IN THE UNITED STATES COURT OF APPEALS
FOR THE FIFTH CIRCUIT
No. 91-2246
MCDERMOTT, INC.,
Plaintiff-Appellee,
Cross-Appellant,
versus
CLYDE IRON, ET AL.,
Defendants,
AmCLYDE, A Division of
AMCA International, Inc., and
RIVER DON CASTING LTD.,
Defendants-Appellants,
Cross-Appellees.
Appeal from the United States District Court
for the Southern District of Texas
(December 11, 1992)
Before HIGGINBOTHAM and DUHÉ, Circuit Judges, and HARMON,* District
Judge.
HIGGINBOTHAM, Circuit Judge:
This is a suit for damage to property resulting from a failure
of a large crane on an offshore platform. AmClyde and River Don
appeal from a judgment on the jury's verdict urging that AmClyde's
contract with McDermott, and general maritime law, protect them
from liability in warranty and tort in addition to the limits on
tort liability under the East River doctrine and that, in any
*
Harmon, District Judge of the Southern District of Texas,
sitting by designation.
event, they are entitled to the credit of McDermott's settlement
with others. McDermott cross-appeals attacking the application of
East River and the denial of recovery for damage to the crane
itself. We reverse the judgment against AmClyde. We conclude that
River Don is liable to McDermott, but hold that River Don is
entitled to full credit for McDermott's settlement.
I.
On January 10, 1986, McDermott contracted to purchase a 5,000
ton Shearleg crane designed and manufactured by AmClyde. The
contract covered twenty-five pages and included several provisions
purporting to limit potential liability. McDermott intended to use
the crane to move the deck portion, the Snapper deck, of an
offshore platform used in drilling for oil and natural gas.
AmClyde designed the crane's hook. River Don was not a party to
the McDermott-AmClyde contract but manufactured the hook under a
subcontract with AmClyde.
On October 10, 1986, McDermott was using the crane to lift the
approximately 3,950 ton Snapper deck. The crane was mounted aboard
the vessel Intermac 600 in the Gulf of Mexico off the coast of
Texas. As the crane lifted the deck, one of the prongs on the hook
and one of the slings holding the deck broke, and the deck fell
onto the barge with serious damage to the crane and deck. This
suit followed.
McDermott sued AmClyde, River Don, two manufacturers of the
slings, and another sling supplier asserting tort and contract
claims. AmClyde filed a third-party claim against Hudson
2
Engineering, the McDermott subsidiary that designed the sling
rigging arrangement used for the lift. AmClyde also counterclaimed
for the cost of replacing the allegedly defective hook.
AmClyde and River Don moved for partial summary judgment
arguing that AmClyde and McDermott agreed in the contract to
restrict any tort and contract liability to repair or replacement
and that under general maritime law there is no recovery for
product damage and resulting economic loss under East River
Steamship Corp. v. Transamerica Delaval, Inc., 476 U.S. 858 (1986).
The magistrate judge denied the motion.
On the eve of trial, McDermott settled with the three sling-
related defendants for $1 million. AmClyde and River Don claimed
a dollar-for-dollar credit for the $1 million settlement against
any judgment against them, citing Hernandez v. M/V RAJAAN, 841 F.2d
582 (5th Cir. 1988). In his opening statement, counsel for
McDermott told the jury that McDermott accepted responsibility for
any part the slings played in causing the damage. The settlement
documents were not formally executed until after the jury returned
its verdict. That detail disclosed that the settlement agreement
attributed one half of the total settlement to crane damages and
one half to deck damages.
Shortly after trial began, the magistrate judge, relying on
East River, ruled that McDermott could not recover in tort for
damage to the product itself, the crane and the hook, but that it
could recover in tort for damage to the deck as "other property."
3
At trial then, McDermott's claim for damages to the crane was
limited to the remedies provided for in its contract with AmClyde.
The jury found the crane's hook to be defective, that the
defect was one of materials or workmanship and misrepresentation,
and that this defect was a producing cause of injury. The jury
also found that AmClyde breached express and implied warranties
that were a producing cause of injury. The jury awarded
compensatory damages of $2.1 million for damage to the deck,
attributing the cause of the accident 32% to AmClyde, 38% to River
Don, 0% to Hudson Engineering and 30% to "McDermott/sling
defendants." The jury was not asked to determine separately
McDermott's contribution to the accident despite its assumption of
any damage caused by the sling defendants. The court later denied
AmClyde and River Don's request for a $1 million credit against the
verdict and rendered judgment on the jury's verdict against AmClyde
in the amount of $672,000.00 and against River Don in the amount of
$798,000.00.2
AmClyde and River Don appeal, and McDermott cross-appeals.
AmClyde and River Don first argue that recovery for damages to the
deck cannot be supported by a breach of contract, because the
parties disclaimed all warranties, except a limited replacement and
repair warranty for materials and workmanship. Second, they
contend that McDermott was not entitled to any recovery in tort for
damage to the deck, because (1) the McDermott-AmClyde contract
2
The jury also found in favor of McDermott on AmClyde's
counterclaim. AmClyde does not appeal this determination.
4
waived all tort liability as to AmClyde and River Don, and (2) East
River precludes any tort claims for damage to both the crane and
the deck. Third, AmClyde and River Don assert that the trial court
should have granted their motions for directed verdict and judgment
notwithstanding the verdict, because McDermott failed to prove
causation. Finally, AmClyde and River Don claim an offset of the
$1 million settlement under Hernandez, alternatively, that they are
entitled to a new trial because of various erroneous rulings on
questions of evidence.
