IN THE SUPERIOR COURT OF THE STATE OF DELAWARE
ASHLAND LLC; INTERNATIONAL )
SPECIALTY PRODUCS INC. ISP )
ENVIRONMENTAL SERVICES INC.; )
and ISP CHEMCO LLC, )
) C.A. No. N15C-10-176 EMD CCLD
Plaintiff/Counterclaim )
Defendants, )
)
v. )
)
THE SAMUEL J. HEYMAN 1981 )
CONTINUING TRUST FOR LAZARUS )
S. HEYMAN; et al., )
)
Defendant/Counterclaim )
Plaintiffs.
Submitted: September 15, 2020
Decided: November 10, 2020
Upon Plaintiff-Counterclaim Defendant Ashland LLC’s Motion for Partial Summary Judgment
DENIED
Upon Defendant-Counterclaim Plaintiff The Samuel J. Heyman 1981 Continuing Trust for
Lazarus S. Heyman’s Motion for Partial Summary Judgment
GRANTED
Christopher Viceconte, Esquire, Gibbons P.C., Wilmington, Delaware, William S. Hatfield,
Esquire, Camille V. Otero, Esquire, Jennifer A. Hradil, Esquire, Joshua Elias, Esquire, Gibbons
P.C., Newark, New Jersey, Attorneys for Plaintiffs and Counterclaim Defendants.
William M. Lafferty, Esquire, John P. DiTomo, Esquire, Thomas P. Will, Esquire, Miranda N.
Gilbert, Esquire, Morris Nichols Arsht & Tunnell LLP, Wilmington, Delaware, Andrew J.
Rossman, Esquire, Jonathan B. Oblak, Esquire, Tyler G. Whitmer, Esquire, Nicholas Hoy,
Esquire, Quinn Emanuel Urquhart & Sullivan, LLP New York, New York, Attorneys for the
Defendants and Counterclaim Plaintiffs.
DAVIS, J.
I. INTRODUCTION
This is a breach of contract case assigned to the Complex Commercial Litigation
Division of this Court. The causes of action arise from environmental liability allocations under
a Stock Purchase Agreement, dated May 30, 2011 (the “SPA”), and statutory law. Plaintiffs
Ashland LLC, International Specialty Products Inc. (“ISP”), ISP Environmental Services Inc.
(“IES”) and ISP Chemco LLC (“Chemco”) (collectively “Ashland”) allege that Defendants The
Samuel J. Heyman 1981 Continuing Trust for Lazarus S. Heyman, et al. (the “Heyman
Defendants”),1 must also indemnify Ashland for attorneys’ fees incurred in this action. Ashland
and the Heyman Defendants have filed cross-motions for summary judgment.
Ashland filed its Plaintiffs/Counterclaim Defendants’ Motion for Summary Judgment as
to Their Entitlement to Their Attorneys’ Fees and Expenses Incurred in This Action (the
“Ashland Motion”) on August 21, 2020.2 On July 24, 2020, the Heyman Defendants filed a
Motion for Partial Summary Judgment (the “Heyman Motion”).3 The Court held a hearing on
the motions on September 15, 2020.4 At the conclusion of the hearing, the Court took the
matters under advisement.
This is the Court’s decision on the motions. For the reasons set forth more fully below,
the Ashland Motion is DENIED and the Heyman Motion is GRANTED. The Court holds that,
except as to SPA Section 8.2(c), the SPA does not provide for prevailing party reimbursement of
attorneys’ fees incurred in connection with direct claims between the parties for breach of the
SPA.
1
The Heyman Defendants include Linden Property Holdings LLC (“LPH”).
2
D.I. No. 1081.
3
D.I. No. 1082.
4
D.I. No. 1095.
