B.N. Excavating, Inc. v. PBC Hollow-A, L.P.

OPINION BY BOWES, J.:

B.N. Excavating, Inc. (“Appellant”) appeals the trial court order wherein the court sustained the preliminary objections in the nature of a demurrer filed by PBC Hollow-A, L.P. and PBC Hóllow-B, L.P. (“Appellees”), struck Appellant’s complaint for.a mechanics’ lien, and dismissed the mechanics’ lien claim with prejudice. After careful review, we reverse and remand.

*276The trial court succinctly summarized the relevant facts and procedural history as follows:

[Appellant] filed a mechanics’, lien claim on or about June 8, 2009 in the amount of $118,670.71 against property and improvements owned by [Appellees] and known as Providence Business Park, West, Phase II, and located at 571 and 575 Hollow Road, Phoenixville, PA, 19460 (“Property”). The Property is owned by [Appellees]. [Appellant] filed a Complaint in Action upon Mechanics’ Lien on August 10, 2009. [Appellant’s] Mechanics’ Lien claim arises from work allegedly performed by [Appellant] as subcontractor at the property pursuant to a contract between [Appellant] and Warihay Enterprises, Inc., which served as [Appellees’] general contractor. [Appellant] claims that it entered into a contract with Warihay to provide “labor and materials for excavation work, including but not limited to, a silt fence, temporary riser, emergency spillway, topsoil stripping, cut and fill, concrete pipe, sub-grading for building pad, storm water bed, rock ribbing and other site work.” [Appellant] claims that it completed its work on the property on December 18, 2008, and filed its Mechanics’ Lien claim within six (6) months of completion of the work. [Appellees] filed Preliminary Objections to the Complaint on the Mechanics’ Lien on August 31, 2009. [Appellant] answered the Preliminary Objections on September 14, 2009. After memoranda of law were filed, oral argument on the Preliminary Objections was heard on May 14, 2010, after which [the trial court] sustained [Appellees’] Preliminary Objections.

Trial Court Opinion, 8/2/10, at 1-2 (internal citations omitted).

Appellant filed a timely notice of appeal and complied with the trial court’s order to file a concise statement of errors complained of on appeal pursuant to Pa.R.A.P. 1925(b). A three-judge panel of this Court reversed the order sustaining. Appellees’ demurrer, ruling that it did not appear with certainty that the law precluded recovery. En banc review of that panel decision was granted, and the matter is now ready for disposition. Appellant raises' two issues.

1. Whether the trial1 court erred in sustaining [Appellees’] Preliminary Objections and striking Appellantf’s] ... Lien Claim based on disputed facts regarding whether the work was incidental to the erection or construction of an improvement, and without receiving evidence on the issue.
2. Whether the trial court erred in concluding that the work performed by [Appellant] was not incidental to the erection or construction of an improvement.

Appellant’s brief at 4.

In sustaining Appellees’ preliminary objections, the trial court concluded that our reasoning in Sampsom-Miller Associated Companies v. Landmark Realty Co., 224 Pa.Super. 25, 303 A.2d 43 (1973), barred Appellant’s mechanics’ lien for the excavation performed incident to the planned construction because Appellees averred that a structure was never erected. In Sampsowr-Miller, this Court employed a strict construction of the Mechanics’ "Lien Law to hold" that the plain words of the Mechanics’ Lien Law established that “no lien can attach to land for work unconnected to the construction of a building.”1 Id. *277at 46. In reaching this conclusion, the Sampson-Miller Court first considered the statutory definition of erection, construction, alteration, or repair pursuant to 49 P.S. § 1201(12)(a), which included, inter alia, excavation “when such work is incidental to ... erection, construction, alteration or repair.” See 49 P.S. § 1201(12)(a).2 Significantly, the Court then observed, that the General Assembly intended to differentiate between situations where groundwork is performed incidental to construction as opposed to when groundwork is performed independent from construction. Sampson-Miller, supra at 45.

