OPINION ON REHEARING
BILL MEIER, JUSTICEAppellant Lindemann Properties, Ltd. filed a motion for rehearing and a motion for en banc reconsideration of our opinion that issued on December 8, 2016. We deny both motions, withdraw our opinion and judgment dated December 8, 2016, and substitute the following.
I. Introduction
Lindemann sued Appellee Ward A. Campbell for a declaration that Campbell’s radio-transmission-tower easement terminated when he removed the original tower and replaced it with a new one. The trial court ultimately signed a take-nothing judgment in favor Campbell, concluding that the easement had not terminated, and awarded him attorney’s fees. In what we construe as three issues, Lindemann challenges the trial court’s findings and conclusions regarding the easement, the denial of its related request for injunctive relief, and the award of attorney’s fees. We will affirm in part and reverse and remand in part,
II. Background
On March 7, 1977, Howell E. Smith d/b/a Muleshoe Cattle Company granted, sold, and conveyed to Campbell’s father, A.O. Campbell, Jr., “an easement or right for the installation of a radio-transmission tower, consisting of the tower itself and guy wires as necessary to support the same.” The easement expressly granted the following rights:
Together with the right of ingress and egress over my adjacent lands to or from said easement for the purpose of inspecting, maintaining, constructing and removing said radio transmission tower and appurtenances.
TO HAVE AND TO HOLD the above described easement and rights unto the *876said A.O. Campbell, Jr., his successors and assigns, perpetually, until said radio transmission tower shall be abandoned and/or removed.
The easement did not specify the tower’s height or size, but it stated the following regarding its location:
Said radio transmission tower will be located on a tract 500 feet by 500 feet, the center of which to be determined by the actual location when installed on the following tract of land located in the County of Archer, State of Texas, to-wit:
Situated on Lot No. One (1), Block No. Seventy-five (75) ATNC Subdivision, Archer County, Texas.
Grantor recognizes that the general location as above described is based on a preliminary survey only and hereby agrees the easement hereby granted shall apply to the actual location of said radio transmission tower when located,
The original tower was built in 1977 on the Archer County property referenced in the easement (the “Property”). It measured 400 feet tall and 18 inches wide, it used 1.5 gauge tubing and multiple guy wires, and it was serviced by a small building located directly adjacent to its base. A pipe fence was constructed around the original tower and the small building.
When the original tower was completed, Campbell’s father’s company, Haigood and Campbell, used it to facilitate two-way radio transmissions between a fleet of vehicles. Over the ensuing years, Haigood and Campbell allowed a number of tenants to mount “a dish or an antenna or something” on the tower for them own broadcast purposes, including the Archer County Sheriffs Department, the Archer County Volunteer Fire Depaitment, Jen-son Well Service, Bridwell Oil Company, Burns Operating, Motorola Communications, and SkyBeam Texas. Some paid rent; some did not.
Campbell, a successor-in-interest under the easement contract, became responsible for the original tower in 1990. Although he had it painted, its lightbulbs changed, and its guy wires inspected and tightened, he never had a structural analysis of the tower performed, including before several of the tenants began using it.
Lindemann, a family limited partnership formed in 2009, owns the Property on which the easement is located. The Property was burdened by the easement when the Lindemann family acquired it in 1983.
In early November 2011, Campbell was contacted by Chris Mayo at Site Property Company (SPC), a broker who was working on behalf of LKCM Radio Group, L.P. to find a location for LKCM’s broadcasting equipment. After some initial communications about the tower and LKCM’s requirements, SPC hired an engineer to perform a structural analysis of the tower to determine whether it could support the additional proposed loading. The results indicated that it would not; the tower was overloaded and in “terrible” condition. SPC then requested a structural report for the existing loads on the tower, hoping to use it to negotiate favorable terms for a potential “drop & swap,” a procedure in which an existing tower is removed and replaced with “an equivalent tower as far as configuration and height but meeting current standards.” The report indicated that the tower was not in compliance with the International Building Code; noted that “during the field mapping, the tower mast was observed to be visually ‘snaking’ with significant frame bending around each guy pull-off level above elev. 200ft”; and recommended that the tower be replaced “since the strengthening modifications required [were] too extensive and not feasible.”
Campbell did not remedy any of the tower’s structural issues after obtaining *877the engineering report, and it continued in operation. However, soon thereafter, in early 2012, Campbell began soliciting bids for the construction of a new tower and negotiating a lease with LKCM to install its broadcasting equipment on the new tower. In April 2012, Campbell and LKCM entered into a lease agreement involving a new tower, and in June 2012, Campbell accepted a quote for the construction of a new tower.1
Construction on the new tower began in October 2012 and concluded on or about November 8, 2012. The new tower stands 420 feet tall, measures 36 inches wide at its widest point, uses 2.5 gauge tubing, and is located within the same pipe fence that was originally constructed to enclose the original tower and small building. Whereas the original tower used six guy-wire anchors, the new tower uses only three, and the wires are located closer to the tower’s base. As was the original tower, the new tower is serviced by a small building located directly adjacent to its base.