2
II. RELEVANT FACTS
This litigation involves, in part, property located at 4000 Road to Grasselli, Linden, New
Jersey (the “Linden Property”).5 The Linden Property is subject to an Administrative Consent
Order (“ACO”) with the New Jersey Department of Environmental Protections (“NJDEP”) and
liabilities under the Industrial Site Recovery Act (“ISRA”).6 In 1991, ISP’s subsidiary, IES,
became the owner of the Linden Property and assumed all liabilities for its remediation.7
A. BACKGROUND
In June 1989, NJDEP and ISP’s predecessor, GAF Chemicals entered into the ACO
covering both on-site and off-site remedial obligations at the Linden Property. 8 In August 2005
and July 2011, the NJDEP issued No Further Action letters (the “NFAs”) for on-site soil and
groundwater after IES completed its on-site remedial work.9
NJDEP continued to pursue ISP for off-site liabilities at the Linden Property. 10 NJDEP
requested that ISP complete a supplemental off-site investigation followed by an ecological risk
assessment (“ERA”) for off-site contamination pursuant to the ACO.11 ISP conducted the
off-site investigation and the first step of the ERA, but did not complete the remaining steps
because it requested clarification and a meeting with the NJDEP.12
5
See Ashland LLC v. The Samuel J. Heyman 1981 Continuing Trust for Heyman, 2020 WL 1231100 at *1 (Del.
Super. Feb. 25, 2020). For a more fulsome discussion of the facts in this civil proceeding, reference should be made
to the Court’s February 25, 2020 decision.
6
See id.
7
See id.
8
See id.
9
See id. at *2.
10
See id.
11
See id.
12
See id.
3
On May 3, 2006, NJDEP, IES and Chemco amended the ACO confirming that IES has
responsibility for the ACO.13 NJDEP also reiterated that an ERA was necessary.14
In June 2007, NJDEP filed a complaint against ISP (the “NJDEP Complaint”) asserting
remedial and natural resource damage (“NRD”) claims related to the Arthur Kill and Piles Creek
waterways in connection with the Linden Property.15
In June 2011, ISP entered into a Consent Judgment (the “Consent Judgment”) with the
NJDEP in which the Piles Creek claims were dismissed with prejudice, but “claims associated
with the Arthur Kill Waterway” were expressly preserved and dismissed without prejudice. 16
In August 2011, Ashland acquired ISP, IES, and Chemco from the Heyman Defendants
for approximately $3.2 billion.17 Ashland acquired ISP through the SPA.18 Under the SPA, IES
conveyed the Linden Property back to LPH for one dollar.19 Defendant LPH presently owns the
Linden Property.20
B. THE LINDEN PROPERTY OBLIGATIONS UNDER THE SPA
The SPA establishes the parties’ obligations regarding the Linden Property. Section 2(e)
to Schedule 5.19 provides:
In connection with the Linden Transfer, the Seller Parties shall assume all
Liabilities to the extent related to or arising from or existing at the Linden
Property, including Liabilities arising under or relating to (i) Environmental Laws,
provided that such Liabilities shall not include any off-site migration or disposal
of Hazardous Materials from the Linden Property prior to the Closing, any claims
or damages associated with any off-site migration or disposal of Hazardous
Material from the Linden Property prior to the Closing, and for the avoidance of
doubt, any off-site contamination of soils, groundwater or sediments, any third
party superfund sites including the Newark Bay Complex, any natural resources
13
See id.
14
See id.
15
See id.
16
Id.
17
See id. at *3.
18
See id.
19
See id.
20
See id.
4
damages or exposure claims relating to operations or discharges prior to Closing,
(ii) the Linden Contracts, (iii) any personal property located at the Linden
Property, (iv) the Linden Litigation, or (v) the Linden Transfer (including any
Liabilities to the extent arising by virtue of the delivery of a limited warranty
deed, but excluding any Liabilities arising out of or relating to fraudulent
conveyance or similar liability), in each case, other than as set forth in the proviso
in clause (i) above, whether arising before, on or after the Closing Date (the
“Linden Excluded Liabilities”).21
Section 2(f) to Schedule 5.19 states:
In connection with the Linden Transfer, the Seller Parties shall be responsible, at
their sole cost and expense, for compliance, if applicable, with any requirements
of the Industrial Site Recovery Act (“ISRA”) and, if ISRA applies to the Linden
Transfer, Seller Parties shall (i) within five (5) Business Days after execution of
this Agreement, make any required filings or notifications (such as a General
Information Notice, as defined under ISRA) to the New Jersey Department of
Environmental Protection (“NJDEP”), and (ii) use reasonable best efforts to, prior
to closing, make all other filings, undertake all other measures, including where
required undertaking any site investigation or Remedial Action required by ISRA.
