In the United States Court of Federal Claims
No. 19-388C
(Filed: April 22, 2019)
(Reissued: May 7, 2019) 1
NOT FOR PUBLICATION
*************************
ACTIONET, INC.,
Plaintiff,
Post-award bid protest;
v. Preliminary injunction;
Likelihood of success
THE UNITED STATES, on the merits; Standing;
Prejudice; Unstated
Defendant, evaluation criteria;
Disparate treatment.
and
ACCENTURE FEDERAL SERVICES LLC,
Intervenor.
*************************
OPINION
This is a post-award bid protest of the Department of Energy’s
(“DOE”) award of a Blanket Purchase Agreement for Information
Technology services to Accenture Federal Services LLC (“Accenture”).
Plaintiff, ActioNet, Inc., currently holds an IDIQ task order contract with
DOE for IT services. Currently pending is plaintiff’s motion for a
preliminary injunction. Oral argument was held on April 11, 2019. As
announced at the conclusion of that argument, we deny the motion, primarily
due to a lack of likelihood of success on the merits.
1
This opinion was originally issued under seal to afford the parties an
opportunity to propose the redaction of protected information. The parties
did not agree on all of the proposed redactions. We have redacted
information necessary to safeguard the competitive process. Redactions are
indicated by brackets.
BACKGROUND
I. The Solicitation
DOE issued Request for Quotations No. DE-SOL-0008790 (“RFQ”
or “solicitation”) on November 15, 2017, asking holders of Federal Supply
Schedule 70 contracts to submit bids for a single award blanket purchase
agreement (“BPA”) against which orders could be placed for information
technology (“IT”), telecommunications, and cybersecurity services for a
period of up to five years (one base year and four option years). The total
estimated value for all five years was $2,000,000,000. The BPA as a whole
is known as “CBOSS,” which stands for CIO Business Operations Support
Service. The RFQ included performance work statements (“PWS”) for two
planned initial orders: one for IT Modernization Strategy Support, known as
the “IM-60;” and the other was for Cybersecurity Strategy and Program
Management Support, known as “IM-30.” In large part, bidders were to
tailor their offers to these two task orders. 2
The agency made the award on a best value tradeoff basis, which was
promised by the RFQ, based on the four following factors: 1) Past
Performance, 2) Management Approach, 3) Technical Approach, and 4)
Price. Past Performance was the most important evaluation factor and was
rated for relevance and quality of performance with an overall adjectival
rating of either Outstanding, Good, Satisfactory, Marginal, or Unsatisfactory.
DOE reserved for itself the right to eliminate offers rated marginal or lower
on Past Performance, and it did so for one offeror.
Management Approach, the second most important factor, and
Technical Approach, the third in importance, were also rated adjectively
from Outstanding to Unsatisfactory. Proposals were assigned strengths and
weaknesses for these two factors according to the definitions provided in the
2
For example, the solicitation specifically solicited examples (three of the
six required) of doing work similar to the two planned task orders; the
Technical Approach factor was measured against the PWSs for these two
task orders; and a major portion of the price evaluation was of these two task
orders.
2
solicitation. See Pl.’s Ex. 1 at 699. 3 The overall adjectival ratings for these
factors were dependent on these strengths and weaknesses assigned as well.
Although the RFQ estimated a total value of $2 billion for the BPA
across five years, it did not require the agency to evaluate the total price of
each offer. Instead, the solicitation stated that the agency would compare
labor rates across offers, total prices for the two anticipated initial orders (IM-
60 and IM-30), and the load percentage to be charged on other direct costs
and materials. The results of the BPA labor rates evaluation was the most
important element of the price evaluation. The solicitation also stated that
the agency would perform a price realism and reasonableness analysis of all
offerors’ prices and rates. The agency reserved the right to conduct
discussions with offerors but warned that it might make an award without
having done so.