Appellant’s first argument challenges the trial court’s singular reliance upon Ap-pellees’ allegation that, “There is no building or structure of any type on the Property,” in order to sustain the preliminary objection. See Appellees’ Preliminary Objection at 4; Trial Court Opinion, 8/2/10, at 3. Appellant disputes the status of the property and contends that the trial court ignored reasonable inferences in the mechanics’ lien claim and complaint that established that the work was performed incidental to the erection or construction of an improvement. Appellant continues that since the matter turns upon what is essentially a question of fact, the • trial court dismissed its claim prematurely without first constructing a factual record to support its decision. Upon review of the pleadings in the certified record, we agree with Appellant that the trial court erred in sustaining the demurrer based upon the assertion leveled in Appellees’ preliminary objections.' ■'

We reiterate our standard of review of an order sustaining a. demurrer as follows:

When reviewing the dismissal of a complaint based upon preliminary objections in the nature of a demurrer, we treat as true all welbpleaded. material, factual averments and all inferences fairly deducible therefrom. Where the preliminary objections will result in the dismissal of the action, the objections may be. sustained only in cases that are clear ánd free’ from doubt. To be clear and free from doubt that dismissal is appro*278priate, it must appear with certainty that the law would not permit recovery by the plaintiff upon the facts averred. Any doubt, should be resolved by a refusal to sustain the objections. Moreover, we review the trial court’s decision for an abuse of discretion or an error of law.

Ira G. Steffy & Son, Inc. v. Citizens Bank of Pennsylvania, 7 A.3d 278, 282-283 (Pa.Super.2010) (quoting Burgoyne v. Pinecrest Community Ass’n, 924 A.2d 675, 679 (Pa.Super.2007)). A demurrer should be sustained only when the complaint is clearly insufficient to establish the pleader’s right to relief. Ellenbogen v. PNC Bank, 731 A.2d 175, 181 (Pa.Super.1999).

Thus, in order to review Appellees’ demurrer properly; the trial court was required to determine whether the law precluded recovery notwithstanding Appellant’s well-pleaded factual' averments and all reasonable inferences that could be drawn therefrom. Instantly, Appellant’s pleadings and attached documentation aver that it performed the excavation and preparation of building pads in accordance with Appellees’ planned construction of two buildings. Specifically, Appellant’s mechanics’ lien claim referenced exhibits that included (1) the proposal/contract for “Providence Business Park West Phase 2;” (2) invoices for the performance of work including, inter alia, the creation of a construction entrance and sub-grading for two building pads; and (3) the formal notice of intention to file a mechanics’ lien claim for “excavation and site work for improvements to Providence Business Park-West Phase 2.” See Mechanics’ Lien Claim, 6/8/09, Exhibits B-D. Thereafter, Appellant attached the Mechanics’ Lien Claim and' the identical supporting documentation to the Complaint it filed on August 10,' 2009. See Complaint in Action Upon Mechanics Lien Claim, 8/10/09. However, as noted supra, instead of applying the proper review of Appellees’ demurrer, the trial court ignored the assertions Appellant actually leveled in both the mechanics’ lien claim and the complaint in action upon the mechanics’ lien claim. Instead, the trial court'based its decision to dismiss the lien upon a single disputed averment in Appellees’ preliminary objections.3 The trial court’s misapplication of the law constitutes reversible error.

Upon review of the pleadings and supporting documentation, we find that the reasonable inference drawn from Appellant’s factual averments is that Appellant performed its excavation incidental to the proposed construction of the two-building project that Appellees failed to complete. See Ira G. Steffy & Son, Inc., supra at 282 (“When reviewing the dismissal of a complaint based upon preliminary objections in the nature of a demurrer, we treat as true all well-pleaded material, factual aver-ments and all inferences fairly deducible therefrom.”).