McDermott contends that it is entitled to recover for damage
to the crane as well as the deck. McDermott requests a remand for
trial on the amount of damages to the crane only, contending that
the jury has already determined the liability of AmClyde and River
Don. McDermott argues that it should not be limited to the
replacement of defective parts under the contract, because (1)
AmClyde's refusal to replace the hook free of charge caused the
limited warranty to fail of its essential purpose; (2) AmClyde made
broad and undisclaimed warranties by incorporating technical
specifications into the document; (3) the warranty was modified by
later dealings between the parties and assurances from AmClyde that
it would "stand behind its product"; (4) the replacement warranty
applies only to AmClyde's manufacture of the crane, not to its
design and sale. Second, McDermott contends that East River does
not bar recovery for damage to the crane, because other property,
the deck, along with the crane was damaged. Third, McDermott
argues that its claims against River Don should not be governed by
5
the rule of East River because there was no contractual
relationship directly between them. Finally, McDermott claims pre-
judgment interest and urges that the jury's verdict should be
corrected to show that the jury allocated causation and not fault.
II.
We are convinced that the contract between McDermott and
AmClyde controls AmClyde's liability to McDermott. It is urged
that McDermott's recovery in warranty is limited to the
replacement/repair warranty in the McDermott-AmClyde contract, and
the contract precludes McDermott from recovering in tort. We agree
and reverse the judgment against AmClyde. Although we conclude
that River Don is not protected by the limited liability provisions
in the contract between McDermott and AmClyde, and River Don is
liable to McDermott, we find that River Don is entitled to a credit
of McDermott's settlement with the sling defendants. We address
AmClyde first, then River Don.
III.
The language of the contract is critical to McDermott's
recovery against AmClyde in warranty, and we focus on Article XV3.
3
ARTICLE XV - WARRANTY
A. The Seller warrants equipment of its own manufacture to
be free from defects in materials and workmanship under
normal use and service for a period of six (6) months after
first use and not to exceed twelve (12) months after
shipment or notification of readiness for shipment. This
warranty extends only to the Buyer, and in no event shall
the Seller be liable for property damage sustained by a
person designated by the law of any jurisdiction as a third
party beneficiary of this warranty or any other warranty
held to survive the Seller's disclaimer. This warranty does
not extend to normal wear and tear or to the equipment,
6
The parties agree that we must look to the law of New York in
interpreting this contract. Under New York law, these issues of
contract interpretation are considered questions of law. Maio v.
Gardino, 585 N.Y.S.2d 529, 530 (N.Y. App. Div. 1992); Trustco Bank
materials, parts and accessories manufactured by others, and
THE BUYER AGREES THAT IT MUST RELY SOLELY ON THE
MANUFACTURER'S WARRANTIES APPLICABLE, AND THAT IT SHALL HAVE
NO REMEDY AGAINST THE SELLER FOR BREACH OF A MANUFACTURER'S
WARRANTY. This warranty shall be NULL AND VOID if any
repairs, modifications or alterations are made to the
equipment supplied hereunder during the warranty period by
the Buyer or by others on his behalf without the prior
written consent of the SELLER. THE WARRANTY DESCRIBED IN
THIS PARAGRAPH SHALL BE IN LIEU OF ALL OTHER WARRANTIES,
EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, ANY
IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A
PARTICULAR PURPOSE.
B. Upon written notification received by the Seller within
the above stated warranty period of any failure to conform
to the above warranty, upon return prepaid to the Seller of
any nonconforming original part of component and upon
inspection by the Seller to verify said nonconformity, the
Seller shall repair or replace said original part or
component without charge to the Buyer. The Seller shall
ship the repaired or replaced part or component to the Buyer
at the Buyer's expense. Correction of nonconformities, in
the manner provided above, shall constitute fulfillment of
all liabilities of the Seller to the Buyer or any other
person whether based upon Contract, tort, strict liability
or otherwise.
C. The remedies set forth herein are exclusive, without
regard to whether any defect was discoverable or latent at
the time of delivery of the apparatus to the Buyer. The
essential purpose of this exclusive remedy shall be to
provide the buyer with repair or replacement of parts or
components that prove to be defective within the period and
under the conditions previously set forth. This exclusive
remedy shall not have failed of its essential purpose (as
that term is used in the Uniform Commercial Code) provided
the Seller remains willing to repair or replace defective
part to components within a commercially reasonable time
after it obtains actual knowledge of the existence of a
particular defect.
7
v. 11 North Pearl Assoc., 580 N.Y.S.2d 847, 848 (N.Y. Sup. Ct.
1992). Thus, our review is de novo.
A.
In Article XV, AmClyde warrants that equipment of its own
manufacture will be free from defects in materials and workmanship
and that the exclusive remedy for the breach of this limited
warranty will be repair or replacement of defective parts. Such
agreed upon limits on remedy are generally valid. N.Y. U.C.C. Law
§ 2-719 (McKinney 1991)4; Employers Ins. of Wausau v Suwannee River
Spa Lines, Inc., 866 F.2d 752, 776 (5th Cir. 1989); American Elec.
Power Co. v. Westinghouse Elec., 418 F. Supp. 435, 452-53 (S.D.N.Y.
1976).
The jury found a defect in materials or workmanship, and
therefore, a breach of this limited warranty. McDermott attempts
to escape the restriction on remedy that it agreed to urging that
this remedy "failed of its essential purpose."5
4
N.Y. U.C.C. § 2-719(1) provides:
Subject to the provisions of subsections (2) and (3) of this
section and of the preceding section on liquidation and
limitation of damages,
(a) the agreement may provide for remedies in addition to or
in substitution for those provided in this Article and may
limit or alter the measure of damages recoverable under this
Article, as by limiting the buyer's remedies to return of
the goods and repayment of the price or to repair and
replacement of non-conforming goods or parts; and
(b) resort to a remedy as provided is optional unless the
remedy is expressly agreed to be exclusive, in which case it
is the sole remedy.