In addition, the Seller Parties shall use reasonable best efforts to amend any
consent decree or other binding agreement with any Governmental Entity relating
to the Linden Excluded Liabilities, and to replace or substitute any related
financial assurance (including any bond or letter of credit), to include the name of
the Linden Transferee following the Linden Transfer and, if permitted by NJDEP,
to remove the name of ISP or any of the Companies therefrom.22
The Heyman Defendants attempted to terminate the ACO. However, the NJDEP
declined LPH’s termination request in December 2013 because “the scope of the ACO
includes discharges off-site to Piles Creek and the Arthur Kill.”23
LPH initially established a remediation funding source (“RFS”) under the ACO
with a 2011 letter of credit, satisfying SPA Section 2(f)’s requirement that the Heyman
Defendants would “replace or substitute any related financial assurance” for the Linden
Property’s obligations.24 LPH later posted a smaller amount and eventually terminated
21
App. to Defs./Countercl. Pls.’ Br. in Supp. of Their. Mot. for Partial Summ. J. HA0116. Hereinafter “SPA __.”
22
Id.
23
Id. at *8-*9.
24
Id. at *9; SPA Sch 5.19, § 2(f).
5
its smaller letter of credit forcing IES to establish its own letter of credit to avoid severe
penalties threatened by the NJDEP.25 Ashland wrote to LPH that it would not take
responsibility for the Linden Property off-site liabilities and this dispute led to the current
action.26
C. ENSUING LITIGATION
On August 2, 2019, Ashland and the Heyman Defendants filed motions for partial
summary judgment.27 The Court held a hearing on the motions on October 11, 2019.28
After taking the motions under advisement, the Court held that the Heyman Defendants
breached their contractual obligation under SPA Section 2(f) to expend reasonable best
efforts to amend the ACO to include LPH and remove ISP (or IES) by instead attempting
to terminate the ACO outright.29 The Court also held that the Heyman Defendants
breached their obligation under Section 2(f) to “replace any financial assurance” required
under the ACO by first posting a smaller amount and then terminating the letter of credit
posted as the RFS.30
The Court further ruled that SPA Section 4(a) of Schedule 5.19 required the
Heyman Defendants to indemnify Ashland for losses related to the Linden Excluded
Liabilities, and that the general indemnification provision in SPA Section 7.2 required the
Heyman Defendants to indemnify Ashland for any losses related to any breach of any
covenant or agreement.31
25
See id.
26
See id.
27
See id.
28
See id.
29
See id. at *13.
30
Id.
31
See id. at *16.
6
D. INDEMNIFICATION PROVISIONS—SPA SECTION 7.2 AND SECTION 4(a) OF
SCHEDULE 5.19
The SPA contains indemnification provisions. Relevant here are SPA Section 7.2
and Section 4(a) of Schedule 5.19. SPA Section 7.2 and Section 4(a) of Schedule 5.19
provide that the Heyman Defendants will indemnify Ashland in certain circumstances.
SPA Section 7.2 sets out the Heyman Defendants’ general indemnification obligations:
Section 7.2 Indemnification by the Seller Parties. Subject to the limitations set
forth in this Article VII, each Seller Party hereby agrees that from and after the
Closing it shall, jointly and severally, indemnify, defend and hold harmless,
without duplication, Buyer, its Affiliates and their respective directors, officers,
shareholders, members, fiduciaries, trustees and employees (other than the
Employees) and their heirs, successors and permitted assigns, each in their
capacity as such (the “Buyer Indemnified Parties”) from and against any and all
Losses actually suffered or incurred by any of the Buyer Indemnified Parties, to
the extent arising out of:
...
