Atlantic & Pacific Railroad v. Mingus

Lee, J.

(dissenting). — This is an action of ejectment, brought by the plaintiff in error to recover possession of one hundred and twenty acres of land situate in San Miguel county, New Mexico. The plaintiff claimed title under an act of congress of July 27, 1866, granting lands to the Atlantic & Pacific Railroad Company, against which the defendant relied on the United States patent issued December 10, 1891. The case was tried to a jury, which, under the direction of the court, returned a verdict of not guilty, and judgment was .accordingly rendered thereon in favor of the defendant. Plaintiff sued out a writ of error to this court. He has assigned as error the rulings of the .district court admitting in evidence defendant’s patent, refusing to direct the jury to find for plaintiff, refusing the instructions requested by plaintiff, and directing the .jury to find for defendant. These various rulings are brought before this court for review by exceptions properly taken. It appears from an examination of the record that they all raise substantially the same question, and therefore it will not be necessary for us to consider and pass upon them separately. There is no conflict in the testimony as to the facts upon which the rights of the parties depend. The facts appear to be undisputed, and, so far as, they are deemed material to a decision of the case, are as follows:

The Atlantic & Pacific Railroad Company is a corporation-, created by act of congress, approved July 27, 1866, the essential provisions of which are as follows: “Be it enacted,” etc.: “Section 1. That John Brown, * * * John C. Fremont, * * * and all such other persons who shall or may be associated with them, and their successors, are hereby created and erected into a body corporate and politic, in deed and in law, by the name, style, and title of the Atlantic & Pacific Railroad Company, and by that name shall have perpetual succession, and shall be able;to sue,, plead and be impleaded, defend and be defended, in all courts of law and equity within the United States, and may make and have a common seal. And said corporation is hereby authorized and empowered to lay out, locate, construct, furnish, maintain andjenjoy, a continuous railroad and telegraph line, with this appurtenances, namely: Beginning at or near the!town of Springfield, in the state of Missouri, thence • to the western boundary line of said state, and thence by the most eligible railroad ¡route as shall be determined by said company, to a point on the Canadian River, thence to the town of Albuquerque, on the River del Norte, and thence, by way of the Agua Frio, or other suitable pass, to the head waters of the Colorado Chiquito, and thence, along the thirty-fifth parallel of latitude, as-near as may be found most suitable for a railway route to the Colorado river, at such point as may.be selected by said company for crossing; thence by the most, practicable and eligible route, to the Pacific. The said company shall have the right to construct a branch from the point at which the road strikes the Canadian river eastwardly, along the most suitable route as selected, to a point in the western boundary line of Arkansas, at or near the town of Van Burén. And the said company is hereby vested with all the powers,, privileges and immunities’ necessary to carry into effect the purposes of this act, as herein set forth. The capital stock of said company shall consist of one million shares of one hundred dollars each, which shall in all respects be deemed personal property, and shall be transferable in such manner as the laws of ,said corporation shall provide.” Then follow various details relating to the organization of the company. “Sec. 2. And be it further enacted: That the right of way through the public lands be, and the same is hereby, granted to the said Atlantic & Pacific Railroad Company, its successors and assigns, for the construction of a railroad and telegraph line as proposed; and the right, power, and authority is hereby given to said corporation to take from the public lands adjacent to the line of said road material of earth, stone, timber, etc., for the construction thereof. Said way is granted to said railroad to the extent of one hundred feet in width on each side of said railroad where it may pass through the public domain, including all necessary grounds for station buildings, workshops, depots, machine shops, switches, side tracks, turntables and water stations; and the right of way shall be exempt from taxation within the territories of the United States. The United States shall extinguish as rapidly as may be consistent with public policy and the welfare-of the Indians, and only by their voluntary cession, the Indian title to all lands