Filed 10/24/18
CERTIFIED FOR PUBLICATION
COURT OF APPEAL, FOURTH APPELLATE DISTRICT
DIVISION ONE
STATE OF CALIFORNIA
SAVE OUR HERITAGE ORGANISATION, D073064
Plaintiff and Appellant,
v. (Super. Ct. No. 37-2016-00045022-
CU-TT-CTL)
CITY OF SAN DIEGO et al.,
Defendants and Respondents;
THE PLAZA DE PANAMA COMMITTEE,
Real Party in Interest and Respondent.
APPEAL from a judgment of the Superior Court of San Diego County,
Gregory W. Pollack, Judge. Affirmed.
Brandt-Hawley Law Group and Susan Brandt-Hawley for Plaintiff and Appellant.
Mara W. Elliott, City Attorney, and Heidi Vonblum, Deputy City Attorney, for
Defendants and Respondents, City of San Diego et al.
Seltzer Caplan McMahon Vitek and G. Scott Williams for Real Party in Interest
and Respondent, Plaza de Panama Committee.
I
INTRODUCTION
Save Our Heritage Organisation (SOHO) appeals from a judgment denying its
petition for writ of mandamus challenging the approval by the City of San Diego (City)
of an environmental impact report (EIR) addendum for revisions to the Plaza de Panama
project (project) at Balboa Park. SOHO contends we must reverse the judgment because
the City's approval of the addendum violated the California Environmental Quality Act
(CEQA; Pub. Resources Code, § 21000 et seq.)1 in two respects. First, SOHO contends
CEQA Guidelines section 15164 (Guideline 15164),2 which authorizes the addendum
process utilized by the City, is invalid because CEQA contains no authority for the
addendum process and the addendum process conflicts with CEQA's public review
requirements. Second, SOHO contends the City approved the project revisions without
making new findings under section 21081.
We conclude SOHO has not met its burden of establishing the addendum process
is invalid. We further conclude the City was not required to make findings under section
21081. We, therefore, affirm the judgment.
1 Further statutory references are to the Public Resources Code unless otherwise
stated.
2 The CEQA Guidelines (Guidelines; Cal. Code Regs., tit. 14, § 15000 et seq.) are
promulgated by the state's Natural Resources Agency (Resources Agency) for the
implementation of CEQA by public agencies. (§ 21083; Center for Biological Diversity
v. Department of Fish & Wildlife (2015) 62 Cal.4th 204, 217, fn. 4.) Further Guideline
references are to the CEQA Guidelines.
2
II
BACKGROUND
This case has a lengthy record and litigation history. We summarize only the facts
and history relevant to an understanding of the issues on appeal.
A
Balboa Park is a large urban park in San Diego. Included within Balboa Park's
Central Mesa are the buildings and plazas designed and constructed for the 1915 Panama-
California Exposition and the adjoining buildings and improvements later constructed for
the 1935 California Pacific International Exposition. From the west, visitors access
Balboa Park's Central Mesa by the Cabrillo Bridge. Most of Balboa Park's Central Mesa
is a National Historic Landmark District and the Cabrillo Bridge is a National Historical
Landmark. (Save Our Heritage Organisation v. City of San Diego (2015) 237
Cal.App.4th 163, 168 (SOHO I).)
B
The City approved the project in 2012. The purpose of the project was to restore
pedestrian and park uses to Balboa Park's Central Mesa and to alleviate vehicle and
pedestrian conflicts. As described in the administrative record, the project "proposes to
remove vehicular access and parking from the Plaza de Panama, El Prado, Plaza de
California, the Mall, and Pan American Road East and allow these areas to be used by
pedestrians only. A new bridge, 'Centennial Bridge,' would connect the eastern end of
Cabrillo Bridge to the western side of the Alcazar parking lot. From that point a new
'Centennial Road' would traverse through the Alcazar parking lot exiting to the east,
3
continue to the south past a new Organ Pavilion [underground] parking structure and then
connect to Presidents Way. Additional parkland would be provided atop the new parking
structure. A tram would provide service from the parking structure to the Plaza de
Panama with possible expansion to serve other areas of the Park. Excavation activities
required for construction of the underground parking structure would require that the
project dispose of excess soils within the inactive Arizona Street Landfill."