II. The Evaluation and Award
The Technical Evaluation Committee (“TEC”) performed the non-
price evaluation of offers and presented its findings to the Source Selection
Official (“SSO”), who frequently met with the TEC and the Contracting
Officer (“CO”) throughout the evaluation process. The CO conducted the
price analysis. The source selection decision was made by the SSO.
DOE received six offers in response to the RFQ. The TEC first
evaluated the Past Performance factor by itself, completing that evaluation
on September 24, 2018. One of the six offerors was eliminated by the CO
because it was rated only marginal for Past Performance. The TEC then
completed its evaluation of the other two non-price factors on November 19,
2018. The results for all three factors were as follows (ranked in order):
3
“PX” refers to Plaintiff’s Exhibit; “DX” refers to Defendant’s Exhibit.
Because briefing on the motion for preliminary relief was completed prior to
the filing of the Administrative Record, citations to the procurement record
are to the documents as the parties presented them as attachments to their
briefs.
3
Quoter Past Performance Management Technical
Approach Approach
Accenture Outstanding Good Good
Quoter No. 2 Good Outstanding Good
Quoter No. 3 Satisfactory Outstanding Good
Quoter No. 4 Satisfactory Good Good
ActioNet Satisfactory Satisfactory Satisfactory
PX 5 at 9. 4
The CO completed her price analysis the next day on November 20,
2018. All five remaining offerors’ prices were found to be both fair and
reasonable overall, but plaintiff’s evaluated prices for the two initial tasks
orders were found to be unrealistically low. The highest offeror was
$25,990,987.33 for the two orders; Accenture was at $21,358,203.81; and
ActioNet bid the work for only [ ]. The next lowest offeror, by
comparison, was $19,766,505.24.
The CO evaluated the BPA labor rates by comparing the offerors’
proposed rates against one another for each category. The mean for each
labor category was calculated and then a standard deviation analysis was
performed against that mean for each category. Rates within two standard
deviations on the low side of the mean and one standard deviation above
were considered to be within range. The CO then evaluated what
percentage of all of the labor categories each offeror’s prices were. The
higher the number, the better. Plaintiff was evaluated to have 90.8% of its
rates within range while intervenor was found to have 72.3%.
As to the load rates for materials and other direct costs, ActioNet had
a range of rates starting at [ ] for materials and subcontractor costs up to [
] for travel and other direct costs. Accenture offered [ ] for its load across
categories and a [ ] load for its teaming partner [ ].
The SSO reviewed the analyses performed by the TEC and CO and
ranked the offers for non-price factors. Intervenor was the highest ranked,
and plaintiff was the lowest. Accenture was chosen as the most
advantageous (best value) quote to the government. The SSO did, however,
4
Further factual detail regarding the non-price evaluations will be supplied
as necessary as we discuss the merits of the protest below.
4
perform a trade-off analysis between Accenture and each of the four other
offerors in her source selection decision. As between the plaintiff and the
intervenor, the SSO found that ActioNet had a price advantage in the
categories of BPA and load rates, but, due to the unrealistically low prices
offered for the two initial offers, the SSO determined that the price factor
was not in favor of plaintiff. The SSO’s decision document also states that,
even if plaintiff’s order prices were found to be realistic, she would still
award to Accenture due to the technical (including Past Performance)
advantage offered by its quote. The trade-offs between intervenor and the
other offerors each also ended with the conclusion that the rating for Past
Performance was the most important discriminator in choosing Accenture for
award.
III. Procedural History
DOE notifed the offerors of its decision on November 30, 2018, and
awarded the first two task orders on December 6, 2018. The period of
performance began the next day. Plaintiff filed a protest at the Government
Accountability Office (“GAO”) on December 10, 2018, however, which
resulted in an automatic stay of performance. GAO denied the protest on
March 5, 2019, finding both that the agency had a reasonable basis for its
evaluation and award decision and that ActioNet lacked standing because it
did not challenge the ratings of the offerors other than Accenture rated higher
than it. ActioNet, Inc., B-417173, 2019 CPD ¶ 100 (Comp. Gen. Mar. 5,
2019).