falling under the operation of this act and acquired in the donation to the road named in the act. Sec. 3. And be it further enacted: That there be, and hereby is, granted to the Atlantic & Pacific Railroad Company, its successors and assigns,, for the purpose of aiding in the construction of said railroad and telegraph line to the Pacific coast, and to-secure the safe and speedy transportation of the mails, troops, munitions of war, and public stores, over the-route of said line of railway and its branches, ■ every alternate section of public land, not mineral, designated by odd numbers, to the amount of twenty alternate-sections per mile, on each side of said railroad line, as said company may adopt, through the territories of the United States, and ten alternate sections’ of land per mile on each side of said railroad whenever it. passes through any state, and whenever on the line thereof, the United States have full title, not reserved, sold, granted, or otherwise appropriated, and free from preemption or other claims or rights, at the time the line of .said road is designated by a plat thereof, filed in the office of the commissioner of the general land office.” After a number of provisions which need not be quoted here, the section concludes: “And provided further, that no money shall be drawn from the treasury of the United States to aid in the construction of the said Atlantic & Pacific Railroad.” Section 4 provides the manner in which the railroad shall be examined by commissioners and accepted, and patents for lands issue as the road is constructed. Section 5 provides how the road shall be built. “Sec. 6. And be it further enacted: That the president of the United States shall cause the lands to be surveyed for forty miles in width on both sides of the entire line of said road after the general route shall be fixed, and as fast as may be required by the construction of said railroad, and the odd sections of land hereby granted shall not be liable to sale or entry, or preemption, before or after they are surveyed, except by said company, as provided in this act; but the provisions of the act of September, eighteen hundred and forty-one, granting preemption rights, and the acts amendatory thereof, and of the act entitled, ‘An act to secure homesteads to actual settlers on the public domain,’ approved May twenty, eighteen hundred and sixty-two, shall be, and the same are hereby extended to all other lands on the line of said road when surveyed, excepting those hereby granted to said company.” “Sec. 8. And be it further enacted: That each and every grant, right, and privilege herein are so made and given to and accepted by said Atlantic & Pacific Railroad Company, upon and subject to the following conditions, namely: That the said company shall commence work on said road within two years from the approval of this act by the president, and shall complete not less than, fifty miles per year after the second year, and shall construct, equip, furnish, and complete the main line of the whole road by the fourth day of July, A. D. 1878. Sec. 9. And be it further enacted: That the United States make the several conditional grants herein, and that the said Atlantic & Pacific Railroad Company accept the same, upon the further condition that if the said company make any breach of the conditions hereof, and allow the same to continue for upwards of one year, then, in such case, at any time hereafter, the United States may do any and all acts and things which may be needful and necessary to insure a speedy completion of the said road.” “Sec. 11. And be it further enacted: That said Atlantic & Pacific Railroad, or any part thereof, shall be a post route and military road, subject to the use of the United States for postal, military, naval, and all other government service, and also subject to such regulations as congress may impose, restricting the charges for such government transportation.” “Sec. 19. And be it further enacted: That unless the said Atlantic & Pacific Railroad Company shall obtain bona fide subscriptions to the stock of said company to the amount of one million of dollars, with ten per centum paid, within two years after the passage of and approval of this act, it shall be null and void. Sec. 20. And be it further enacted: That the better to accomplish the object of this act, namely, to promote the public interest and welfare by the construction of said railroad and telegraph line, and keeping the same in working order, and to secure to the government at all times, but particularly intime of war, the use and benefits of the same for postal, military, and other purposes, congress may, at any time, having due regard for the rights of the said Atlantic & Pacific-Railroad Company, add to, alter, amend, or repeal this-act.”