In view of the learned dissent’s position that we misapplied our standard and scope of review in this case, we highlight that “In determining whether the trial court properly sustained preliminary objections, the appellate court must examine the averments in the complaint, together with the documents and. exhibits attached thereto ...” See Foster v. UPMC *279South Side Hospital, 2 A.3d 655, 662 (Pa.Super.2010)(quoting Lugo v. Farmers Pride, Inc., 967 A.2d 968, 966 (Pa.Super.2009) (emphasis added)). Inasmuch as the foregoing references to Appellant’s pleadings establish Appellant’s assertion that it performed excavation incidental to the proposed construction, the certified record refutes the dissent’s repeated protestations that the pleadings are insufficient. While the dissent purports to express no opinion about the vitality of our holding in Sampsorir-Miller, supra, the dissent’s position that Appellant failed to allege that a structure actually existed is founded, at least implicitly, upon its interpretation of the Sampsorir-Miller Court’s holding that “no lien can attach to land for work unconnected to the construction of a building.” Id. at 46. However, nothing in the Mechanics’ Lien Law requires that a structure actually exist. While the Mechanics’ Lien Law states that “improvements] and the estate or title of the owner to the property shall be subject to a lien[,]” and includes buildings and structures in the definition of improvements, as we explain at length infra, the Mechanics’ Lien Law expressly provides that property is lienable for excavation performed incidental to the erection or construction of an improvement. See 49 P.S. §§ 1301, 1201(1), (12)(a).

As highlighted by Appellant’s pleadings, the certified record belies the trial court’s factual determination that the status of the property was undisputed. We addressed a similar issue in Morehall Contracting Co., Inc. v. Brittany Estates Ltd., 396 Pa.Super. 265, 578 A.2d 508 (1990), and concluded that the trial court erred in sustaining a developer’s demurrer to a mechanics’ lien claim due to uncertainty regarding whether the subcontractor performed site work incidental to the erection of an improvement and whether the improvement had in fact been erected. In that case, the subcontractor alleged, inter alia, that it “furnished labor and materials used in the erection, and/or construction of ... a housing development known as ‘Brittany Estates’ ...” Id. at 510. In granting the developer’s demurrer, the trial court found that the groundwork identified in the subcontractor’s complaint was unrelated to the erection or construction of an improvement pursuant to § 1201(12)(a), apparently because the subcontractor did not assert that a building was erected. We reversed, finding that the subcontractor’s factual averments were sufficient to establish his right to relief. Specifically, we reasoned

The key question, then, is whether these above-mentioned factual averments shovi that any construction actually took place at Brittany Estates.' The answer to this question is unclear because the language of the complaint gives rise to two equally plausible interpretations. The first possible interpretation is that the language above is merely a general reference to the development plan of Brittany Estates, containing no averment that structures were actually constructed on the site. This is the interpretation relied upon by the court below. The second interpretation, however, is that the language means what it literally states: ie., that appellant performed work “used in the erection and construction of .:. a housing development known as Brittany Estates.” We rtecog-nize that the court’s interpretation of the complaint is plausible, and that the complaint may not be as specific as it could, or should be. However, because reason- . able minds might differ regarding the interpretation of this language, we cannot hold that appellant has “clearly and without, a doubt” failed to allege sufficient facts to establish his right to relief. The trial court, therefore, erred in *280granting appellee’s preliminary objections and dismissing appellant’s complaint.

Id. at 510-511 (emphasis in original). Accordingly, we remanded the case for further proceedings.

Alert to our standard of review and mindful of the trial court’s obligation to view Appellant’s factual averments and reasonable inferences as true, we cannot find that a sufficient record existed to sustain Appellees’ demurrer and dismiss Appellant’s claim. As this case is not clear and free from doubt, dismissal was not warranted. See Ira G. Steffy & Son, Inc., supra at 283 (“Any doubt should be resolved by a refusal to sustain the objections”). Considering that our Supreme Court previously sustained a mechanics’ lien claim including the excavation of cellars and foundations, it is possible that Appellant’s evidence regarding the site preparation and sub-grading of two building pads in the case at bar might provide a sufficient basis to attach a lien claim. McCristal v. Cochran, 147 Pa. 225, 23 A. 444, 445 (1892) (claim for digging cellars and foundations is clearly part of erection and construction of new building). Similarly, Appellant’s installation of a storm-water bed and emergency spill way might constitute alterations or repairs to existing buildings in Appellees’ business park. Accordingly, an issue of fact exists which must be explored in an evidentiary proceeding.

