STATE OF VERMONT
ENVIRONMENTAL COURT
Appeal of Carl James Anderson }
}
} Docket No. 219-10-02 Vtec
}
}
Decision and Order
Appellant Carl James (A Jim@ ) Anderson appealed from a decision of the Development Review
Board (DRB) of the City of Burlington approving an application for approval of a 40-unit
residential apartment building at 300 Lake Street in the City of Burlington. Appellant appeared
and represented himself; Appellee-Applicants Burlington Community Land Trust and Housing
Vermont are represented by Richard C. Whittlesey, Esq.; the City of Burlington is represented by
Kimberley J. Sturtevant, Esq. An evidentiary hearing was held in this matter before Merideth
Wright, Environmental Judge. The parties were given the opportunity to submit written requests
for findings and memoranda of law. Upon consideration of the evidence and the written
memoranda and proposed findings, the Court finds and concludes as follows. All section
references are to the Zoning Ordinance of the City of Burlington, unless otherwise noted.
Appellee-Applicants propose to construct a 40-unit apartment building on the lower portion of a
vacant 1.65-acre roughly triangular lot bordered by Depot Street to the southeast, the railroad
tracks to the west, and land of Burlington College to the north. The property is located in the
Waterfront Residential Medium Density zoning district, in which multi-family apartment
housing is a permitted residential use. From the building site the land slopes steeply upwards to
the north, to a plateau at the elevation of North Avenue at the Burlington College buildings.
From the building site the land also slopes steeply upwards to the east, across Depot Street and
continuing upwards to the building sites on the west side of North Avenue. Depot Street slants
diagonally down from North Avenue to Lake Street along the southeasterly boundary of the site.
Depot Street is at present restricted in use due to the instability of the slope and the potential for
subsidence. It is not a through-way and is basically only used for emergency access. Appellant
lives in a building at the top of the slope which could potentially be affected by such subsidence.
In connection with this project, Appellee-Applicants propose to stabilize the slope by site
engineering methods involving the reshaping and regrading of the bank to the east of the
building site and insertion of a geo-grid. Trees will only be removed where necessary to improve
the slope of the land; that is, to flatten or reduce the degree of slope. Except where necessary to
stabilize the slope, or to remove dead trees, the grove of cottonwood trees existing to the east and
southeast of the proposed building site will be preserved. After regrading, the slope will be
replanted with 610 staghorn sumacs, whose root systems will further help to stabilize the slope,
and jute matting will be placed to stabilize the slope as the vegetation regrows. Because the
property had been in industrial use in the past, topsoil on the disturbed areas of the property will
be stripped and tested for contamination. Soils that test clean will be reused on the site; those that
are contaminated will be disposed of properly.
Appellee-Applicants propose to construct a four-story L-shaped residential building on the lot, to
provide forty housing units, of which 34 are proposed as so-called > affordable= units, that is,
affordable for those with less than 80% of the area= s median income, so that the project qualifies
under Article 14 of the Zoning Ordinance regarding Inclusionary Housing. There will be
eighteen two-bedroom units, with the remainder being one- and three-bedroom units. The project
is intended to provide affordable, safe, decent housing for families.
The building is located at the foot of an existing hill, and is designed so that it will not interrupt
the ridgeline above, that is, it will not interrupt the view of the City= s skyline from areas near the
lake looking towards the east, and will not interrupt the view of the lake from buildings or public
areas at the top of the slope looking towards the west. The building itself is well-designed
visually to bridge the differences in building mass and materials from the large industrial Moran
plant up to the residential and institutional buildings such as the Commodore condominiums, the
Burlington Police Department building, and the Burlington College buildings along North
Avenue. The building is designed so that the units either have decks or patios, or have large
sliding windows with railings, to give access or the sense of access to the outdoors and to break
up the scale of the building facades. The materials proposed for the building are brick, fiber-
cement clapboard, and vertical metal siding, to relate the building to the industrial waterfront
setting but to give it a more comfortable residential scale. For the same reason, the mass of the
building is interrupted by the use of the vertical metal siding on the fourth floor, and brick at the
base, to avoid a monolithic look. The roof overhang provides shading in the summer, and also
casts a shadow line that further adds to the design sense of the building as residential in scale.
