STATE OF MICHIGAN
COURT OF APPEALS
ESTATE OF SUSAN K. ARRINGTON, by Co- UNPUBLISHED
Personal Representatives SARA ARRINGTON July 20, 2017
LACAVA and MATTHEW ARRINGTON
Plaintiff-Appellant,
v No. 332523
Lake Circuit Court
COUNTY OF LAKE, PALOMA INDUSTRIES LC No. 14-008636-NO
OF NAGOYA JAPAN, RHEEM
MANUFACTURING, EMERSON ELECTRIC
COMPANY, FISHER CONTROLS
INTERNATIONAL, INC., GRUNDFOS PUMPS
CORP, TJERNLUND PRODUCTS, INC., A O
SMITH CORP, REGAL BELOIT ELECTRIC
MOTORS, INC., MICHAEL ELLIS, STEPHEN R.
BOEHRINGER, TRECHA BROTHERS SUPPLY
COMPANY, INC., GAS & LUBE EQUIPMENT
REPAIR, INC., RESIDENTIAL IMAGES, INC.,
FARM BUREAU INSURANCE COMPANY OF
MICHIGAN, MICHAEL DEAN GREEN, GREEN
CONSTRUCTION, CRYSTAL FLASH LIMITED
PARTNERSHIP OF MICHIGAN,
Defendants,
and
PHELPS PLUMBING & HEATING, INC., NO-
CHE-MO, INC., HERBERT B. PHELPS, also
known as BRADLEY PHELPS, DAVID A.
SHARLOW and KEVIN G. ELLIOT,
Defendants-Appellees.
Before: FORT HOOD, P.J., and CAVANAGH and RONAYNE KRAUSE, JJ.
PER CURIAM.
-1-
Plaintiff appeals as of right the trial court’s order granting summary disposition in favor
of defendants Herbert B. Phelps, also known as Bradley Phelps,1 No-Che-Mo, Inc., and Phelps
Plumbing and Heating, Inc.2 We affirm.
On appeal, plaintiff first argues that the trial court erred in concluding that plaintiff’s
cause of action was time-barred by MCL 600.5839. We disagree.
Where it is clear from the record that the trial court’s basis for granting summary
disposition was that plaintiff’s action was barred by the applicable statute of limitations,3 we
review the trial court’s decision as having granted summary disposition pursuant to MCR
2.116(C)(7).
Pursuant to MCR 2.116(C)(7), a party may move to dismiss a claim on the
grounds that the claim is barred by the applicable statute of limitations. The
question whether a cause of action is barred by the applicable statute of
limitations is one of law, which this Court reviews de novo. This Court also
reviews de novo a trial court’s decision regarding a summary disposition motion.
In reviewing whether a motion under MCR 2.116(C)(7) was properly decided, we
consider all documentary evidence and accept the complaint as factually accurate
unless affidavits or other appropriate documents specifically contradict it. [Frank
v Linkner, ___ Mich ___, ____; 894 NW2d 574 (2017) (Docket No. 151888); slip
op at 5 (citations and quotation marks omitted).
The applicable statute of limitations, MCL 600.5839(1) provides, in pertinent part, as
follows:
A person shall not maintain an action to recover damages for injury to
property, real or personal, or for bodily injury or wrongful death, arising out of
the defective or unsafe condition of an improvement to real property, or an action
for contribution or indemnity for damages sustained as a result of such injury,
against any state licensed architect or professional engineer performing or
furnishing the design or supervision of construction of the improvement, or
against any contractor making the improvement, unless the action is commenced
within either of the following periods:
1
Herbert B. Phelps and H. Bradley Phelps are the same person. For clarity of analysis, we will
refer to this individual as “Phelps.” We will refer to defendants collectively as “defendants” in
our analysis unless reference to an individual defendant is necessary.
2
David A. Sharlow and Kevin G. Elliott were dismissed from the litigation by an order of the
trial court entered March 15, 2016. In their briefs on appeal, the parties note that all other
defendants were also dismissed from this litigation in the trial court and are not parties to this
appeal.
