they share equipment. 40 C.F.R. § 52.21(b)(6)(ii) (2016) (emphasis added).
These facilities do not share equipment.
II. DEP’s Single Source Analysis of the Bodine Compressor Station
Trout Run applied for a GP-5 permit to construct and operate the Bodine
Compressor Station on August 14, 2013. (FOF ¶ 1.) As part of its review of
Trout Run’s permit application, DEP demanded emissions data for Seneca’s Well
Pad E, which was otherwise exempt from permitting requirements. (R.R. at 42a,
286a, 292a-94a; EHB Adjudication at 43 (Labuskes, J., concurring).) After
initially refusing to provide such data, Seneca finally yielded to DEP’s demands
and provided the data under protest. (R.R. at 290a-91a, 295a-96a.) Subsequently,
DEP issued the GP-5 permit to Trout Run, authorizing the construction and
operation of the Bodine Compressor Station on October 10, 2013. (FOF ¶ 5.)
However, DEP concluded that Seneca’s Well Pad E should be aggregated with
Trout Run’s Bodine Compressor Station under the same GP-5 permit as a
single source, despite Well Pad E being exempt from permitting requirements.
(FOF ¶ 13; R.R. at 42a.) Specifically, DEP stated that any difference in SIC codes
was overridden by its finding of a support relationship between the two facilities;10
common control existed because of the existence of common ownership, a
contractual agreement between the parties, and a support/dependency relationship;
and based upon the distance between the two facilities, they met the contiguous or
adjacent criterion. (R.R. at 197a-98a.)
10
Trout Run originally maintained that the proper SIC code for the Bodine Compressor
Station was 4922, and the SIC code for Seneca’s Well Pad E was 1311. (R.R. at 197a.)
8
Trout Run and NFG Midstream appealed DEP’s decision to aggregate the
two facilities to the EHB on November 12, 2013. Seneca intervened in the matter.
As part of settlement discussions, “[NFG] Midstream provided additional
information to [DEP] relevant to the single source analysis.” (FOF ¶ 15.) Based
upon this new information, DEP conducted another review and issued a document
titled: “Re-Evaluation of Single Source Analysis” on March 31, 2015, wherein
DEP still found the two facilities should be aggregated, albeit on different grounds
than its first determination. (FOF ¶¶ 16, 18; R.R. 202a-04a.) In the new analysis,
DEP concluded that both facilities have the same SIC code11 and that the facilities
are contiguous or adjacent, comporting with the common sense notion of a plant.
(R.R. at 203a.) With regard to the requirement that the facilities be under common
control, DEP reasoned:
Common control can be evaluated based on (1) ownership, (2) a
contract/contract for service relationship or (3) a support/dependency
relationship.
[DEP]’s October 6, 2012, guidance document provides that:
common control is determined on a case-by-case basis
and is guided by the general definition of control used by
the Securities and Exchange Commission (“SEC”). The
SEC defines “control” . . . as the possession, direct or
indirect, of the power to direct or cause the direction of
management and policies of a person, whether through
ownership of voting securities, by contract, or otherwise.
Common control can be established by ownership. In response to the
information provided by NFG [Midstream] and Seneca to [DEP] on
February 27, 2015, [DEP] undertook a more rigorous analysis of the
corporate relationships among [Trout Run], Seneca [], and [NFGC].
11
Trout Run agreed to change the SIC code for the Bodine Compression Station from
4922 to 1311 as part of its settlement negotiations with DEP. (R.R. at 59a.)
9
The information available to [DEP] indicates that: 1) a number of
executive officers are shared among the three corporate entities; 2)
[NFGC]’s operations are integrated to such an extent that its
different branches are more like different sections of one
organization, as opposed to entirely separate organizations; and 3)
[NFGC] owns 100% of both Seneca [] and [Trout Run].
The totality of the circumstances in this case supports [DEP]’s
conclusion that those corporate relationships fulfill the SEC definition
of “control,” and that, consequently, the activities at Bodine and Well
Pad E are under common control. This conclusion precludes the need
to consider whether common control exists under a contract/contract
for service or support/dependency relationship.
(Id. at 203a-04a (emphasis added) (second alteration in original).) Finding all
three prongs of the single source test satisfied, DEP again concluded that “Bodine
and Well Pad E must be treated as a single source; meaning, their air contaminant
emissions must be aggregated.” (Id.)
Unsatisfied with the reevaluation conducted by DEP, Petitioners continued
with their appeal before the EHB. After extensive discovery, the parties filed a
joint stipulation of facts. (R.R. at 959a-63a.) The EHB then held three days of
evidentiary hearings to address factual matters for which there was no stipulation.12
The testimony presented to the EHB primarily addressed: (1) how DEP made its
12
The EHB heard testimony from John Twardowski, the DEP employee who conducted
both the initial 2013 and revised 2015 single source analysis associated with Trout Run’s GP-5
permit; James Welch, the finance manager for NFG Midstream; Douglas Kepler, Vice President
of Environmental Management at Seneca; David Shimmel, an Environmental Engineer Manager
with DEP; Muhammad Zaman, the Environmental Program Manager for DEP’s Air Quality
Program; Michael Clinger, the Manager of Project Engineering with Seneca; and David Bauer,
an employee of NFGC and a corporate officer/treasurer of various NFCG subsidiaries, including
NFG Midstream and Seneca. Mr. Bauer may also be an officer of Trout Run, but he testified
that he was not sure. (R.R. at 173a.) In addition, the deposition testimony of Krishnan
Ramamurthy, DEP’s Chief of the Division of Permits, was admitted into evidence. (Id. at 297a-
332a.)