Next, we address Appellant’s contention that the groundwork it performed was, in fact, incidental to the erection or construction of an improvement notwithstanding the trial court’s interpretation of our holding in Sampson-Miller. Sitting en banc, we take this opportunity to revisit that decision and we hold that, to the extent Sampson-Miller has been construed as creating a bright-line rule that a mechanics’ lien can never attach to land absent an erected structure, this Court disagrees with the holding. We do not interpret Section 1201(a)(12) as equating the phrase “incidental to the erection [or] construction” with the requirement that a structure actually exist, particularly where, as here, excavation clearly was performed in preparation for planned construction.

Our review of this issue requires that we interpret the meaning of the term “incidental” and determine whether excavation and site preparation performed as an integral part of an unfulfilled construction plan fell within the statutory definition of erection, construction, alteration or repair pursuant to 49 P.S. § 1201(12)(a). The following legal principles are pertinent to our review. Under Pennsylvania jurisprudence, á mechanics’ lien attaches to a building primarily and encumbers the appurtenant land only as a consequence of the building’s location. See Presbyterian Church v. Stettler, 26 Pa. 246, 1856 WL 7081, *1 (1856) (“The equity of a mechanics’ lien upon a building, is founded upon the labour and materials furnishéd by him in constructing it. That the land on which the building stands goes with the building ... is the result of necessity, because the building cannot be enjoyed without it.”). Thus, it is beyond argument that a mechanics’ lien cannot attach to land that is wholly unrelated to the construction of a permanent structure. However, this case is not about whether groundwork performed independent of construction can be the basis of a mechanics’ lien. Instead, we must confront the more difficult question concerning whether land is lienable for groundwork and site preparation performed as an integral part of a planned construction process even if construction never occurred. For the following reasons, we find that it is.

*281The genesis of the proposed requirement that a structure must exist in order for a mechanics’ lien to protect preliminary-site work stems, from the Sampson-Miller Court’s review of the mechanics’ lien statutes that preceded our 1963 law, a past provision in the Pennsylvania Constitution of 1874 that prohibited the General Assembly from broadening the scope of lien rights beyond what existed when the Constitution was adopted, and several cases that interpreted the earlier statutes.4 Id. at 43-44, 45. That Court found that the law protected preliminary site work that was “connected to, and an integral part of’ construction. Id. at 45. After compiling those cases, which addressed matters ranging from engineers’ liens for services associated with the construction of a manufacturing facility to the erection of permanent outbuildings at- oil refineries,5 the Sampson-Miller Court noted, “In no case, however, has a lien been allowed' for work on land alone where no building or permanent structure is erected.” Id. at 45-46. It then affirmed the trial court’s holding that “no lien can attach to land for work unconnected to the construction of a building.” Id. -at 46 (emphasis added).

In reaching its decision, the Sampson-Miller Court employed a narrow interpretation of the phrase “incidental to the erection, construction, alteration or repair” in order to fashion a requirement that a structure must exist in order for a mechanics’ lien to attach to property that was improved by preliminary groundwork— even- where the excavation was performed as an integral part of a construction plan. This point of view has at least two flaws. First, the interpretation conflicts with another section of the Mechanics’ Lien Law relating to the “Right to lien in case of noncompletion of work[.]” See 49 P.S. § 1305. That provision explains, “[ejxcept in case of destruction by fire or other casualty, where, through no fault of the claimant, the improvement is not completed, the right to- lien shall nevertheless exist.” 49 P.S. § 1305. Herein, Appellant completed performance of its excavation work on December 18, 2008, and through no fault of its own, Appellees failed to complete the planned improvement. Accordingly, since the statutory definition of “improvement” includes a structure, see 49 P.S. § 1201(1), pursuant to § 1305, Appellant’s “right to lien shall nevertheless exist” even though a structure never was erected.