Plaintiff filed its complaint in this court on March 13, 2019, along
with a request for a Temporary Restraining Order (“TRO”) and a preliminary
injunction. A status conference was held on March 14, 2019. Accenture
intervened on that day as well. Although the agency represented that it had
no plans to issue any new orders prior to April 12, 2019 (the date when
plaintiff’s incumbent contract was set to expire), plaintiff maintained its
request for a preliminary injunction. We entered a briefing schedule on
March 18, 2019, concluding with oral argument on April 11, 2019.
On March 19, 2019, the government filed a notice of intent to issue
six additional task orders on or by March 21, 2019. This prompted plaintiff
to file a motion on March 22, 2019, requesting that the court issue interim
relief to preserve the status quo until the preliminary injunction hearing on
April 11, 2019. After a response from defendant on March 28, 2019, we
5
denied the request for interim relief by order on March 29, 2019, finding that
plaintiff had not made a showing of irreparable harm if an injunction were
not issued prior to the preliminary injunction hearing. ActioNet, Inc. v.
United States, No. 19-388C, 2019 WL 1423096, at *3-4 (Fed. Cl. Mar. 29,
2019). Oral argument on plaintiff’s motion for a preliminary injunction was
held on April 11, 2019, at the conclusion of which we announced that the
court would deny plaintiff’s motion and requested the parties to propose a
briefing schedule for resolution on the merits of a permanent injunction. We
confirmed that result by short order on April 12, 2019. This opinion
contains our reasoning for having done so.
DISCUSSION
We have jurisdiction over challenges to agency actions taken or not
taken in connection with a federal procurement. See 28 U.S.C. § 1491(b)
(2012). Our review under this section is deferential to agency decision
making in accordance with the standard set forth in the Administrative
Procedures Act, 5 U.S.C. § 706, which is to say that we review agency action
in a procurement for illegality and a lack of rationality. Impressa
Construzioni Geom. Domenico Garufi v. United States, 238 F.3d 1324, 1332-
33 (Fed. Cir. 2001). So long as the agency’s decision was not irrational or
otherwise illegal, we will leave it undisturbed.
The issue of prejudice is also relevant to our review under this statute.
First, a protestor must show that it is an economically interested party, which,
in the post-award context, means that it had a substantial chance of award but
for the alleged error(s) of the agency. Data Gen. Corp. v. Johnson, 78 F.3d
1556, 1562 (Fed. Cir. 1996). The protestor need not show that it was next
in line for award, however, to establish standing, only that there would have
been a reasonable likelihood of it being awarded the contract. Id. at 1563
If it cannot make such a showing, it was not prejudiced by the error(s), and
jurisdiction will not attach. Even if the disappointed bidder establishes
standing, it must also show that the error alleged was prejudicial, which
means that, not only an error took place, but that it affected the outcome of
the agency’s decision. Labatt Food Serv., Inc. v. United States, 577 F.3d
1375, 1380-81 (Fed. Cir. 2009) (holding that the agency’s acceptance of bid
revisions by email did not prejudice protestor because it had no bearing on
the agency’s review of final proposals).
Here, we find that plaintiff has established standing. Plaintiff alleges
6
that it was rated too low for each of the non-price factors, alleges that its
prices should have been viewed more favorably, and that intervenor was
rated more highly for several of the factors. We also know that the agency
performed a trade-off between Accenture and ActioNet. We thus conclude
that, had plaintiff been evaluated more favorably and/ or intervenor been
rated less favorably, a different outcome is reasonably likely. Put another
way, as both this court and the Federal Circuit have articulated the test, when
the protestor shows that it is “‘within the active zone of consideration’” by
the agency, it has established standing. E.g., Advanced Mgmt. Strategies
Group, Inc. v. United States, 139 Fed. Cl. 404, 411 (2018) (quoting Alfa
Laval Separation, Inc. v. United States, 175 F.3d 1365, 1367 (Fed. Cir.