10
decision to aggregate the facilities; (2) the characteristics of Well Pad E and the
Bodine Compressor Station; and (3) the corporate structure of NFGC and its
subsidiaries, including Trout Run, NFG Midstream, and Seneca. Based on the
testimony, exhibits, and joint stipulations, the EHB found the following facts
relevant to determining whether there was common control:
31. Well Pad E and the Bodine Compressor Station facility do not
share common workforces, plant managers or security forces.
32. Well Pad E and the Bodine Compressor Station facility lack a
common secure perimeter, common work rules, coordinated
operations, common safety requirements, or process equipment.
33. [NFG Midstream] subsidiaries and Seneca do not share
purchasing functions, personnel services, benefit plans, maintenance
responsibilities, environmental compliance or remediation
responsibilities.
34. Neither Seneca nor its employees have the authority to enter
[NFG] Midstream’s facility sites without permission.
35. [NFG] Midstream employees do not have the authority to enter
Seneca’s exploration and production facilities without permission.
36. The Bodine Compressor Station facility and Well Pad E are
unmanned facilities.
37. The persons who maintain and service the Bodine Compressor
Station are third party contractors retained and directed by [NFG]
Midstream.
....
41. Seneca is a Pennsylvania corporation established in 1913.
....
11
43. Seneca is a wholly-owned subsidiary of [NFGC], a publicly
traded holding company organized under the laws of the State of New
Jersey.
44. [Trout Run] is a Pennsylvania limited liability company
established in 2010.
45. [NFG Midstream] is a Pennsylvania corporation established in
2008.
46. [Trout Run] is a subsidiary of NFG Midstream.
....
49. NFG Midstream is a wholly-owned subsidiary of [NFGC].
....
53. Ronald Tanski is the Chief Executive Officer of [NFGC] and the
Chairman of the Board for both NFG Midstream and Seneca.
54. David Bauer is the Treasurer for [NFGC], NFG Midstream and
Seneca.
55. [NFGC] does not engage in the day-to-day operation of NFG
Midstream or its subsidiaries.
56. [NFGC] does not engage in the day-to-day operation of Seneca.
57. Ronald Tanski and David Bauer, on behalf of [NFGC], are
responsible for reviewing and approving the final budgets and
business plans of both Seneca and NFG Midstream.
58. [NFGC] presents consolidated financial statements which
incorporate the financial statements of its subsidiaries, including
Seneca, NFG Midstream and []Trout Run.
59. [NFGC] files a consolidated tax return that reflects the revenues
and expenses of its subsidiaries, including Seneca, NFG Midstream
and []Trout Run.
12
60. In order to pay dividends and interest on its debt, [NFGC] relies
on interest and dividend payments from its 100% owned subsidiaries,
including Seneca, NFG Midstream and []Trout Run.
61. All of the funding for the operations of [NFGC]’s subsidiaries is
conducted at the parent company level.
62. Seneca and NFG Midstream do not independently issue their own
loans.
63. The assets of Seneca and NFG Midstream are assets of [NFGC].
64. The air contamination sources at issue in this case are considered
to be part of [NFGC]’s net investment in property, plant and
equipment.
(FOF ¶¶ 31-37, 41, 43-46, 49, 53-64 (citations omitted).)
Based upon the above findings, the EHB concluded that each prong of the
three-part single source test was satisfied and that “the Bodine Compressor Station
and Well Pad E satisfy the common sense notion of a plant and reasonably
constitute a ‘facility’ as that term is used in the statutes and regulations.” (EHB
Adjudication at 19 (emphasis added).) In reaching its conclusion, the EHB refused
to give DEP’s Guidance document deference because DEP has been inconsistent
with its interpretation of the requirements and also found federal guidance “not
dispositive.” (Id. at 17-18.)
With regard to the second prong of the single source analysis – common
control – the EHB rejected DEP’s apparent reliance on common ownership
alone as sufficient to establish common control. It cautioned:
it is not the mere presence of a common ownership interest that
demonstrates the necessary control. There must be sufficient
information to demonstrate that the common owner has the power to
influence or direct the behavior of the entities or the course of events
that are relevant to the single source determination.
13
(Id. at 29 (emphasis added).)
The EHB found “[t]he analysis should include the broader issue of who
controls or has the ability to control preconstruction and construction
decisions as well as who controls or has the ability to control the ongoing
operation of the air contamination sources at the Bodine Compressor Station
and Well Pad E.” (Id. at 28 (emphasis added).) It concluded that the plain
meaning of “control” should govern and derived its definition from the Oxford
English Dictionary, which “defines ‘control’ as ‘the power to influence or direct
people’s behavior or the course of events,’” instead of using the SEC definition of
“control” that DEP utilized. (Id. at 29 (quoting Oxford English Dictionaries
online, https://en.oxforddictionaries.com/definition/us/control (last visited May 10,
2017)).)