The original tower remained in place and in operation while the new tower was being constructed. Thus, although the new tower is located within the same pipe fence as the original tower, it is not located in the exact same location as the original tower. The following image shows the location of the new tower (on the right) in relation to where the original tower stood (on the left):
*878[[Image here]]
Campbell hired Gordon Parkey to construct the new tower and to remove the original tower. According to Parkey, the new tower “went live” on November 14, 2012. Around the same time, Parkey also told Tim Lindemann, Lindemann’s representative, that a single antenna continued to operate on the original tower and that he would not transfer it to the new tower until he returned from performing another job and taking a trip to Colorado. Parkey’s absence consequently “drug the time frame out of how long” both towers stood—and apparently operated—simultaneously. Parkey deconstructed and removed the original tower sometime in December 2012.
Lindemann sued Campbell in April 2013 and sought a declaration that the easement had terminated, a permanent mandatory injunction ordering Campbell to remove the new tower and all appurtenances *879thereto, and attorney’s fees.. During the bench trial that ensued, Tim Lindemann testified that the easement had terminated because Campbell had built a new tower, abandoned the original tower, removed the original tower, and simultaneously used both the original and new towers. Camp.bell agreed that the easement provides for the installation of a single radio-transmission tower, but he opined that his right to maintain the tower allowed him to remove the original tower and to construct the new one. The trial- court sided with Campbell. It signed a final judgment that Lindemann take nothing on its claims and awarded Campbell attorney’s fees through trial in the amount of $56,106.19 and conditional appellate attorney’s fees. The trial court entered the following findings of fact, among others:
13.The Original Tower remained standing until it was replaced and removed in 2012 due to evidence of structural instability.
[[Image here]]
16. Replacement of the Original Tower was necessary to maintain a functional tower in the Tract.
17. The Original Tower was removed after it was replaced by the New Tower.
18. The Original Tower was removed as soon as was practicable after. all transmission equipment was relocated to the New Tower.
19. The Original Tower was removed only after it was no longer transmitting.
20. The New Tower does not increase the burden on the surface estate.
21. The New Tower does not exceed the scope of the Easement.
22. The building of the New Tower does not effect a termination of the Easement. •
23. No actions of [Campbell] in connection with the maintenance of the Easement effected a termination of the Easement.'
24.The Easement has not terminated and is still in existence.
The trial court entered the following conclusions of law, among others:
7. The New Tower does not increase the burden on the surface estate.
8. The New Tower does not exceed the scope of the Easement.
9. The building of the New Tower does not effect a termination of the Easement.
[[Image here]]
■ 11. [Campbell’s] right to maintain included his right to replace the Original Tower with the New Tower.
12. The removal of the Original Tower after replacement with the New Tower' does not effect a termination of the Easement.
13. The Original Tower was not abandoned; it was replaced.
14. No actions of Campbell in connection with the maintenance of the Easement effected a termination of the Easement.
15. The Easement has not terminated and is still in existence.
III. Easement Termination
Lindemann argues in its first issue that the easement automatically terminated when Campbell either removed or abandoned the original tower. It contends that the plain terms of the easement authorized the placement of only a single radio-transmission tower on the Property, that the parties to the easement objectively intended that it would terminate upon the original tower’s removal or abandonment, and that the evidence conclusively demonstrates that Campbell removed or abandoned the original tower. Lindemann also disputes the trial court’s decision to construe the term “maintaining,” as it is used in the easement,, to include the right to *880remove the original tower and to replace it with a new one. Alternatively, Lindemann contends that the easement terminated because Campbell improperly exceeded its scope.
Campbell responds that the right to maintain the original tower includes the right to replace it when necessary and that the new tower did not exceed the easement’s scope.
A. Standards of Review
A trial court’s findings of fact have the same force and dignity as a jury’s answers to jury questions and are reviewable for legal and factual sufficiency of the evidence to support them by the same standards. Catalina v. Blasdel, 881 S.W.2d 295, 297 (Tex. 1994); Anderson v. City of Seven Points, 806 S.W.2d 791, 794 (Tex. 1991); see also MBM Fin. Corp. v. Woodlands Operating Co., 292 S.W.3d 660, 663 n.3 (Tex. 2009). We may sustain a legal sufficiency challenge only when (1) the record discloses a complete absence of evidence of a vital fact, (2) the court is barred by rules of law or of evidence from giving weight to the only evidence offered to prove a vital fact, (3) the evidence offered to prove a vital fact is no more than a mere scintilla, or (4) the evidence establishes conclusively the opposite of a vital fact. Ford Motor Co. v. Castillo, 444 S.W.3d 616, 620 (Tex. 2014); Uniroyal Goodrich Tire Co. v. Martinez, 977 S.W.2d 328, 334 (Tex. 1998), cert. denied, 526 U.S. 1040, 119 S.Ct. 1336, 143 L.Ed.2d 500 (1999). When reviewing an assertion that the evidence is factually insufficient to support a finding, we set aside the finding only if, after considering and weighing all of the evidence in the record pertinent to that finding, we determine that the credible evidence supporting the finding is so weak, or so contrary to the overwhelming weight of all the evidence, that the answer should be set aside and a new trial ordered. Pool v. Ford Motor Co., 715 S.W.2d 629, 635 (Tex. 1986) (op. on reh’g); Cain v. Bain, 709 S.W.2d 175, 176 (Tex. 1986); Garza v. Alviar, 395 S.W.2d 821, 823 (Tex. 1965). We defer to unchallenged findings of fact that are supported by some evidence. Tenaska Energy, Inc. v. Ponderosa Pine Energy, LLC, 437 S.W.3d 518, 523 (Tex. 2014).