The parking garage under the building has been designed to be open to view from outside, to
enhance the safety of the garage space. The L-shape of the building provides an open triangular
courtyard of space between the building, the parking area, and the railroad tracks, suitable for
gardening or play area, and capable of providing a clear turnaround space for emergency
vehicles.
Access to the building is via an extension of Lake Street, which narrows between two trees to
enter the parking lot for the building. The improvements to Lake Street and to the stormwater
collection system for Lake Street are proposed to be completed on a schedule to tie in to the
parking lot and access for the building, and the stormwater system for the building and its
surroundings.
The proposed apartment building must comply with the City= s Zoning Ordinance, and in
particular Article 5 (Use and Dimensional Requirements), Article 6 (Design Review), Article 7
(Site Plan Review, which allows the substitution of appropriate design review criteria through '
7.1.7), Article 10 (Parking), Article 13 (Major Impact Developments); Article 14 (Inclusionary
Zoning) and the Conditional Use criteria from Article 17, made applicable through to the project
by Article 13.1.5.
Appellee-Applicants propose to accept and to incorporate into the application before the Court
the City= s so-called standard conditions of approval, and the following specific conditions of
approval proposed by the City.
Related to design and pre-construction
1. That the project be granted a parking waiver for up to 23 spaces, based on the parking needs
characteristic of affordable housing units, and this property= s proximity to the bike path and to
public transportation, and that the Applicant/Property Owner applicant investigate providing its
tenants of other transportation alternatives, such as implementing a so-called ride-share or car-
share program.
2. That the Applicant/Property Owner is responsible for obtaining all necessary Zoning Permits
and Building Permits through the Department of Public Works as well as any other permits that
may be required.
3. That the Applicant/Property Owner is responsible to meet all energy efficiency codes, and to
maintain conformance with all applicable codes, regulations and guidelines (e.g. Burlington
Electric Department= s Guidelines for Energy Efficient Construction dated November 13, 2000).
4. That the Applicant/Property Owner is responsible to insure that all elements on the approved
site plans, including landscaping, sidewalks and road connections, are installed as approved.
5. That the Applicant/Property Owner provide to the City= s Public Works Department, prior to
the commencement of construction, detailed construction drawings for the approved sanitary
sewers, the approved erosion control and storm water drainage plan, and the approved water
supply system, to enable the Department to review compliance during construction.
Related to during construction
6. During construction of the building and its infrastructure, that the Applicant/Property Owner
require the contractors to provide dust control, including applications of water and/or calcium
chloride as needed.
7. During construction of the building and its infrastructure, that the Applicant/Property Owner
require the contractors to implement temporary erosion control measures in accordance with the
A Vermont Handbook For Soil Erosion and Sedimentation Control On Construction Sites -
Special Publication No. 3,@ including hay bale check dams, silt fencing, stabilized construction
entrance, or other measures as required by site conditions. The Project Engineer or other
designated professional shall inspect the construction erosion control devices on a routine basis
and after every significant storm event (10 year event or greater) to ensure that these erosion
control devices are maintained and functioning properly.
8. At the completion of building and infrastructure construction, that the Applicant/Property
Owner require the site to be graded, covered with topsoil, and seeded, including mulching of all
exposed soil and sloped areas, to stabilize the site, and that any necessary erosion control devices
remain in place and be maintained until the site has stabilized.
Related to post-construction, prior to occupancy, or continuing during occupancy
9. That a Zoning Certificate of Occupancy must be issued by the Department of Planning and
Zoning prior to the use and/or occupancy of the subject premises; that prior to issuance of the
Certificate of Occupancy, the Department of Code Enforcement must certify that work and
conditions of approval associated with the Development Review Board application have been
met; and that the Applicant/Property Owner must submit a Certificate of Completion certifying
that the Project as described by the Applicant/Property Owner and approved [in this decision]
has met its conditions of approval PRIOR to the issuance of the Certificate of Occupancy.
10. That the Applicant/Property Owner proposes to pay an impact fee in the amount of
$91,896.60, to be paid to the Treasurer= s Office at least seven (7) days prior to the issuance of
the Certificate of Occupancy, calculated by the City as1 $6,825.33 on account of > T= impacts,
$7,762.14 on account of > F= impacts, $1,516.74 on account of > PO= impacts, $25,963.02 on
account of > P= impacts, $16,148.82 on account of > L= impacts, and $33,896.60 on account of > S=
impacts.