With the above cited principles in mind, the EHB concluded that NFGC had
the power to influence or control the behavior of NFG Midstream and Seneca
“[b]ecause [NFG] Midstream and Seneca are both wholly-owned subsidiaries of
[NFGC] and [NFGC] exercises ultimate financial control over both subsidiaries[;
therefore,] [NFG] Midstream and Seneca are under ‘common control.’” (EHB
Adjudication, Conclusions of Law (COL) ¶ 9.) The EHB supported its conclusion
that NFGC had the requisite control over both operations as follows:
The testimony in this case makes it evident that [NFGC]’s
control of [NFG] Midstream and Seneca arises at least in part from the
power of the purse. [DEP] called Mr. David Bauer as a witness at
the hearing. Mr. Bauer is the Treasurer for [NFGC], [NFG]
Midstream and Seneca. He testified extensively about the financial
relationship between the three entities. [NFGC] owns 100% of the
stock of [NFG] Midstream and 100% of the stock of Seneca. Mr.
Bauer explained that [NFG] Midstream and Seneca implement their
own budgets, but those budgets are subject to review by himself and
Mr. Ron Tanski, [NFGC]’s CEO, at annual meetings with the
14
subsidiaries. [DEP] questioned Mr. Bauer about whether he and Mr.
Tanski had veto power or final say over the budgets of [NFG]
Midstream and Seneca. Mr. Bauer stated that if there are any
disagreements with the proposed budgets presented by [NFG]
Midstream and Seneca, he and the President of the subsidiary would
reach an understanding on the budget issue and proceed on that basis.
In addition to questions about budgets, Mr. Bauer was asked about his
role in the selection of projects or capital investments by Seneca and
[NFG] Midstream. Mr. Bauer stated that the process for deciding on
which projects to support with capital investments is similar to the
budget process. As described by Mr. Bauer, Seneca would develop
and submit a business plan to Mr. Bauer and Mr. Tanski for review
and based on their assessment of the plan, Mr. Bauer and Mr. Tanski
would determine whether [NFGC] wanted to commit capital to that
business. The same process would be followed in reviewing a
business plan for [NFG] Midstream.
It is clear from Mr. Bauer’s testimony that [NFGC], through the
financial arrangements with its subsidiaries, [NFG] Midstream and
Seneca, has the power to influence the behavior and/or course of
events of both [NFG] Midstream and Seneca vis-à-vis the Bodine
Compressor Station and Well Pad E. While the issue was not as
fully developed as we would have liked, we have no doubt that the
initial construction of both Well Pad E and the Bodine
Compressor Station, including all of the air contamination
sources located at these sites, would have been subject to the
budget and business plan process discussed by Mr. Bauer in his
testimony. [NFGC]’s ability to influence the preconstruction and
construction decisions that are part of the GP-5 permitting and the
PSD and [N]NSR programs is the type of control/common control that
satisfies the requirements of this part of the three part test. Although
the evidence at the hearing demonstrated that [NFGC] does not
take an active role in day-to-day operations, we also believe that
based on its involvement with the financial arrangements of
[NFG] Midstream and Seneca, it could play a more active role in
those operations if it so chooses. That too would satisfy our
understanding of control since it is the possession of the power to
influence or direct the behavior of the parties or the course of
events, not the actual exercise of that power that satisfies the
requirement for common control.
15
(Id. at 29-31 (emphasis added).)13
The EHB did not consider EPA’s concept that the facilities together should
form a “common sense notion of a plant.” Instead, the EHB noted that “[t]he idea
of the common sense notion of a plant . . . arose out of the [United States Court of
Appeals for the District of Columbia] Circuit’s decision in Alabama Power” and,
while discussed in a preamble to EPA’s August 1980 PSD regulations, it “never
made it directly in to any of the relevant statutes and regulations and is not a
specific part of the three part regulatory test.” (EHB Adjudication at 37.)
According to the EHB:
We remain skeptical about importing concepts and discussion
from regulatory preambles and giving them equal weight with the
actual language of the properly promulgated regulations.[] We agree
with the [DEP] that the proper way to think about the common sense
notion of the plant is in the context of the requirements of each of the
three parts of the regulatory test and the overall definition of a
stationary source. As discussed above, we have found that Well Pad E
and the Bodine Compressor Station are within the same industrial
grouping, under common control, and adjacent to each other;
therefore, they collectively satisfy the regulatory definition of a
“facility.” We do not find the fact that the Bodine Compressor Station
and Well Pad E fail to share a “secure perimeter, security, work rules,
coordinated operations, safety requirements, overall management and
process equipment that is proximately located and arranged to
produce products,” is a proper basis to override the regulatory criteria.
These common characteristics of a plant do not readily translate to the
types of facilities found in oil and gas field operations and, therefore,
their absence is not particularly meaningful to our understanding of
the common sense notion of a plant in this context.
13
Because the EHB disposed of the second prong of the single source analysis test as it
did, it was not required to address the other two approaches – existence of a service contract and
a support/dependency relationship – relied upon by DEP in its two determinations. However, in
a footnote, the EHB found neither approach would have supported a finding of common control.
(EHB Adjudication at 31 n.3.)