Second,. notwithstanding the Sampson-Miller Court’s constricted view of the term “incidental,” the plain meaning of the word does not compel such a categorical result. Webster’s Desk Dictionary of the English *282Language 457 (1990) defines “incidental,” in relevant part, as “happening in ... subordinate conjunction with something else.” Similarly, Black’s Law Dictionary 765 (7th ed. 1999), defines “incidental” as “Subordinate to something of greater importance; having a minor role.” These definitions illustrate that the term “incidental” does not speak to the issue that the Sampsonr-Miller Court suggests.

Nevertheless, the Sampsonr-Miller Court effectively curtailed the accepted everyday definition of “incidental” and it applied a bright-line rule requiring actual construction when the statute does not call for it. While the Court lamented the inequities inherent in its perspective of the law and implored the legislature to amend the wording of the statute, ostensibly to employ a more liberal phrase than “incidental to,” no amendment is needed when we actually utilize the plain language of the statute. The Mechanics’ Lien Law requires only that excavation and other preliminary groundwork occur in conjunction with the erection, construction, or repair of a structure rather than as an independent, unconnected improvement to the land. The statute does not demand that the erection, construction, or repair be completed. The plain language of the law simply requires excavation and preliminary groundwork to be connected to a structure and not merely an independent improvement.

Moreover, the cases that the Sampson-Miller Court relied upon for its holding failed to address the precise issue that controls our review of the case at bar. In point of fact, structures were erected in each of those cases and the pertinent issues therein were far removed from the issue controlling the present case. See e.g. Alan Porter Lee, Inc. v. Du-Rite Products Co., 366 Pa. 548, 79 A.2d 218 (1951) (limiting mechanics’ lien by engineer to services for supervision of construction rather than merely planning and designing construction); Yearsley v. Flanigen, 22 Pa. 489 (1854) (if included in contract for construction, work for laying of pavement may be included in mechanics’ lien; however, no lien attaches for pavement under separate contract); Short v. Miller, 120 Pa. 470, 14 A. 374 (1888) and Short v. Ames & Kees, 121 Pa. 530, 15 A. 607 (1888) (permitting lien for erection of permanent outbuildings associated with oil refineries); Kinsinger v. Keasbey & Mattison Co., 193 Pa.Super. 383, 165 A.2d 107 (1960) (disallowing lien for installation of mechanical controls in fencing). In fact, our review of the case law relied upon by Sampsonr-Miller did not reveal a single ease that actually articulated the proposed “expressions of the intentions of the legislature” that the Court ultimately felt constrained to follow in order to bar the complainant’s lien claim. Sampsonr-Miller, supra at 46. At most, those cases support the uncontested proposition that a mechanics’ lien must be connected to the construction of a building. Thus, to the extent the Sampsonr-Miller Court cited case law to bolster its ultimate position, that discussion is not enlightening.

Instantly, Appellant alleged that it performed its excavation and site work as part of a planned two-building construction project. In contrast to the facts underlying the case at bar, we observe that the relevant facts in Sampsonr-Miller did not reveal whether the excavation performed therein was part of planned construction or whether it was a completely independent improvement to the land. While it is certain from the Sampson-Miller Court’s recitation of the facts that no structure ever was erected in that case, it is unclear whether the site work was incidental to or independent of any planned construction. As we previously observed, if the grading and excavation was performed indepen*283dent of a construction plan, then it is beyond cavil that the excavation did not fall, within the parameters of 49 P.S. § 1201(12)(a). However, the facts of the current case prevent us from resolving it as straightforward as the Sampson-Miller Court disposed of that case. Although Appellees advocate that we employ a general reading of Sampson-Miller and dismiss the lack of factual clarity in that case as irrelevant, we are compelled to confront the troubling nuances because they affect the precise issue controlling the outcome of this case, i.e., whether the statutory phrase “incidental to erection” requires that a structure actually be built when the work clearly was performed incident to planned construction. Due to the unclear factual scenario, we read the Sampson-Miller Court’s interpretation of the Mechanics’ Lien Law against the established facts of that case. See Oliver v. City of Pittsburgh, 608 Pa. 386, 11 A.3d 960, 966 (2011) (“various principles governing judicial review protect against [an untenable slippage in the law], including the axiom that the holding of a judicial decision is to be read against its facts”). Hence, we now clarify that where, as here, excavation is performed as an integral part of a construction plan, the activity falls within 49 P.S. § 1201(12)(a) regardless of whether a structure is ever erected.6