The organization of the company and subscription to the stock seem to have been carried out, in accordance with the provisions of the act, to the satisfaction of the government, within the time fixed, and the company was in numerous ways afterward treated as being duly organized to do business and exercise the powers conferred by the act of incorporation. It proceeded to survey and locate its railroad line along the general route prescribed by congress, and from time to time the plats of location designating its line were filed with the secretary of the interior, as required. Thereupon, by executive orders under the direction of the president of the United States, the alternate sections of public land within the forty mile limits on each side of the located line were withdrawn from sale, entry, or preemption, as provided by section 6 of the act of congress. Such withdrawal of lands in the territory of New Mexico was made by letter of the secretary of the interior May 8, 1872, to take effect from March 12, 1872, the date of the filing of the location plats: and the lands within the grant limits from there westward to the Pacific ocean were similarly withdrawn, to take effect at various dates in the year 1872. The price of the public lands in the even numbered sections within the grant limits, which were retained by the government, was increased to double minimum, or $2.50 per acre. By the eighth section of the Act of July 27, 1866, the company was required to commence construction within two years from that date, and build not less than fifty miles of railroad per year thereafter. Up to April 20, 1871, it had built only seventy-five miles of road. On that date congress passed an additional act authorizing the company to mortgage its road, franchises, lands, and other property to secure bonds to be issued to raise money for construction. That act is as follows: “An act to enable the Atlantic & Pacific Railroad Company to mortgage its road. Be it enacted,” etc.: “That the Atlantic & Pacific Railroad Company, organized under ■act of congress of July twenty-seventh, eighteen hundred and sixty-six, is hereby authorized to make and issue its bonds in such form and manner, for such sums, payable at such times, and bearing such rate of interest, and to dispose of them on such terms as its •directors may deem ádvisable; and to secure such bonds, the said company may mortgage its road, equipment, lands, franchises, privileges, and other rights and property, subject to such terms, conditions, and limitations, as its directors may prescribe. As proof and notice of the legal execution and effectual delivery of ■any mortgage hereafter made by said company, it shall be filed and recorded in the office of the secretary of the interior; provided, that if the company shall hereafter suffer any breach of the conditions of the act above referred to, under which it is organized, the rights of those claiming under any mortgage made by the company to the lands granted to it by said act shall extend •only to so much thereof as shall be coterminous with, or appertain to, that part of said road which shall have been constructed at the time of the foreclosure of said mortgage.”' Under the authority of this act the company executed mortgages covering the road and lands from Missouri to Albuquerque, New Mexico, to secure bonds to the aggregate amount of $3,590,629, and from Albuquerque to San Francisco to $16,000,000. The first of these includes the lands in controversy. These mortgages were duly executed and recorded in the office •of the secretary of the interior, as required by the act. The bonds secured by them fall due at different dates from 1901 to 1922. The bonds were sold and the moneys realized from their sale used toward the construction of the road. They are still outstanding and none of them will de due, according to their terms, before 1901. The interest has been paid. No. default as to any of the mortgages has occurred, and none of them have been foreclosed, nor by their terms could have been, or can now be, foreclosed. By the fourth day of July, 1878, — the date fixed by the act of 1866 for the completion of the road, — the company had only constructed one hundred and twenty-five miles-westward from Springfield, Missouri, the beginning point of the line. Afterward, and prior to July 6, 1886, it built fifty miles more in the Indian Territory, and five hundred and sixty miles westward from Albuquerque to the Needles on the Colorado river, all of which was examined and accepted by order of the president of the United States. It also acquired by contract of purchase two hundred and forty-three miles of road upon its located line from the Needles to Mojave, California, which had been constructed by the Southern Pacific Railroad Company. The intervening portion of the line from Sepulpa, in the Indian Territory, to Albuquerque, and from Mojave to San Francisco, in California, were in 1886, and still remain, unconstructed.

On July 6, 1886, congress passed an act to forfeit the land grant to the Atlantic & Pacific Railroad Company appertaining to the unconstructed portion of its railroad line, and restored the land to settlement, which act is as follows: “An act to forfeit the lands granted to the Atlantic & Pacific Railroad Company to aid in the construction of a railroad and telegraph line from the states of Missouri and Arkansas to the Pacific coast, and to restore the same to settlement, and for other purposes. Be it enacted by the senate and house of representatives of the United States of America, in congress assembled, that all the lands,- excepting the right of way and the right, power, and authority given to said corporation to take from the public lands adjacent to the line of said road material of earth, stone, timber, and so forth, for the construction' thereof, including all necessary grounds for station buildings, workshops, depots, machine shops, switches, side tracks, turntables and water stations, heretofore granted to the Atlantic & Pacific Railroad Company, by an act entitled, ‘An act granting lands to aid in the construction of a railroad and telegraph line from the states of Missouri and Arkansas to the Pacific coast,’ approved July twenty-seventh, eighteen hundred and sixty-six, and subsequent acts and joint resolutions of congress, which are adjacent to, and coterminous with, the uncompleted portions of the main line of said road, embraced within both the granted and indemnity limits, as contemplated to be constructed under and by the provisions of the said act of July twenty-seventh, eighteen hundred and sixty-six, and acts and joint resolutions subsequent thereto and relating to the construction of said road and telegraph, be and the same are hereby, declared forfeited and restored to the public domain. Approved July 6, 1886'.” Upon the passage of this act, all the lands within the grant limits which had been withdrawn from entry and sale by executive orders, as before stated, and which were opposite those portions of the railroad line not then constructed, were by order of the interior department declared to be restored to the public domain, and open for settlement and entry under the land laws. This included, among others, all the lands from the eastern boundary of New Mexico to Albuquerque, within which was the tract in controversy in this suit. This tract is shown by the testimony of the receiver of the land office of the district' in which it is situated to be nonmineral public land, to which, on March 12, 1872, the United States had full title, and which at that date was not reserved, sold, granted, or otherwise appropriated by the United States, and was free from preemption or other rights or claims. It is part of an odd numbered section within the forty mile limits of the Atlantic & Pacific grant. It therefore, falls within the el&ss of lands which by the act of 1866 was granted to the Atlantic & Pacific Bail-road Company, and as such was specifically included in the order of withdrawal of March 12, 1872, and from which withdrawal it was subsequently, after the act of July 6, 1886, released, and restored to entry. It was entered as a preemption January 9, 1888, and patented to the grantor of defendant December 10, 1891.