16
(Id. at 37-38 (footnote omitted).) The EHB further stated: “Even if we were to
elevate the concept of a common sense notion of a plant to a stand-alone test, we
think the facts support that the Bodine Compressor Station and Well Pad E satisfy
the common sense notion of a plant.” (Id. at 38.) The EHB did not offer any
explanation as to why the test would be satisfied.
Writing separately, Judge Bernard A. Labuskes, Jr., stated he concurred with
the result but questioned who exactly should be included and covered by the
permit. (EHB Adjudication at 42-46 (Labuskes, J., concurring).)14 He appeared to
struggle with how a permit issued to one party could aggregate a second source,
which was exempt from permitting. (Id. at 43 (“I am not sure how this plays out,
but if the two parts of the single source cannot or should not be included in the
permit, why are their emissions being aggregated? Either they constitute a single
source or they do not.”).) He seemed to foresee potential issues with enforcement,
writing:
By including only part of the single source in the permit, [DEP] has
created a rather odd situation. The permittee’s activities in general
and emissions in particular going forward will now in part be
constrained by the emissions and activities of a party that is not
subject to or controlled by the permit – Seneca. The third party’s
emissions and activities are beyond the scope of the permit, yet
those emissions and activities directly affect the permittee. Indeed,
Seneca, who would otherwise be exempt, is now effectively being
regulated indirectly by a permit. The permittee has no direct
control over the third party, so the parent of the permittee, which is
not a permittee itself, must apparently control the third party for the
benefit of the permittee. If the parent does not do that, will the parent
be subject to enforcement action? Since the parent is not a permittee,
14
In his concurring opinion, Judge Richard P. Mather, Sr., expressed concern about not
deferring to DEP’s expertise when interpreting the term “common control.” (EHB Adjudication
at 47-51 (Mather, J., concurring).)
17
presumably attempting to enforce the permit against it would require
piercing the corporate veil, which is very difficult to do. [DEP] has
placed the compressor station and the well pad in the same bubble for
a disembodied aggregation analysis but popped that bubble for what
really matters – the permit.
(Id. at 43-44 (emphasis added).)
III. Petitioners’ Appeal
Petitioners now petition this Court for review.15 The Marcellus Shale
Coalition (Amicus Curiae) filed a brief amicus curiae in support of Petitioners. On
appeal to this Court, Petitioners and Amicus Curiae raise four issues. First,
Petitioners argue that the EHB erred in construing the common control test by
equating the power to influence decisions relevant to a facility’s emissions with
control of a facility. Second, Petitioners argue that, even assuming the EHB’s
construction of common control is appropriate, there was no evidence presented
showing that NFGC had the power to influence Trout Run or Seneca. Third,
Petitioners argue that the EHB’s Order could unlawfully impose obligations and
liability on Seneca, who is otherwise exempt from permitting requirements, as well
as Trout Run. Finally, Petitioners contend that the EHB’s conclusion that the two
facilities fell within the common sense notion of a plant is arbitrary and capricious
and rests on an incorrect understanding of the regulatory regime. We shall address
each issue seriatim.
15
This Court’s scope of review of an order of the EHB is whether the EHB “committed
an error of law or a constitutional violation, or whether any necessary findings of fact are not
supported by substantial evidence.” Brockway Borough Mun. Auth. v. Dep’t of Envtl. Prot., 131
A.3d 578, 585 n.9 (Pa. Cmwlth. 2016) (internal quotation omitted).
18
A. Common Control
The Clean Air Act imposes requirements over the emissions of stationary
sources, and the EPA has defined various terms in the PSD regulations, as has
DEP. However, the phrase “common control” is not defined by the Clean Air Act
or the APCA or in the PSD regulations. Moreover, the Chief of DEP’s Division of
Permits admits there are no DEP regulations governing the common control
analysis; rather, DEP relies on the DEP Guidance document and SEC guidance.
(R.R. at 313a.) The DEP Guidance document defines “common control” based
upon the SEC’s definition of the term “control,” which includes the terms
“controlling,” “controlled by,” and “under common control with,” as “the
possession, direct or indirect, of the power to direct or cause the direction of the
management and policies of a person, whether through the ownership of voting
securities, by contract, or otherwise.” (DEP Guidance at 7, R.R. at 211a (citing 17
C.F.R. § 240.12b-2).) This definition is also included in an interpretative rule to
EPA’s PSD regulations issued on September 11, 1980, but is not in the regulations
adopted by Pennsylvania. According to the interpretative rule:
Control can be a difficult factual determination, involving the power
of one business entity to affect the construction decisions or pollution
control decisions of another business entity. EPA thought that a
simplifying test of control, such as some specified voting share, would
serve the interest of the business community, by providing clarity and
predictability. Comments on this issue were solicited and suggestions
were received. Upon receiving the comments, the [EPA] did not find
a convincing argument in favor of any particular, simplified test of
control. Some commenters seemed to favor unfettered inquiry into
control in each case. Therefore, the [EPA] has decided that
determinations of control will be made case-by-case, without benefit
of a voting-share test or other simplifying test. However, the [EPA]
will be guided by the general definition of control used by the [SEC].
