FOX CREEK CONSTRUCTION, INC., )
)
Plaintiff-Respondent, )
)
v. ) No. SD35668
)
OPIE’S LANDSCAPING, LLC, ) Filed: November 19, 2019
)
Defendant-Appellant. )
APPEAL FROM THE CIRCUIT COURT OF CHRISTIAN COUNTY
Honorable Jennifer Growcock
AFFIRMED
Opie’s Landscaping, LLC (“Opie”), appeals the bench-trial judgment that ordered
it to pay $40,250 to Fox Creek Construction, Inc. (“Contractor”). In two points, Opie
claims the trial court erred by applying the wrong measure of damages to Contractor’s
breach-of-contract claim.1 Because Opie has failed to meet its burden of demonstrating
reversible error, we affirm.
1
Opie’s original appeal before this court contained an additional point relied on that caused us to transfer
the case to our high court pursuant to Rule 83.02. Opie subsequently abandoned that point in its substitute
brief, and our high court re-transferred the case. As a result, the only points left for our resolution are those
analyzed herein. See Rule 83.08(b) and Rule 83.09. Unless otherwise noted, all rule references are to
Missouri Court Rules (2019).
1
Governing Principles of Review
“In appeals from a court-tried civil case, the trial court’s judgment will be
affirmed unless there is no substantial evidence to support it, it is against the weight of
the evidence, or it erroneously declares or applies the law.” White v. Director of
Revenue, 321 S.W.3d 298, 307-08 (Mo. banc 2010) (citing Murphy v. Carron, 536
S.W.2d 30, 32 (Mo. banc 1976)). We begin with a presumption that the judgment is
correct, and the appellant has the burden of proving it erroneous. Flooring Sys, Inc. v.
Staat Constr. Co., 100 S.W.3d 835, 837 (Mo. App. E.D. 2003).
The Evidence2
Contractor was engaged by Mike and Annette Ensley (“Homeowners”) to do
some major remodeling of their home. Contractor’s arrangement with Homeowners was
a “cost-plus” contract that required Homeowners to pay Contractor the actual cost of the
work plus 15% of that total cost as Contractor’s profit. One portion of the remodeling
job involved the construction of a waterfall outside of Mrs. Ensley’s library window.
Contractor sub-contracted with Opie to build the waterfall. Although Opie admitted that
it had an oral contract with Contractor, Opie’s brief fails to identify its specific terms.
Although Contractor had not previously used Opie to build a water feature,
“[Opie had] hired a new guy from Wickman’s Garden, Logan, who was specially in –
specialized in water features, and [Opie] was going to get into the water features – putting
in water features with Logan and that Logan could do the job.” Opie gave Contractor an
estimate of $35,000 to build the waterfall. It took Logan approximately one month to
2
Unless otherwise necessary for context, we recite the relevant evidence and the inferences to be drawn
from it in the light most favorable to the trial court’s decision. Heubel v. VSV, LLC, 567 S.W.3d 276, 278
n.2 (Mo. App. S.D. 2019).
2
build the waterfall, and once it was completed, Contractor paid Opie the full $35,000
estimated price.
Shortly thereafter, Homeowners returned from a vacation and began experiencing
problems with the waterfall. The first problem was that the waterfall was in the wrong
location. To address the problem, Opie added a second, smaller waterfall that could be
seen from the library.
The next problem arose when Homeowners discovered water “flying” down their
driveway. That led to a discovery that the waterfall leaked – so much so that the pumps
could not pump enough water to keep the waterfall flowing. Two months after the
waterfall was completed, the leak was so bad that Homeowners’ well pump was running
24 hours per day, resulting in large electric bills for June, July, and August. The rocks in
the waterfall were not level and would move around. The liner was also “sticking
outside” and “looked shoddy.” Opie said3 it had the wrong pumps, the wrong floats, and
the reservoir was too small, but all of those deficiencies would be fixed. Despite those
admissions, Opie continued to claim that the water loss was due solely to natural
evaporation.
Frustrated with the lack of progress, Homeowners contacted Cliff Fitzwater (“Mr.