SOHO opposed the project and filed a petition for writ of mandamus challenging
the project on multiple grounds related to the project's effects on the environment,
historical resources, and land use. The superior court granted the petition on some of the
asserted grounds and entered a judgment directing the City to rescind the project
approval. Real party in interest, The Plaza de Panama Committee (Committee), which
was spearheading the project, and SOHO each appealed aspects of the judgment. We
reversed the judgment, ultimately concluding the City had not abused its discretion in
approving the project. (SOHO I, supra, 237 Cal.App.4th at pp. 168–169, 172, 188, 192.)
The Committee subsequently filed a motion seeking an award of attorney fees
under Code of Civil Procedure section 1021.5. The superior court entered an order
denying the motion and we affirmed the order on appeal. (Save Our Heritage
Organisation v. City of San Diego (2017) 11 Cal.App.5th 154, 157–158 (SOHO II).)
C
While the appeals were pending, several physical changes to the project's
environmental setting occurred. The City removed all parking spaces, signage, wheel
stops and plants from the Plaza de Panama and reconfigured traffic to allow for nearby
4
tram, bus, and valet drop off. The City then resurfaced the Plaza de Panama and added
planters, benches, umbrella tables, and chairs. The City added 27 accessible parking
spaces to the Organ Pavilion parking lot, created a tram service yard, and replaced
existing trams with new trams capable of moving 50 to 100 people at a time. The City
also completed maintenance on the wooden deck on the east end of the Palm Canyon
pedestrian bridge and reconstructed the north portion of the Alcazar parking lot to
comply with the Americans with Disabilities Act of 1990 (ADA) (42 U.S.C. § 12101 et
seq.) by adding 14 accessible parking spaces and a path of travel through the Alcazar
Garden.
Unrelated to the project, but within the Central Mesa, the San Diego Zoological
Society (Zoo) constructed a 600-space parking structure with accompanying pedestrian
and ADA parking improvements. The parking structure is only for use by Zoo
employees, but the Zoo has an agreement with the Old Globe Theater allowing the
theater's patrons to use the structure after 6:00 p.m. for a fee.
D
In 2016, the City adopted an addendum to the EIR addressing several
modifications to the project.3 The modifications included: (1) changing and reducing
the number of the supports for the Centennial Bridge to comply with current California
3 Contemporaneously, the City made decisions about the Committee's role in and
the financing for the project. These decisions are the subject of a separate action. (See
San Diegans for Open Government v. Public Facilities Financing Authority of the City of
San Diego et al. (D072562, Apr. 26, 2018) [nonpub. opn.].)
5
Department of Transportation requirements; (2) redesigning and adding storm water
basins to comply with current City storm water standards; (3) adding ventilation to the
subterranean parking structure to comply with changes to the California Building Code;
(4) increasing the elevation of the Arizona Street Landfill site because of soil added to the
site after the project's initial approval; (5) making energy efficiency upgrades required by
the revised Building Energy Efficiency Standards and California Green Building
Standards; (5) increasing the construction phasing plan schedule by two months; and (6)
refining the construction design to reduce the project's cost by $4 million. Completion of
the modified project will result in 353 additional parking spaces, or 93 more spaces than
contemplated by the original project.
The addendum reviewed the potential environmental effects of the project
modifications on land use, historical resources, visual effects and neighborhood
character, transportation circulation and parking, air quality, biological resources, energy
conservation, geologic conditions, greenhouse gas emissions, health and safety and
hazardous materials, hydrology and water quality, noise, paleontological resources,
public services and facilities, and public utilities. The addendum concluded:
1. There were no substantial changes to the project requiring major revisions
to the EIR because of new or substantially increased significant environmental effects;
2. There were no substantial changes in circumstances requiring major
revisions to the EIR because of new or substantially increased significant environmental
effects;
6
3. There was no new, previously unknown or unknowable, information of
substantial importance showing: (a) the project will have significant effects not discussed
in the EIR; (b) the project will have substantially more severe significant effects than
shown in the EIR; (c) previously infeasible mitigation measures and project alternatives
are now feasible and would substantially reduce significant environment effects; or (d)
considerably different mitigation measures than analyzed in the EIR would substantially
reduce significant environmental effects. The City incorporated these findings into its
resolution adopting the addendum.
III
DISCUSSION
"In a CEQA case, as in other mandamus cases, our review of the administrative
record for error is the same as the trial court's; we review the agency's action, not the trial
court's decision." (Muzzy Ranch Co. v. Solano County Airport Land Use Com. (2007) 41
Cal.4th 372, 381.) Our review of the City's action requires us to consider whether the
City abused its discretion either (1) by failing to proceed in the manner required by law,
or (2) by making a factual conclusion unsupported by substantial evidence. (§§ 21168,
21168.5; Save Tara v. City of West Hollywood (2008) 45 Cal.4th 116, 131.) We
determine de novo whether the City failed to proceed in the manner required by law
while we accord greater deference to the City's factual conclusions. (Ibid.)
