ANDRUS, J. — Mount Zion Lutheran Church appeals a summary judgment
determination that its insurer, Church Mutual Insurance Company, has no
obligation to reimburse it for certain costs incurred when it remodeled its fire-
damaged church building. We affirm.
FACTS
On May 7, 2014, a fire caused significant interior damage to Mount Zion
Lutheran Church in Mountlake Terrace. Mount Zion was insured by Church Mutual
Insurance Company under Policy Number 0067342-02-381415 (the Policy).
Under the Policy, Mount Zion could collect the ‘Actual Cash Value” (ACV) of the
“Covered Property,” regardless of whether it chose to repair or replace the church.
If Mount Zion chose to rebuild, it could file a claim for repair or replacement costs
exceeding the ACV.
No. 78107-3-1/2
Church Mutual hired J.S. Held Construction Consulting to prepare a scope
of repair and cost estimate. J.S. Held estimated the cost to replicate the church
building as it existed before the fire to be $729,106.42 (the Replacement Cost
Valuation or RCV). J.S. Held estimated the ACV of the church to be $593,361.66,
which Church Mutual paid to Mount Zion. The Policy allowed Church Mutual to
withhold the difference between the RCV and ACV, approximately $135,744, until
Mount Zion completed the repairs.
J.S. Held’s estimate included the cost of replacing arched glulam beams in
the church sanctuary and replacing the sanctuary roof, a cost of over $196,000.
Slaed Spiller, an independent adjuster hired by Church Mutual, inspected the
church, including the glulam beams, and discussed their replacement with Pastor
Frank Paine. Pastor Paine indicated to Spiller that he preferred to repair, rather
than replace, the glulam beams, as replacement would require removal of the
church’s roof. Church Mutual hired Rimkus Consulting Group to assess the glulam
beams, and it concluded they did not need to be replaced.
By the end of June 2014, Mount Zion had four bids, all of which reflected
the cost of repairing, rather than replacing, the glulam beams. None included
replacing the entire sanctuary roof. The bids ranged from $363,989, to $426,716,
well below the ACV already paid to the church.
In late July 2014, Mount Zion retained a public adjuster, Drew Lucurell, to
assist with its insurance claim. Church Mutual’s adjuster, Spiller, testified that
Lucurell claimed the glulam beams had to be replaced, rather than repaired.
Although Rimkus and the four bidding contractors did not deem replacement of the
-2-
No. 781 07-3-1/3
beams to be necessary, Church Mutual acquiesced and allowed Mount Zion to
replace them. J.S. Held did not modify its RCV.
Mount Zion retained Seattle Remodeling Company to perform the repairs.
Spiller performed a routine post-repair inspection of the church on October 28,
2015, and he discovered that the glulam beams had been repaired, not replaced.
Mount Zion prepared a replacement cost claim in April 2016 in which it
reallocated the cost estimated to replace the glu lam beams and sanctuary roof to
a set of “substitute expenditures.” The claim is not a part of the record. But Church
Mutual submitted documents from Lucurell’s files indicating the church spent a
total of $750,682.30 in repair and replacement costs. From what we can glean
from the record, the contractor granted the church a credit of $53,874 for
eliminating work to replace the glulam beams, identified supplemental
expenditures of $28,432, and included additional costs of $75,500 for ‘extras”
requested by the church. Church Mutual asserts on appeal it reimbursed the
church for the cost of repairing the glulam beams, but we cannot find any evidence
in the record to support this contention.
Mount Zion presented evidence that it elected to refurbish, rather than
replace, the arched glulam beams in the sanctuary because removing the roof
would have added significant time to the reconstruction timeline. Believing it was
entitled to the funds to install new glulam beams, Mount Zion chose to make
“substitute expenditures” with funds otherwise allocated for the beam replacement.
For example, Mount Zion presented evidence that the original church had
a perpendicular wing with offices and a small kitchenette, which were irreparably
-3-
No. 78107-3-1/4
damaged. Mount Zion chose to replace the old kitchenette with a full-size kitchen,
redesigning it to make it more functional for the church’s current needs. According
to Lucurell’s documents and Church Mutual’s adjuster Spiller, the full-size kitchen
had upgraded kitchen cabinets, an upgraded sink and faucets, new self-closing
drawers, and upgraded appliances.
Church Mutual presented evidence that Mount Zion also upgraded the
hardware on the front entry doors, upgraded the flooring and base trim in the
sanctuary and foyer, upgraded wall and ceiling insulation, reframed the mezzanine
for use as storage, installed underground conduits for phone and internet cables,
added custom built shelving to a meeting room and classroom, refurbished a street
sign not damaged in the fire, and upgraded lighting in the foyer, fellowship building,
and sanctuary.
Church Mutual refused to pay the cost of replacing beams the church did
not replace. It also refused to reimburse the church’s “substitute expenditures” as
“unnecessary” under the Policy.