5
N.Y. U.C.C. § 2-719(2) provides:
Where circumstances cause an exclusive or limited remedy to
fail of its essential purpose, remedy may be had as provided
8
The policy behind the failure of essential purpose rule is to
insure that the buyer has "at least minimum adequate remedies."
U.C.C. § 2-719 Comment 1. Typically, a limited repair/replacement
remedy fails of its essential purpose where (1) the "[s]eller is
unsuccessful in repairing or replacing the defective part,
regardless of good or bad faith; or (2) [t]here is unreasonable
delay in repairing or replacing defective components." Cayuga
Harvester, Inc. v. Allis-Chalmers, Corp., 465 N.Y.S.2d 606, 613
(N.Y. App. Div. 1983). McDermott and AmClyde were aware of this
rule, expressly addressing the doctrine in their contract. Article
XV.C, provides: "[t]his exclusive remedy shall not have failed of
its essential purpose . . . provided the Seller remains willing to
repair or replace defective part to components within a
commercially reasonable time after it obtains actual knowledge of
the existence of a particular defect." See James J. White & Robert
S. Summers, Uniform Commercial Code § 12-10 (3d ed. 1988) (stating
that such a clause may give the seller greater protection).
McDermott argues that the limited remedy failed of its
essential purpose, because AmClyde did not replace the crane hook
free of charge. McDermott, with agreement of AmClyde and River
Don, sent the hook to Packer Engineering for testing. Packer
determined that the hook was defective, and McDermott demanded a
replacement from AmClyde under the limited warranty. AmClyde
responded that McDermott must first send them a purchase order.
McDermott sent the purchase order, and AmClyde later sent a new
in this Act.
9
hook, both parties expressly reserving their rights. AmClyde, as
we noted, counterclaimed for the cost of the replacement hook,
arguing that the hook was not defective, but failed at McDermott's
negligent hand. Based on the jury's verdict, the magistrate judge
refused to order payment for the replacement hook.
McDermott's assertion that AmClyde did not replace the hook
free of charge is apparently based on AmClyde's requirement of a
purchase order and the contest of its obligation to provide a free
replacement. McDermott received a new hook and at no cost.
AmClyde never denied its obligation to replace a defective hook.
It only denied that the hook was defective. It lost that argument
and honored its obligation. We find no failure of purpose.6
B.
McDermott argues that in addition to the limited warranty in
Article XV, the contract gained another express warranty by
incorporating design specifications.7 The Specifications state
6
McDermott further argues that the replacement warranty
applies only to AmClyde's manufacturing of the crane, not to its
design and sale. We find no merit to this contention. See e.g.,
American Elec. Power Co. v. Westinghouse Corp., 418 F. Supp. 435
(S.D.N.Y. 1976) (court recognized the validity of a similar
limitation of warranty/exclusive remedy provision where
defendant's responsibility encompassed manufacturing,
construction, and design); Shipco 2295, Inc. v. Avondale
Shipyards, Inc., 631 F. Supp. 1123 (E.D. La. 1986), aff'd, 825
F.2d 925 (5th Cir. 1987), cert. denied, 485 U.S. 1007 (1988)
(Avondale's limited warranty/exclusive remedy provision was
enforced notwithstanding Avondale's involvement in manufacturing,
construction, and design).
7
ARTICLE I - SCOPE OF WORK
A. Provide one 5000 short ton shearleg derrick package for
barge mounting in accordance with specification no. 8506-
12D/B REV 2 entitled "Specifications for 5000 short ton
10
that "[t]he crane when erected will be capable of lifting 5000 ST
to a reach of 100 feet measured from the boom heel pin." McDermott
argues that this language created an express warranty of the
crane's lifting capacity or a "design warranty."
We decline this journey, however, because assuming there was
a "design warranty," it was not breached. The jury found that the
defect in the crane was one of materials or workmanship and
misrepresentation and specifically not a defect in design.
McDermott also argues that AmClyde gave other express
warranties after the parties executed the contract. McDermott
relies on an exchange of letters between AmClyde vice president
Michael J. Ucci and McDermott vice president W.L. Higgins. Mr.
Ucci wrote in part:
In the unlikely event the 5000 ST Shearleg Derrick being
designed by Clyde does not perform according to the
specification, Clyde would ensure that any deficiencies are
corrected. Our track record in this area should speak for
itself, but in addition I am giving you my personal assurance
that we will stand behind our product.
Mr. Higgins responded:
To the extent that you have expanded on the intent of the
warranty of the 5000 ST Shearleg Derrick, we understand you to
say that Clyde will correct any such deficiencies and will
cooperate with McDermott to do so expeditiously and with a
minimum of inconvenience and expense. This of course would
conceptually include having the work done locally to avoid the
time and expense of taking the equipment out of service and
sending it to Duluth, Minnesota to correct deficiencies.
shearleg derrick" dated December 12, 1985 (EXHIBIT A) and as
described in your Proposal dated December 9, 1985, all of
which are incorporated by this reference.
(emphasis added).
11
We accept your personal assurance that Clyde will accept the
additional warranty responsibility. McDermott trusts that the
entire Clyde organization endorses the intent of your Comfort
Letter and in particular, the notion that Clyde will stand
behind its product.
McDermott argues that these letters created a new warranty.
An express warranty arises through "[a]ny affirmation of fact
or promise by the seller to the buyer which relates to the goods
and becomes part of the basis of the bargain." N.Y. U.C.C. § 2-
313(1)(a) (McKinney 1991). We do not read these two letters to
create a new or different warranty. Instead, Mr. Ucci only
reaffirmed AmClyde's obligation to repair or replace any defective
parts. Regardless, McDermott cannot overcome the contract's
integration clause requiring a signed writing for its
modification.8 These provisions are specifically validated by
U.C.C. § 2-209(2), and a signed writing is required to modify or
rescind them.9 McDermott counters with a waiver argument. As
8
ARTICLE XXI - INTEGRATION
This document constitutes the entire Agreement between the
parties. There are no understandings as to the subject
matter of this Agreement other than as herein set forth.