Our holding is consistent with the rationale we employed in Dollar Bank, FSB v. EM2 Development Corp., 716 A.2d 671, 673 (Pa.Super.1998), wherein we revisited the issue concerning whether excavation and site preparation was incidental to construetion pursuant to Section 1201(12)(a), and we tempered the perspective contained in Sampson-Miller. In contrast to the bright-line rule that the trial court herein derived from the Sampsonr-Miller Court’s holding, in Dollar Bank, we held that when excavation and related site work is performed as part of a “continuous scheme to erect” a structure, the Mechanics’ Lien Law would permit the lien to attach. Id. at 673.7 While Dollar Bank was decided on a full factual record, a luxury we do not enjoy in this case, our refinement therein of the Sampson-Miller Court’s principles is instructive.

In Dollar Bank, the Toscano Development Corporation purchased thirty undeveloped lots, excavated the land, and installed sewer lines and other infrastructure. Id. at 671. EM2 Development purchased one of the lots in order to build a house. Dollar Bank financed the - purchase and construction, and it recorded the mortgage. Id. at 672. During the construction, EM2 Development entered into a contract with Allegheny Millwork to provide finishing materials. .Id. However, EM2 Development failed to pay for the materials, and Allegheny Millwork filed a mechanics’ lien. Id. Thereafter, Dollar Bank foreclosed on the property and acquired the land at a sheriffs sale, which extinguished the mechanics’ lien. Id. at 672. Allegheny Millwork then moved to set aside the sheriffs sale, arguing that the mechanics’ lien had priority over the *284bank’s mortgage. The trial court rejected Allegheny Millwork’s position. Id. ■

Pursuant to § 1508 of thé Mechanics’ Lien Law of 1963, as amended, mechanics’ liens take priority from the date of visible commencement of new construction. In Pennsylvania, “[t]he excavation for the foundation of the new structure is the accepted test of its commencement, to which mechanics’ liens relate.” Pusey & Jones v. Pennsylvania Paper Mills, 173 F. 634, 647 (C.C.M.D.Pa.1909). Indeed, since 1901, Pennsylvania jurisprudence has recognized the significance of excavation and other site preparation performed in connection with construction. See 49 P.S. § 1201 Comment-Joint State Gov’t Commission, Subdivision (12), Subsection (a). Thus, on appeal, we confronted the issue of whether the mechanics’ lien took effect when Toscano began its excavation, which would have preceded the mortgage, or on the date EM2 Development began construction.

In order to resolve the salient issue in Dollar Bank, we analyzed whether the site work Toscano performed prior to EM2 Development’s purchase qualified as erection or construction pursuant to Section 1201(12)(a). Upon review of the facts therein, we concluded that the excavation was not incidental to construction “as evidenced by the fact that the work was' not performed as part of a continuous scheme to construct a home.” Id. at 673. Significantly, we reasoned that when Toscano performed the excavation, it was not engaged in home building, but rather, it was selling the improved lots: Id.

While the procedural posture of that case is not directly on point with the limited facts contained in the pleadings herein, the analysis we’employed in Dollar, Bank is applicable to the case sub judice. Herein, Appellant’s excavation of the construction site, sub-grading of two building pads, and its construction of an underground storm water system to service the planned buildings was a necessary precedent to Appellees’ plan to erect two industrial buildings on its property. Appellees’ structures could not be erected until Appellant first graded the land and prepared the building pads. In contrast to groundwork that lacks any connection with construction and the property development that Toscano engaged in Dollar Bank, Appellant’s performance in this case was essential to the scheduled erection of two new buildings and not simply the independent grading and clearing of a site merely for the sake of improving the land. In fact, the groundwork Appellant performed on the selected site was so linked with the planned erection of Appellees’ two new buildings as to become an essential part of the continuous construction operation. Hence, we find that when Appellant performed its excavation and related site improvements in preparation for construction on Appellees’ property, it performed acts incidental to construction or erection pursuant to section 1201(12)(a). Simply stated, unlike the character of the landscaping activities we addressed in Parkhill, supra, which were neither connected with nor necessary to the construction of a building, the groundwork Appellant performed herein was incidental to construction. Accordingly, in contrast to the trial court, we are not persuaded that the Mechanics’ Lien Law precluded Appellant from obtaining relief under the facts of this case, especially in light of the principle that excavation is the accepted test to determine the commencement of construction. Dollar Bank, supra; Pusey & Jones, supra at 647.

