¶1 This retaining wall collapse dispute pits owners Ryan and Holly Baddeley against STI Northwest, Inc., an engineering firm hired by the Baddeleys’ contractor, Gregory Seek, d/b/a Creative Rock Landscaping (CRL). The CRL-STI contract was formed after completion and before wall failure. The purpose was to aid the contractor in obtaining an overlooked building permit. STI opined that the wall appeared sound, and the contractor obtained the permit. The Baddeleys sued STI on various theories after *336the collapse. After the trial court dismissed the Baddeleys’ negligence claim against STI, it entered a second order summarily dismissing the breach of contract, intentional misrepresentation, and negligent misrepresentation claims against STI. Judgment was granted for the contractor’s bond. Then, the Baddeleys appealed the second order, mainly contending the court misapplied the economic loss rule.
Brown, J.*336¶2 Since the Baddeleys did not contract with STI and are not third-party beneficiaries of the contractor-STI contract, they have no contract based claim. Thus, the economic loss rule has no part in this appeal. The Baddeleys also fail to establish the elements for intentional misrepresentation and negligent misrepresentation. Accordingly, we affirm.
FACTS
¶3 In May 2003, the Baddeleys contracted with CRL partly for a retaining wall. In September 2003, Wayne Hammond, the chief building inspector for the city of Liberty Lake, saw the 15 foot high retaining wall for which he had not issued a building permit. He placed a stop work and do not occupy order on the site. Mr. Hammond told CRL it needed to submit plans and a report from a certified engineer in order to obtain a building permit. CRL contracted with STI to conduct a geotechnical evaluation to aid in getting the building permit.
¶4 In October 2003, STI submitted a report to CRL for a proposed plan based on information provided by CRL. Unsatisfied because the report did not match what he had seen, Mr. Hammond required tests. On November 3, 2003, Professional Engineer Paul T. Nelson submitted another report for STI to CRL to review the CRL design “and provide opinions regarding the adequacy of the construction.” Clerk’s Papers (CP) at 98. Mr. Nelson related an engineer had visited the site and partly reported and opined:
At that time two pits were dug near the back of the reinforcement to verify its placement, spacing, and length. We observed *337that the geogrid had been placed at the proper elevations and spacing. We also visually verified the placement spacing by inspecting the face of the wall, where geogrid could be seen between the blocks at the appropriate levels. Visual inspection of the excavation sidewalls indicated very good compaction, as the sidewalls stood vertically.
Based on our design review and site visit, it is our opinion that the retaining wall was adequately designed and constructed. Since the wall has been standing for several months with no visible movement, it is our opinion that it will perform as anticipated in the long term.
CP at 98-99. Mr. Hammond issued the permit based on the report and Mr. Nelson’s certification of the project.
¶5 The wall then failed, forcing dismantlement. Zan Munyan, a deconstruction worker, noticed minimal geogrid connected to the rounded corners, some unconnected geogrid, and geogrid on three wall sides placed in just one row. Mr. Munyan noticed “[n]o small pieces of geogrid were placed or inserted between blocks to make it appear to an observer looking at the face of the wall that geogrid was present.” CP at 439.
¶6 The Baddeleys sued Mr. and Mrs. Seek, d/b/a CRL; their bonding company, Gulf Insurance; STI; and Mr. Nelson. The claims against STI were professional negligence, breach of contract damaging a third-party beneficiary, and negligent and/or intentional misrepresentation. The trial court first summarily dismissed the negligence claim against STI, and it later dismissed the remaining claims. The Baddeleys received judgment for the $6,000 bond, and then they appealed.
ANALYSIS
A. Intentional Misrepresentation
¶7 The issue is whether, considering the necessary elements, the trial court erred in summarily dismissing the Baddeleys’ intentional misrepresentation claim.
*338¶8 We review summary judgment orders de novo.1 Korslund v. DynCorp Tri-Cities Servs., Inc., 156 Wn.2d 168, 177, 125 P.3d 119 (2005). Summary judgment is appropriate when the facts and reasonable inferences, viewed in the light most favorable to the nonmoving party, establish no remaining genuine issue of material fact and the moving party is entitled to judgment as a matter of law. Id. Once the moving party shows no genuine fact issue remains, the burden shifts to the nonmoving party to raise a genuine issue of material fact. Vallandigham v. Clover Park Sch. Dist. No. 400, 154 Wn.2d 16, 35, 109 P.3d 805 (2005). A fact is not reasonably disputed if a reasonable person could reach but one conclusion about the given facts, permitting summary judgment. Korslund, 156 Wn.2d at 177.