Mount Zion sued Church Mutual, alleging breach of contract, breach of the
duty of good faith and fair dealing, and violations of the Washington Consumer
Protection Act (CPA) and Washington Insurance Fair Conduct Act (IFCA). Mount
Zion filed a “motion for legal ruling regarding replacement cost coverage,” arguing
it was entitled under the Policy to the full amount of the RCV, regardless of its
decision not to replace the sanctuary beams. The trial court denied Mount Zion’s
motion, holding it is “not entitled to Replacement Cost Coverage for any substituted
-4-
No. 78107-3-115
costs incurred that were unnecessary to repair or replace the lost or damaged
portions of the church building.” Mount Zion appeals.
ANALYSIS
The sole issue on appeal is whether Mount Zion is entitled to receive the
full RCV calculated by Church Mutual under the Policy.
Standard of Review
This court reviews de novo an order granting or denying summary
judgment. Ruvalcaba v. Kwanci Ho Baek, 175 Wn.2d 1, 6, 282 P.3d 1083 (2012).
The trial court’s ruling was based on an interpretation of the Policy. Interpretation
of an insurance contract is also a question of law we review de novo. Kut Suen
Lui v. Essex Ins. Co., 185 Wn.2d 703, 710, 375 P.3d 596 (2016).
Rules of Construction or Interpretation of Insurance Contracts
This appeal involves the proper interpretation of section C, paragraph 7 of
the Policy. This court construes insurance policies as contracts. jç~ at 710. In
construing the language of an insurance policy, its provisions must be construed
together so as to give force and effect to each clause. Transcon. Ins. Co. v. Wash.
Pub. Util. Dist. Util. Sys., 111 Wn.2d 452, 456, 760 P.2d 337 (1988). When this
court interprets an insurance policy, it gives it “a fair, reasonable, and sensible
construction as would be given to the contract by the average person purchasing
insurance.” Kut Suen Lui, 185 Wn.2d at 710 (internal quotation marks omitted)
(quoting Key Tronic Corp. v. Aetna (CIGNA) Fire Underwriters Ins. Co., 124 Wn.2d
618, 627, 881 P.2d 201 (1994)). If the language is clear and unambiguous, the
-5-
No. 78107-3-1/6
court must enforce it as written and may not modify the contract or create ambiguity
where none exists. Transcon. Ins. Co., 111 Wn.2d at 456.
Conversely, if a policy provision is, on its face, susceptible to multiple but
reasonable interpretations, the policy is ambiguous, and the court must attempt to
discern the intent of the parties and enforce the contract. Id. at 456-57. A court
may rely on extrinsic evidence of the intent of the parties to resolve any ambiguity.
Quadrant Corn. v. Am. States Ins. Co., 154 Wn.2d 165, 171-72, 110 P.3d 733
(2005). Any ambiguity remaining after examination of the extrinsic evidence is
resolved against the insurer and in favor of the insured. ~ But the expectations
of the insured cannot override the plain language of the contract. j~ç[~
Relevant Insurance Provisions
Section C, paragraph 7 of the Policy provides:
C. LOSS CONDITIONS
7. Valuation.
a. Replacement Cost. If Replacement Cost is shown in the
Declarations Page as applicable to Covered Property, we will
determine the value of Covered Property in the event of loss
or damage as follows:
(1) At Replacement Cost (without deduction for depreciation)
as of the time of loss or damage .
(2) You may make a claim for loss or damage covered by this
insurance on an “Actual Cash Value” basis instead of on a
Replacement Cost basis. In the event you elect to have loss
or damage settled on an “Actual Cash Value” basis:
(a) We will then determine the value of Covered
Property on an “Actual Cash Value” basis when
applying the Coinsurance Condition;
-6-
No. 78107-3-1/7
(b) You may still make a claim on a Replacement Cost
basis if you notify us of your intent to do so
(3) We will not pay on a Replacement Cost basis for any loss
or damage:
(a) Until the lost or damaged property is actually
repaired or replaced; and
(b) Unless the repairs or replacement are made as
soon as reasonably possible after the loss or damage.
(4) We will not pay more for loss or damage on a Replacement
Cost basis than the least of:
(a) The Limit of Insurance applicable to the lost or
damaged property;
(b) The cost to replace “on the same premises” the lost
or damaged property;
1) Of comparable material and quality; and
2) Used for the same purpose; or
(c) The amount you actually spend that is necessary to
repair or replace the lost or damaged property.
The term “on the same premises” is a limitation on the amount of loss
or damage we will pay. It does not require you to replace lost or
damaged property at the same site.
(emphasis added).
Mount Zion contends the trial court erred in ruling it had no right to receive
the full RCV amount. We conclude, however, that Mount Zion is not entitled to the
full amount of the RCV because section C.7.a.(3)(a) of the Policy limits Church
Mutual’s obligation to pay for any loss until the lost or damaged property is actually
repaired or replaced.
In Hess v. N. Pac. Ins. Co., 122 Wn.2d 180, 859 P.2d 586 (1993), the
Washington Supreme Court held that an insurer had no obligation to pay full
-7-
No. 78107-3-1/8
replacement cost value of a cabin the insured chose to neither rebuild nor replace.