b) any breach of any covenant or agreement of the Seller Parties . . .32
Section 4(a) of Schedule 5.19 establishes the Heyman Defendants’ indemnification
obligations with respect to the Linden Excluded Liabilities:
4. Indemnification
Subject to the limitations set forth in paragraph 4(c) of this Schedule:
(a) Each Seller Party, hereby agrees that from and after the Closing it shall, jointly
and severally, indemnify, defend and hold harmless, without duplication, the
Buyer Indemnified Parties from and against any and all Losses actually suffered
or incurred by any of the Buyer Indemnified Parties, to the extent arising out of (i)
the Wayne Excluded Liabilities and the Linden Excluded Liabilities . . .33
Both provisions state that the Heyman Defendants will indemnify Ashland against “Losses.”
Section 1.1 defines Losses as:
32
SPA § 7.2.
33
Id. at Sch. 5.19, §4.
7
. . . with respect to any Indemnified Party, and all losses, liabilities, claims,
obligations, judgments fines, settlement payments, award or damages of any kind
actually suffered or incurred by such Indemnified Party after Closing (together
with all reasonably incurred cash disbursements, costs and expenses, including
costs of investigation, defense and appeal and reasonable attorneys’ and
consultants’ fees and expenses), whether or not involving a Third Party Claim. 34
The definition of Third Party Claim is contained in SPA Section 7.5. SPA Section 7.5
defines Third Party Claim as:
. . . any written claim or demand for which an indemnifying party (an
“Indemnifying Party”) may have liability to any Indemnified Party hereunder,
other than those relating to Taxes . . . asserted against or sought to be collected
from any Indemnified Party by a third party . . . .35
E. SPA SECTION 8.2(C)
Article VIII of the SPA governs termination of the SPA. SPA Section 8.2 talks to the
“Effect of Termination.” Section 8.2(b) requires Ashland to pay a fee if Ashland terminates the
agreement under Section 8.1(f).36 SPA Section 8.2(c) addresses fee-shifting between Ashland
and the Heyman Defendants if there has been a termination and the Heyman Defendant need to
bring suit to collect the fee. Specifically, SPA Section 8.2(c) provides:
The parties acknowledge that the agreements contained in Section 8.2 are an
integral part of the Transactions, and that, without these agreements, the parties
would not enter into this Agreement; accordingly, if Buyer fails to promptly pay
the amount due pursuant to Section 8.2(b), and, in order to obtain such payment,
the Seller Parties commence a suit that results in a judgment against Buyer for the
amount set forth in Section 8.2(b), Buyer shall pay to the Seller Parties their costs
and expenses (including attorneys’ fees) in connection with such suit, together with
interest on such amount or portion thereof at the Interest Rate in effect on the date
such payment was required to be made through the date of payment.37
34
Id. at § 1.1. (emphasis added).
35
Id. at § 7.5.
36
Id. at § 8.2(c).
37
Id. (emphasis added).
8
F. PROCEDURAL POSTURE
Ashland commenced this action on October 20, 2015. On January 6, 2016, the Heyman
Defendants filed their Answer to the Complaint and Counterclaims. On October 26, 2017,
Ashland filed its Second Amended Complaint seeking (i) declaratory judgment for breach of
contract; (ii) breach of the implied covenant of good faith and fair dealing; (iii) fraud; (iv) unjust
enrichment against the Heyman Defendants; (v) cost recovery and contribution under the Spill
Act; and (vi) unjust enrichment against LPH.38
On August 2, 2019, both Ashland and the Heyman Defendants filed motions for partial
summary judgment. Ashland filed its motion on Count I and Counterclaims II and III and the
Heyman Defendants filed their motions on Count I, II, III, IV and VI as well as on
Counterclaims II and III.39 The Court granted Ashland’s motion with respect to breach of
contract claims relating to the ACO under Count I and Counterclaims II and III, finding that the
Heyman Defendants breached SPA Section 2(f).40 The Court denied Ashland’s motions on all
other grounds. The Court also denied the Heyman Defendants’ motion but held that Ashland’s
unjust enrichment claims would not go forward.41
On July 24, 2020, the Heyman Defendant filed the Heyman Motion. Ashland filed the
Ashland Motion on August 21, 2020. The Court held a hearing on the motions on September 15,
2020. The Heyman Motion and the Ashland Motion both seek summary judgment on Ashland’s
claim for attorneys’ fees incurred in connection with litigating the contract claims and
counterclaims under the SPA.