3
Plaintiff initiated its lawsuit on March 17, 2014.
-2-
(a) Six years after the time of occupancy of the completed improvement,
use, or acceptance of the improvement.
(b) If the defect constitutes the proximate cause of the injury or damage
for which the action is brought and is the result of gross negligence on the part of
the contractor or licensed architect or professional engineer, 1 year after the defect
is discovered or should have been discovered. However, an action to which this
subdivision applies shall not be maintained more than 10 years after the time of
occupancy of the completed improvement, use, or acceptance of the
improvement. [Emphasis added.]
“By enacting MCL 600.5839, the Legislature chose to limit the liability of architects,
engineers, and contractors in order to relieve them of the potential burden of defending against
lawsuits commenced long after an improvement was completed.” Caron v Cranbrook Ed
Community, 298 Mich App 629, 636; 828 NW2d 99 (2012). Plaintiff does not dispute that
defendants were “contractor[s]” as contemplated by MCL 600.5839(1), or that the work
performed on plaintiff’s decedent’s property was “an improvement to real property” as set forth
in the statute. More importantly, in its brief on appeal, plaintiff does not challenge the trial
court’s application of MCL 600.5839(1) as the appropriate and governing statute of limitations.
Instead, plaintiff focuses its arguments on appeal on challenging (1) the trial court’s
determination with respect to when defendants last performed any work at plaintiff’s decedent’s
home, (2) and how such a determination impacts the analysis of whether plaintiff’s action is
time-barred.
In Beauregard-Bezou v Pierce, 194 Mich App 388, 392-393; 487 NW2d 792 (1992), a
panel of this Court, reviewing an earlier version of MCL 600.5839(1),4 considered the issue
whether “[the] plaintiff’s claim was filed within six years of the time [the plaintiff] occupied,
used or accepted the improvement” to her home, as contemplated by then MCL 600.5839(1).5 In
that case, the plaintiff fell and fractured her hip on a staircase that the defendant residential
building contractor had constructed in her home. Beauregard-Bezou, 194 Mich App at 390. In
Beauregard-Bezou, the plaintiff conceded that she had occupied and used her home for more
than six years before falling, but the plaintiff maintained that she had not “accepted” the
improvement. Beauregard-Bezou, 194 Mich App at 392. The Beauregard-Bezou Court cited an
earlier decision from this Court, Fennell v John J Nesbitt, Inc, 154 Mich App 644, 649; 398
NW2d 481 (1986), stating, in pertinent part, as follows:
We do not read MCL 600.5839 as a “discovery” statute of limitations.
Rather, we find that its operation is predicated upon the time of occupancy or use
4
As pertinent to this appeal, the substantive language at issue remains the same and has not been
altered.
5
The applicable statutory provision is now MCL 600.5839(1)(a).
-3-
or acceptance of the improvement. [Beauregard-Bezou, 194 Mich App at 392
(emphasis in original).]6
Specifically, the Beauregard-Bezou Court noted its agreement with the Fennell panel’s
conclusion that “the operation of [then MCL 600.5839(1)] is predicated upon the time of
occupancy, or use or acceptance[ ]” of the real property at issue. Beauregard-Bezou, 194 Mich
App at 393. The Beauregard-Bezou Court ultimately rejected the plaintiff’s contention that “the
period [of limitation] only begins to run at the time of the latest of the three contingencies [listed
in the statutory language].” Id. at 393-394.