We may review conclusions of law to determine their correctness based upon the facts, but we will not reverse because of an erroneous conclusion if the trial court rendered the proper judgment. City of Austin v. Whittington, 384 S.W.3d 766, 779 n.10 (Tex. 2012) (citing BMC Software Belgium, N.V. v. Marchand, 83 S.W.3d 789, 794 (Tex. 2002)); H.E.B., L.L.C. v. Ardinger, 369 S.W.3d 496, 513 (Tex. App.—Fort Worth 2012, no pet.).
B. Express Easements and Construction
An easement is a nonpossessory interest that authorizes a holder’s use of property for only a particular purpose. Marcus Cable Assocs., L.P. v. Krohn, 90 S.W.3d 697, 700 (Tex. 2002). The easement holder’s rights are limited to those that are expressed in the grant. DeWitt Cty. Elec. Coop., Inc. v. Parks, 1 S.W.3d 96, 103 (Tex. 1999). It follows that we apply basic principles of contract construction and interpretation when considering an express easement’s terms. Marcus Cable, 90 S.W.3d at 700. We give the terms their plain and ordinary meaning when they are not expressly defined, and we read the terms of an easement as a whole to determine the parties’ intentions and to carry out the purpose for which the easement was created. Id. at 701; DeWitt Cty. Elec. Coop., 1 S.W.3d at 101. We assume that the parties intended for every clause to have some effect. Koelsch v. Indus. Gas Supply Corp., 132 S.W.3d 494, 498 (Tex. App.—Houston [1st Dist.] 2004, pet. denied).
*881C. We Cannot Construe Only Some Terms
Referring to the easement’s use of the terms “a” and “said,” Lindemann argues that “[b]y its plain terms, the Easement only authorized the placement of a single tower on the Property”—the original tower. We certainly agree that the words “a” and “said” are singular, but the problem ■with .Lindemann’s construction is that it focuses exclusively on the meaning and effect of only those terms while completely disregarding the meaning and effect of other, potentially relevant terms. Linde-mann’s contention that the easement “automatically terminated upon removal or abandonment of the Original Tower” is similarly premised upon a reading of only part of the easement contract (the haben-dum clause). This erroneous approach patently conflicts with the well-established requirements that we examine contracts as a whole and assume that the parties intended for every clause to have some effect— indispensable rules that have been a component of our contract-construction standards for decades. See, e.g., Coker v. Coker, 650 S.W.2d 391, 393 (Tex. 1983) (“No single provision taken alone will be given controlling effect; rather, all the provisions must be considered with reference to the whole instrument.”); Citizens Nat’l Bank in Abilene v. Tex. & Pac. Ry. Co., 136 Tex. 333, 338, 150 S.W.2d 1003, 1006 (“It is not usually proper to consider a single paragraph, clause, or provision by itself, to ascertain its meaning. To the contrary, each and every part of the contract must be construed and considered with every other part....”), cert.. denied, 314 U.S. 656, 62 S.Ct. 109, 86 L.Ed. 526 (1941). Of course, this begs the question whether the easement contract contains any terms that must be considered in addition to the terms “a,” “said,” and “abandoned and/or removed.” It does—“maintaining.”
D. “Maintaining” Includes Replacement When Necessary
If the facts of this case were that Campbell had removed the original tower and done nothing else, then Lindemann’s simple argument that the easement terminated pursuant to the habendum clause would control the outcome. But. the facts are not that clear-cut, nor is the analysis. Not only did Campbell remove the original tower—something the ingress/egress clause expressly permitted—he also constructed a replacement tower within the same fenced area that enclosed the original tower. The' question then is 'whether the easement afforded Campbell'the right to replace the original tower with the new tower. See DeWitt Cty. Elec. Coop., 1 S.W.3d at 103. The easement expressly grants the holder' the right to “maintain! ]” the radio-transmission tower. We are not the first court to consider whether the term “maintain;” as used in an easement contract, may include the right to replace.