1999)). We will consider the separate prejudice question as it pertains to the
merits below.
Standing established, we move to the merits of plaintiff’s request for
a preliminary injunction. We consider four factors when entertaining a
request for preliminary injunctive relief: (1) plaintiff’s likelihood of success
on the merits; (2) whether plaintiff will suffer irreparable harm without the
injunction; (3) the balance of the harms between the parties; and (4) the
public’s interest in an injunction. Bona Fide Conglomerate, Inc. v. United
States, 96 Fed. Cl. 233, 239 (2010). This court is generally reticent to enjoin
agency procurement action without a showing that the protestor is likely to
succeed on the underlying merits of its protest. See Intelligent Waves, LLC
v. United States, 135 Fed. Cl. 299, 314 (2017). We begin with the first
factor, as it is dispositive in this case.
Plaintiff broadly attacks each and every element of DOE’s evaluation
of its own procurement, arguing at each step that it should have been more
highly rated and that it was treated differently than other offerors. It also
argues that intervenor’s rating for the Past Performance factor was too high.
Although plaintiff’s attack is broad in scope, its briefing and oral argument
was focused more specifically on certain arguments. This opinion is
generally concerned with those more focused inquiries, but we have
considered each of plaintiff’s arguments and find that none of them support
a showing of likelihood of success on the merits. 5
5
Plaintiff’s brief incorporated by reference large sections of its complaint to
fill in the details of its arguments in violation of RCFC 5.4(b)(3), which
requires materials incorporated by reference to be included in the page count
for the limit on the length of briefs. We have not, however, struck any
7
I. Past Performance
We begin with the most important evaluation factor, Past
Performance. The thrust of plaintiff’s argument is that its own past
performance examples were irrationally viewed as less relevant than they
should have been and that DOE irrationally found ActioNet’s performance
for several of these contract efforts to have been less stellar than the agency
had previously rated those efforts in the past. As to intervenor’s rating, the
primary argument offered by plaintiff is that Accenture’s references for IT
migration services were considered more relevant than they should have
been. Plaintiff also sees disparate treatment in this regard by DOE as
between it and the intervenor. Plaintiff further argues that the agency
impermissibly relaxed the requirements to receive an Outstanding rating for
Accenture despite not finding each of intervenor’s references to have
exceeded the scope of the solicitation’s requirements, as plaintiff argues is
required by the RFQ.
Each offeror was required to provide six narrative examples of past
performance. These six were to show similar services performed to the
CBOSS PWS and to show similar levels of size, scope, and complexity. Of
the required examples, DOE asked, among other things, that two of them be
examples of “IT Modernization/Cloud Migration.” PX 1 at 700. DOE
promised to review the past performance questionnaires for each of the past
performance efforts and stated that it might review any available past
performance records, such as CPARs. The agency also reserved the right to
contact references for each narrative example as well as review other
pertinent past performance information (“any other source”). Id. at 702.
A. Plaintiff’s Past Performance
Plaintiff provided five of its six references from the incumbent IDIQ
DOE contract. The sixth was for its [
]. Past performance questionnaires were available for all six
references, and DOE reviewed the CPARs ratings going back as far as 2012
for all offerors’ provided references. DOE also contacted, or attempted to
contact, technical points-of-contact (“POC”) for each reference.
The result for plaintiff was that its CPARs ratings were very good
portion of plaintiff’s briefs or considered any arguments waived due to this
mistake. For further briefing, plaintiff is directed to comport with Rule 5.4.