19
45 Fed. Reg. 59,874, 59,878 (Sep. 11, 1980).
While interpretative rules “do not have the force and effect of law,” Shalala
v. Guernsey Memorial Hospital, 514 U.S. 87, 88 (1995), the EPA’s regulations
governing penalties for non-compliance with the emission limitations provide a
nearly identical definition to the SEC definition advanced in the September 11,
1980 interpretative rule. See 40 C.F.R. § 66.3(f) (2015) (“Control (including the
terms controlling, controlled by, and under common control with) means the power
to direct or cause the direction of the management and policies of a person or
organization, whether by the ownership of stock, voting rights, by contract, or
otherwise”).16 Because the enforcement regulations found at 40 C.F.R. § 66.3(f)
(2015) address the same issues as the PSD regulations found at 40 C.F.R. §
52.21(b)(6) (2015), the regulations are in pari materia, and should, if possible, be
construed as one regulation. Section 1932 of the Statutory Construction Act of
1972, 1 Pa. C.S. § 1932; see Highway News, Inc. v. Pennsylvania Dep’t of
Transp., 789 A.2d 802, 808 (Pa. Cmwlth. 2002) (stating that “it is well settled that
the rules of statutory construction apply to regulations as well as statutes”); see
also Ocean Cnty. Landfill Corp. v. United States Envtl. Prot. Agency, Region II,
631 F.3d 652, 654 n.1 (3d Cir. 2011) (defining common control as used in the
single source test through the definition in 40 C.F.R. § 66.3(f)).
16
The EPA’s PSD regulations were originally promulgated on June 19, 1978, and were
revised on August 7, 1980, in response to the United States Court of Appeals for the District of
Columbia’s decision in Alabama Power. 45 Fed. Reg. 52,676 (Aug. 7, 1980). The interpretative
rule at issue was added a little over a month after the revision, on September 11, 1980. 45 Fed.
Reg. 59,874 (Sep. 11, 1980). The EPA’s regulation on penalties was promulgated in July 28,
1980, and also took the Alabama Power decision into consideration. 45 Fed. Reg. 50,086,
50,087 (Jul. 28, 1980).
20
Generally, an administrative agency’s interpretation of its own regulations is
entitled to deference unless that interpretation is unreasonable. Dep’t of Envtl.
Prot. v. N. Am. Refractories Co., 791 A.2d 461, 464 (Pa. Cmwlth. 2002) (citations
omitted); see also Tire Jockey Serv., Inc. v. Dep’t of Envtl. Prot., 915 A.2d 1165,
1186 (Pa. 2007) (stating that “[t]his Court follows a two-step analysis when
reviewing an agency’s interpretation of its governing regulations: (1) whether the
interpretation of the regulation is erroneous or inconsistent with the regulation, and
(2) whether the regulation is consistent with the statute under which it was
promulgated”). “The task of the reviewing court is limited to determining whether
the agency’s interpretation is consistent with the regulation and with the statute
under which the regulation was promulgated.” N. Am. Refractories Co., 791 A.2d
at 464.
Here, DEP, in both its original determination and revised determination,
primarily relied upon a common ownership interest to conclude common control
existed. (R.R. at 197a-98a, 203a-04a.) The EHB rejected this approach,
cautioning “the mere presence of a common ownership interest” does not
demonstrate control.” (EHB Adjudication at 29.) The EHB did not give DEP’s
use of the SEC’s definition deference because: it viewed the term “control” as
unambiguous; the definition used by DEP originated in a preamble17 to EPA’s PSD
regulations, not the regulations themselves; and the definition is derived from the
regulation of securities, not pollutants. (Id. at 25-26.) Instead, the EHB
advanced a theory that control exists if a “common owner has the power to
17
The EHB describes the interpretative rule issued on September 11, 1980, as a preamble
to the August 7, 1980 PSD regulations. The August 7, 1980 regulations contain no preambular
language on the SEC definition. It appears the EHB was referring to the September 11, 1980
interpretative rule.
21
influence or direct the behavior of the entities or the course of events that are
relevant to the single source determination.” (Id. at 29 (emphasis added).)
1. Meaning of “Control”
We begin with Petitioners’ argument that the EHB’s reliance on influence,
instead of control, has no basis in the Clean Air Act and the APCA. Petitioners
argue that the EHB’s novel “power to influence” standard is vastly different from
the concept of “control” as used in the DEP Guidance. Petitioners illustrate their
argument by analogy to litigation insofar as a litigant may attempt to influence a
court by presenting legal argument, but no litigant can actually control an
independent court. Petitioners argue that in the corporate context, even a single
shareholder possesses the power to influence a company’s decision. Yet, single
shareholders do not control the corporation; it is only the board of directors of the
corporation that is endowed with such power.
From DEP’s perspective, the EHB applied the plain and unambiguous
language of the regulations to carry out the purposes of the Clean Air Act and
APCA. DEP contends that the Board’s construction of the term “control” is
consistent with the relevant regulations and the purpose of the APCA, which is to
provide Pennsylvania with air quality greater than that required by federal
law. Dep’t of Envtl. Prot. v. Pennsylvania Power Co., 384 A.2d 273, 284 (Pa.
Cmwlth. 1978).
