Action to foreclose mechanics’ liens against moneys claimed to be due to Thomas F. Moore under a subcontract with the Mack Paving and Construction Company, which had a contract with the Bronx valley sewer commissioners for the construction of a trunk sewer through a part of the county of Westchester. The plaintiff furnished materials of the value of $2,287.98 to the subcontractor Moore. Several defendants have liens for various amounts filed subsequently to the plaintiff’s.
This is the second trial of the case, after the reversal by the Appellate Division of a judgment given to the plaintiff at the first trial. According to the estimate of the engineer of the Bronx valley sewer commission the subcontractor
Moore contracted to perform for the Mack Construction Company part of the work to be done by that company under its contract with the Bronx valley sewer commission, to wit: All of section 5 and the south end of section 4.
In this contract, Moore “ declares, agrees and admits that he has examined the contract plans and specifications for the construction of the Bronx Valley Sewer, and especially those portions which refer to the construction of section 5, and that part of section 4 above described, and is thoroughly familiar with all that relates to the same.” That contract provided:
“66 Section 5. The contractor hereby agrees to receive and accept as and for his full compensation for furnishing all the materials and labor and building, constructing and fully completing and maintaining for six (6) months all of the work called for under this contract, and for all the labor and materials incidental thereto, as required by the specifications, and as shown on the plans of the work referred to therein, the following prices:
188.24
Diameter
6'0"
Section of sewer
A
Cut
0-15
at fifteen ($15) dollars per foot. * * * The above prices include all excavation, back-filling, waterproofing, concrete, foundations, piling, underdrain, forms, reinforcement, labor, materials and all other things necessary for the full and enduring completion of the entire work.”
The contract contained a similar provision as to section 4.
The plaintiff’s - claim relates to the interpretation put upon the word “ cut ” at the head of one of the columns of tabulation by the engineer of the Bronx valley sewer commission in his monthly estimate of work done, under which the Mack Paving and Construction Company, the contractor, and in turn Moore, the subcontractor, were paid. The engineer has construed the word to mean “ distance from the surface of the ground to the flow line or bottom of the inside of the sewer when the sewer is constructed in open cut.”
The Mack Company’s contract with the commission provides that the commissioner’s engineer “ shall be the sole and final judge and arbiter as to the intent and meaning of any clause in this contract.” The engineer’s interpretation was made in good faith. There is no claim or proof of fraud or collusion, and his interpretation must be accepted. Besides, the Moore contract contains the following provision: “ It is understood by the parties to this agreement that certain work has been done on Section Five by said first party (Mack Company) and estimated at twelve hundred and seventy-six dollars ($1,276.00) by the Bronx Valley Sewer Commission, and it is agreed by the parties to this agreement that when the sewer is built over the lines of this work, the party of the first part shall deduct from the amount due the party of the second part (Mack) seventy per cent (70$) of the said estimated amount.”
This estimate" was made by the commissioners’ engineer under- his said interpretation of the word “ cut.” This court, therefore, must assume that Moore, when he contracted with the Mack Company, accepted that interpreta
The defendants Mack Paving and Construction Company and the Massachusetts Bonding and Insurance Company are entitled to judgment dismissing the complaint, with costs.
Judgment accordingly.