38
See Ashland, 2020 WL 1231100, at *9 (Del. Super. 2020).
39
See id.
40
See id. at *14.
41
See id. at *17.
9
III. PARTIES’ CONTENTIONS
A. THE HEYMAN DEFENDANTS’ CONTENTIONS
The Heyman Defendants are moving for summary judgment on Ashland’s claim for
attorneys’ fees. The Heyman Defendants argue that, under the “American Rule,” Ashland is
responsible for its own attorneys’ fees for litigation brought against the Heyman Defendants
under the SPA. The Heyman Defendants contend that the absence of clear and unequivocal
fee-shifting language in the SPA with respect to indemnification claims means that the parties
did not intend to shift fees as to those types of claims. As further support, the Heyman
Defendants reference another provision of the SPA that sets out fee-shifting to the prevailing
party in litigation between the Heyman Defendants and Ashland.
B. ASHLAND’S CONTENTIONS
Ashland seeks summary judgment in its favor on the attorneys’ fee issue. Ashland argues
that the SPA’s plain language entitles them to attorneys’ fees. Ashland claims that the SPA’s
indemnification provisions and the SPA’s definition of “Losses” provides recovery of attorneys’
fee. Ashland notes that the Court ruled that the Heyman Defendants must indemnify and hold
harmless Ashland for Losses arising out of the Linden Excluded Liabilities and the Seller’s
breach of contract. Ashland then references the definition of “Losses” to include reasonable
attorneys’ fees “whether or not involving a Third Party Claim.” Therefore, under the plain
language of the contract Ashland contends that it is entitled to reasonable attorneys’ fees under
the SPA’s indemnification provisions.
IV. STANDARD OF REVIEW
The standard of review on a motion for summary judgment is well-settled. The Court’s
principal function when considering a motion for summary judgment is to examine the record to
10
determine whether genuine issues of material fact exist, “but not to decide such issues.”42
Summary judgment will be granted if, after viewing the record in a light most favorable to a
nonmoving party, no genuine issues of material fact exist and the moving party is entitled to
judgment as a matter of law.43 If, however, the record reveals that material facts are in dispute,
or if the factual record has not been developed thoroughly enough to allow the Court to apply the
law to the factual record, then summary judgment will not be granted.44 The moving party bears
the initial burden of demonstrating that the undisputed facts support his claims or defenses.45 If
the motion is properly supported, then the burden shifts to the non-moving party to demonstrate
that there are material issues of fact for the resolution by the ultimate fact-finder.46
Where the parties have filed cross motions for summary judgment and have not argued
that there are genuine issues of material fact, “the Court shall deem the motions to be the
equivalent of a stipulation for decision on the merits based on the record submitted with the
motions.”47 Neither party’s motion will be granted unless no genuine issue of material fact exists
and one of the parties is entitled to judgment as a matter of law.48
V. DISCUSSION
Delaware follows the American Rule, “which provides that each party is generally
expected to pay its own attorneys’ fees.”49 The Court should not interpret indemnification
42
Merrill v. Crothall-American Inc., 606 A.2d 96, 99-100 (Del. 1992) (internal citations omitted); Oliver B. Cannon
& Sons, Inc. v. Dorr-Oliver, Inc., 312 A.2d 322, 325 (Del. Super. 1973).
43
Id.
44
Ebersole v. Lowengrub, 180 A.2d 467, 470 (Del. 1962); see also Cook v. City of Harrington, 1990 WL 35244, at
*3 (Del. Super. Feb. 22, 1990) (citing Ebersole, 180 A.2d at 467) (“Summary judgment will not be granted under
any circumstances when the record indicates . . . that it is desirable to inquire more thoroughly into the facts in order
to clarify the application of law to the circumstances.”).