Here, we agree that the “power to influence” standard used by the EHB is
different than the “control” standard found in the DEP Guidance, which cites to the
SEC definition. In In re Flag Telecom Holdings, Ltd. Securities Litigation, the
United States District Court for the Southern District of New York found that
22
although there was “considerable influence over ‘the direction of the management
and policies,’” the allegations in the complaint were insufficient to establish
control within the meaning of the SEC regulation. 308 F. Supp. 2d 249, 273-74
(S.D.N.Y. 2004) (emphasis added). Contrary to EHB’s belief, the term “control”
is more than the power to merely influence; it involves the power to direct.
Notably, even DEP’s Chief of the Division of Permits defined control as requiring
something more, explaining if “one entity can make the other entity . . . do specific
tasks, then basically, they are [sic] controlling, to some degree.” (R.R. at 326a.)
He agreed that if there is no ability to direct the other entity to undertake specific
tasks, then this was “indicative of a lack of common control.” (Id.) Based upon
the foregoing, we conclude the EHB erred in using “power to influence,” which is
a more lax standard.18
2. Corporate Governance Standards
We next turn to Petitioners’ argument that the EHB’s and DEP’s analysis of
common control disregards long-standing principles of corporate governance. The
power to manage a subsidiary, according to Petitioners, is in its board of directors
not its parent corporation, and the directors have a legal duty to act in the best
interest of the subsidiary, not the parent.19 Relying on United States v. Bestfoods,
18
Although we believe the EHB erred in utilizing the “power to influence” as the
equivalent of “control,” we agree with the EHB that DEP’s reliance on common ownership alone
is also insufficient to demonstrate “common control,” as discussed infra.
19
We have referred to Trout Run and Seneca as subsidiaries and NFGC as the parent but
in reality the relationship is more complex. Seneca is a wholly-owned subsidiary of NFGC, but
Trout Run is a wholly-owned subsidiary of NFG Midstream, which is a wholly-owned subsidiary
of NFGC, making Trout Run an indirect subsidiary of NFGC. While, on its face, this may seem
like a distinction without a difference, in reality, the distinction adds another layer of corporate
governance and accompanying fiduciary duties to the equation. Although we continue to refer to
(Footnote continued on next page…)
23
524 U.S. 51 (1998), Petitioners argue that if DEP wanted to show common control,
it needed to either pierce the corporate veil by showing that the two subsidiaries
are the alter ego of the parent or show NFGC’s direct involvement in the
operations of Well Pad E and the Bodine Compressor Station. DEP, according to
Petitioners, did neither.
Amicus Curiae argues that allowing the EHB’s interpretation of “control” to
stand would “lead to the demise of corporate law” because the “test would become
the exception that swallows the rule, ensnaring entire corporate family structures
based solely on their status as a corporate parent.” (Amicus Curiae’s Br. at 26.)
Amicus Curiae takes a broad view of the impacts of the EHB Adjudication and
notes that by its very nature, natural gas extraction requires multiple facilities
within a close proximity.20 According to Amicus Curiae, the EHB’s Adjudication
would require each operator of an emitting facility to not only know its own
equipment and emissions, but also the equipment and emissions of facilities owned
and operated by other independent corporations operating under a single corporate
umbrella.
_____________________________
(continued…)
Trout Run and Seneca as subsidiaries and NFGC as the parent as a matter of convenience, we are
cognizant of the true relationships, and the distinction is not lost in our analysis.
20
In response to Amicus Curiae’s Brief, DEP asks this Court to Strike Section IV of the
Amicus Brief and its attached exhibits. We will grant this Application in part and deny it in part.
Because this Court cannot consider evidence that was never made part of the official record, we
will strike the exhibits attached to Amicus’ Brief. Banfield v. Cortés, 110 A.3d 155, 172 n.14
(Pa. 2015). However, we will not strike Section IV of Amicus Curiae’s Brief, as it addresses an
issue raised by the parties – the impact of the EHB’s aggregation analysis in practice – but
distinguishes itself from the briefs of the parties by reflecting an industry-wide perspective. See
Rule 531(a) of the Pennsylvania Rules of Appellate Procedure, Pa. R.A.P. 531(a) (defining
“amicus curiae” as “a non-party interested in the questions involved in any matter pending in an
appellate court”).
24
DEP responds that there is no need to pierce the corporate veil in this matter,
as corporate veil piercing is implicated only when a parent corporation is held
liable for the actions of its subsidiaries. DEP asserts that, unlike the District
Court’s decision under review by the United States Supreme Court in Bestfoods,
the EHB’s Adjudication does not impose any such liability on either NFGC or
either subsidiary. Thus, DEP views the EHB’s approach of looking to the “power
of the purse” as consistent with, and serving the purposes of, the APCA.
In Bestfoods, the United States Supreme Court interpreted a provision in the
Comprehensive Environmental Response, Compensation, and Liability Act21
(CERCLA) that imposes liability on a polluter for the costs of cleaning up
hazardous substances. Bestfoods, 524 U.S. at 65. CERCLA imposes liability on
“any person who at the time of disposal of any hazardous substance owned or
operated any facility at which such hazardous substances were disposed of.”