11. That the Applicant/Property Owner and any successor in interest provide a statement in the
leases of the individual units that discloses the nearness and future use of the railroad tracks so
that tenants are aware of the potential for noise and vibration that may occur.
12. That the Applicant/Property Owner is responsible to provide sufficient water flow and water
pressure for domestic needs and for fire fighting.
Article 5: Use, Density & Dimensional Requirements:
The proposed 40-unit residential apartment building is a permitted use in the Waterfront
Residential Medium Density zoning district. The allowed density for the site is 40 units,
calculated under ' 5.2.1 and ' 5.2.2 as 1.65 acres times 20 units per acre, times 120% to apply
the 20% density bonus for affordable housing units under ' 14.1.14, which totals 39.6, which
may be rounded up under ' 5.2.3 to 40 units.
Section 5.3.2 of the Zoning Ordinance allows a maximum lot coverage of 72% for buildings,
walks (excluding accessibility ramps), parking, drives, decks, patios and paved surfaces, plus an
additional 10% for decks, patios, porches, terraces, game courts, and swimming pool aprons. The
Project proposes only a 32% lot coverage, calculated as 23,728 square feet of coverage on a
74,291 square foot lot.
Section 5.3.5 and Table 5-D require a 15-foot front yard setback from the railroad right-of-way,
from Lake Street, and from Depot Street, and a 20-foot side yard setback from the land of
Burlington College to the north. No rear yard setback is applicable because the parcel is bordered
by public ways on more than one side. The proposed plans provide a 20.4-foot setback from the
railroad; an approximately 225-foot setback from Lake Street; and a 39-foot setback from Depot
Street, meeting the front yard setback requirements. The proposed plans provide a 34-foot
setback from the land of Burlington College, meeting the side yard setback requirements.
Section 5.3.7 requires a 50-foot setback from the ordinary high water mark of Lake Champlain.
The proposed plans provide an approximately 460 foot setback from the ordinary high water
mark of the Lake.
Section 5.3.18(b)(2) allows a maximum height of 60 feet above average grade. The proposed
apartment building is less than 50 feet above the average grade, including the small louvered
penthouse structure that provides ventilation to equipment located inside on the top floor of the
building.
Accordingly, the proposed apartment building meets all the requirements of Article 5.
Article 6: Design Review:
' 6.1.10(a) - Relate Development to its Environment
The proposed apartment building relates well to its environment. It is placed within the sloped
bank to the east and north to fit well in the topography of the land. It will be surrounded by
existing trees and shrubs and planted landscaping to the north, east and south. The proposed
building is of a scale, shape and materials so that it relates harmoniously to residential,
institutional and industrial buildings and the mixed use and history of the formerly industrial
waterfront neighborhood. The proposed building is sited below the elevation of North Avenue
not visible above the ridgeline, nor does it intrude into the City= s skyline when viewed from
below.
' 6.1.10(b) - Preserve the Landscape
The landscape surrounding the proposed building will be stabilized and preserved by the site
work and landscaping proposed for the project. The proposal will preserve the vegetated slopes
to the east and north of the building and the proposed building has been sited to preserve the
existing significant grove of cottonwood trees to the south.
' 6.1.10(c) - Provide Open Space
The layout of the building provides defined open space within to the south and west of the
building, available for gardening and play area use.
' 6.1.10(d) - Provide Efficient and Effective Circulation
A sidewalk will connect the proposed building along Lake Street Extension to the waterfront and
the downtown. The design separates vehicular and pedestrian circulation. Adequate circulation is
provided for vehicles and emergency vehicles, including a reinforced emergency turnaround in
the open space area. Handicapped-accessible parking spaces are provided adjacent to the main
entry, and access to the building is provided though ramps and elevators accessible to disabled
and elderly persons.
' 6.1.10(e) - Provide for Nature's Events
Stormwater will be collected by drains and swales and transferred primarily through
underground piping to underground filter structures, and thence into the municipal stormwater
system and to Lake Champlain, except for a swale conducting the stormwater flow currently
draining from the undisturbed slope to the north of the building site to a culvert under the
railroad line. The stormwater plan has been designed to meet the currently applicable
requirements of the State of Vermont.