All previous communications concerning the subject matter of
this Agreement are hereby abrogated and withdrawn. This
Agreement may not be modified except by a writing signed by
both parties, and any printed terms and conditions submitted
by either party during the course of this Agreement shall be
of no force or effect, unless expressly agreed to the
contrary in writing by both parties.
9
N.Y. U.C.C. § 2-209(2) provides:
A signed agreement which excludes modification or rescission
except by a signed writing cannot be otherwise modified or
rescinded, but except as between merchants such a
requirement on a form supplied by the merchant must be
separately signed by the other party.
12
circular as the notion may be, it is true that an integration
clause can be waived, see U.C.C. § 2-209(4),10 but we conclude that
no waiver occurred.
McDermott states that both parties "as a normal course of
conduct . . . regularly accommodated, modified, supplemented, and
finalized important aspects of the Shearleg Crane and its warranted
qualities after signing an initial contract document," and contends
that this course of dealing constituted a waiver of the contract's
modification requirement. The only case McDermott cites on this
point is Linear Corp. v. Standard Hardware Co., 423 So. 2d 966
(Fla. Dist. Ct. App. 1982). That case involved a contract for the
sale of electronic security devices between a manufacturer and a
wholesaler. The contract expressly stated that the goods were not
purchased on consignment and could not be returned. The contract
further required a signed writing to modify. The court found a
waiver of this writing requirement and a new agreement to
repurchase, concluding from a number of letters and telephone
conversations that the seller had agreed to a return of unsold
equipment.
In Linear, the new agreement involved a major change to the
contract, the right to return the goods. The changes referred to
by McDermott involved technical details that would have been
difficult to spell out in the contract. More important, the
10
N.Y. U.C.C. § 2-209(4) provides:
Although an attempt at modification or recision does not
satisfy the requirements of subsection (2) or (3) it can
operate as a waiver.
13
McDermott-AmClyde contract authorized changes to "plans, designs,
or specifications."11 These changes did not modify the contract;
they were contemplated by the parties, and the parties specifically
provided for them in the contract. Relatedly and significantly,
AmClyde and McDermott abided by the integration clause in
performing the contract, executing a modification by a signed
writing on one occasion. Representatives of McDermott and AmClyde
executed a formal contract Addendum changing the indemnity/Hold
Harmless provisions. At the same time, the parties left the
WARRANTY and INTEGRATION clauses untouched. If Mr. Ucci and Mr.
Higgins intended to create a new warranty, they could have done so
by complying with the contract's integration clause.
C.
The jury found that AmClyde breached an implied warranty of
the hook. AmClyde argues, however, and we agree that this finding
has no legal consequence. The McDermott-AmClyde contract waived
all implied warranties. N.Y. U.C.C. Law § 2-316(2) (McKinney
1991).12 Moreover, McDermott admitted that the contract waived all
11
ARTICLE V - CHANGES
A. Buyer may, at any time by a written order, make changes
within the general scope of this Contract in any one or more
of the plans, designs, or specifications. If any such
change causes an increase or decrease in the cost of or the
time required for the performance of any part of this
Contract, the Seller must advise Buyer Representative
immediately and confirm to Buyer in writing within 5 working
days. Nothing in this section shall excuse Seller from
proceeding with the Contract as changed.
12
N.Y. U.C.C. § 2-316(2) provides:
Subject to subsection (3), to exclude or modify the implied
14
implied warranties under Fed. R. Civ. P. 36(b). AmClyde asked
McDermott to admit or deny "[t]hat the Contract for Supply of 5,000
Short Ton Shearleg Derrick between McDermott and Clyde Iron dated
January 10, 1986, in Article XV(A), waived any implied warranty."
McDermott replied "Admitted." The magistrate should have ignored
the jury's answer to this question. American Automobile Ass'n. v.
AAA Legal Clinic, 930 F.2d 1117, 1120 (5th Cir. 1991).
IV.
This brings us to McDermott's tort claims against AmClyde.
Article XV of the McDermott-AmClyde contract provides that:
"Correction of nonconformities, in the manner provided above, shall
constitute fulfillment of all liabilities of the Seller to the
Buyer or any other person whether based upon Contract, tort, strict
liability or otherwise." (emphasis added). AmClyde argues that
this provision protects it from liability to McDermott in tort. We
agree.
Contractual provisions waiving negligence and strict liability
claims are enforceable under New York law. See Laudisio v. Amoco
Oil Co., 437 N.Y.S.2d 502, 504 (N.Y. Sup. Ct. 1981) (negligence);
Velez v. Craine & Clark Lumber Corp. 350 N.Y.S.2d 617, 623 (N.Y.
1973) (strict liability). Contractual waivers of liability are
warranty of merchantability or any part of it the language
must mention merchantability and in case of a writing must
be conspicuous, and to exclude or modify any implied
warranty of fitness the exclusion must be by a writing and
conspicuous. Language to exclude all implied warranties of
fitness is sufficient if it states, for example, that "There
are no warranties which extend beyond the description on the
face hereof."
15
subject to close judicial scrutiny and "it must appear plainly and
precisely that the limitation extends to negligence or other fault
of the party attempting to shed his ordinary responsibility."
Howard v. Handler Bros. & Winell, 107 N.Y.S.2d 749, 752 (N.Y. App.