~ at 188. A policy provision stated that the insurer would pay no more than the
actual cash value of the damage unless the “actual repair or replacement [was]
complete.” j~ç~ at 184. This language unambiguously capped the insurer’s liability
at the actual cash value of the cabin until the cabin was repaired or replaced. ~l.
at 188.
Hess supports the trial court’s interpretation of the Policy. As in Hess’s
policy, section C.7.a.(3)(a) of the Policy places a condition on Church Mutual’s
obligation to make any payment under section C.7.a.(4). Church Mutual has no
obligation to pay on a replacement cost basis for any lost or damaged property
that is not repaired or replaced. This language is not ambiguous. Mount Zion is
not entitled to the replacement cost of glulam beams it chose not to replace.
Mount Zion further argues there is no basis for considering the glulam
beams separately from the building to which they are attached because they are
both “Covered Property” under the Policy. We disagree.
First, under section C.7.a.(2) of the Policy, the insured has the option of
making a claim for loss or damage on an ACV basis instead of on a replacement
cost basis. If this option is selected, section C.7.a.(2)(a) requires the insurer to
determine the ACV of the “Covered Property.” The “Covered Property” here is the
church and all of its component parts, and the ACV reflects that value.
However, if the insured opts to make a claim on a replacement cost basis,
as Mount Zion has done here, section C.7.a.(4) requires the insurer to reimburse
for costs incurred to repair or replace the lost or damaged property.” It does not
-8-
No. 781 07-3-1/9
require payment to repair or replace “the Covered Property.” While the ACV
explicitly covers the entire building and all of its component parts as one unit, the
RCV explicitly covers only lost or damaged property within the Covered Property.
Second, although the Policy does not define “lost or damaged property,” it
uses this phrase repeatedly throughout the Policy in contexts that undercut Mount
Zion’s argument. For example, under section C.3.a.(4) of the Policy, insureds are
required to provide “complete inventories of the damaged and undamaged
property,” and if possible, to set aside “damaged property” for examination by the
insurer. The Policy clearly distinguishes between components of a building that
have been damaged and are in need of repair or replacement from undamaged
components of that same building.
It is a fair, reasonable, and sensible construction of the Policy to consider
the arched glulam beams separately from the rest of the lost or damaged property
within the church building when determining how to compute replacement costs
due to Mount Zion.
Even though Mount Zion is not entitled to the full RCV because it did not
replace the glulam beams, it may nevertheless be entitled to reimbursement for its
“substitute expenditures” if they were “necessary” to replace lost or damaged
property as set out in Paragraph 7.a.(4)(c).
Mount Zion argues the word ‘necessary” cannot be interpreted to require it
to “replicate” the preexisting structure as a condition precedent to receiving
replacement cost proceeds. Mount Zion is correct; there is nothing in the Policy
requiring Mount Zion to rebuild the church, its office, and its kitchen in the exact
-9-
No. 78107-3-1110
same configuration as existed before the fire. But Church Mutual is not advancing
such a narrow construction of the Policy.
Mount Zion further asks this Court to adopt a ‘functional similarity” test in
determining whether its remodeling was “necessary.” It argues it should be
reimbursed the full cost of its upgraded kitchen because what it built was
“functionally similar” to the property lost or damaged by fire. Mount Zion relies on
several federal and out-of-state cases for this argument. ~ Fitzhuqh 25
Partners, L.P. v. KILN Syndicate KLN 501, 261 S.W.3d 861 (Tex. App. 2008)
(insured’s contention that purchasing an office park was a “replacement” for a
multi-family apartment complex destroyed by fire was rejected because the word
“replacement” in an insurance policy inherently contains the element of functional
similarity); Seeber v. Gen. Fire and Cas. Co., 19 N.E.3d 402, 411-12 (Ind. App.
2014) (“replacement” coverage did not permit insured to replace destroyed
commercial property with residential condominiums because properties were not
used for same purpose); SR Int’l Bus. Ins. Co., Ltd. v. World Trade Cent. Prop.,
LLC, 445 F. Supp. 2d 320, 333 (S.D.N.Y. 2006) (in the context of determining
whether non-removable tenant improvements should be included in the insurer’s
hypothetical replacement cost estimate, the court said “replacement property need
only be ‘functionally similar’ to its predecessor, [and] it is inevitable that certain
elements of the destroyed property will not be reproduced.”).
None of these cases address the meaning of ‘necessary to repair or replace
lost or damaged property.” Nor do they conclude that an insurer is legally obligated
to reimburse an insured for the cost of improvements that did not pre-exist the fire.
-10-
No. 78107-3-I/il
We conclude the Policy does not impose on Church Mutual the obligation
to pay for Mount Zion’s remodeling choices just because the remodeled space
serves the same function as the old. Church Mutual has the contractual right to
evaluate each line item of Mount Zion’s insurance claim and to determine
(1)whetherthere was lost or damaged property; and (2) whetherthe amount spent
by Mount Zion was necessary to repair or replace that lost or damaged property.
Affirmed.