Upon this state of facts the sole question in the record is whether the title of the plaintiff company to the land in controversy acquired by the act of July 27, 1866, was divested by the forfeiture act of July 6, 1886. If it was, then the plaintiff at the commencement of the suit had no title, defendant’s patent was valid, and he was entitled to verdict and judgment. If it' was not, then defendant’s, patent was void, and should have been excluded; while plaintiff’s title was good, and the district court should have directed a verdict in its favor and given judgment accordingly. The act of J uly 6, 1886, on its face undoubtedly purports to divest the title of the railroad company to the land, and restore it to the public domain. It does not provide for any subsequent proceedings of any kind to effect a forfeiture, nor is it simply a declaration by congress of the intention of the United States to treat the grant as forfeited for failure to perform the conditions. It declares the lands forfeited absolutely, and restored to the public domain, and the executive branch of the government has dealt with the lands as being 'the property of the United States. Therefore, it is not a question of the construction of the act, but of its validity. If the act, for the purpose it professes to accomplish, is within the constitutional powers of congress, then it operated to divest the title of the plaintiff, and the judgment of the district court must be affirmed. If not, the plaintiff’s title is good, and the judgment of the court below was erroneous. This is the only question in the ease. This question, although thus reduced to a simple form, is the most serious that a court can be called upon to decide. The power to declare void an act of the highest legislative body of the government is an' extraordinary one, and it is well settled that such power is only to be exercised where it is perfectly clear and free from doubt that the act in question is beyond the powers conferred on congress by the constitution, or is within its prohibitions. The respect due to. the legislative branch of the government requires its acts should not be questioned except for the strongest and clearest reasons; and, on the other hand, private rights, which are guarantied by the constitution, are equally entitled to respect, and when it is plain that they have been infringed, courts should not hesitate to protect them. Whatever conclusion is reached, it should only be after grave consideration, with full sense of the responsibility which a decision of the question involves. This we have endeavored to give it.

As to the title acquired by the plaintiff under the original granting act of 1866, without reference to subsequent legislation, there will be no necessity for extended discussion. The language of the act in section 3 is: “That there be, and hereby is, granted to the Atlantic & Pacific Bailroad Company,” etc., “every alternate section of public land, not mineral, designated by odd numbers, to the amount of twenty sections per mile, on each side of said railroad line,” etc. This is the same language that has been used in various other congressional railroad grants, and it has been construed by the supreme court of the United States in a number of cases. The effect of the granting clause is held to be to pass the legal title to the grantee, so that it attaches to the specific lands upon filing the plats of location, and relates back to the date of the act. Schulenberg v. Harriman, 21 Wall. 44, 60; Leavenworth, etc., R. Co. v. U. S., 92 U. S, 733, 741; Buttz v. Railroad Co., 119 U. S. 55, 66-73, 7 Sup. Ct. Rep. 100; Wright v. Roseberry, 121 U. S. 488, 496-509, 7 Sup. Ct. Rep. 985; St. Paul & P. R. Co. v. Northern Pac. R. Co., 139 U. S. 1, 5, 11 Sup. Ct. Rep. 389; Salt Co. v. Tarpey, 142 U. S. 241, 245-250, 12 Sup. Ct. Rep. 158; U. S. v. Southern Pac. R. Co., 146 U. S. 593, 13 Sup. Ct. Rep. 163. The court has also passed upon this identical grant in the case of U. S. v. Southern Pac. R. Co., 146 U. S. 593, 13 Sup. Ct. Rep. 163, holding in the light of its previous decisions, that the act of congress made a grant in praesenti, and uses the following language: “Applying these well settled rules in the cases at bar, there can be little difficulty in arriving at a conclusion. The grant to the Atlantic & Pacific was