It appears from the record, that the County of Macon had built, or caused to be built, a bridge over Camp creelc. The evidence indicates that there were two portions of the bridge, one over the main stream and the other over a slough. This was done in 1882 or 1883. More than seven years thereafter, both portions of the bridge were washed away, one washed away entirely and the other so much so that it was impossible to cross it in a vehicle or on horseback, and difficult to cross on foot. The county authorities employed Joiner to rebuild the bridge. He did so by making an entirely new bridge over the main stream, and by replacing the arches of the bridge over the slough and putting in “some new sleepers, a new top, new banisters, and some abutting boards.” At the direction of one of the county commissioners, he used some of the old sleepers in rebuilding the bridge over the slough. These sleepers Joiner thought were insufficient and defective, but he doubled them so as to make them as strong as their defective condition would permit. In November, 1894, while the plaintiff was crossing, on a wagon loaded with cotton, that portion of the bridge which was over the slough, it fell in by reason of the weakness and rottenness of the timbers, and plaintiff was thereby injured and damaged. She brought suit against the county, and on the trial of the case the judge, after hearing the facts, granted a nonsuit.
Under the facts above recited, we think the court erred in granting the nonsuit. We think the question should have been submitted to a jury, for them to detérmine from the evidence whether that portion of the bridge which fell in and injured the plaintiff was rebuilt by the county authorities, or
Judgment reversed.