In this case, the record reflects, and the parties do not dispute, that plaintiff’s decedent
was issued a certificate of occupancy for her new home on September 6, 2005.7 Therefore, the
six-year limitation period would have begun to run at “the time of occupancy of the completed
improvement[.]” MCL 600.5839(1)(a). While the record is unclear with regard to when
plaintiff’s decedent actually occupied the home, the record does not suggest it was anything but
contemporaneous with the issuance of the certificate of occupancy. Plaintiff notes in its brief on
appeal that defendants visited plaintiff’s new home on two separate occasions in January 2006
and December 2006 to perform additional work and repairs on the heating system in plaintiff’s
decedent’s home. According to plaintiff, the limitation period set forth in MCL 600.5839(1)(a)
did not start to run until the latter of the two occasions, December 20, 2006, when additional
work was completed on plaintiff’s decedent’s water heating system. In support of its argument,
plaintiff contends that in the time following the issuance of the certificate of occupancy on
September 6, 2005, defendants “had an ongoing relationship with [plaintiff’s decedent] to
maintain and supervise the heating system for years after it was installed.”
We note that in his January 28, 2016 affidavit, Phelps, president of Phelps Plumbing and
Heating, Inc., averred that Phelps Plumbing and Heating, Inc. “made certain changes to the
[heating] system that [plaintiff’s decedent] had requested[ ]” after the certificate of occupancy
was issued. Specifically, plaintiff’s decedent informed Phelps Plumbing and Heating, Inc. on or
about January 18, 2006 that a representative from Paloma, a company on whose behalf plaintiff’s
decedent sold heating products, “wanted some piping for the boiler placed further apart.” The
reason for the work was ostensibly to improve the efficiency of the heating system. The
requested work was performed and plaintiff’s decedent was billed accordingly. The record also
reflects that a service technician, Chuck Carmoney, visited plaintiff’s decedent’s home on
December 20, 2006, on behalf of Phelps Plumbing and Heating, Inc., after plaintiff’s decedent
contacted Phelps Plumbing and Heating, Inc. stating that her hot water system was not operative.
When the service technician arrived at plaintiff’s decedent’s home, “the hot water system had
already started working and therefore [Phelps Plumbing and Heating, Inc.] did not need to do
anything to [the hot water system] at that time.” Therefore, on December 20, 2006, Phelps
6
While Fennell addressed a prior version of MCL 600.5839 that did not include a provision
addressing gross negligence, this does not impact our analysis.
7
From the record, it appears that the majority of the work performed by defendants was initiated
in mid-to-late 2004 and carried over into the spring of 2005.
-4-
Plumbing and Heating, Inc. “made no improvements to the water system and in fact did nothing
to it[,]” and plaintiff’s decedent was merely charged $40 for a “service call[.]” It also appears
from the record that a representative from Phelps Plumbing and Heating, Inc. visited plaintiff’s
decedent’s home in October of 2008, apparently to perform additional work, but the specific
nature of the work is unclear from the record.
Even accepting plaintiff’s assertions that Phelps Plumbing and Heating, Inc. visited
plaintiff’s decedent’s home in January 2006 and December 2006 to perform additional work on
the heating system, the relevant statutory language clearly provides that any wrongful death
action needed to be commenced “[s]ix years after the time of occupancy of the completed
improvement, use or acceptance of the improvement.” MCL 600.5839(1)(a). From the record, it
is clear that any subsequent visits Phelps Plumbing and Heating, Inc. made to plaintiff’s
decedent’s home following the issuance of the certificate of occupancy on September 6, 2005
were for repairs or service calls, and there is nothing in the record to indicate that these
subsequent visits or any additional work performed impacted plaintiff’s decedent’s “use, or
acceptance of the improvement.” MCL 600.5839(1)(a). Therefore, contrary to plaintiff’s
assertions in its brief on appeal, where the statute of limitations had expired well before
plaintiff’s decedent’s tragic death on December 27, 2012, MCL 600.58528 simply does not apply
to allow plaintiff’s claims to proceed. Consequently, while the trial court employed different
reasoning in reaching its conclusion, its ultimate determination that plaintiff’s cause of action
was time-barred is nonetheless correct. See Messenger v Ingham Co Prosecutor, 232 Mich App
633, 643; 591 NW2d 393 (1998) (recognizing that “[w]hen this Court concludes that a trial court
has reached the correct result, this Court will affirm even if it does so under alternative
reasoning.”)