45
Moore v. Sizemore, 405 A.2d 679, 680 (Del. 1970) (citing Ebersole, 180 A.2d at 470).
46
See Brzoska v. Olsen, 668 A.2d 1355, 1364 (Del. 1995).
47
Super. Ct. Civ. R. 56(h).
48
E.I. DuPont de Nemours and Co. v. Medtronic Vascular, Inc., 2013 WL 261415, at *10 (Del. Super. Jan. 18,
2013).
49
Shawe v. Elting, 157 A.3d 142, 149 (Del. 2017).
11
provisions “in an expansive way that would be inconsistent with the American Rule.”50
Indemnification provisions “are presumed not to require reimbursement for attorneys’ fees
incurred as a result of substantive litigation between the parties to the agreement absent a clear
and unequivocal articulation of that intent.”51 “There is no specific language that must be used
in order for an indemnity provision to provide for recovery in first-party actions.”52 However, a
party is not entitled to attorneys’ fees under an indemnification provision “when there is no
specific language in the indemnification provision ... that covers fee-shifting.”53
The Court previously held that the Heyman Defendants breached Section 2(f) of
Schedule 5.19, which relates to the Linden Excluded Liabilities.54 Under Section 4(a) of
Schedule 5.19, the Heyman Defendants must indemnify “against any and all Losses” incurred by
Ashland to the extent arising out of the Linden Excluded Liabilities.55 The Heyman Defendants
must also indemnify Ashland against “Losses actually suffered or incurred by” Ashland arising
out of any breach of any covenant or agreement by the Heyman Defendants.56 Therefore, the
Heyman Defendants must indemnify against Losses related to their breach of Section 2(f).
Applying the law discussed above, however, the parties must have intended clearly and
unequivocally to overcome the presumption against fee-shifting under the American Rule for
Ashland to recover attorneys’ fees under the indemnification clauses.57
50
TranSched Sys. Ltd. v. Versyss Transit Sols., LLC, 2012 WL 1415466, at *2 (Del. Super. Mar. 29, 2012). See also
Nasdi Holdings, LLC v. North American Leasing, Inc., 2020 WL 1865747, at *5 (Del. Ch. Apr. 13, 2020); Senior
Hous. Capital, LLC v. SHP Senior Hous. Fund, LLC, 2013 WL 1955012, at *45 (Del. Ch. May 13, 2013).
51
TranSched Sys. Ltd., 2012 WL 1415466, at *2
52
Deere & Co. v. Exelon Generation Acqs., LLC, 2016 WL 6879525, at *2 (Del. Super. Nov. 22, 2016).
53
Senior Hous., 2013 WL 1955012, at *45
54
See Ashland LLC, 2020 WL 1231100 at *14 (Del. Super Feb. 25, 2020).
55
SPA Sch. 5.19, § 4(a).
56
Id. § 7.2(b).
57
See TranSched Sys. Ltd., 2012 WL 1415466, at *2.
12
The SPA’s plain language of the does not show a clear and unequivocal intent to shift
fees. Article I of the SPA defines Losses as including reasonable attorneys’ fees, “whether or not
involving a Third Party Claim.”58 Article I defines Third Party Claim as having “the meaning set
forth in Section 7.5(a).”59 Section 7.5(a) defines Third Party Claim as:
. . . any written claim or demand for which an indemnifying party (an
“Indemnifying Party”) may have liability to any Indemnified Party hereunder,
other than those relating to Taxes . . . asserted against or sought to be collected
from any Indemnified Party by a third party.60
Third Party Claim is a defined term involving a written demand against an Indemnified
Party. It is not a generic term for third party claims and its use in the SPA’s definition of Losses
does not imply clearly and unequivocally that first party claims are included. The definition of
Losses also lacks explicit language applying to first-party claims.