made in 1866; to the Southern Pacific in 1871. They were grants in praesenti. When maps of definite location were filed and approved, the grants severally took effect by relation as of the dates of the acts. The map of definite location of the Atlantic & Pacific Company’s road along the lands in controversy was filed and approved on April 11, 1872. Then the specific tracts were designated, and to them the title of the Atlantic & Pacific attached as of July 27, 1866. If anything in the land laws of the United States can be considered as thoroughly settled by repeated decisions, it is this.” That court also holds that the title of the grantee under such grants was superior to that under a United States patent issued for lands within the grant, so long as it was still in force; and that a patent, issued under such circumstances, is void, and may be attacked in a court of law. Wright v. Roseberry, 121 U. S. 488, 7 Sup. Ct. Rep. 985. It may be considered as settled on the authority of these decisions that the plaintiff’s title under the grant of 1866 would be sufficient to enable him to recover in this action, unless it has been divested by the forfeiture act of 1886.

It is claimed by defendant in error that the act of July 6.1886, operated in law to do just what it states on its face, viz., to forfeit the lands which had been granted by the act of 1866, and restores them to the public domain. His position is that the grant was a conditional one, and that upon breach of the conditions the United States had the right and power to forfeit the grant. His contention is fully elaborated in the brief of his counsel, where it is here recapitulated as follows: First. That the final clause of section 9 of the Act of 1866 is in legal effect an express reservation of the right of congress to declare a forfeiture. Second. That under the conditions stated in section 9, when the same were broken, even without any express reservation in the act of the right of the government to declare a forfeiture, congress might, as a legal result of the broken conditions, declare such forfeiture. Third.' That in the grant of lands by the United States, in order to preserve the right of forfeiture, it is no more necessary to expressly reserve such right upon nonperformance of the condition in the act than it is at common law in a deed conveying lands with a condition subsequent to expressly reserve a right to enter on condition broken; but in both cases the right to do the act operating to make the forfeiture arising from nonperformance effective results as a legal incident from the nonperformance of the condition. Fourth. That, in the absence- of any express reservation of the power to declare a forfeiture of the grant in question, the courts may maintain the right of congress, upon breach of the condition, to declare a forfeiture' on the ground of public policy alone. Fifth. That the mortgage act of 1871 is only declarative of the common law fight to mortgage, and was enacted for the sole purpose of removing all doubt on that subject, to thereby aid the company to proceed with construction; and that it was not intended by said act to enlarge the rights of the company or to subordinate the interests of the government in the lands to the rights of future mortgagees. Sixth. That persons holding mortgages on said lands took only the title vested in the company at the date of the several mortgages, and subject to the right of the United States to declare the lands forfeited for n.onperformance of the conditions subsequent, except such lands as might be coterminous with construction. Seventh. That the rights of mortgagees can not be considered in this action, as no interest under any mortgage is set up by the plaintiff, but only the interests acquired under 'the act of 1866. Eighth. That the case of Railway Co. v. Esquibel, 5 N. M. 123, is conclusive in this court against the plaintiff. Defendant’s counsel further refer to the decision of this court in the case of Railway Co. v. Esquibel, 5 N. M. 123, upon a similar clause in the Texas Pacific act, as conclusive of the proposition that this clause was for the benefit of the goverhment, and not of the grantee, and that the railroad company can not be heard to say that the forfeiture of the land grant is not á proper measure to secure the completion of tho road.