8
(none were obtainable for the [ ] contract); the questionnaires were largely
good and ranged from [ ] to [ ]; the interviews of POCs,
however, were mixed and contained some information that DOE viewed
negatively, or as the agency put it “a significant amount of highly
unfavorable feedback.” PX 3 at 51. The agency thus found some risk
attached to plaintiff’s Past Performance information but found that the
information was generally favorable. It also found that some of plaintiff’s
references were not as relevant as the agency sought. It thus awarded a
Satisfactory rating for plaintiff.
Plaintiff attacks the agency’s conclusion in general by comparing its
CPARs ratings, which were favorable across the board, with DOE’s finding
that there was significant unfavorable information present for ActioNet,
which DOE found to present some risk of poor performance going forward.
In plaintiff’s view, its high CPARs ratings should have afforded it a higher
overall rating. We disagree.
The agency reviewed what it said that it would and came to a
documented conclusion that is rationally related to the information that it
received and reviewed. 6 DOE might have weighted the relative merits of
the CPARs more heavily and come to a different conclusion, but it neither
violated applicable law nor the solicitation’s promised evaluation scheme in
reaching the conclusion that it did; we thus cannot upset the result.
Plaintiff also argued more particularly that its two narrative examples
for IT modernization and migration should have been viewed by the agency
6
We are cognizant that the agency admittedly was operating under a
misapprehension as to one of the POC interviews that it conducted. The
contract effort cited by that POC was not one of the six provided references
by plaintiff. We do not reach the question of whether this was
impermissible per the terms of the solicitation, however, because we find no
prejudice from this error to the plaintiff. Plaintiff has not shown how the
absence of this information would have changed the result of the agency’s
Past Performance evaluation. Other less-than-favorable information would
have remained from the POC interviews, including the TEC’s finding of
significant unfavorable information for ActioNet’s example of IT
Modernization/Cloud Migration, a highly relevant focus of the CBOSS
procurement.
9
to be more relevant than they were. Much of the briefing and oral argument
was spent on this allegation, the crux of which is that the agency used a metric
of 13,000 users migrated from legacy systems to cloud-based systems to
determine relevancy for these examples. The agency found that plaintiff did
not show that it met this requirement for either example, but it found that
intervenor’s examples did. Plaintiff argues that this was an unstated
evaluation criterion because the agency morphed the 13,000 “user”
requirement to mean “seat type users with distinct credentials,” which it
views as the only way that the agency could have found it not to have met
the requirement. PX 3 at 41. Plaintiff also argues that it was treated
unequally in this regard because it views intervenor’s two examples as
insufficient to meet the test.
1. Unstated Criteria
The allegation that the agency applied a different meaning of “users”
than that stated in the RFQ must be rejected because plaintiff has not shown
how it was prejudiced by the error. This criteria was applied equally across
all offerors, and to the extent that it was a mystery prior to bid submission,
that mystery prejudiced all offerors equally, which is to say that it prejudiced
none of them as regards the outcome. 7 The fact that intervenor was found
to have met the requirement, without having known what to aim for prior to
bidding, is not evidence of prejudice in this instance because it is only
happenstance that it met the requirement. Plaintiff has not alleged bad faith
or unequal access to information prior to bidding. Thus we conclude that
there is no prejudice here even if the exact definition used by the agency was
unstated prior to bidding.
We also do not view this allegation as otherwise having merit. The
fact that the agency cited a more specific definition of a general term from
the solicitation is not per se irrational nor application of an unstated criteria.
Defendant and Intervenor provided several citations to the record where the
agency clearly intimated what it was looking for regarding migrating “end
users” and that the agency was looking for a “managed seat service
environment.” PX 1 at 253 (“end users”); id. at 383-84 (“managed seat
service environment” and “seat service end users.”). We think the offerors
7
Plaintiff does not allege that it would have offered a different past
performance example had it known of the definition of users ahead of time.
10
were on notice of the agency’s bent in this regard.