Fitzwater”), owner of Fitzwater Design, who had extensive experience with water
features. Mr. Fitzwater looked at the waterfall in approximately June 2016. He
described the problems with the waterfall as: (1) a lot of liner showing; (2) the water
falling over natural rock; (3) a water hose was running continuously; and (4) the reservoir
size seemed small. Mr. Fitzwater advised Homeowners to contact Opie to fix the
3
Although Logan was the person actually building the waterfall, it appears that Homeowners would go to
Contractor about the problems that kept arising. Contractor would then communicate with Opie, and Opie
in turn went to Logan. Opie eventually fired Logan from the job.
3
problems. The only way Mr. Fitzwater would have fixed the waterfall would be to
rebuild it such that it did not fall over the natural rock, a job that would require removing
the existing water feature and building a new one. He estimated the cost of removal and
reconstruction to be approximately “35 – to 40-thousand.”
In September 2016, after six months of continuing problems with the waterfall,
Homeowners told Opie to remove it. Opie did so, and Homeowners never paid
Contractor the $35,000 plus 15% profit that Contractor would have received from
Homeowners if the waterfall had functioned correctly.
Contractor made a demand upon Opie to repay Contractor the $35,000 it had paid
for the waterfall, plus an additional 15% that Contractor would have received from
Homeowners if the waterfall had functioned properly. When that demand went unmet,
Contractor filed the instant breach-of-contract suit, which prayed for damages in the
amount of $40,250 (the $35,000 paid to Opie, plus Contractor’s 15% lost profit).
The trial court entered its $40,250 judgment in favor of Contractor based upon the
following undisputed evidence:
Contractor contracted with Homeowners to install a water feature for $35,000
plus 15% profit;
Contractor subcontracted with Opie to install the water feature for a cost of
$35,000.
Contractor paid $35,000 to Opie upon the installation of the water feature;
After six months of Opie’s failed attempts to repair the water feature,
Homeowners demanded that Opie remove it, which it did;
Homeowners did not pay Contractor the $35,000 plus 15% profit because
Homeowners were not provided with a functioning water feature;
Opie retained the $35,000 plus all materials used in constructing the water
feature; and
4
Mr. Fitzwater testified that it would cost at least $35,000 to reconstruct a
functioning water feature.
This appeal timely followed.
Analysis
For ease of analysis, we address Opie’s points together. Point 1 claims the trial
court erred in awarding Contractor $40,250 in damages because such an award
constituted a misapplication of law,4 in that “under Missouri law, the proper measure of
damages for a substantial but defective completion of a construction contract is the cost
of repair[.]”
Point 2 claims the trial court’s award of $40,250 in damages to Contractor was
against the weight of the evidence, in that Contractor “failed to present evidence to rebut
the presumption raised by [Opie] that the cost of reconstruction . . . would constitute an
unreasonable economic waste.”
“The proper measure of damages is a question of law for determination by the
trial court.” Forney v. Missouri Bridge & Concrete, Inc., 112 S.W.3d 471, 474 (Mo.
App. W.D. 2003) (quoting Gee v. Payne, 939 S.W.2d 383, 385 (Mo. App. W.D. 1997)).
“The particular facts and circumstances of a case dictate which measure of damages is
appropriate[,]” and the goal “is to put the non-breaching party in as good a position as it
would have been in if the contract had been performed.” Id. at 474.
Whether the trial court applied the proper measure of damages is a question of
law that this court reviews de novo. Penzel Constr. Co. v. Jackson R-2 School Dist., 544
S.W.3d 214, 236 (Mo. App. E.D. 2017). “An appellate court will reverse a judgment that
4
Although not explicitly stated in the point relied on, we read Opie’s argument as claiming that the trial
court misapplied the law regarding the proper measure of damages.
5
awards damages for breach of contract if the record shows an absence of ‘proof of actual
facts [that] present a basis for a rational estimate of damages without resorting to
speculation.’” Cornejo v. Crawford Cty., 153 S.W.3d 898, 902 (Mo. App. S.D. 2005)
(quoting Gillham v. LaRue, 136 S.W.3d 852, 856 (Mo. App. S.D. 2004)).
The fundamental flaw in Opie’s challenge to the trial court’s calculation of
damages is that Opie treats the appropriate measure of damages as if its contract were
with Homeowners instead of with Contractor.5 The trial court found that Opie breached
its contract with Contractor – a finding Opie does not contest on appeal. “The doctrine of
material breach is simply the converse of the doctrine of substantial performance.