Div. 1951), aff'd, 106 N.E.2d 67 (N.Y. 1952); Gross v. Sweet, 424
N.Y.S.2d 365, 368 (N.Y. 1979). McDermott does not attack the
exculpatory provision in the McDermott-AmClyde contract as being
vague or ambiguous. The provision is precise. It specifically
mentions "tort" and "strict liability," terms familiar to
sophisticated business entities such as these. See Gross, 424
N.Y.S.2d at 368 (noting that broadly worded clauses may be
sufficient where sophisticated business entities are involved).
Moreover, similar clauses are common in commercial markets. See
e.g. Nicor Supply Ships Assocs. v. General Motors, 876 F.2d 501,
504 (5th Cir. 1989); Arkwright-Boston Mfrs. Mutual Ins. Co. v.
Westinghouse Elec. Corp., 844 F.2d 1174, 1181 n.15 (5th Cir. 1988);
American Electric, 418 F. Supp. at 452 n.25.13
We hold that McDermott has no claims against AmClyde, except
for breach of the limited warranty in their contract. We reverse
this portion of the judgment of the district court.14
V.
13
The exculpatory provision's preclusion of liability in
tort bars McDermott's misrepresentation claim as well.
Therefore, the jury's finding of a misrepresentation defect was
of no legal significance.
14
Because we reverse the judgment against AmClyde, we need
not address AmClyde's other assignments of error.
16
Turning to River Don, McDermott's contention that it should
have been allowed to proceed against River Don for a breach of
warranty is unclear. On one hand, McDermott states it "was not
allowed to proceed in contract against River Don for any damages
but was restricted to tort damages by River Don to the deck section
alone," and "[t]he court, inexplicably, would not allow any
evidence of contract remedies that River Don would owe to
McDermott, Inc., directly or as third party beneficiary, per
Article XV." On the other hand, McDermott says "the evidence
adduced at trial demonstrated that River Don made express and
implied warranties regarding the Hook which were communicated to
McDermott with the expectation that these representations would be
relied upon." Regardless, McDermott has not preserved this issue
for appeal.
The magistrate judge did not rule on McDermott's contract
claim against River Don. The magistrate relied upon East River in
ruling that McDermott could recover in tort for the damage to the
deck but not to the crane. Without objection, the district judge
submitted only McDermott's warranty claims to the jury.
VI.
River Don argues that the exculpatory provision in the
McDermott-AmClyde contract protects it as well as AmClyde from
liability in tort. River Don relies on Aeronaves De Mexico, S.A.
v. McDonnell Douglas, 677 F.2d 771 (9th Cir. 1982). In that case,
an airplane's landing gear failed. Aeromexico sued the
manufacturer of the plane, McDonnell Douglas, and the subcontractor
17
who manufactured the landing gear assembly, Menasco. Id. at 772.
The contract between Aeromexico and McDonnell Douglas contained a
warranty provision, similar to that in the McDermott-AmClyde
contract, barring a negligence action against McDonnell Douglas.
Id. at 773. Aeromexico did not contest the validity of that
provision but on appeal argued that the exculpatory provision did
not bar its suit against Menasco, because Aeromexico and Menasco
were not in privity. The court rejected this contention,
concluding that recovery by Aeromexico from Menasco would be a
windfall. The court relied on the fact that if Aeromexico were
allowed to sue Menasco directly, Menasco could file a third party
claim against McDonnell Douglas. Id. In fact, the district court
found that the contract between McDonnell Douglas and Menasco
permitted such a claim. Id. at n.4. The liability would be
visited upon McDonnell Douglas, "thus nullifying the contractual
allocation of risks" between McDonnell Douglas and Aeromexico. Id.
at 773.
We decline to apply the rationale of Aeronaves de Mexico. We
are mindful of the fact that we must apply New York law to
interpret the McDermott-AmClyde contract. We are not persuaded
that New York would here abandon the rule of privity. If River Don
had a claim against AmClyde and thus could shift ultimate liability
to AmClyde, this fact would not persuade us that McDermott is
barred from recovering against River Don. If AmClyde wanted to
prevent River Don from shifting liability, AmClyde could have
sought this protection from River Don in their subcontract.
18
AmClyde only warranted equipment of its own manufacture. The
contract did not preclude McDermott from suing other
manufacturers.15
River Don's tort liability turns then on the East River
doctrine. In East River Steamship Corp. v. Transamerica Delaval,
Inc., 476 U.S. 858, 871 (1986), the Supreme Court held that "a
manufacturer in a commercial relationship has no duty under either
a negligence or strict products liability theory to prevent a
product from injuring itself." The Court reasoned that when the
only damage is economic loss to the product itself, the purchaser
has simply lost the benefit of its contractual bargain and should
be limited to its contractual warranty remedies. Id. at 872-876.
McDermott argues that East River does not shield River Don
from tort liability, because River Don is not a party to the
contract between McDermott and AmClyde. In Shipco 2295, Inc. v.
Avondale Shipyards, Inc., 825 F.2d 925, 929 (5th Cir. 1987), we
held that under East River there is "no rational reason to give the
buyer greater rights to recover economic losses for a defect in the
product because the component is designed, constructed, or
furnished by someone other than the final manufacturer." Allowing
such a recovery would "undermine the objective of East River that
the parties receive the benefit of their bargain." Id.; see also
Nathaniel Shipping, Inc. v. General Elec. Co., 920 F.2d 1256, 1263-
15
Article XV provides in part: THE BUYER AGREES THAT IT
MUST RELY SOLELY ON THE MANUFACTURER'S WARRANTIES APPLICABLE, AND
THAT IT SHALL HAVE NO REMEDY AGAINST THE SELLER FOR BREACH OF A
MANUFACTURER'S WARRANTY.
19
64, modified, 932 F.2d 366 (5th Cir. 1991). Thus, East River
applies to River Don.