A
SOHO contends the City failed to proceed in the manner required by law because
Guideline 15164, which authorizes the addendum process utilized by the City, is invalid.
7
1
Guideline 15164 provides: "(a) The lead agency or a responsible agency shall
prepare an addendum to a previously certified EIR if some changes or additions are
necessary but none of the conditions described in [Guideline] 15162 calling for
preparation of a subsequent EIR have occurred. [¶] ... [¶] (c) An addendum need not be
circulated for public review but can be included in or attached to the final EIR ... . [¶] (d)
The decision-making body shall consider the addendum with the final EIR ... prior to
making a decision on the project. [¶] (e) A brief explanation of the decision not to
prepare a subsequent EIR pursuant to [Guideline] 15162 should be included in an
addendum to an EIR, the lead agency's required findings on the project, or elsewhere in
the record. The explanation must be supported by substantial evidence."
The Resources Agency's discussion of Guideline 15164 states it was "designed to
provide clear authority for an addendum as a way of making minor corrections in EIRs ...
without recirculating the EIR ... ."4 The Resources Agency's statement of reasons for
initially adopting Guideline 15164 states, "The concept of an addendum to an EIR is new
in the CEQA [G]uidelines, although such a device has been used by many agencies
previously. This section is designed to provide clear authority for the practice and to
encourage other agencies to use the device as a way of making minor corrections in EIRs
4 The Resources Agency adopted discussions together with the Guidelines to
explain the Guidelines. (Las Lomas Land Co., LLC v. City of Los Angeles (2009) 177
Cal.App.4th 837, 849, fn. 8.) "Although the discussions are not part of the California
Code of Regulations, they may assist courts in construing CEQA and the Guidelines."
(Ibid.)
8
without recirculating the EIR. The addendum is the other side of the coin from the
supplement to an EIR. This section provides an interpretation with a label and an
explanation of the kind of document that does not need additional public review. The
need for this section was shown by the many telephone calls received in the Resources
Agency asking how to handle this situation." (Cal. Natural Resources Agency,
Amendments to the State CEQA Guidelines, Text of Adopted Amendments with
Statement of Reasons (Dec. 30, 1982), pp.100–101.)
Guideline 15164, "like any agency action, comes to the court with a presumption
of validity." (Association of California Ins. Companies v. Jones (2017) 2 Cal.5th 376,
389 (Jones).) SOHO, as the party attacking the Guideline, has the burden of
demonstrating its invalidity. (Benton v. Board of Supervisors (1991) 226 Cal.App.3d
1467, 1478, disapproved on another point in Friends of College of San Mateo Gardens v.
San Mateo County Community College Dist. (2016) 1 Cal.5th 937, 958, fn. 6 (Friends).)
2
In reviewing the validity of Guideline 15164, we consider whether the Guideline
is (1) consistent and not in conflict with CEQA, and (2) reasonably necessary to
effectuate the purpose of CEQA. (Gov. Code, § 11342.2; Jones, supra, 2 Cal.5th at
p. 396; Communities for a Better Environment v. California Resources Agency (2002)
103 Cal.App.4th 98, 108, disapproved on another point in Berkeley Hillside Preservation
v. City of Berkeley (2015) 60 Cal.4th 1086, 1109, fn. 3.) The analysis of these questions
depends on whether the Guideline is a quasi-legislative rule or an interpretive rule.
(Jones, at p. 396.)
9
"Quasi-legislative rules represent 'an authentic form of substantive lawmaking' in
which the Legislature has delegated to the agency a portion of its lawmaking power.
[Citations.] Because such rules 'have the dignity of statutes,' a court's review of their
validity is narrow: 'If satisfied that the rule in question lay within the lawmaking
authority delegated by the Legislature, and that it is reasonably necessary to implement
the purpose of the statute, judicial review is at an end.' " (Jones, supra, 2 Cal.5th at
pp. 396–397.)