In Houston Pipe Line Co. v. Dwyer, Dwyer sought a declaration that a pipeline easemént across her land had terminated because Houston Pipe Line had removed an eighteen-inch low pressure pipeline and replaced it with a thirty-inch high pressure pipeline. 374 S.W.2d 662, 663 (Tex. 1964). The easement’s granting clause originally gave the easement holder the right “to lay, maintain, operate, repair and remove a Pipe Line for the transportation of gas,” but the words “and remove” were struck', .although a different part of the instrument authorized removal upon términation of the easement. Id. Dwyer argued that as changed, the easement “authorized the construction, maintenance, operation and repair of one pipeline only, and did not authorize its replacement or removal except upon termination of the easement as provided in the habendum clause.” Id. at 664. Houston Pipe Line countered that *882even after deleting the term “and. remove,” the remaining terms were “consistent with the right to remove and replace the original pipe when conditions make it necessary.” Id. The supreme'court agreed with Houston Pipe Line, reasoning in part,
If plaintiffs are correct in their contention, then defendant’s rights and easement under the 1926 agreement would terminate simply by removing and replacing the original pipe, regardless of its condition, with pipe of any size. The agreement in question does not compel such an unreasonable result. We hold that the terms ‘operate’ and ‘maintain’ in the granting clause are at least broad enough to include the right to remove and replace the original pipe with pipe of the same size when necessary.
Id. (emphases added). The supreme court thus held that if the condition of a pipeline easement is such that in order to maintain it, replacement is necessary, then the term “maintain,” as expressly used in the easement, was broad enough to include removal and replacement.
Lindemann’s arguments are indistinguishable from Dwyer’s. Like the supreme court, we decline to unreasonably construe the term “maintain[ ]” without any regard for the condition of the easement. We therefore review the evidence to determine whether the condition of the original tower rendered its removal and replacement necessary. See id.
The original tower was approximately thirty-five years old and in very poor condition when it was removed and replaced. Further, although the structural analysis that SPG had an engineer perform in December 2011 was not for the specific purpose óf assessing the original tower’s condition, the tests nonetheless revealed that it had numerous structural issues, including snaking of the mast and frame bending around the guy wires. Indeed, the original tower was designated a “Class II” tower, but it could not even pass the test for a “Class I” tower without some manipulation of the data.2 The engineer recommended that -the original tower be replaced:
Q. Based on your analysis, correct me if I’m wrong, but you do not find any way in which the tower that you did the analysis on could be beefed up, fixed to where it wouldn’t—where'you didn’t have these failures, correct? •
A. We stated such.
Q. Okay. So in your professional opinion, the only appropriate remedy for this tower was a replacement?
A. Correct.
On rehearing, Lindemann directs us to evidence that replacement was unnecessary, but under our standards of review, the evidence demonstrating necessity is neither legally nor factually insufficient simply because the record contains some contrary evidence.
Citing public policy that a wrongdoer should not benefit from his wrongdoing, Lindemann argues that the evidence is conclusive that Campbell failed to inspect and maintain the structural integrity of the original tower and, therefore, that his own “misconduct” did not create a necessity warranting removal and replacement of the original tower. The public policy on which Lindemann relies is completely in-apposite because there is no evidence that Campbell intentionally, illegally, or fraudulently overloaded the original tower for the purpose of creating a necessity to justify its removal and replacement. See Kulubis v. Tex. Farm Bureau Underwriters Ins. Co., 706 S.W.2d 953, 954-55 (Tex. 1986) *883(disavowing rule that illegal or fraudulent acts by one co-insured prevented recovery under insurance policy by the other co-insured). Campbell acknowledged that he did not have the original tower inspected, but he also testified that he performed some maintenance of the original tower (by having it painted, its lightbulbs changed, and .its guy wires tightened); that he was never made aware of anything regarding the original tower’s condition that caused him any concern; and that after receiving the "engineering report in December 2011, he “moved as fast as [he] could move” to address the issues that it raised. In light of this and the entire record, we cannot agree that Campbell’s behavior over the years warrants application of the above policy.
Lindemann also argues that by implying the right to replace the original tower into the meaning of “maintaining” arid then authorizing the original tower to be removed if it was being replaced, the trial court “rendered the plain and unqualified meaning of both of the terminating events meaningless” and “effectively rewrote the habendum clause to add an exception or limitation.” The trial court’s construction did neither. “When provisions in an agreement appear to be in conflict, the court should examine and consider the entire writing, seeking to harmonize and reconcile the conflicting provisions to the greatest extent possible.” Derr Constr. Co. v. City of Hous., 846 S.W.2d 854, 862 (Tex. App.—Houston [14th Dist.] 1992, no writ). If the tower is removed and replaced— because to maintain the tower, its condition rendered removal and replacement necessary—the terminating clause is simply not triggered because the easement holder merely exercised his rights to remove and maintain the tower as expressly granted by the ingress-egre,ss clause. However, if the tower is removed and not replaced, or removed and replaced when it was not necessary to maintain the tower, then the habendum clause is triggered. The easement’s terms are thus reconcilable, and the terminating events continue to have meaning, even without the purported improper addition of any language thereto.