The roof of the building is an impermeable surface sloping gently in towards the center of the
building to conduct rain and snowmelt to a stormwater pipe running down the interior of the
building. An unobstructed area for snow to be plowed on site is provided directly adjacent to and
west of the drive and north of the fire lane, from which snow will be removed from the site.
Building entrances will be protected from precipitation by an integral canopy.
' 6.1.10(f), related to making advertising features understandable, is inapplicable to the proposed
apartment building which has no advertising features.
' 6.1.10(g) - Integrate Special Features with the Design
The trash collection area is proposed to be screened from the main pedestrian walks and building
entrance by trees and shrubs chosen for their fragrance to offset any disagreeable odors from the
accumulating trash. Mailboxes and electric meters are located indoors, while the gas meter
located on the east side of the building and will be boxed in and screened from view.
' 6.1.10(h) - Make Spaces Secure and Safe
The garage is designed only partially underground so that it will be both visible and audible from
the outside, enhancing the security of residents using the garage spaces. The emergency vehicle
turn-around has been designed with a 50-foot radius to allow fire trucks to maneuver close to the
building. The stabilization of the Depot Street slope will also enhance access by emergency
vehicles. The building and site are accessible by fire, police and rescue personnel.
Lighting that has been designed to shed no direct light beyond the site perimeters will illuminate
the outside of the building to the north and east of the building to provide additional security.
The fire suppression system for the building has been designed to exceed the requirements of all
applicable codes, and the building will conform to the life safety requirements of the applicable
building and fire safety codes at the time the building receives its building permit.
' 6.1.10(i) - Protect Burlington= s Heritage
There are no existing structures or architectural features on the site or adjacent to the site
requiring preservation. The scale and materials of the proposed building provide a visual
transition to the nearby Moran Plant and the historic waterfront buildings, and blend well with
the neighborhood.
' 6.1.10(j) - Consider the Microclimate
The site and building are designed to obtain some passive solar gain to the building, to shade the
entryways, and to use native vegetation in the landscape plan. The design minimizes any effect
on the light, air, water, noise and temperature experienced in the surrounding area.
' 6.1.112(a) - Protect Existing Scale and Streetscape
Like other structures to the south on Lake Street, the proposed building is set at the toe of a slope
and its roof is well below the elevation of North Avenue, making it compatible withe the existing
scale and streetscape. The layout, scale, materials and design of the building and the lot is
consistent and compatible with other development in the area, and compatible with the
neighborhood structures on the top of the slope at North Avenue.
' 6.1.11(b) - Protect Views and View Corridors
The proposed building is located at the base of the slope and will not affect views of Lake
Champlain or the Adirondack Mountains for adjacent sections of the community.
' 6.1.11(c) - Consider the City Skyline
The proposed building will be below the level of the top of the sloped bank to the east and
consequently will not have any effect on the City= s skyline. The effect of the relatively flat roof
has been carefully considered; it is designed to avoid affecting the view over the building either
from the east or the west and to enable the building to blend visually into the hillside.
' 6.1.11(d) - Protect Solar Access
Because of the location of the building, no shadows will be cast on adjacent lands or buildings
and will not block solar utilization on the site or adjacent lands.
' 6.1.11(e) - Reduce Energy Utilization
The proposed building design incorporates best available technologies and materials. The energy
performance of the proposed building is designed to reduce energy operating cost by at least
40% over the baseline construction requirements described in ASHRAE/IESNA Standard 90.1-
1999 and the energy efficiency measures dictated by existing regulations. The Project meets the
requirements of Leadership in Energy and Environmental Design and incorporates water saving
devices, electricity saving devices and an energy efficient window system.
' 6.1.11(f) - Minimize Shadow Impacts
The proposed building is designed and oriented to provide maximum sunlight on all public areas.
The L-shaped building is oriented to allow for good solar access to the south and west.
' 6.1.11(g) - Conceal Rooftop Devices
No exposed rooftop equipment is proposed. An inconspicuous 42" high louvered structure on the
roof will provide ventilation for the mechanical equipment located inside the building on the
fourth floor.