Section 107(a)(2) of CERCLA, 42 U.S.C. § 9607(a)(2) (emphasis added). The
Court found that if CERCLA imposed liability only on owners, and the subsidiary
owned the site on paper, the parent could not be liable without piercing the
corporate veil. Bestfoods, 524 U.S. at 63-65. This is because a statute can
abrogate common law principles only if it speaks directly to the issue, and
CERCLA is silent on the implications of corporate ownership on liability for
remediation costs. Id. at 62-63. However, by placing liability on both owners and
operators, CERCLA imposes both derivative liability on parents if the corporate
veil is pierced under the ownership provision and direct liability for the parent’s
own actions, if it operates the facility, under the operator provision. Id. at 65.
Direct liability under CERCLA is determined by considering “whether, in degree
21
42 U.S.C. §§ 9601-9675.
25
and detail, actions directed to the facility by an agent of the parent alone are
eccentric under accepted norms of parental oversight of a subsidiary’s
facility.” Id. at 72 (emphasis added). Because the only evidence presented in
Bestfoods to show that the parent operated the site was that the directors of the
parent served as the directors of the subsidiary, the United States Supreme Court
held that the evidence was insufficient to support liability. Id. at 69-70.
Petitioners and Amicus argue that Bestfoods directly controls our inquiry on
common control. They argue there is no difference between imposing liability and
imposing permit obligations because “[t]he receipt of any permit involves the
assumption of liability for violating its terms.” (NFG Midstream’s Reply Br. at
17.) NFG Midstream argues Trout Run’s GP-5 permit requires Trout Run to
monitor Seneca’s emissions and to compel Seneca to comply with the terms of the
permit, which it has no ability to do. Because violations of the GP-5 permit can
carry significant criminal and civil penalties, NFG Midstream argues that Trout
Run could be placed in the difficult position of being subject to fines for activities
beyond its control. Seneca similarly argues that its well pad operations are exempt
from permitting requirements under the APCA because Well Pad E is covered by
Exemption No. 38. (R.R. at 42a; EHB Adjudication at 43 (Labuskes, J.,
concurring).) DEP’s action removes this exemption and could expose Seneca to
penalties based on the activities of Trout Run.
We agree that the receipt of a permit does require compliance with the
permit, including suffering whatever consequences result from noncompliance.
See, e.g., 40 C.F.R. § 52.21(j)-(r) (detailing obligations and responsibilities under
the Clean Air Act). Although aggregation for purposes of permitting does not
directly impose liability on the sources aggregated, it does so indirectly.
26
Generally, a corporation is considered a separate and distinct legal entity, even if
its stock is owned entirely by one person. Lumax Indus., Inc. v. Aultman, 669
A.2d 893, 895 (Pa. 1995). DEP’s single source determination abrogates this
general rule because DEP essentially is holding the permittee liable for the acts
and/or omissions of a related corporation, Seneca, which we emphasize is exempt
from permitting, simply because of their relationship with NFGC. DEP’s action
here is designed to limit the emissions of the Bodine Compressor Station by setting
an emission threshold based upon the aggregate emissions of Trout Run’s Bodine
Compressor Station and Seneca’s Well Pad E. Thus, DEP is requiring an emission
source owned by one company to be bound by a permit that includes the emissions
of another corporation, even though that corporation is otherwise exempt from
permitting requirements. Because the permitting and enforcement provisions are
in pari materia and should be read together, 1 Pa. C.S. § 1932, the same standard
should apply to both, particularly when the issuance of the permit imposed
obligations that, if not complied with, could lead to enforcement consequences.
Furthermore, like CERCLA, the Clean Air Act and APCA impose liability
on owners and operators but are otherwise silent on the implications of corporate
ownership on liability. Therefore, as the Supreme Court explained in Bestfoods, in
the absence of such statutory direction, common law principles, such as piercing
the corporate veil, are not abrogated. Bestfoods, 524 U.S. at 61-63. There is some
element of general control inherent in any parent-subsidiary corporation
relationship, but the courts have recognized “the longstanding rule of limited
liability in the corporate context remains the background norm.” Lansford-
Coaldale Joint Water Auth. v. Tonolli Corp., 4 F.3d 1209, 1221 (3d Cir. 1993).
27
Under the facts of this case, where one facility is exempt from permitting
requirements, but its emissions are still being aggregated with another facility for
purposes of that facility’s permit, DEP is required to either demonstrate NFGC’s
direct involvement in the operations of Well Pad E and the Bodine Compressor
Station or pierce the corporate veil by showing that the two entities are the alter
ego of one another or their parent. This approach is in accordance with well-
settled corporate law principles and consistent with case law imposing liability for
environmental violations discussed above. Furthermore, such an approach
addresses the genuine concern, which we share, that was first expressed by Judge
Labuskes in his concurring opinion concerning the effect of aggregating an exempt
source with a non-exempt one and the enforcement problems that would
undoubtedly ensue as a result. Here, neither the EHB with its “power to influence”
standard nor DEP with its simple common ownership standard utilized the correct
standard when analyzing whether common control existed under these
circumstances. Finding this to be error, we vacate EHB’s Order and remand for
the EHB to apply the correct standard.22
22
Instead of remanding for further proceedings, Petitioners urge this Court to resolve the
matter based upon the existing record, which they consider to be fully developed. We agree that
the EHB has already made extensive factual findings, but the EHB should be afforded the
opportunity to apply the appropriate standard based upon our guidance first. The EHB is the
fact-finder, and we cannot usurp that authority. Furthermore, we note that there are no explicit
credibility determinations, and we are hesitant to imply any. Therefore, we decline to resolve
this matter based upon the existing record and instead vacate the Order and remand the matter to
the EHB for further proceedings consistent with this opinion.