East River applies when the action is for damage to the
product itself and not for damage to "other property." Shipco, 825
F.2d at 929. Therefore, the issue in this case is whether the deck
is "other property" so as to escape East River's bar to recovery in
tort. We ask "what is the object of the contract or bargain that
governs the rights of the parties?" Id. at 928; see also Petroleum
Helicopters, Inc. v. Avco Corp., 930 F.2d 389, 393 n.9 (5th Cir.
1991); Nicor Supply Ships Assocs. v. General Motors, 876 F.2d 501,
505 (5th Cir. 1989).
River Don argues that the deck is not "other property,"
because McDermott owns the deck as well as the crane, pointing to
Nicor. Nicor Supply Ships chartered its vessel to Digicon.
Digicon then installed structures and equipment on the vessel for
use during the term of the charter. A fire damaged the ship and
Digicon's equipment. Nicor and Digicon sued several parties. 876
F.2d at 502-03. East River barred Nicor's claim for damage to the
ship. Digicon's claim for damage to its equipment survived
"[b]ecause these items were not part of the contract under which
the vessel was sold." Id. at 506. The decision did not turn on
Digicon's ownership of the damaged equipment. The object of the
McDermott-AmClyde contract was the manufacture, design, and sale of
the crane, and that is the relevant inquiry. The deck was not the
object of the sales contract rather the deck is "other property."
20
McDermott argues that River Don is liable for damage to the
crane, because when a plaintiff suffers damage to "other property",
East River allows recovery of all damages. East River allows
recovery for damage to other property, 476 U.S. at 875-76, but when
there is damage to other property, recovery for the loss to the
product itself is still in contract and not tort. We emphasized
this point in Nicor. Speaking of Digicon's recovery in tort, we
stated
[h]aving sustained "physical injury to a proprietary
interest," Digicon may recover for economic loss as well, but
its recovery for loss of profits is limited to losses
resulting from its inability to use the "other property" it
placed on the vessel as a result of the casualty. Digicon is
not entitled to recover for its loss of profits resulting from
its inability to use the vessel itself or for its inability to
use the "other property" if that resulted solely from the
disability of the vessel itself.
876 F.2d at 506 (emphasis added). Therefore, this contention is
without merit.16 The trial court correctly applied East River to
allow McDermott's recovery against River Don for damage to the
deck, but not the crane.
VII.
River Don argues that McDermott failed to prove causation. We
review the evidence in the light most favorable to McDermott.
Martin v. American Petrofina, Inc., 779 F.2d 250 (5th Cir. 1985).
The verdict stands if reasonable jurors could reach different
conclusions. Id. We decline to disturb the verdict.
16
McDermott also attempts to circumvent East River by
arguing that the decision is inapplicable to the crane, a product
that is unreasonably dangerous. The Supreme Court rejected this
distinction East River. 476 U.S. at 869-70.
21
At trial, McDermott and River Don offered different theories
of causation. McDermott argued that the hook was defective, and
the defect caused the hook to break. River Don conceded that the
hook contained flaws but argued that McDermott's use of a right
hand to left hand cable laid sling arrangement caused the hook to
break. That is, McDermott's sling arrangement allowed the slings
to rotate during the lift. This rotation caused the slings to
break first, putting more stress on the hook than it was designed
to handle.
McDermott offered the testimony of Dr. Kenneth Packer, an
expert in foundry practice, welding, and metallurgy. Packer
testified that the hook contained a flaw that caused the hook to
fail; that the hook broke first. On cross-examination, Dr. Packer
testified that the hook was flawed when it left River Don's
foundry.
River Don argues that Dr. Packer failed to substantiate
McDermott's theory of causation and could not discount other
plausible theories, namely that the slings broke first. River Don
refers to the fact that the crane, with the flaw, lifted objects
weighing as much or more than the deck before the accident and in
fact successfully lifted the deck on one occasion. Therefore,
River Don argues that the flaw could not have caused the hook to
fail.
We find that McDermott presented sufficient evidence for the
jury to conclude that hook failure caused the deck to fall. See
Brown v. Parker-Hannifin Corp., 919 F.2d 308, 312 (5th Cir. 1990)
22
("To establish causation, [plaintiff] need not rule out every
conceivable explanation for the failure . . ."). First, the jury
could have reasonably inferred that the flaw in the hook caused it
to break. The jury could have considered the presence of the flaw
in earlier lifts in evaluating the likelihood that the hook caused
the accident, but the presence of the flaw from the beginning does
not eliminate it as a cause of the accident. Second, Dr. Packer
was not the only witness to testify that the hook failed first.
Steven Whitcomb, a project manager at Hudson Engineering, prepared
a report on the cause of the accident. The report was based on a
computer analysis of the two theories of causation, hook failure
and sling failure. He delivered this report in a presentation to
AmClyde. At trial, he testified about his report to AmClyde in
which he concluded that the hook failed first and was the cause of
the accident. McDermott also presented eye witnesses to the
accident who testified that the hook broke first.
VIII.
River Don contends that any judgment rendered against it must
be offset by the $1 million settlement between McDermott and the
sling defendants under Hernandez v. M/V RAJAAN, 841 F.2d 582 (5th
Cir. 1988). Hernandez held that a maritime plaintiff "is entitled
to receive a full damage award less any amount he recovered in a
settlement with third-party defendants." Id. at 591; see also
Constructores Tecnicos v. Sea-Land Serv., Inc., 945 F.2d 841 (5th
Cir. 1991); Rollins v. Cenac Towing Co., 938 F.2d 599 (5th Cir.
1991); Myers v. Griffin-Alexander Drilling Co., 910 F.2d 1252 (5th
23
Cir. 1990). This rule of setoff "ensure[s] that the plaintiff does
not recover more than the damages determined at trial."