The contention of plaintiff in error is briefly this: That the estate granted by the act of July 27, 1866, is one upon condition subsequent. That while, at common law, iü the absence of any express provision upon the subject, the right of the grantor to forfeit the estate for breach of condition undoubtedly exists, yet if the granting act, at the same time that it specifies the conditions, also declares what shall be the effect of a breach of them, such declaration of the consequence of a breach becomes as much a part of the condition as the act or omission itself. That the only conditions imposed by the granting act were: First, in the eighth section, that the railroad must be commenced within two years, prosecuted at the rate of at least fifty miles per year thereafter, and be finished by July 4, 1878; and, second, in the nineteenth section, that the company must obtain bona fide subscriptions to its stock to the amount of a million dollars within two years, with ten per cent paid in. That as to the second of these it was expressly provided that, if not done within the time fixed, the act shall be null and void. That the first condition — of construction within a fixed time — is the same that has been attached to all the grants by congress in aid of railroads or similar works, and that all such grants, — being over thirty in number, — with the exception of this and two others, have contained the further express condition that if the road or work should not be completed within the time fixed by the act the lands granted should revert to the United States. That after legislating in this sense since 1850, including nine other railroad grants made at the same session of congress in 1866, congress made a radical change in the corresponding condition as to the Atlantic & Pacific grant, by omitting the usual words providing for reversion or forfeiture of the lands to the United States in ease of breach of the condition, and inserting in its place an express provision, specifying as a further condition on which the grant is made by the United States and accepted by the company that in case of breach of the conditions continuing for a year “the United States may do any and all acts and things which may be needful and necessary to insure a speedy completion of the said road.” That by this change from legislative expression, sanctioned by long and continuous use in acts upon the same subject, to one entirely different, congress intended that the rights and liabilities of the parties should likewise be different in respect to the matters thus changed. That by expressly omitting the customary provision for reversion of the lands to the United States, and providing something else as the consequence of a breach of condition, congress excluded the idea of forfeiture, and limited the effect of a breach to the one specified. That the specification of the consequence mentioned necessarily implies that the general power of forfeiture was not intended to be reserved, because, if the latter existed, it would include all other powers with reference to the lands, and a reservation of lesser powers, necessarily so included, would be unnecessary. That by excluding, in contradiction to its previously established policy on this subject, the provision for reversion, and specifying something else, it became a part of the condition that the effect of the breach should be limited to the one so specified, and all other conditions must be read with this one attached. That by the ninth section the United States renounced any right it might otherwise have had to forfeit the grant, except it should be in furtherance of the completion of the road; and that to come within this reservation the act of forfeiture must be for that declared purpose, whereas the forfeiture act of 1886 is by its title avowedly for the purpose of opening the lands to settlement, and not in connection with any plan or proposal for completion of the road. Plaintiff in error also contends, and has introduced a large amount of evidence in an effort to show it, that the government, by failing to extinguish the Indian titles, and to survey the lands as earned by construction, and by locating new Indian reservations upon the line of the road and within its grant limits since the definite location of the line, is primarily responsible for the delay in construction, and that the performance of the conditions on part of the company can not be strictly required, or a breach declared for nonperformance, until the government has performed its own undertaking. We shall not attempt a review of this evidence, nor to determine whether the facts alleged on the point are or are not proven; nor whether, if proven, they can be availed of by the plaintiff in error to shield it from forfeiture of its land grant. In view of the conclusion at which we have arrived, it is not necessai-y to do so.