Two decisions from the South Carolina Court of Appeals illustrate the key difference between circumstances where ex*285cavation and preliminary, site work is performed incidental to construction and situations where the work is performed independent of construction. South Carolina’s Mechanics’ Lien Law extends to excavation and other “work of making the real estate suitable as a site for the building or structure.” See S.C.Code Annotated § 29-5-10. In Clo-Car Trucking Co. v. Glifflure Estates of South Carolina, Inc., 282 S.C. 573, 320 S.E.2d 51 (App.1984), the South Carolina Court of Appeals considered whether a mechanics’ lien can exist if a structure for which site work was performed was never erected. In answering this question negatively, the court found no indication that the clearing and grading was performed in connection with the construction of a building. Id. at 52-53. Hence, citing, inter alia, Sampson-Miller, supra, the Court of Appeals held, “a mechanic’s lien cannot attach to land or to an owner’s interest in land where the work done is unconnected with and forms no integral part of the erection, alteration, or repair of either a building or a structure of some description.” Id. at 54.

Later, in A.V.A. Construction v. Santee Wando Construction, 303 S.C. 333, 400 S.E.2d 498 (App.1990), the Court of Appeals reversed the trial court’s reliance upon Clo-Car Trucking Co. to dismiss a contractor’s mechanics’ lien because no building or structure had been erected on the property that it had cleared, graded, paved, and installed a drainage system. In distinguishing the relevant facts in that case from Clo-Car Trucking Co., the Court of Appeals noted that, unlike the excavation and site work performed in Clo-Car Trucking Co., it was clear from the record in A.V.A. Construction that the work was performed in anticipation of the planned construction of a residential subdivision. Id. at 499-500. Thus, viewing the cases together, the South Carolina Court of Appeals applied the precise framework that applies to the case at bar. As noted supra, where, as here, the facts of the .case indicate present or planned construction, the Mechanics’ Lien Law would apply. See also Carroll Contracting Co. v. Newsome, 201 Mo.App. 117, 210 S.W. 114 (1918) (lien permitted for excavating cellar and foundation of building although building was not completed); Green v. Reese, 261- P.2d 596 (Okla.1953) (labor performed in leveling and- building up certain vacant lots for future construction of building is lienable).

In light of the statutory definitions within 49 P.S. § 1201(12)(a) and the averments contained in the complaint, it does not appear with certainty that the law precludes Appellant’s recovery. Accordingly, we reverse the trial court’s order wherein it sustained Appellees’ demurrer and dismissed Appellant’s mechanics’ lien with prejudice, and we remand for further proceedings.

Order reversed and case remanded'. Jurisdiction relinquished.

Judge MUNDY files a Dissenting - Opinion in which Judge PANELLA and Judge LAZARUS join.