Constructores, 945 F.2d at 850.
McDermott argues that Leger v. Drilling Well Control, Inc.,
592 F.2d 1246 (5th Cir. 1979), states the law of this circuit and
does not entitle River Don to a dollar-for-dollar credit. A recent
panel of this court suggested that it is unclear whether Leger or
Hernandez provides the rule of settlement credit in this circuit.
See Hardy v. Gulf Oil Corp., 949 F.2d 826, 835 (5th Cir. 1992).
Judge Brown wrote a concurring opinion to emphasize the need to
resolve this conflict en banc. Id. at 836. However, we think that
Hernandez is the law of this circuit. The panel in Myers attempted
to make this point clear:
we read Hernandez as adopting the reasoning of the Eleventh
Circuit opinion in Self v. Great Lakes Dredge & Dock Co., 832
F.2d 1540 (11th Cir. 1987), which declined to follow Leger on
grounds that Leger was inconsistent with Edmonds v. Compagnie
Generale Transatlantique, 443 U.S. 256, 99 S. Ct 2753, 61 L.
Ed. 2d 521 (1979).
Myers, 910 F.2d at 1256.
Until the Eleventh Circuit decided Self, Leger was binding
precedent in that circuit as well as our own. See Bonner v. City
of Prichard, 661 F.2d 1206 (11th Cir. 1981) (en banc) (adopting as
binding precedent all decisions of the former Fifth Circuit handed
down before the close of business on September 30, 1981). In Self,
the Eleventh Circuit decided that Leger's pro rata approach to
settlement credit was inconsistent with the Supreme Court's opinion
in Edmonds. Thus, in Self, the Eleventh Circuit returned to the
pro tanto or dollar-for-dollar approach to credit set out in our
24
earlier opinion in Billiot v. Seward Seacraft, 382 F.2d 662, 664-65
(5th Cir. 1967). We had abandoned Billiot in Leger based on United
States v. Reliable Transfer Co., 421 U.S. 397 (1975). Today, there
is no doubt in the Eleventh Circuit that Self overruled Leger.
Great Lakes Dredge & Dock Co. v. Tanker, 957 F.2d 1575, 1580
(1992).
In Hernandez, we explicitly adopted the Eleventh Circuit's
reasoning in Self. Therefore, we also overruled Leger as precedent
in this circuit and returned to the rule in Billiot. See, e.g.,
Pruitt v. Levi Strauss & Co., 932 F.2d 458, 465 (5th Cir. 1991) (a
panel may ignore the decision of a prior panel in the event of a
superceding decision by the Supreme Court). Since Hernandez, we
have applied its dollar-for-dollar approach. See Constructores,
945 F.2d 841; Rollins, 938 F.2d 599; Myers, 910 F.2d 1252. Two
recent panels cited Leger, suggesting that it remains good law.
See Empresa Lineas Maritimas v. Schichau-Unterweser, 955 F.2d 368,
374 (5th Cir. 1992); Teal v. Eagle Fleet, Inc., 933 F.2d 341, 346
(5th Cir. 1991). However, they did not apply the Leger approach.
We continue to apply Hernandez in calculating settlement credit.
The district court refused to allow any set-off, concluding
that McDermott would not be paid for more than its injury, because
East River left it otherwise uncompensated for the damage to the
crane. This is true, but not relevant. The jury determined that
McDermott's total loss for the damage to the deck was $2.1 million,
$1.47 million after a reduction of 30% for the responsibility
attributed to McDermott/sling defendants. $1.47 million is
25
McDermott's "full damage award." It cannot recover more. We must
then deduct the Hernandez credit.
This requires us to address McDermott's post-trial revelation
that half of the settlement was allocated to the crane and half to
the deck. McDermott urges that because River Don is only liable
for the deck, it is only entitled to credit for that part of the
settlement covering damage to the deck. River Don urges us not to
consider this allocation, because it was made after trial, it was
not a party to the agreement and the settlement is not in the
record.
We see little reason to give effect to this allocation and
strong reasons not to do so. Where defendants are potentially
liable for the same damages and less than all defendants settle,
uncertainty of the effect upon the nonsettling defendants does
little to facilitate settlement and may well frustrate the single
recovery rule itself. A plaintiff should not be able to wait for
the jury's verdict to allocate the settlement in a way that reduces
the remaining defendants' credit. See King Cotton, Ltd. v. Powers,
409 S.E.2d 67, 70 (Ga. Ct. App. 1991); see also Alexander v.
Seaquest Inc., 575 So. 2d 765, 766 (Fla. Dist. Ct. App. 1991)
(apportionment of settlement comes too late if done after jury
verdict, because nonsettling tortfeasors lose the right to settle);
Dionese v. City of West Palm Beach, 500 So. 2d 1347, 1351 (Fla.
1987) (disclosure of settlement's terms may lead the non-settling
defendant to settle instead of going to trial).
26
Rejecting McDermott's allocation of one-half to the crane and
one-half to the deck leaves two options. We could apportion the
settlement ourselves, or use the entire sum in calculating any
credit due River Don. We decline the first option. See Lendvest
Mortgage, Inc. v. De Armond, 123 B.R. 623, 624-25 (Bankr. N.D. Cal.
1991) (rather than attempt to allocate a settlement, a court should
offset the entire amount). There is no evidence in the record
concerning McDermott's damages to the crane. A remand to the trial
court offers no solution.