Lindemann further contends that the plain meaning of “replace”—“to take the place of[,] esp. as a substitute or successor”—contradicts the plain meaning" of “maintain”—“to keep in an existing state (as of repair, efficiency, or validity).” It argues that while the easement holder may maintain the tower by replacing its parts, “‘maintaining’ cannot mean intentionally removing and replacing the entire Original Tower because it would be the opposite of preserving the existing condition of the Original Tower.” [Emphasis added.] Linde-mann disregards a well-established standard for construing easements—one that the supreme court expressly evoked in Dwyer. An easement “carries with it the right to do such things as are reasonably necessary for the full enjoyment of the easement,” Cent. Power & Light Co. v. Holloway, 431 S.W.2d 436, 439 (Tex. Civ. App.—Corpus Christi 1968, no writ) (emphasis added), although it cannot be forgotten that the rights reasonably necessary for full enjoyment “do not encompass rights foreign to the purpose for which the easement is granted.” State v. Brownlow, 319 S.W.3d 649, 656 (Tex. 2010). As explained, the supreme court in Dwyer concluded that it would be unreasonable not to consider the condition of the pipeline when determining whether the term “maintain,” which was expressly included in the easement, was broad enough to include removal and replacement. 374 S.W.2d at 664. The supreme court did so because, simply enough, a pipeline may be in such a condition .that replacement is necessary to maintain it. The same holds true for the radio-transmission tower here. Construing the term “maintaining” to al*884low replacement of only parts of the tower, but not the entire tower when necessary, is unreasonable and could effectively preclude Campbell from fully enjoying the easement.
Lindemann also seeks to factually distinguish Dwyer by arguing that unlike the easement in this case, the easement there “did not expressly state that [it] would terminate upon removal of the pipeline”; “[t]he Dwyer court simply would not have implied a right to remove and replace had the agreement expressly said that removal would terminate the easement.” Linde-mann is concerned, it appears, that implying a right to remove and replace would conflict with the habendum clause’s own removal provision. But we do not imply any right to remove; the ingress/egress clause, as written, expressly permits Campbell to remove the original tower. We rely on Dwyer only insofar as it pertains to replacement If there is any potential conflict between the removal provisions contained in the ingress/egress and habendum clauses, not only was it pre-existing, but harmonization is necessarily achieved by construing the term “maintaining” to permit replacement when necessary, as explained above.
Finally, even if removal and replacement did not trigger termination, the easement alternatively provides for termination in the event of abandonment. Linde-mann argues that the evidence conclusively proved that Campbell abandoned the original tower. We may properly treat the trial court’s conclusion of law number 13— “The Original Tower was not abandoned; it was replaced”—as a finding of fact. See Ray v. Farmers’ State Bank of Hart, 576 S.W.2d 607, 608 n.1 (Tex. 1979) (“Although this finding appears among the conclusions of law, the designation is not controlling and we may treat it as a finding of fact.”). As alluded to, Campbell exercised his right under the ingress/egress clause to perform a necessary removal and replacement of the original tower. In doing so, he did not simultaneously trigger the habendum clause’s abandonment clause. Indeed, “abandon” means “to cease to assert or exercise an interest, light, or title to[,] esp. with the intent of never again resuming or reasserting it.” Webster’s Third New Int’1 Dictionary 2 (2002). Campbell has done precisely the opposite since 1977; he replaced the original tower and has persisted to this day in asserting and protecting his rights afforded to him under the easement contract. Lindemann argues on rehearing that Campbell “admitted that he abandoned the Original Tower” because he testified that he “ceased” using the original tower, but as the factfinder, the trial court could have reasonably inferred that Campbell ceased using the original tower because he replaced it with the new tower, not because he abandoned the original tower. See City of Keller v. Wilson, 168 S.W.3d 802, 821 (Tex. 2005) (requiring courts to resolve conflicting inferences in favor of the verdict if reasonable minds could).
We conclude and hold that the term “maintaining,” as used in the easement, is broad enough to include the right to replace the tower when necessary; that the evidence is both legally and factually sufficient to show that the original tower’s replacement was necessary; and that the easement did not terminate when Campbell removed the original tower and replaced it with the new tower. See id.; see also Marcus Cable, 90 S.W.3d at 700. The evidence is therefore legally and factually sufficient to support the trial court’s findings of fact 13,16, 22, 23, 24 and conclusion of law 13; and conclusions of law 9, 11, 12, and 14 are not erroneous. See Ford Motor Co., 444 S.W.3d at 620; Pool, 715 S.W.2d at 635. We overrule this part of Lindemann’s first issue.
*885E. Scope of Easement
In the other part of what we construe as its first issue, Lindemann argues that even if Campbell had the right to replace the original tower, the easement nevertheless terminated because Campbell exceeded its scope by. moving the location of the new tower, by constructing a substantially larger new tower, and by operating both towers simultaneously. Linde-mann finds its support in the second half of Dwyef s analysis, in which the supreme court considered whether Houston Pipe Line could replace the original eighteen-inch pipeline with a substantially larger thirty-inch pipeline. See 374 S.W.2d at 664-66. The supreme court reasoned that because the easement contained no limitation on the size of the pipeline, “when [Houston Pipe Line] constructed its 18-inch pipeline with the consent and acquiescence of [Dwyer], the extent of [Houston Pipe Line’s] easement rights under the 1926 agreement became fixed and certain.” Id. at 666. Consequently, Houston Pipe Line “was not authorized to remove th[e] 18-inch line initially constructed and replace it with a line of substantially greater size.” Id. Lindemann employs the same rationale here—the easement did not specify the height, the size, or the precise location of the radio-transmission tower, so when Campbell’s predecessor constructed the original tower, those terms became fixed, and when Campbell constructed the new tower, which deviated from those fixed terms, he improperly exceeded the easement’s scope.