2. Disparate Treatment
ActioNet also believes that it should have been found to have met the
13,000 user requirement and that Accenture should not have, which is in its
view unequal treatment. Plaintiff’s first cited example of cloud-base
migration involved the moving of accounts for Office 365, a cloud-based
suite of applications. Plaintiff provided that it moved [ ] users and [ ]
generic mailboxes to these cloud-based programs. For its second cited
example, plaintiff offered its migration of DOE’s website from a self-hosted
solution to a cloud-based one, which now has [ ] of monthly page views
but only [ ] of DOE users on the inside managing the content of the
website. The agency found neither of these examples to have met the
requirement. For the first example, [ ] is not 13,000, and the agency did
not consider the additional [ ] generic mailboxes to be users. For the
second example, the DOE website, the agency again found that website
viewers were not the same thing as the industry standard of a “user,” which
is a “credentialed user.” PX 3 at 43. We are in no position to disagree with
these conclusions.
Plaintiff also alleges that Accenture too should have been found not
to be compliant with the 13,000 user requirement. The first example
provided by intervenor to the agency for this requirement was its work for
the [ ] on the
[ ] website, which has millions of users and hundreds of thousands
of concurrent users daily. Plaintiff argues that this example is inapposite
because Accenture did not migrate the [ ] website to the cloud; it alleges
that was done by a prior contractor. Thus, even assuming the proper metric
was used, plaintiff should not have been credited with this work.
Defendant rebutted this point at oral argument by showing that
intervenor did not claim credit for the initial move of the website to the cloud
nor was the agency confused about this fact. In fact, Accenture’s proposal
represented that it migrated three critical applications used on the website to
the cloud; the three applications have [ ] users. See id. at 38 (stating
that Accenture had “migrated three core systems” to the cloud). We thus
find no basis to question the agency’s views of these contracts due to this
distinction.
11
The second cited example of cloud migration by Accenture was its
migration of the [
] to a cloud-based application. Both the proposal and DOE’s
evaluation of it cite over [ ] credentialed users of this system. We thus
find a rational connection between the requirement of the migration of
13,000 end users to this cited effort and find no reason to call into question
the agency’s evaluation in this regard.
B. Accenture’s Outstanding Rating for Past Performance
The last avenue of plaintiff’s challenge to DOE’s past performance
evaluation concerns whether intervenor was eligible to receive an
Outstanding rating per the terms of the solicitation. The RFQ states that a
proposal will be considered to be Outstanding for Past Performance if the
quoter shows that its
Past Performance examples involved greater size, scope,
magnitude of effort, and complexity as the CBOSS BPA
requires, and the Past Performance record is highly favorable,
with little or no adverse information. It supports an
expectation of a very high level of confidence in outstanding
performance and customer satisfaction with little risk.
PX 1 at 697. At oral argument, plaintiff argued that the fact that only two
of the references of intervenor were shown to involve greater size, scope,
magnitude of effort, and complexity shows that it should have been
considered Good at best. We disagree.
The term “involved” can be read several ways. It could mean that
each example of Past Performance exceeded CBOSS requirements, or it
could be read to mean that, of all of the examples provided by an offeror,
some must involve a scope greater than CBOSS. The agency applied the
second definition. That is not unreasonable nor was it applied unequally to
different offerors. In sum, we have considered all of plaintiff’s offered
arguments regarding Past Performance, including those not specifically
referenced above, and find them unavailing. Plaintiff has not shown a
likelihood of success on the merits for Past Performance.
12
II. Management Approach
For the Management Approach factor, plaintiff’s argument centered
on how the agency evaluated the relevant experience of ActioNet’s offered
key personnel. Admittedly, the TEC’s report mistakenly stated a higher
number of years for the relevant categories than the solicitation required.