¶9 Like the trial court, we determine if the parties have met the burden of production. Barker v. Advanced Silicon Materials, LLC, 131 Wn. App. 616, 624, 128 P.3d 633, review denied, 158 Wn.2d 1015 (2006). The burden of production prohibits us from weighing the credibility of witnesses or evaluating the persuasiveness of the evidence. Id. Deciding evidence persuasiveness is the jury’s role. Id.
¶10 Many outside jurisdictions have held the economic loss rule does not bar fraud. See R. Joseph Barton, Drowning in a Sea of Contract: Application of the Economic Loss Rule to Fraud and Negligent Misrepresentation Claims, 41 Wm. & Mary L. Rev. 1789,1830 (2000). A plaintiff may plead and prove all nine elements of fraud or, in the alternative, may show that the defendant breached an affirmative duty to disclose a material fact. Stiley v. Block, 130 Wn.2d 486, 515-16, 925 P.2d 194 (1996) (Talmadge, J., concurring). The nine fraud elements are (1) a representation of an existing fact, (2) the fact is material, (3) the fact is false, (4) the defendant knew the fact was false or was *339ignorant of its truth, (5) the defendant intended the plaintiff to act on the fact, (6) the plaintiff did not know the fact was false, (7) the plaintiff relied on the truth of the fact, (8) the plaintiff had a right to rely on it, and (9) the plaintiff had damages. Baertschi v. Jordan, 68 Wn.2d 478, 482, 413 P.2d 657 (1966). The plaintiff must show every element by clear, cogent, and convincing evidence. Id. at 483.
¶11 Here, the record does not show STI intended the Baddeleys to act on any fact. STI rendered a professional opinion to CRL regarding the soundness of CRL’s design and construction of the retaining wall. While opining, STI merely reviewed the factors it considered in reaching its opinion. STI’s opinion was given to CRL, and in turn to the building inspector, to further CRL’s effort to obtain a building permit. STI stated to Mr. Seek: “The purpose of the evaluation was to review the design and provide opinions regarding the adequacy of the construction.” CP at 98. No evidence shows that STI gave the Baddeleys the opinion or that they were aware of the report until after its delivery to Mr. Seek and the building inspector. Thus, the Baddeleys fail to show the necessary intent element. Accordingly, the Baddeleys’ intentional misrepresentation claim must fail. Baertschi, 68 Wn.2d at 483.
B. Negligent Misrepresentation
¶12 The issue is whether the trial court erred in summarily dismissing the Baddeleys’ negligent misrepresentation claim. Since no contract relationship exists between STI and the Baddeleys, the economic loss rule does not apply.
¶13 To establish negligent misrepresentation, a plaintiff must show by clear, cogent, and convincing evidence that the defendant negligently supplied false information the defendant knew, or should have known, would guide the plaintiff in making a business decision, and that the plaintiff justifiably relied on the false information. Lawyers Title Ins. Corp. v. Baik, 147 Wn.2d 536, 545, 55 P.3d 619 (2002); Restatement (Second) of Torts § 552(1) *340(1977). In addition, the plaintiff must show that the false information was the proximate cause of the claimed damages. Id.
¶14 This record does not show that STI made any representations to the Baddeleys, that they knew about the CRL-STI contract, or that the Baddeleys justifiably relied on STI’s information. In essence, the Baddeleys’ negligent misrepresentation claim now appears to be an attempt to breathe new life into their professional negligence claim, which was dismissed and has not been appealed. In short, the Baddeleys fail to make a prima facie showing of negligent misrepresentation. Therefore, the trial court properly dismissed this claim and did not err.
¶15 Affirmed.
Kato, J. Pro Tem., concurs.
STI’s motion to dismiss was brought under CR 12(b)(6) and CR 56. Because the trial court considered evidence outside of the complaint in reaching its decision, dismissal was pursuant to CR 56 and, thus, review will be under CR 56. Haberman v. Wash. Pub. Power Supply Sys., 109 Wn.2d 107, 120-21, 744 P.2d 1032, 750 P.2d 254 (1987).