To the extent that plaintiff further asserts that the trial court erred in concluding that
defendants were not grossly negligent, MCL 600.5839(1)(b), we again disagree.
As plaintiff acknowledges in its brief on appeal, gross negligence is “conduct so reckless
as to demonstrate a substantial lack of concern for whether an injury results.” MCL
691.1407(8)(a); see also Costa v Community Emergency Med Servs, Inc, 475 Mich 403, 411; 716
NW2d 236 (2006). One can be said to be grossly negligent when an objective observer could
conclude that “the actor simply did not care about the safety or welfare of those in his charge.”
Tarlea v Crabtree, 263 Mich App 80, 90; 687 NW2d 333 (2004) (footnote and citation omitted).
We recognize that plaintiff presented the February 16, 2016 affidavit of their expert, A.
James Partridge, who averred that defendants “failed to satisfy the standards of care applicable to
8
MCL 600.5852(1) provides, in pertinent part, as follows:
(1) If a person dies before the period of limitations has run or within 30 days after
the period of limitations has run, an action that survives by law may be
commenced by the personal representative of the deceased person at any time
within 2 years after letters of authority are issued although the period of
limitations has run.
-5-
to a licensed plumbing/mechanical contractor in their installation of the water heater.” Partridge
further concluded that defendants failed to comply with applicable building codes and the water
heater’s installation manual. Noting that defendants were grossly negligent in the installation of
the water heating system, Partridge averred, in pertinent part, as follows:
I have concluded that Phelps Plumbing and Heating, Inc., and their
employees failed to satisfy the codes and the water heater manufacturer[’]s
instructions by (1) installing a water heater to perform the function of a boiler. . . .
(2) not connecting the 2 water heater flues to a gas vent or chimney, (3) not
terminating the flue at least 2 feet above the highest point of any portion of the
building within a horizontal distance of 10 feet, (4) not protecting the flue passing
through the wood rim joist with a non-combustible material, (5) terminating the
flues in the wind pressure drift area, (6) not designing and constructing a venting
system to develop a positive flow adequate to remove flue gases to the outside,
(7) not installing a low-water cut-off, (8) not installing temperature/pressure
gauge, and (9) terminating flue gas within 3 feet of opening door [sic].
* * *
Phelps Plumbing and Heating, Inc., and their employees installed a water
heater not suited for the application and contrary to the codes and standards noted
above, which resulted in the heat exchanger failure and carbon monoxide
poisoning death of [plaintiff’s decedent].
In his January 28, 2016 affidavit, Phelps averred that plaintiff’s decedent “wanted to use
her own supplies and equipment for the [heating] system” and that plaintiff’s decedent supplied
“the hot water heaters, exhaust fan and piping and vents for the system.” Phelps further averred,
in pertinent part, as follows:
That I was aware that [plaintiff’s decedent] was a dealer for Paloma
products. I had known [plaintiff’s decedent] for a number of years. She had
indicated that because she was a dealer for [Paloma’s] products, she wanted to use
their products, with respect to the [heating] system in her home. [Plaintiff’s
decedent] indicated that her company, which she and her brother owned, sold and
serviced Paloma parts. She also gave me instructions on how the parts were to
[be] install[ed] and indicated that she had conferred with a Paloma representative
with respect to the installation of the parts and equipment she supplied from
Paloma.
-6-
No-Che-Mo, Inc.9 then installed the two hot water heaters, exhaust fan,
piping and vents and other HVAC parts and materials that were supplied by
[plaintiff’s decedent].
* * *
. . . [Plaintiff’s decedent] informed us that one of the Paloma boilers, that
looked like a domestic hot water heater, wasn’t large enough and wasn’t doing the
job. She then supplied a larger hot water heater, which I then installed on behalf
of No-Che-Mo, [Inc.] per the specifications that [plaintiff’s decedent] had
supplied. In addition, an extra pump was installed for the new hot water heater
she supplied. [Footnote added.]