There is no dispute that this mistake was made, but we agree with GAO that
the particular number of years was not the basis for plaintiff’s weakness
under this factor. ActioNet, Inc., 2019 CPD ¶ 100 at 9-10. It was instead
the fact that ActioNet’s proposal for its key personnel lacked sufficient detail
to determine whether its personnel had the requisite experience (even if the
number listed for necessary years of experience was too high). See PX 4 at
32-33 (Management Approach evaluation of supporting documentation for
key personnel). We have reviewed plaintiff’s Attachment F and conclude
that the agency was not irrational in finding it to be lacking sufficient detail
for DOE to satisfy itself that plaintiff’s personnel had the required years of
experience. 8
III. Technical Approach
The Technical Approach factor was not discussed during oral
argument, but we briefly consider it here because it is plain from the record
that the agency had a reasonable basis for its evaluation of this factor. DOE
considered the proposed approach for the two initial task orders under this
factor. Plaintiff was assigned two weakness for its IM-60 approach and one
weakness for the IM-30 order. Plaintiff challenges all of them.
8
We are also satisfied that there was no error in how DOE contacted and
considered plaintiff’s key personnel references. As explained in
defendant’s brief, faced with too many potential references to contact in a
short period of time, the TEC limited the references it contacted to those who
were project references as opposed to more general business references. We
also see no irrationality in the TEC’s conclusion that one of plaintiff’s
references was potentially biased due to her current employment at ActioNet.
The fact that the TEC was unable to reach another of plaintiff’s references is
no evidence or irrationality or misconduct. That person was retired, and
plaintiff did not provide DOE with up-to-date contact information for him.
13
A. IM-60 Order
The TEC found plaintiff’s approach for this initial task order to be
problematic because the timeframe proposed was, in the agency’s view, too
short to achieve the level of satisfactory performance it desired. One of the
overarching goals of the contract was to obtain a modernization and updating
of DOE’s IT infrastructure and cybersecurity. The IM-60 task order was
anticipated to be an agency wide survey of DOE’s IT infrastructure and
environment and to identify future needs across the agency. The anticipated
period of performance for this task order was six months with an additional
six-month option.
Plaintiff proposed to complete its [ ] agency-wide assessment in[
]. PX 7 at 5 (timeline); id. at 6-9
(narrative description). DOE assigned a weakness for this timeframe, finding
it to be evidence that plaintiff did not understand the requirement. Plaintiff
views that conclusion as factually wrong, arguing that the agency misread its
proposal. Plaintiff urges that the [
].
We agree with GAO that DOE had a rational basis for its conclusion
in this regard. See ActioNet, Inc., 2019 CPD ¶ 100 at 12. Even considering
the [ ] nature of the report to be produced in [ ], it was
reasonable for the agency to consider that too short a period of performance
for even a draft, not to mention that plaintiff’s [ ] was much
accelerated compared to the agency’s anticipated 6-12 month period. A [
] report would necessarily be comprehensive in scope, meaning that the
majority of fact gathering, and evaluative work would be complete in that
period. That is a reasonable basis on which the agency could conclude as it
did.
The second weakness assessed to plaintiff’s proposed effort for the
IM-60 order was for ActioNet’s lack of details for its risk management and
mitigation plan. Plaintiff takes aim at this weakness by citing its [
]. The TEC concluded that this
high-level approach was insufficient as it was unrelated to the execution of
the IM-60 effort. We find no irrationality with this conclusion.
14
B. IM-30 Order
The second initial task order was aimed at providing immediate and
critical support to DOE’s cybersecurity efforts across the agency. The TEC
found that the [ ] full-time equivalents (“FTEs”) proposed to complete this
task order were insufficient for the level of service sought and even the level
of service proposed by ActioNet. The agency found this [ ] level of effort
to be a risk to the successful execution of the task order.
Plaintiff argues, first, that this was a mechanical application of an
unstated labor floor, and, second, that plaintiff was not given credit for the
[
]. Defendant and intervenor respond that the agency did not
mechanically apply a labor floor but instead found that the number of hours
proposed by plaintiff to be problematic. We agree.