In our original opinion, we followed Lin-demann’s lead and assumed that Dwyer controlled the analysis. Upon further reflection on rehearing, we conclude that the second half of Dwyer s analysis is inappo-site under the facts of this case.
In Dwyer, the supreme court was principally concerned not with the mere fact that Houston Pipe Line increased the width of its pipeline but rather with the effect that increasing the size of the pipeline had on the easement’s boundaries and limits. Specifically, the easement did “not prescribe metes and bounds for the easement, nor d[id] it define a course or direction for the pipe to follow across the land.” Id. at 663. Therefore, “the extent of defendant’s easement rights under the 1926 agreement became fixed and certain” when the original eighteen-inch pipeline was constructed. Id. at 666. Consequently, when Houston Pipe Line replaced the old eighteen-inch pipeline with the new thirty-inch pipeline, that action necessarily had the corresponding effect of “Widening' the ditch as well as placing the pipe approximately two feet deeper than it was in the original ditch,” which, naturally, caused the easement’s previously determined boundaries to increase in size. Id. at 665 (emphases added).
Here, compared to the original tower, the new tower stands 20 feet taller (420 feet compared to 400 feet), is twice as wide (36 inches compared to 18 inches), and uses larger tubing (2.5 gauge compared to 1.5 gauge). However, unlike the increase in the pipeline’s width in Dwyer, which effectively enlarged the easement, the new tower’s increase in height, width, and tubing size had no effect whatsoever on the easement tract’s 500’ x 500’ boundaries. Dwyer does not control here. Cf. Lower Colo. River Auth. v. Ashby, 530 S.W.2d 628, 632 (Tex. Civ. App.—Austin 1975, writ ref'd n.r.e.) (“The easement is then designated as a strip of land 100 feet wide following a course through appellee’s land described by metes and bounds.... None of the vagueness.and indefiniteness of the easement in Dwyer is present here.”).
Under the -easement, the location of the original tower fixed the center point for determining the location of the 500’ x 500’ easement tract. Lindemann argues that by constructing the new tower eighteen feet from the original tower’s location, Camp*886bell changed the center point of the, 500’ x 500’ easement tract and, therefore, the location of the entire easement. Linde-mann contends that Campbell should have first removed the original tower and then constructed the new tower in the exact same location. Lindemann is concerned that if Campbell was not required to construct the new tower in the exact same location as the original tower, then he could “continually erect ‘replacement’ towers in new locations, every one of which will change the location of the easement.”
The easement tract is located -on a hilltop. The new tower is located approximately eighteen feet from where the original tower stood. Aside from grass and mesquite trees, the only other physical objects in the area are electric poles and wires and some oil.field remanent?. Tim Lindemann acknowledged that the construction of the new tower caused no change in Lindemann’s day-to-day operations. Lindemann is concerned that a surveyor may be confused at some point in the future because the 500’ x 500’ easement tract shifted approximately eighteen feet when the new tower was constructed, but considering these facts and the extent of the record, we cannot conclude that relocation was in any way substantial. See Herren v. Pettengill, 273 Ga. 122, 588 S.E.2d 735, 736 (2000) (“The majority rule in the United States is that an easement with a fixed location cannot be substantially changed or relocated without the express or- implied consent of the owners of both the servient estate and the dominant estate....”); Umberger v. State ex rel. Dep’t of Game, Fish & Parks, 248 N.W.2d 395, 397 (S.D. 1976) (“It has long been the general view that where an easement is acquired by grant in a given location in the servient tenement it becomes fixed by specific designation from a mutual agreement, or by usage and acquiescence. Its location may not be substantially changed by any one party without the consent of the other.”); Youngstown Steel Prods. Co. of Cal. v. City of Los Angeles, 38 Cal.2d 407, 240 P.2d 977, 979 (1952) (“Once the location of an easement has been finally established, whether by express terms of the grant or by use and acquiescence, it cannot be substantially changed' without the bonsént of both parties.”); see also McGoey v. Brace, 395 Ill.App.3d 847, 335 Ill.Dec. 214, 918 N.E.2d 559, 563-64 (2009) (discussing Illinois’s substantiality standard for relocating easements).
Even more so, in Harris v, Phillips Pipe Line Co., the court of appeals agreed with the trial court that Phillips had acted within the terms of its easement when it replaced and relocated a pipeline parallel to and fifteen feet away from its original location. 517 S.W.2d 361, 363-65 (Tex. Civ. App.—Austin 1974, writ ref'd n.r.e.). Phillips relocated the new pipeline because construction would have been hazardous at any less distance from the old' pipeline, which remained in operation during the construction of the new pipeline. Id. at 363. The evidence showed that 'if Phillips had shut down the old pipeline, it would have been "required to shut down its refinery, 20 gasoline plants, and more than 200 gas wells that supplied the plants. Id. In light of those "facts, the court of appeals reasoned that “[t]o require Phillips to cease use of the pipe line in order to replace it with a new line would deny Phillips a right expressly given by the grant, the right to use, maintain,’ and "operate the pipe line.” Id. at 364-65.