Interpretive rules are devoid of quasi-legislative authority and instead represent the
agency's understanding of a statute's meaning and effect. Interpretive rules are
consequential, but they are not an exercise of delegated lawmaking power. (Jones, supra,
2 Cal.5th at p. 397.) "A court reviewing the validity of an interpretive rule therefore must
consider more than simply whether the rule is within the scope of the authority conferred,
and whether the rule is reasonably necessary to effectuate the statute's purpose. Rather, a
court must also consider whether the administrative interpretation is a proper construction
of the statute. [Citations.] In answering the latter question, the standard of review ' "is
one in which the judiciary, although taking ultimate responsibility for the construction of
the statute, accords great weight and respect to the administrative construction." '
[Citation.] While the agency's position therefore matters a great deal, its interpretation
does not carry with it the dignity of statutes." (Ibid.)
Some rules defy easy categorization and may have both quasi-legislative and
interpretive characteristics. (Jones, supra, 2 Cal.5th at p. 397.) The California Supreme
Court has not decided whether the Guidelines are quasi-legislative rules or interpretive
10
rules. (Friends, supra, 1 Cal.5th at p. 954.) We need not categorize the Guidelines
generally or Guideline 15164 specifically to resolve this appeal. Even if Guideline 15164
is purely interpretative, we conclude SOHO has not established its invalidity.
3
The Resources Agency promulgated Guideline 15164, among others, to
implement section 21166. Section 21166 provides: "When an environmental impact
report has been prepared for a project ..., no subsequent or supplemental environmental
impact report shall be required ... unless one or more of the following events occurs: [¶]
(a) Substantial changes are proposed in the project which will require major revisions of
the environmental impact report. [¶] (b) Substantial changes occur with respect to the
circumstances under which the project is being undertaken which will require major
revisions in the environmental impact report. [¶] (c) New information, which was not
known and could not have been known at the time the environmental impact report was
certified as complete, becomes available." The project changes, changed circumstances,
and new information referred to in section 21166 only require a subsequent EIR if they
involve new significant environmental effects, substantially more severe significant
environmental effects, or newly feasible or different mitigation measures which would
substantially reduce one or more significant environment effects. (Guideline 15162,
subd. (a).)
Section 21166 effectively creates a presumption against further environmental
review after a project has been previously subjected to environmental review. (Moss v.
County of Humbolt (2008) 162 Cal.App.4th 1041, 1049; see § 21167.2; Friends, supra,1
11
Cal.5th at p. 956 [EIRs are entitled to a presumption of finality once adopted].)
" '[S]ection 21166 comes into play precisely because in-depth review has already
occurred, the time for challenging the sufficiency of the original EIR has long since
expired [citation], and the question is whether circumstances have changed enough to
justify repeating a substantial portion of the process.' " (Moss, supra, 162 Cal.App.4th at
p. 1050.) Section 21166 " 'restrict[s] the powers of agencies "by prohibiting [them] from
requiring a subsequent or supplemental environmental impact report" unless the stated
conditions are met.' " (Moss, at p. 1050.)
Although section 21166 does not expressly authorize the addendum process
prescribed in Guideline 15164, the addendum process fills a gap in CEQA for projects
with a previously certified EIR requiring revisions that do not warrant the preparation of
subsequent EIRs. (See Ventura Foothill Neighbors v. County of Ventura (2014) 232
Cal.App.4th 429, 435.) "CEQA authorizes the Resources Agency to fill such gaps in the
statutory scheme, so long as it does so in a manner consistent with the statute." (Friends,
supra, 1 Cal.5th at p. 956.)
Guideline 15164 is consistent with and furthers the objectives of section 21166 by
requiring an agency to substantiate its reasons for determining why project revisions do
not necessitate further environmental review. (Guideline 15164, subd. (e) [an agency
should include a brief explanation of its decision not to prepare a subsequent EIR in an
addendum to the EIR, in its required findings on the project, or elsewhere in the record];
Bowman v. City of Petaluma (1986) 185 Cal.App.3d 1065, 1081–1082 [using an
addendum to determine whether further environmental review is necessary is an
12
appropriate way to fill a procedural gap in CEQA and the Guidelines]; see American
Canyon Community United for Responsible Growth v. City of American Canyon (2006)
145 Cal.App.4th 1062, 1083; 1 Kostka & Zischke, Practice Under the Cal. Environmental
Quality Act (Cont.Ed.Bar 2018) § 19.42.) If the agency's reasons are not supported by
substantial evidence, a project opponent could challenge and a court could set aside the
agency's determination. (Guideline 15164, subd. (e) [an agency's explanation of its
decision not to prepare a subsequent EIR must be supported by substantial evidence]; see
Friends, supra, 1 Cal.5th at p. 953 [a court reviews an agency's determination about
whether an initial environmental document requires major revisions for substantial
evidence].)