Substantial performance is performance without a material breach, and a material breach
results in performance that is not substantial.” Fire Sprinklers, Inc. v. Icon Contracting,
Inc., 279 S.W.3d 230, 233 (Mo. App. E.D. 2009) (internal citation omitted).
Opie does not explain how its claim that it substantially performed on the contract
can be reconciled with the trial court’s unchallenged finding that Opie breached the
contract. Id. at 234. Opie’s argument is especially unconvincing given that, at the time
of trial, Homeowners had no water feature whatsoever. As in Fire Sprinklers, Opie’s
contention that it substantially performed under the contract is not supported by the
record. Id. “If one party materially breaches a contract, the aggrieved party may cancel
the contract and be relieved of its performance under the contract.” Id. Thus, after Opie
breached the contract, Contractor was entitled to cancel the contract and sue Opie for a
total breach. Id.
5
To the extent that Homeowners might have qualified as a third-party beneficiary to the contract between
Contractor and Opie, neither party has asserted such an argument nor made any attempt to bring
Homeowners into the case.
6
Damages [for a total breach] are calculated on the assumption that neither
party will render any remaining performance. They therefore compensate
the injured party for the loss that it will suffer as a result of being deprived
of the balance of the other party’s performance, minus the amount of any
savings that resulted from the injured party not having to render any
remaining performance of its own.
Id. (citing Farnsworth, Contracts, 581, section 8.15).
Here, it is uncontested that Contractor paid Opie $35,000 to build the waterfall for
Contractor.6 Had Opie constructed a satisfactory waterfall, Homeowners would have
been obligated to pay Contractor $35,000 plus 15% profit for the waterfall; a total of
$40,250. Opie never provided Contractor with a properly-functioning waterfall, and, as a
result, Homeowners never paid Contractor the $40,250 Contractor would have received
in the absence of Opie’s breach. Despite its failure to provide Contractor with a properly-
functioning waterfall, Opie refused to return the $35,000 that Contractor had paid. Thus,
Contractor was entitled to recover $40,250, the amount necessary to fully compensate
Contractor for Opie’s breach. See id.
While Opie argues that Contractor was only entitled to recover $2,500, the cost
that landscaping expert Mr. Edward Colby estimated would be necessary to repair the
waterfall, the cost of repair is a measure of damages appropriate only in the case of
substantial but defective performance, which the trial court found was not what occurred
here. See Stom v. St. Clair Corp., 153 S.W.3d 360, 364 (Mo. App. S.D. 2005). Further,
at the time of trial, there was nothing to repair. Opie had done as Homeowners requested
and removed the waterfall completely.
6
Opie claims for the first time in its substitute brief that Contractor’s payment for the waterfall constituted
an implicit acceptance of Opie’s performance. Because this argument was not made to the trial court, we
do not consider it. Rule 78.07(b); Smith v. Associated Nat. Gas Co., 7 S.W.3d 530, 534 (Mo. App. S.D.
1999) (“[i]t is a fundamental rule that contentions not put before the trial court will not be considered by the
appellate court”) (quoting Strunk v. Hahn, 797 S.W.2d 536, 549 (Mo. App. S.D. 1990)).
7
Given the judgment’s uncontested finding that Opie breached the contract, Opie
has failed to demonstrate that the trial court applied an incorrect measure of damages. As
a result, Opie’s additional claim that the judgment was against the weight of the evidence
because Contractor “failed to present evidence of the cost of repair . . . to rebut the
presumption . . . that the cost of reconstruction . . . would constitute an unreasonable
economic waste” fails because no such evidence was relevant under the correct measure
of damages used by the trial court.
Opie’s points are denied, and the judgment is affirmed.
DON E. BURRELL, J. – OPINION AUTHOR
NANCY STEFFEN RAHMEYER, C.J. – CONCURS
JEFFREY W. BATES, J. – CONCURS
GARY W. LYNCH, J. – CONCURS
DANIEL E. SCOTT, J. – CONCURS
WILLIAM W. FRANCIS, JR., J. – CONCURS
MARY W. SHEFFIELD, J. – CONCURS
8