28
B. Common Sense Notion of a Plant
Petitioners next argue that the Bodine Compressor Station and Well Pad E,
when examined together, fail to meet the “common sense notion of a plant”
standard, and as such, the emissions of the two facilities cannot be aggregated. In
Petitioners’ view, the requirement serves as “the anchor of the PSD’s definition of
a ‘stationary source,’” or the “overarching federal standard,” and must be
established as a prerequisite for aggregation of emission sources for permitting
purposes. (NFG Midstream’s Br. at 47; NFG Midstream’s Reply Br. at 25.)
Petitioners consider the EHB’s main error in this regard is considering the common
sense notion of a plant requirement superfluous. Petitioners argue that under a
correct understanding of the concept of a common sense notion of a plant, the
EHB’s Order must be reversed based on the EHB’s own findings of fact.
DEP argues that the common sense notion of a plant concept “is not a
statutory requirement and has not been properly promulgated as part of a
regulation.” (DEP’s Br. at 37.) Because the concept derives from EPA’s preamble
to its August 1980 regulations, and because Petitioners do not argue that any part
of the three-part single source test is ambiguous, the preambular language may not
be used as an interpretive tool.
In its Adjudication, the EHB agreed with DEP, stating it was “skeptical of
importing concepts and discussion from regulatory preambles and giving them
equal weight with the actual language of the properly promulgated regulations.”
(EHB Adjudication at 37.) Regardless, the EHB stated that even if the concept of a
common sense notion of a plant was elevated to a stand-alone test, as Petitioners
urge, “the facts support that the Bodine Compressor Station and Well Pad E satisfy
the common sense notion of a plant.” (Id. at 38.)
29
A preamble may be considered in construing a regulation if an ambiguity
exists. See UMCO Energy, Inc. v. Dep’t of Envtl. Prot., 938 A.2d 530, 537 (Pa.
Cmwlth. 2007). “However, preambles may not be used to create ambiguity where
none exists, and in any case where a preamble is used as a tool to resolve an
ambiguous [regulation], the preamble is not controlling.” Id. (citing English v.
Commonwealth, 816 A.2d 382, 387 (Pa. Cmwlth. 2003)). Here, there is no
ambiguity in the regulations, and Petitioners do not argue such an ambiguity exists.
Instead, they argue “common sense notion of plant” is a separate concept that also
must be satisfied, in addition to the three regulatory requirements.
We agree with Petitioners that “common sense notion of plant” is an
overarching principle but disagree that it is a separate, standalone test. Rather, if
the three prongs of the regulations – commonality of SIC codes, adjacency or
contiguousness, and common control – are each met, the facilities will also satisfy
the meaning of “common sense notion of plant.” This is consistent with the Chief
of the Division of Permits’ understanding of the concept. As he stated, “It’s not
creating a separate prong, necessarily. It’s just an umbrella term to tie all the
pieces together, whether the two operations are functionally operating as a single
operation.” (R.R. at 326a).
Here, the EHB was correct that “common sense notion of plant” is not a
separate requirement, but because it applied the incorrect standard to determine
whether common control existed, one of the regulatory requirements to aggregate,
it is not possible to determine whether the concept of “common sense notion of
plant” is met. If, on remand, the EHB finds common control exists, thus satisfying
the final element set forth in the regulations, then a “common sense notion of
plant” necessarily exists. However, if common control, or any of the other prongs,
30
are not satisfied, then the two facilities cannot meet the definition of “common
sense notion of plant.”
IV. Conclusion
Having concluded that both DEP and the EHB wrongly interpreted the term
“common control” as used in the applicable regulations, we are compelled to
vacate the Order of the EHB and remand this matter to the EHB for further
proceedings consistent with this Opinion.
_____________________________________
RENÉE COHN JUBELIRER, Judge
31
IN THE COMMONWEALTH COURT OF PENNSYLVANIA
National Fuel Gas Midstream :
Corporation and NFG Midstream :
Trout Run, LLC, :
Petitioners :
:
v. : No. 116 C.D. 2016
:
Pennsylvania Department of :
Environmental Protection, :
Respondent :
:
Seneca Resources Corporation, :
Petitioner :
:
v. : No. 195 C.D. 2016
:
Pennsylvania Department of :
Environmental Protection, :
Respondent :
ORDER
NOW, June 2, 2017, the Order of the Environmental Hearing Board in the
above-captioned matter is VACATED, and this matter is REMANDED for further
proceedings consistent with the foregoing Opinion.
The Pennsylvania Department of Environmental Protection’s Application to
Strike is GRANTED in part and DENIED in part. The attachments to the brief
Amicus Curiae submitted by the Marcellus Shale Coalition are stricken from the
brief.
Jurisdiction relinquished.
_____________________________________
RENÉE COHN JUBELIRER, Judge