Campbell proceeded just like Phillips did with -its easement in Harris. Constructing the-new tower less than twenty feet from the- original tower allowed Caihpbell’s tenants to continue to broadcast uninterrupted during the new tower’s construction.3 Although permitting the *887original tower to continue to operate while the new tower was being constructed did not avoid a three-month shut down of numerous gasoline plants and gas wells, it did involve a potentially more important purpose: the safety and welfare of the residents of Archer County. Both the Archer County Sheriffs Department and the Archer County Volunteer Fire Department utilized the original tower for radio communications. There can be no doubt that requiring Campbell to remove the original tower so that the new tower could be constructed in the exact same location would have required these public-service entities to find an alternative broadcast location for at least some period of time. The potential disruption- in these vital services is more than enough reason to justify locating the new tower less than twenty feet away from the original tower so that these tenants could continue to broadcast uninterrupted during the new tower’s construction. Campbell’s attorney made this ■important point during his cross-examination of Tim Lindemann:
Q. Do you believe that the Archer County Sheriffs Department and the Archer County Volunteer Fire Department’s ability to transmit is important for public safety?
A. Yes.
Q. And would you agree with me that that is of such importance that it could be a factor in the. method and manner in which you handle those two transmission attempts, correct?
A. Be more specific. Am I handling the antennas now?
Q. Let me back up. With that importance to public safety, it would be a very significant important factor in the way that a person; a reasonable person would handle those two antennas when dealing with this tower, correct?
A, I’m sorry. I still don’t understand . what you’re asking.
Q.- I think-my point is made.
As for Lindemann’s contention that Campbell exceeded the easement’s scope by operating both towers simultaneously, the evidence showed that the lone antenna that remained operating on the original tower during Parkey’s absence from the jobsite belonged to “one of the' Archer County services tenants.” Our reasoning immediately above is therefore equally applicable here. The uninterrupted operation of the public-service entities’ radio transmissions justified the relatively brief but simultaneous operation of both towers.
The easement did not terminate because Campbell did not exceed its scope. The evidence is legally and factually sufficient to support the trial court’s, findings of fact 21 and 24, and conclusions of law 8 and 15 are not erroneous. See Ford Motor Co., 444 S.W.3d at 620; Pool, 715 S.W.2d at 635. We overrule thé remainder of Linde-mann’s first issue.
F. Response to the Dissent
Relying on the easement’s terms “a” and “said,” the dissent first contends that the only reasonable construction of the easement is that it permitted the placement of one radio transmission only—the tower that was built in- 1977. Notwithstanding that this result is reached by construing only some of the easement’s terms, the supreme- court rejected the ivery same argument over fifty years ago, when it construed a pipeline easement that permitted the installation of only “a” pipeline but that also granted its holder the right to “maintain” and to “operate” the pipeline— much like the easement here. See Dwyer, 374 S.W.2d at 664 (“[Respondents] contend that the agreement ... authorized the construction, maintenance, operation and re*888pair of one pipeline only, and did not authorize its replacement or removal except upon termination of the easement as provided in the habendum clause.” (emphasis added)). The supreme court held that it would be unreasonable to simply conclude—-just like the dissent does here— that the easement terminated upon the pipeline’s removal and replacement without additionally considering whether the pipeline was in such a condition that its removal and replacement was necessary to “maintain” it. Id. at 664. Thus, the only reasonable construction of the easement is the majority’s, not the dissent’s. See Plains Expl. & Prod. Co. v. Torch Energy Advisors Inc., 473 S.W.3d 296, 305 (Tex. 2015) (“We ‘construe contracts from a utilitarian standpoint bearing in mind the particular business activity sought to be served,’ and avoiding unreasonable constructions when possible and proper.”).
The dissent next argues that our construction of the easement “eviscerates the habendum clause and its specific language making the Easement determinable and rewrites the Easement to make it perpetual,” but as we already explained, the ha-bendum clause’s termination provision continues to have meaning when the tower is removed and not replaced or when the tower is removed and replaced when it was not necessary to maintain the tower.
Finally, the dissent contends that insofar as Dwyer may be construed to authorize replacement for maintenance, it held that the object to be removed must be replaced with another object of the “same size.” But the appropriate inquiry focuses on the replaced object’s effect on the easement’s boundaries, if any, not on the mere increase in the replaced object’s size. See Dwyer, 374 S.W.2d at 665-66.
IV. Injunctive Relief
In its second issue, Lindemann argues that because the trial court erred in concluding that the easement did not terminate, it also abused its discretion by failing to grant Lindemann’s request for permanent injunctive relief. Because Linde-mann’s first issue challenging the trial court’s findings and conclusions regarding the easement’s termination was unpersuasive, this contingent issue seeking injunc-tive relief is also unpersuasive. We overrule Lindemann’s second issue.