. In Bricklayers of Western Pennsylvania Combined Funds, Inc. v. Scott's Development Co., 41 A.3d 16 (Pa.Super.2012) (en banc), appeal granted,-Pa.-, 58 A.3d 748 (2012), this Court abrogated the Sampson-Miller Court’s oft-cited position that the Mechanics' Lien *277Law of 1963 should be strictly construed. We reasoned that the Sampson-Miller Court crafted the strict construction rule in contravention of § 1928(c) of the Statutory Construction Act. 1 Pa.C.S. § 1928(a). However, a close inspection of the Bricklayers Court’s rationale reveals that our specific justification for abrogating the rule of strict construction pursuant to 1 Pa.C.S. § 1928(c) is not applicable as it relates to the portion of the statute that is relevant to the case at bar. In reaching its decision, the Bricklayers Court recognized that statutes that essentially were reenactments of a repealed law that' had existed prior to 1937 retained and preserved their preexisting judicial interpretations. Bricklayers, supra at 25-26. While we ultimately held that the Mechanics’ Lien Law of 1963 was not tantamount to a reenactment of the Mechanics' Lien Law of 1901, the section of the Mechanics' Lien Law of 1963 relevant to both Sampson-Miller and our discussion herein, 49 P.S. § 1201(12)(a), was not only adapted from the Mechanics' Lien Law of 1901, it was specifically intended to retain the then-existing decisional law. See 49 P.S. § 1201 Comment-Joint State Gov’t Commission, Subdivision (12); Sampson-Miller, supra at 45. Nevertheless, our ultimate determination herein is not dependent upon the Bricklayers Court’s characterization of Sampson-Miller because we would arrive at the same conclusion employing either strict or liberal construction.

. The pertinent definitions have remained unchanged since the 1963 enactment. Section 1201(12)(a) provides as follows:

(12) "Erection, construction, alteration or repair” includes:
(a) Demolition, removal of improvements, excavation, grading, filling, paving and landscaping, when such work is incidental to the erection, construction, alteration or repair[.]

49 P.S. § 1201(12)(a).

. In accepting the averment in Appellee's preliminary objection as true,, the trial court overlooked the countervailing position contained in Appellant’s response to the preliminary objections wherein it specifically denied Appellees’ factual averment and stated, inter alia, “[Appellant’s] work was in preparation for the erection of a structure.” See Appellant’s Answer to Preliminary Objections, 9/14/09, at 3.

. In Parkhill v. Hendricks, 53 Pa.Super. 9, 1913 WL 4630, *1 (1912), this Court declared the 1901 Mechanic’s Lien Law unconstitutional and unenforceable insofar as it author- • . ized a lien for "grading and sodding lawns or planting and guarding shade trees” since that activity was not connected to construction of a building and because the right to such a lien did not exist prior to the adoption of the Constitution of 1874. Specifically, we explained.

Such work surely cannot be said to come within the provisions of the act of 1836, which contemplates only work done or materials furnished for or about the erection or construction of buildings. The work for which claim is here made was not done nor was the material furnished for or about the construction of the building, nor can it be sáid to be necessary thereto, as the building might very well be complete without it.

Id. The relevant constitutional provision was repealed in 1967.

. E.g., Alan Porter Lee, Inc. v. Du-Rite Products Co., 366 Pa. 548, 79 A.2d 218 (1951); Yearsley v. Flanigen, 22 Pa. 489 (1854); Short v. Miller, 120 Pa. 470, 14 A. 374 (1888); Short v. Ames & Kees, 121 Pa. 530, 15 A. 607 (1888); Kinsinger v. Keasbey & Mattison Co., 193 Pa.Super. 383, 165 A.2d 107 (1960).

. Although neither party, nor the trial court, nor the Sampson-Miller Court, discusses our holding in Alguire v. Keller, 68 Pa.Super. 279 (1917), to the extent that this Court applied a similar categorical approach in that case in order to preclude a mechanics' lien claim for excavation under the Mechanics’ Lien Law of 1901, we expressly overrule that case. See Wheeler v. Johns-Manville Corp., 342 Pa.Super. 473, 493 A.2d 120, 122 (1985) (between conflicting en banc decisions, most recent holding is precedential).

. We repeated the "continuous scheme” principle in City Lighting Products Co. v. Carnegie Institute, 816 A.2d 1196 (Pa.Super.2003), albeit in a different context.

. These included invoices for a construction entrance, a skimmer, silt fencing, a temporary riser, an emergency spillway, concrete piping, labor to strip topsoil, cut and fill structures, subgrade building pads, an underground storm water bed and rip rock. Appellant's -Mechanics’ Lien Claim, 6/8/09; at Exhibit C.