' 6.1.11(h) - Provide Pedestrian Corridor for Waterfront Access
The proposed building is blocked by the railroad from providing a pedestrian corridor between
the building and the waterfront, and none is required under the ordinance. Pedestrian access to
the waterfront is available along Lake Street to sidewalks and the bike path to Waterfront Park.
' 6.1.11(i) - Make Service Access Secondary to Pedestrian Access
Pedestrian access to the site is separate from the service access.
' 6.1.11(j) - Achieve Design Excellence
The proposed building design has achieved design excellence. The scale and L-shaped design of
the building avoid the appearance of an anonymous institutional building. The design scales
down the overall mass of the building to a comfortable residential scale by using a variety of
materials, textures and colors related to those used in the neighborhood, and incorporating decks
and a roof overhang that create shadows. These techniques achieve the creation of a building
base that ties in visually to the landscape, a middle building mass, and a distinctive upper floor
and roof shape that caps the building at the sky. The building placement is integrated with the
sloped bank to the east and north to work with the curve of the slopes. The height and mass of
the building provides a visual transition between the taller and more industrial Moran Plant and
nearby residential buildings.
Accordingly, the proposed apartment building meets all the applicable requirements of Article 6.
Article 7: Site Plan Review:
' 7.1.6(a) - Adequacy of Traffic Access
One curb cut is proposed on Depot Street, near a jog in Lake Street Extension, which is designed
to continue to the southern edge of the project property. North of the curb cut, Depot Street is
limited to emergency vehicle use, minimizing the possibility of any conflicting traffic. All
vehicles will enter and exit the property via this southern entrance, which is adequate for the
anticipated maximum of 25 vehicle trip ends in the peak hour. Appellant argues that potentially
all the residents could leave the building in a vehicle in the same hour, but presented no traffic
engineering data to support that supposition.
' 7.1.6(b) - Adequacy of Traffic Circulation and Parking
Twenty-seven of the on-site parking spaces are under the building in the parking garage, with an
additional eighteen in an outside parking area along the access drive to the south of the building.
A three-point turn-around and fire lane is provided for emergency vehicles. The trash collection
area is placed on the side of the vehicle access so that it is convenient for residents= use but also
accessible to the pickup vehicles. An adequate area is provided for loading and unloading in
front of the building entrance.
' 7.1.6(c) - Adequacy of Landscaping and Screening
The entire site will be extensively landscaped. After the slope to the east of the proposed
building is regraded to ensure slope stability and prevent erosion, it will be landscaped with
naturalized plantings to screen the proposed building from adjacent lands without blocking views
of the lake and to provide additional slope stability. Adjacent existing trees and vegetation will
be preserved. Due to the location of the building in the landscape, no additional screening is
required. Appellant is concerned that the lighting proposed for the east and north walls of the
building will A direct artificial light eastward into existing residences on North Avenue,@
however, that lighting is proposed for the walls at the ground floor level in those locations, and is
proposed to be provided by fixtures which shield any direct light, with the result that the hillside
to the east of the proposed building will itself screen the indirect light from any residences above
the building site on North Avenue.
' 7.1.6(d) - Adequate Protection of the Use of Renewable Energy Resources
With regard to solar energy resources, the proposed building will not shade adjacent lands, and is
designed for passive solar gain. It may be used to support active solar collection if desired in the
future. With regard to wind energy resources, the site is located on the lakefront and below the
sloped bank to the east, and therefore will not block wind from any adjacent land. Hydropower
resources are not applicable as no hydropower generating resources exist on the site, nor will the
proposal impede access to renewable organic fuel on adjacent land.
Accordingly, the proposed apartment building and its associated site plan meets all the
requirements of Article 7.
Article 10: Parking Regulations
Appellee-Applicants propose to provide 45 parking spaces, designated as 40 spaces for the
residents of the building and five spaces for visitors. They request a waiver to reduce the parking
spaces from the 68 spaces that otherwise would be required for 40 dwelling units, calculated
under ' 10.1.8 as 2 spaces for each of the first four units and 1.5 spaces for each of the remaining
36 units, plus 10% for designated visitor parking
Appellee-Applicants propose the waiver to reduce the parking space requirements by 23 spaces,
based on the reduced parking needs characteristic of affordable housing units, as other affordable
housing units managed by the Burlington Community Land Trust average only .7 vehicles per
dwelling unit. Further, the proposed building is located in close proximity to the bike path, a
reasonable walking distance from the downtown business area, and near public bus
transportation service (and the potential for train service). It therefore qualifies for the requested
23-space parking space waiver under ' 10.1.19(c) and (d).