According to Phelps, before the property underwent an inspection by an inspector for the
County of Lake, plaintiff’s decedent informed him that a representative of Paloma had “done the
initial start-up of the HVAC system and had made adjustments to the HVAC system to get it
ready for an inspection by the County Inspector.” Phelps further averred that additional work
was completed on January 18, 2006 at plaintiff’s decedent’s request where “[plaintiff’s
decedent’s] Paloma representative wanted some piping for the boiler placed further apart.” After
December 20, 2006, Phelps would occasionally cross paths with plaintiff’s decedent in the
community, and “[plaintiff’s decedent] would inform [Phelps] how happy she was with her
[heating] system, how well it was doing and how low her heating bills were. Also, [plaintiff’s
decedent] was trying to get [Phelps] to promote the Paloma products that her company sold[ ] . . .
.” Phelps noted in his affidavit that after plaintiff’s decedent’s death, when he visited her home,
he noticed several items that “were missing and/or not present and/or different than when the
[heating] system was inspected by [Lake County].” Specifically, Phelps averred, in pertinent
part, as follows:
The pump, check valve and relay (for turning the pump on and off) for the
Paloma hot water heaters were gone.
The high limit controller was gone.
The draft hood unit was gone.
The wiring for the controller, pump and check valve were missing. There
were open boxes of wiring everywhere.
The original piping and heater had been re-worked and a different heater
was installed. The old heater was sitting on the floor.
9
According to the record, No-Che-Mo, Inc. was a predecessor entity for Phelps Plumbing and
Heating, Inc.
-7-
The home was sprayed with foam insulation, which was evidenced by
foam on the piping we installed.
The front door to the home had been relocated between the time the first
unit was installed and the second unit was installed.
Phelps continued to aver that “all work I performed was done in accordance with HVAC code
and/or the instructions I received from [plaintiff’s decedent]. . . . That I . . . installed the material
and equipment received and supplied by [plaintiff’s decedent] in accordance with the instructions
she gave me and that the HVAC system was inspected and passed the inspection by the [Lake]
County Inspector, Peter Nammensma.”
Viewing the record evidence in its entirety, we are not persuaded that it supports a
reasonable conclusion that defendants “did not care about the safety or welfare” of plaintiff’s
decedent or others when undertaking the installation of plaintiff’s decedent’s heating system.
Tarlea, 263 Mich App at 90. Moreover, the record evidence does not establish that defendants
engaged in conduct “so reckless as to demonstrate a substantial lack of concern for whether an
injury resulted to [plaintiff’s decedent or others].” Xu v Gay, 257 Mich App 263, 271; 668
NW2d 166 (2003). Rather, the record evidence reflects that plaintiff’s decedent and defendants
acted cooperatively in a manner to assemble her heating system, and we are not persuaded that
defendants’ conduct rose to the level of gross negligence as a matter of law. See Jackson v Co of
Saginaw, 458 Mich 141, 146; 580 NW2d 870 (1998) (recognizing that a court may determine
issues of gross negligence where reasonable minds could not differ on the issue).10 Accordingly,
the trial court correctly determined that MCL 600.5839(1)(b) was not applicable under the
circumstances of this case, and summary disposition was properly granted pursuant to MCR
2.116(C)(7).
Affirmed. Defendants, as the prevailing parties, may tax costs pursuant to MCR 7.219.
/s/ Karen M. Fort Hood
/s/ Mark J. Cavanagh
10
Plaintiff argues in its brief on appeal that the record establishes that Phelps Plumbing and
Heating, Inc. “was not simply taking instruction and material from [plaintiff’s decedent], but that
it was involved in the design and installation of the system itself.” We note that any factual
disputes on this discrete issue are not dispositive in our ultimate conclusion that the record does
not support a finding of gross negligence on the part of defendants.
-8-