Including the full amount of McDermott's settlement in
calculating any credit due River Don is the best solution. See
U.S. Indus., Inc. v. Touche Ross & Co., 854 F.2d 1223, 1262 (10th
Cir. 1988) (where nonsettling defendants are not privy to
settlement negotiations, burden shifts to plaintiff to show that
settlement did not represent common damages); see also Hess Oil
Virgin Islands Corp. v. UOP, Inc., 861 F.2d 1197 (10th Cir. 1988)
("If [plaintiff] wanted to have any particular application of its
settlement with the settling defendants toward [nonsettling
defendant's] liability, it should have specifically stipulated in
the settlement documents what allocations of damages were
applicable to each cause of action."); but see Force v. Director,
OWCP, Dept. of Labor, 938 F.2d 981, 985 (9th Cir. 1991) (defendant-
employer bears burden of proving settlement allocation, because the
LHWCA's policy "of compensating employees for their injuries
requires that 'all doubtful questions of fact be resolved in favor
of the injured employee'").
27
McDermott had a claim against the sling defendants for damage
to the crane and the $1 million payment obtained a release of that
claim as well as the claim for damage to the deck. It was
McDermott's burden to demonstrate that its jury award did not
exceed its right to full compensation for a particular injury.
McDermott has not met its burden of demonstrating that the proceeds
of the settlement with the sling defendants were for damage to the
crane and not the deck. We hold that the entire $1 million should
be included in calculating any credit due River Don. See U.S.
Industries, 854 F.2d at 1262-63; Hess Oil, 861 F.2d at 1209;
Lendvest Mortgage, 123 B.R. at 625. Alexander, 575 So. 2d at 765;
King Cotton, 409 S.E.2d at 70; Dionese, 500 So.2d at 1349.17
Applying Hernandez, McDermott's full damage award is $1.47
million ($2.1 million jury verdict less 30% attributed to
McDermott/sling defendants). We then deduct the $1 million
received in settlement to reach $470,000. By the jury's finding,
River Don is liable to McDermott for its portion of McDermott's
loss (38% of $2.1 million or $798,000). However, McDermott is only
entitled to recover an additional $470,000 from any defendant. We
therefore modify the judgment against River Don for $798,000, and
enter judgment against River Don and in favor of McDermott in the
amount of $470,000.
17
Our conclusion that River Don is entitled to credit for
McDermott's settlement makes consideration of River Don's
alternative argument for a new trial based on evidentiary rulings
unnecessary.
28
It does not follow that McDermott's decision at trial to
assume the fault of the sling defendants was unwise. To the
contrary, this tactical move made more difficult any effort of
River Don and AmClyde to lay any fault on the absent sling
defendants. But for this move the jury may well have been
persuaded that the sling defendants were liable for more than 30%
and the other defendants, including River Don for less. Seen in
the light of these realities of trial, this result makes sense.
IX.
McDermott claims pre-judgment interest. The jury awarded no
interest. McDermott does not challenge the jury instruction,18
which tracked the law of this circuit.19 See Orduna S.A. v. Zen-Noh
18
The jury was charged as follows:
In admiralty cases, the award of pre-judgment interest from
the date of the loss is the rule rather than the exception.
The decision to deny pre-judgment interest must be based on
the existence of peculiar circumstances because pre-judgment
interest is awarded as a compensation for a wrong done. It
is your responsibility to determine whether to award
McDermott, Inc. pre-judgment interest. If you determine
that the - that the Plaintiff is entitled to pre-judgment
interest; that is, interest from the date of the loss until
the date you render your verdict, you must determine the
rate at which the interest will be calculated. The
circumstances which may justify denial of an award for pre-
judgment interest are as follows: A genuine dispute over a
good faith claim exists in a mutual fault situation - mutual
fault setting; the damages awarded are substantially less
than the amount claimed by the Plaintiff; the Plaintiff's
contributory negligence is to such a magnitude as to make
and award of pre-judgment interest inequitable.
19
McDermott refers us to Texas, New York, and Louisiana law;
however, pre-judgment interest on a maritime tort claim is
governed by general maritime law. Wyatt v. Penrod Drilling Co.,
735 F.2d 951, 955 (5th Cir. 1984); Robinson v. Pocahontas, Inc.,
477 F.2d 1048, 1053 (5th Cir. 1973).
29
Grain Corp., 913 F.2d 1149, 1157 (5th Cir. 1990) (noting the
reasons for denying pre-judgment interest). Rather, McDermott
argues that the circumstances justifying denial of pre-judgment
interest were not present in this case. We disagree.
The jury could have found there was a genuine dispute over a
good faith claim in a mutual fault setting. "Our cases have
consistently upheld denials of prejudgment interest in cases of
apportioned fault." Inland Oil and Transport Co. v. Ark-White
Towing Co., 696 F.2d 321, 328 (5th Cir. 1983). In this case, the
jury assessed responsibility 32% to AmClyde, 38% to River Don, and
30% to McDermott/sling defendants. See id. (upholding a denial of
pre-judgment interest where the plaintiff was found to be 25% at
fault).
X.
Finally, McDermott asks us to correct the judgment to show
that the jury apportioned causation and not fault. The judgment
paraphrased the jury verdict as follows: "thirty percent (30%)
fault allocated to plaintiff, McDermott, Inc., thirty-two percent
(32%) fault allocated to AmClyde, a Unit of AMCA International
Corporation, and thirty-eight percent (38%) fault allocated to
River Don Castings, Ltd." (emphasis added). McDermott contends
that the judgment incorrectly paraphrased the jury's verdict which
allocated causation and not fault. Interrogatory #5 asked:
You have been instructed that the failure of the sling at a
load less than its rated minimum breaking strength is a cause
of damage to the deck and crane. If you have also answered
interrogatories 1 and 2 "yes," please state what proportion or
percentage of plaintiff's damages you find from a
30
preponderance of the evidence to have been legally caused by
the fault of the respective parties?
We agree that in answering this interrogatory the jury determined
the percentage of injury caused by each defendant.
REVERSED in part and AFFIRMED as modified in part.
31