The proposed parking spaces are designed to meet the dimensional requirements of ' 10.1.10 and
Table 10-C of the Zoning Ordinance. All the parking spaces are proposed to be 9 feet in width.
Thirty-seven of the parking spaces are proposed to be 20 feet in length for the angled parking
spaces and 22 feet in length for the parallel parking spaces, with travel aisles 20 feet in width.
The remaining eight spaces in the garage are designated for compact cars, 18 feet in length with
ample travel aisles.
The lighting for the parking areas is designed so that all direct rays fall within the parking lot or
walks and not off-site. The lighting is designed to use cut-off type light fixtures to direct the light
to avoid glare and assure that no direct beam illumination extends beyond the site. The pole-
mounted fixtures are proposed not to exceed 16 feet in height, less than the 22-foot height
allowed in the Zoning Ordinance. ' 10.1.17
Accordingly, the proposed apartment building, and its associated parking design, including the
23-space waiver approved in this section, meets all the requirements of Article 10.
Article 13: Major Impact Developments
' 13.1.6(a) - The proposed development shall not result in undue water, air or noise pollution.
Water Pollution - Stormwater: The stormwater plan will treat runoff from the site in accordance
with the Vermont State standards for stormwater treatment, and is designed to handle a 100-year
storm event. The stormwater system is designed to meet the state and federal requirements for
removal of total suspended solids and total phosphorus. It will collect the storm water in catch
basins and pipe it underground to two underground filter structures in Lake Street Extension and
into the municipal stormwater system. On the north side of the building site at the foot of the
northerly slope, a swale will collect and treat the stormwater running off the undisturbed
northerly slope, and direct it through an existing culvert under the railroad tracks.
Water Pollution - Sanitary Sewers: The proposed apartment building will generate residential
domestic wastewater; it will generate no industrial or manufacturing process waste water. All
wastewater from the proposed apartment building will be disposed of through the municipal
wastewater sewer system to be treated at the main municipal wastewater treatment plant. The
municipal wastewater system has sufficient capacity to serve the proposed apartment building.
Air Pollution: As a residential apartment building and does not include any manufacturing or
industrial processes that would create air pollution with any undue adverse effect on air quality.
During construction, Appellee-Applicants will require contractors to provide dust control,
including applications of water and/or calcium chloride as needed to avoid any undue adverse
effect on air quality during construction
Noise Pollution: The proposed apartment building does not include any manufacturing or
industrial processes that would create undue noise. Most of the apartments face Lake Champlain,
the bike path, the Moran Plant and Battery Park. Only 4 apartments will have decks on the side
of the building facing east towards North Avenue and Appellant= s building. Appellant is
concerned that the slope of the land will function as a natural amphitheater to funnel noise from
the building upwards to North Avenue, but presented no evidence that the noise from the
building would be excessive or other than that expected from a multi-family residential use in an
urban setting near the train tracks and bike path. The building itself will mitigate any noise
experienced at residences on North Avenue from the building= s own play area. Of course, the
residents will experience noise and vibration from the passage of trains along the nearby train
tracks. Although this feature of the site may be obvious to prospective tenants, Appellee-
Applicants have agreed to warn tenants of this feature in the lease agreements, to avoid any
future disputes or misunderstandings.
' 13.1.6(b) - The proposed development shall have sufficient water available for its needs.
' 13.1.6(c) - The proposed development shall not unreasonably burden the city= s present or
future water supply or distribution system.
The proposed building will receive water service from the City= s municipal water supply system
through a service main to an existing water supply line along Depot Street, in a volume which
will be sufficient to meet both the building= s fire protection and its residential needs. The
municipal water supply system has sufficient capacity to serve the proposed building.
' 13.1.6(d) - The proposed development shall not cause unreasonable soil erosion or reduction in
the capacity of the land to hold water so that a dangerous or unhealthy condition may result.