There is no support in the record for the idea that the agency had an
unstated minimum number of hours that it was looking for offerors to
propose for this task order. The TEC reviewed the contract requirements
and the proposed effort of ActioNet and concluded that the number of FTEs
offered by plaintiff to be inconsistent with both. Plaintiff has not shown
how it was otherwise irrational for the agency to conclude as it did. The
idea that the agency should have read into plaintiff’s proposal [
]. We find that
DOE reasonably reached the conclusion that it did in this regard.
IV. Price
Plaintiff raises two primary issues as it relates to the CO’s price
evaluation and the SSO’s use of that evaluation in her award decision. The
first is that the agency failed to give plaintiff proper credit for the price
advantage that it offered for BPA labor rates and load rates. The second
issue is with the agency’s finding that plaintiff’s price for the IM-60 and IM-
30 task order was too low (unrealistic).
As to the first issue, we find no error to have occurred. The agency
conducted a standard deviation analysis of all proposed rates and then
compared those rates across all offers to figure out what percentage of overall
15
rates fell within the range that the agency set. Plaintiff does not take issue
with this approach in general. It argues instead that its higher percentage of
rates within the range, when contrasted to Accenture’s lower level, should
have resulted in a more favorable rating for it. The same basic argument is
made for the non-labor load rates, i.e., that plaintiff’s lower rates for this
category vis-à-vis intervenor should have made some difference to the
agency’s ultimate conclusion.
The award decision makes clear that the SSO was aware of ActioNet’s
advantages as to these two considerations. It plainly stated so. The SSO
did not, however, find that those two advantages would overcome the
technical superiority of intervenor’s proposal, especially given the unrealistic
prices for the two task orders proposed by plaintiff. We find no irrationality
in these conclusions. 9 We note also that plaintiff cannot show prejudicial
harm as it pertains to price. The agency was clear that it valued the more
highly ranked Accenture proposal as a better value to the government in view
of its needs for this BPA. Without having successfully established that the
agency made reversible errors in its non-price evaluation, any error as to
plaintiff’s prices is harmless. It was the lowest rated technical offeror. In
view of the agency’s statements in the SSO’s award decision, any price
advantage could not have bridged that gap.
V. Balance Of Harms
Even were we to agree with plaintiff on the merits, plaintiff would not
otherwise be entitled to preliminary injunctive relief. Although there is a
case to be made for plaintiff suffering some harm at this juncture without an
injunction, the balance of harms does not support an injunction. The parties
submitted a series of competing declarations regarding the harm to be
suffered absent an injunction on plaintiff’s part and because of an injunction
on intervenor’s and the agency’s part. Without detailing each, it is sufficient
to say that the agency’s desire to begin modernizing its IT infrastructure by
9
As it concerns the agency’s conclusion that plaintiff’s price for the two task
orders was too low, we see no basis for quibbling with that conclusion. It is
clear that DOE was looking for a larger scope of work for these two orders
than plaintiff viewed them as requiring. The agency’s analysis of these two
task orders supports that conclusion. We are in no position to second-guess
the agency’s own assessment of its needs.
16
moving services to the cloud and its desire to obtain additional cybersecurity
services as quickly as possible rises to, at a minimum, equal the harms to be
suffered by plaintiff’s loss of revenue and potential loss of personnel, both
of which seem less than irreparable given that the awardee of this contract is
looking at approximately $2 billion in work over five years. 10
CONCLUSION
On the whole, we find that plaintiff’s disagreements with the agency
are just that, a difference of opinion on the relative merits of the proposals
the agency reviewed. Such disagreements are insufficient to establish a
likelihood of success on the merits. That fact in combination with the
relative balance of the harms alleged make a preliminary inunction
inappropriate. Thus, we denied plaintiff’s motion for a preliminary
injunction.
s/Eric G. Bruggink
Eric G. Bruggink
Senior Judge
10
As to the latter, we note that intervenor offered a competing declaration
regarding whether any of plaintiff’s personnel had been offered positions,
averring that they had not.
17