V. Attorney’s Fees
Lindemann’s third and final issue challenges the trial court’s award of attorney’s fees to Campbell. Lindemann first contends that reversal is required because it was entitled to judgment on its declaratory-judgment claim, and the trial court clearly intended to award attorney’s fees to the prevailing party. Having overruled Lindemann’s first issue, we overrule this part of its third issue.
In the other part of its third issue, Lindemann argues that the trial court abused its discretion by awarding unsegregated attorney’s fees. Lindemann maintains that some portion of Campbell’s attorney’s services were directed towards the defense of Lindemann’s trespass claim—e.g., “extensive portions of Tim Lindemann’s deposition were focused solely on potential monetary damages, which relate only to the trespass claim”—and that fees are not recoverable for trespass. More importantly, Lindemann challenges the trial court’s conclusion of law 6, which provides that the fees incurred in defending Lindemann’s trespass claim were intertwined with the fees incurred in defending against Lindemann’s declaratory-judgment claim insofar as they relate to Campbell’s contention that the new tower did not increase the burden on Linde-mann’s surface estate:
6. Necessary legal services performed for Defendant on Lindemann’s trespass claim are indistinguishable *889from necessary legal services performed for Defendant to create and sustain its arguments regarding the surface burden of the Original and New Towers. [Emphasis added.]
Campbell directs us to conclusion of. law 6 and responds that the .trial court acted within its discretion to award unsegregated attorney’s fees.
We have previously set out the standards for fees segregation:
Parties seeking attorney’s fees under Texas law “have always been required to segregate fees between claims for which they aré recoverable and claims for which they are not.” Tony Gullo Motors I, L.P. v. Chapa, 212 S.W.3d 299, 311 (Tex. 2006). The supreme court recognized an exception to this rule in Stewart Title Guaranty Co. v. Sterling: attorney’s fees need not be segregated when “the fees rendered are in connection with claims arising, out of the same transaction and are so interrelated that their prosecution or defense entails proof or denial of essentially , the same facts.” 822 S.W.2d, 1, 11-12 (Tex. 1991). But in Chapa, the supreme court held that “[t]o the extent Sterling suggested that a common set of underlying facts necessarily made all claims arising therefrom ‘inseparable’ and all legal fees recoverable, it went too far” and flooded the courts of appeals with claims that recoverable and unrecoverable fees are inextricably intertwined. 212 S.W.3d at 312. The supreme court therefore held as follows:
Accordingly, we reaffirm the rule that if any attorney’s fees relate solely to a claim for which such fees are unrecoverable, a claimant must segregate recoverable from unrecoverable fees. Intertwined facts do not make tort fees recoverable; it is only when discrete legal services advance both a recoverable and unrecoverable claim that they are'so intertwined that they need not be segregated. We modify Sterling to that extent.
Id. at 313-14-(emphasis added).
AMX Enters., L.L.P. v. Master Realty Corp., 283 S.W.3d 506, 521 (Tex. App.—Fort Worth 2009, no pet.) (op. on reh’g).
As Lindemann observed in another part of its brief, the supreme court has reasoned that “the threshold inquiry [in construing an easement] is not whether the proposed use results in a material burden, but whether the grant’s terms authorize the proposed use.” Marcus Cable, 90 S.W.3d at 703. This is because “if a use does not serve the easement’s express purpose, it becomes an unauthorized presence on the land whether or not it results in any noticeable burden to the servient estate.” Id. (emphasis added). Because the relevant ■inquiry ⅛ whether the easement authorized the use and not whether the servient estate suffered any more or less burden, and because the trial court’s conclusion of law 6 is premised upon this very basis, we agree with Lindemann that the fees that Campbell incurred defending against Lin-demann’s trespass claim-did not also advance Campbell’s defense to Lindemann’s declaratory-judgment claim regarding the easement’s construction. We hold that the trial court abused its discretion by awarding Campbell unsegregated attorney’s fees, and we sustain this part of Linde-mann’s third issue.4
VI. Conclusion
Having overruled Lindemann’s first and second issues, we affirm the part of the *890trial court’s judgment ordering that Linde-mann take nothing on its claims against Campbell. But having sustained part of Lindemann’s third issue, we reverse the part of the trial court’s judgment awarding Campbell'attorney’s fees and remand this cause to the trial court for a .new trial on only the issue of attorney’s fees.
WALKER, J., filed a dissenting opinion.
. LKCM's engineers consulted on the design of the new tower. Campbell agreed that construction on the new tower would not have begun until LKCM’s engineers approved its design.
. A structural Class II "translates back to-a 50-year recurrence on the environmental loading criteria, which is the wind and so on,” while a structural Class I "translates to a 25-year wind return period.”
. Tim Lindemann agreed that it was not physically possible to build the new tower in the *887exact same location of the original tower while the original tower was still standing.
. When segregation is required, a claimant’s failure to segregate fees does not mean that the claimant cannot recover any fees; unsegregated attorney’s fees for the entire case are some evidence of what the segregated amount should be, and remand is required to calculate the segregated award. Tony Gullo Motors I, 212 S.W.3d at 314-15.