To the extent that the existing instability of the slope near Depot Street constitutes a dangerous
condition, the proposed site work will improve it; that is, it will be regraded and reinforced by
means of geo-grids and plantings to prevent further subsidence.
Temporary erosion control measures will be implemented during construction in accordance
with the A Vermont Handbook For Soil Erosion and Sedimentation Control On Construction
Sites,@ which are expected to include hay bale check dams and silt fencing. The site will be
graded, covered with topsoil and seeded, and exposed soil and sloped areas will be mulched and
covered with jute matting as necessary. Swales associated with the stormwater system will be
lined with stone where necessary to prevent erosion. The combination of landscaping, geo-grids,
pavement and sidewalks will prevent erosion once the site has stabilized, and the necessary
temporary erosion control devices will remain in place and be maintained until the site has
stabilized. Appellant is concerned that erosion of contaminated soils will occur during
construction; however, this will be prevented during construction as soils will be tested as they
are exposed and will be removed from the site if contaminated. Soils frm the hillside that will
undergo regrading are not expected to be contaminated; the issue of contamination arises
primarily regarding soils in the flat building site next to the railroad tracks.
The stormwater system has been designed to be of sufficient capacity to provide for controlled
runoff of stormwater from all surfaces on the site and building.
' 13.1.6(e) - The proposed development shall not cause unreasonable congestion or unsafe
conditions on highways, streets, waterways, railways, bikeways, pedestrian pathways or other
means of transportation, existing or proposed.
The proposed building is expected to generate no more than 25 vehicle trip ends in the peak
hour. This level of traffic generation will not cause congestion or unsafe conditions on any of the
means of transportation listed in this criterion. The sidewalks and nearby bicycle path have
sufficient capacity to handle the pedestrian and bicycle traffic that may be generated by the
residents.
' 13.1.6(f) - The proposed development shall not place an unreasonable burden on the city= s
ability to provide educational services.
The proposed building is estimated to house approximately 42 school-age residents, in the two-
and three-bedroom units. The Burlington school system has sufficient capacity to serve the
students who will live in the proposed building. In addition, a portion of the impact fees are
allocated to offset the school system costs associated with this proposal.
' 13.1.6(g) - The proposed development shall not place an unreasonable burden on the ability of
the city to provide municipal services.
The City has the capacity to provide all necessary municipal services to the proposed building
and its residents. In addition, the impact fees are allocated to offset the costs of municipal
services associated with this proposal.
' 13.1.6(h) - The proposed development shall not have an undue adverse effect on rare,
irreplaceable or significant natural areas, historic or archaeological sites, nor on the scenic or
natural beauty of the area or any part of the city.
The site does not contain any rare, irreplaceable, or significant natural areas or historic or
archaeological sites. The scenic or natural beauty of the site and its immediate surroundings,
consisting of the sloped bank to the north of the building and the significant trees to the south of
the building, will be preserved. The proposed building has been designed to fit in with the site
and to avoid any adverse effects on the views of the city skyline seen from the west or of the lake
and mountains seen from the east.
' 13.1.6(i) - The proposed development shall not have an undue adverse effect on the city= s
present or future growth patterns, or the city= s fiscal ability to accommodate such growth, or on
the city= s investment in public services and facilities.
The proposed building will occupy a currently vacant site in a district of the City designated for
in-filling by residential uses, under the zoning district designation, and the municipal plan. It is
also within a downtown area designated by the State, and within a growth center designated by
the Chittenden County Regional Plan. It will be consistent with the City= s growth patterns, and
will have no undue adverse effect on the City= s ability to accommodate that growth. Moreover,
an impact fee will be paid in connection with the proposed building to help offset municipal
costs associated with the residential development.
' 13.1.6(j) - The proposed development shall be in substantial conformance with the city's
municipal development plan.
The Project is in conformance with the City= s 2001 Municipal Development Plan to develop a
mixed-use neighborhood in the downtown waterfront that remains an economically inclusive
area and avoids exclusively high-income private development. (Page I-15). In particular it meets
the goals and policies of the Plan to encourage a wide range of housing options to meet different
and changing needs of households with children, the elderly, people with disabilities, and
moderate and low income households (page IX-2); to encourage development that complements
its natural setting (page III-1); and to ensure that people with disabilities have equal access to the
built environment (page III-2); as well as to ensure that building design takes into account
Burlington= s northern climate(page III-2), and to place the appropriate fiscal burden of facilities
and utilities on the users. (page VII-2).