Recently, the Court of Chancery came to the same conclusion when addressing
substantially similar language. In Nasdi Holdings, LLC v. North American Leasing, Inc.,61 the
Court of Chancery addressed an indemnification provision that provided that one party to the
contract shall indemnify the other party “from and against any or all Losses” subject to certain
limitations.62 In a general definitions section, the agreement defined “Losses” to include
“reasonable attorney or consultant fees.”63 The Court of Chancery noted that the party seeking
reimbursement of attorneys’ fees failed to rely on any fee-shifting specific language in the
indemnification provision, other than the general definition of “Losses” elsewhere in the
agreement.64 In denying the request for reimbursement, the Court of Chancery found that the
58
Id. Art. 1.
59
Id. § 7.5(a).
60
Id.
61
2020 WL 1865747 (Del. Ch. Apr. 13, 2020)
62
Id. at *6.
63
Id.
64
Id.
13
indemnification provision did not contain a “clear and unequivocal articulation” of the intent to
require reimbursement for attorneys’ fees incurred through first-party actions.65
Finally, the Court notes that the parties knew how to draft explicit fee-shifting language
in other provisions which further demonstrates that that the parties did not intend for Losses to
encompass fee-shifting on first-party claims. To uphold the parties’ intentions, the Court “must
construe the agreement as a whole, giving effect to all provisions therein.”66 If the parties use
fee-shifting language in one section of the agreement and fail to include such language in
another, it “indicates a lack of intent to create a clear and unequivocal agreement to shift fees in
first-party actions.”67 The SPA includes fee-shifting language in SPA Section 8.2(c). That
section provides that the “Buyer shall pay to the Seller Parties their costs and expenses
(including attorneys’ fees) in connection” with any suit the Heyman Defendants commence to
recover a termination fee.68 SPA Section 8.2(c) shows a clear and unequivocal intent to shift fees
that is not present under the definition of Losses.
Ashland contends that the case law supports the award of attorneys’ fees in the presence
of a hold harmless clause and a broad indemnity clause.69 As set out in Clean Harbors, Inc. v.
Union Pacific Corporation,70 however, this Court noted that it is proper to award such fees
unless there is a provision that “evinces an intent to limit the attorneys’ fees to specific
scenarios.”71 The SPA has such a provision—SPA Section 8.2(c). SPA Section 8.2 talks to the
“Effect of Termination.” Section 8.2(b) requires Ashland to pay a fee if Ashland terminates the
65
Id.
66
GMG Capital Investments, LLC v. Athenian Venture Partners I, L.P., 36 A.3d 776, 779 (Del. 2012).
67
Deere & Co. v. Exelon Generation Acquisitions, LLC, 2016 WL 6879525, at *2 (Del. Super. Nov. 22, 2016).
68
SPA § 8.2(c).
69
See, e.g., Delle Donne & Assoc., LLP v. Millar Elev. Serv. Co., 840 A.2d 1244, 1256 (Del. 2004); Pike Creek
Chiropractic Center, P.A. v. Robinson, 637 A.2d 418 (Del. 1994).
70
2017 WL 5606953, at *6-8 (Nov. 15, 2017).
71
Id., at *7 (reaching conclusion after survey of case law on fee shifting provisions).
14
agreement under Section 8.1(f).72 SPA Section 8.2(c) addresses fee-shifting between Ashland
and the Heyman Defendants if there has been a termination and the Heyman Defendant need to
bring suit to collect the fee. There would be no need to include SPA Section 8.2(c) if the Court
agreed with Ashland’s argument. SPA Section 8.2(c) demonstrates that the parties knew how to
draft specific language to covers fee-shifting.
No facts remain in dispute regarding the SPA indemnification provisions, Section 4(a) of
Schedule 5.19 and SPA Section 7.2(b). The contract language itself controls Ashland’s
entitlement to attorneys’ fees. Therefore, the Court grants the Heyman Defendants’ motion for
summary judgment and denies Ashland’s motion for summary judgment.
VI. CONCLUSION
For the reasons set forth above, the Court GRANTS the Heyman Motion on the claim for
attorneys’ fees and DENIES the Ashland Motion.
Dated: November 10, 2020
Wilmington, Delaware
/s/ Eric M. Davis
Eric M. Davis, Judge