Conversely, initiating further environmental review "every time plans or
circumstances change, or whenever new information comes to light—'would render
agency decisionmaking intractable, always awaiting updated information only to find the
new information outdated by the time a decision is made.' " (Friends, supra, 1 Cal.5th at
p. 956.) Thus, the addendum process reasonably implements section 21166's objective of
balancing the consideration of environmental consequences in public decision making
with interests in finality and efficiency. (See Friends, at p. 949.)
The absence of a public review process for addendums comparable to initial or
subsequent EIRs does not render Guideline 15164 inconsistent with CEQA. Rather, the
absence of public review reflects the nature of an addendum as a document describing
project revisions too insubstantial in their effect to require subsequent environmental
review. The absence of public review also reflects the finality of adopted EIRs and
13
section 21166's proscription against further environmental review except in specified
circumstances. Once an EIR has been certified, "the interests of finality are favored over
the policy of encouraging public comment." (Laurel Heights Improvement Assn. v.
Regents of University of California (1993) 6 Cal.4th 1112, 1130.) Moreover, the absence
of public review largely mirrors analogous precertification revisions to final EIRs, which
do not require recirculation for public comment unless they add significant new
information to the EIR, such as new information showing a significant environmental
impact, a substantial increase in the severity of an environmental impact, or a
considerably different feasible mitigation measure or project alternative that would
clearly lessen the project's significant environmental effects. (§ 21092.1; Guideline
15088.5, subd. (a); Laurel Heights Improvement Assn., supra, at pp. 1120, 1126–1132.)
4
Further, we note the Resources Agency first promulgated Guideline 15164 in
1983. Since then, the Legislature has not modified CEQA to eliminate the addendum
process. " ' "The Legislature is presumed to be aware of a long-standing administrative
practice ... . If the Legislature, as here, makes no substantial modifications to the
[statute], there is a strong indication that the administrative practice [is] consistent with
the legislative intent." ' " (Gerawan Farming, Inc. v. Agricultural Labor Relations Bd.
(2017) 3 Cal.5th 1118, 1156.)
B
SOHO next contends the City failed to proceed in the manner required by law by
failing to make new findings under section 21081 when it approved the addendum.
14
1
Section 21081 provides in part: "[N]o public agency shall approve or carry out a
project for which an environmental impact report has been certified which identifies one
or more significant effects on the environment that would occur if the project is approved
or carried out unless both of the following occur: [¶] (a) The public agency makes one or
more of the following findings with respect to each significant effect: [¶] (1) Changes or
alterations have been required in, or incorporated into, the project which mitigate or
avoid the significant effects on the environment. [¶] (2) Those changes or alterations are
within the responsibility and jurisdiction of another public agency and have been, or can
and should be, adopted by that other agency. [¶] (3) Specific economic, legal, social,
technological, or other considerations, including considerations for the provision of
employment opportunities for highly trained workers, make infeasible the mitigation
measures or alternatives identified in the environmental impact report."
2
New findings under section 21081 are not required in connection with the
approval of an addendum to an EIR. (Fund for Environmental Defense v. County of
Orange (1988) 204 Cal.App.3d 1538, 1553.) "It must be remembered that an addendum
is prepared where '(2) Only minor technical changes or additions are necessary to make
the EIR under consideration adequate under CEQA; and (3) The changes to the EIR made
by the addendum do not raise important new issues about the significant effects on the
environment.' ([Guideline] 15164, subd. (a).) [¶] Nothing in the Code or the Guidelines
suggests new findings are required when an addendum is prepared. Here the
15
'unavoidable adverse impacts' described in the addendum are the same as those described
in the original EIR. If the significant effects as found in the original EIR have been
addressed by findings, and an addendum is only proper where no new significant
environmental impacts are discovered, why should new findings be required in
connection with preparation of an addendum? The only purpose of findings is to address
new significant effects to show the lead agency has properly considered ways in which to
mitigate or avoid such effects." (Fund for Environmental Defense, supra, at p. 1553; see
Citizens for a Megaplex-Free Alameda v. City of Alameda (2007) 149 Cal.App.4th 91,
114–115 [CEQA does not require an agency to adopt findings when the agency
determines a subsequent EIR is not required.]
IV
DISPOSITION
The judgment is affirmed. The City and the Committee are awarded their appeal
costs.
MCCONNELL, P. J.
WE CONCUR:
BENKE, J.
DATO, J.