Appellant claims that it is in the A Urban Reserve@ area that the plan does not intend for develop,
and that it is located on steep slopes which should be protected from development. However, the
building area of this site does not involve a steep slope, and the steep slopes elsewhere on the site
are being stabilized and revegetated. The plan for the site therefore meets the municipal plan= s
goal (page II-6) to avoid construction, cutting and filling, and loss of vegetation on the steep
slopes. Even if the property is within the > Urban Reserve= boundaries, it is on an edge of the >
Urban Reserve= that does have access to existing infrastructure, the lack of which otherwise
would make new development in that area overly costly. The proposed building fits well within
the plan= s goals for development of the waterfront area nearest the downtown, as well as the
purposes of the Waterfront Residential Medium Density zoning district.
' 13.1.6(k) - The proposed development shall not have an undue adverse impact on the present
or projected housing needs of the city in terms of amount, type, affordability, and location.
The proposed building will have a beneficial impact on the housing needs of the City, in
particular in terms of the affordability and location of this rental housing. See also, Article 14,
below.
' 13.1.6(l) - The proposed development shall not have an undue adverse impact on the present or
projected park and recreation needs of the city.
Sufficient park and recreational facilities exist in the immediate vicinity to this site to
accommodate the proposed development, including Waterfront Park, North Beach, and the
bicycle path. In addition, a portion of the impact fee is allocated to offset the costs of municipal
park and recreation facilities associated with this proposal.
Accordingly, the proposed apartment building and its associated site plan meets all the
requirements of Article 10.
Article 14. Inclusionary Zoning
The proposed apartment building will meet the requirements of Article 14, addressing
inclusionary zoning. Indeed, its primary purpose is to provide affordable housing in the
downtown area of Burlington. As all but six of the forty units are designated as affordable, it
provides a sufficient number of affordable units to qualify for the density bonus discussed above
under Article 5.
Section 17.1.5 - Conditional Use Criteria (made applicable to the project by Article 13.1.5)
(1) The capacity of existing or planned community facilities
The site is a vacant lot located in the City= s downtown waterfront area. Nearby existing public
infrastructure has sufficient capacity to serve the proposed building without any significant
impact on the capacity of existing or planned community facilities.
(2) The character of the area affected
This building fits the site and the emerging residential character of the area, and by its design and
materials blends in with the non-residential mixed uses in the waterfront character as well. The
proposed building and its site are consistent area affected.
(3) Traffic on roads and highways in the vicinity
The proposed building is expected to generate no more than 25 vehicle trip ends in the peak
hour. This level of traffic generation will not adversely affect the traffic on roads and highways
in the vicinity.
(4) Bylaws then in effect
The proposal meets applicable zoning bylaws, as discussed throughout this decision.
(5) Utilization of renewable energy resources - see above under ' ' 6.1.11 and 7.1.6.
Accordingly, the proposed apartment building and its associated site plan meets all the
requirements of ' 17.1.5, made applicable to the proposal by ' 13.1.5.
Based on the foregoing, it is hereby ORDERED and ADJUDGED that the proposal meets all the
required criteria under the City= s Zoning Ordinance, and is hereby APPROVED, with the agreed
specific conditions of approval outlined on pages 4 through 6 of this decision and the agreed so-
called standard conditions of approval placed in all permits by the City. This is a final and
appealable decision and order concluding this case. However, any party wishing a separate
judgment order in the form of a Certificate of Appropriateness consistent with this decision, may
circulate such proposed order for form and submit it to the Court.
Dated at Barre, Vermont, this 2nd day of May, 2003.
___________________
Merideth Wright
Environmental Judge
Footnotes
1.
Please note that the subsidiary amounts do not appear to add up exactly to the total impact fee
proposed, and that no key to the abbreviations has been provided, although the Court suspects
they may stand for T[raffic], F[ire], PO[lice], [P]arks, L[ibrary] and S[chools].
2.
It appears that the proposed building is in the WRM district, just east of the Waterfront Core
districts to which these sections apply. However, as the parties addressed these criteria, the Court
will also address them.