If these were the only questions in the case, the decision, so far as this court is concerned, might not be difficult. While there is much force in the argument for plaintiff in error that by the eighth and ninth sections of the Act of 1866 the general power of forfeiture by the grantor was waived, and the remedy for breach of condition limited to that stated in the last clause of section 9, nevertheless, as the same language has been heretofore construed by this court in the Texas Pacific act, we should be disposed to follow the decision in Railway Co. v. Esquibel, supra, and hold that the railroad company, in default as to the completion of the road, could not be heard to say that forfeiture is not an act deemed needful by the United States to insure the completion of the road. .But counsel for plaintiff in error further contends that the act of 1871, authorizing the company to mortgage its road, franchises, and land grant, passed after the company was already in default as to construction at the yearly rate required by the granting act, not only negatived any intention of congress by the act of 1866 to forfeit the grant for nonperformance of the condition, but was such an alteration of the original contract as to introduce new conditions, whereby the United States has postponed its right to take any steps under section 9 until a time that has not yet arrived. His argument, more fully developed orally than in the brief, is that, while the power to mortgage the lands existed without express authorization, yet a mortgage so executed would only create a lien on the lands, burdened with the condition that upon failure of the company to build fifty miles per. year, or to complete the road by July 4, 1878, the government might take measures toward insuring its completion. What those measures might be could not be certainly told beforehand. The line on which the road was required to be built was to a great extent through an Indian country, in a part of which in 1871, and for some years afterward, the Indians were in a state of active hostility. Much of the country was also of doubtful value, either for local business.or for selling lands. But the government wanted to get this road built by private capital, without the aid or security of government money or credit, such as had been given to the Union and Central Pacific roads. It was useless to ask private investors to put their money into bonds secured by mortgage on lands and franchises, as to which, if not completed by 1878, the government would have the right to take steps of unknown character toward its- completion. Nobody would take such a risk. To say nothing of the extinguishment of Indian titles, which was contemplated by the act, there was no assurance that the hostile Indians would be subdued, so as to allow construction to go on within the time fixed, which in fact was not done as to the Comanches for four or five years after 1871. Therefore, in order to offer a security which the public could afford to accept, and at the same time to reserve protection to the government in the ultimate application of the lands to construction and completion of the road, congress, by the mortgage act, altered the condition as to time of construction, so that, instead of July 4, 1878, the time for construction as to the road mortgaged was extended to the date of the foreclosure of the mortgage, and the rights of mortgagees under such mortgage should only extend to lands coterminous with the road constructed at that date. Hence, as to the lands covered by any mortgage executed pursuant to this act, there is no breach of condition as to time of construction until the date of foreclosure; and the United States, by the terms of the act of 1866, as altered by the act of 1871, has agreed that as to lands so mortgaged it will take no steps under section 9, except as to lands which, may be found opposite road unconstructed when the mortgage is, or by its terms can be and ought to be, foreclosed. That for this reason, as to lands so mortgaged, there has been no breach of conditions, and the right of the United States to take steps of its own to complete the road has not yet attached. That the right and duty of the company, or, on its default, of the mortgagees, to go on with the construction, still continues. That the estate created by the act of 1866 remains in the company, subject to the rights of the mortgagees, and in case of ultimate default of both, subject to the right of the government; and that in the meantime it is the right of the company, for the preservation of the security of its mortgages, to maintain the possession which follows the legal title.

We have given to this contention, as well as the answer to it by defendant’s counsel, and the' argument of the committees of congress on the effect of this mortgage act, our most earnest consideration, with a view to ascertain its true ’meaning and legal effect, and the rights of the parties that grow out of it. In the first place, it is quite clear that it introduces a new feature, which was not in the case of Railway Co. v. Esquibel, and that with this mortgage act before us the decision of that case furnishes no guide to a solution of the question now presented. Nor have we been referred to any case in which such a clause has been directly construed. The act of April 20,1871, has been already quoted in full, but we give again the proviso, on which the question turns: “Provided, that if the company shall hereafter suffer any breach of the conditions of the act above referred to, under which it is organized, the rights of those claiming under any mortgage made by the company to the lands granted to it by said act shall extend only to so much thereof as shall be coterminous with or appertain to that part of said road which shall have been constructed at the time of the foreclosure of said mortgage.” If this were part of a deed between private individuals, we do not think there would be any controversy as to its meaning. It seems to be insisted that because these words are found in an act of congress they must be construed in some way so as to deprive them of their usual signification, and introduce some meaning different from that expressed by the words themselves. We understood that the rule of construction of public grants is different from that of private grants,- in this: that the latter are to be construed most strongly against the grantor, and the former most strongly against the grantee; but this only applies to cases where the language is doubtful or ambiguous. It does not go to the extent of changing the clear meaning of words in either case.- It will not', by mere intendment, supply words 'to confer rights, powers, or property upon the grantee of a private deed, nor strike out words of clear and obvious meaning, in order to withhold these from the grantee of a public grant. Where the language is plain, and free from ambiguity, there is no necessity for interpretation, because the words speak for themselves. The supreme court of the United States has laid down the rule for the construction of grants of this character so plainly that there can be no difficulty in understanding and following it. In Leavenworth, etc., R. Co. v. U. S., 92 U. S. 740, having under consideration a railroad grant to the state of Kansas, the court said: “This grant, like that to Iowa, was made for the purpose of aiding a work of internal improvement, and does hot extend beyond the meaning and intent expressed in it. It should be neither enlarged by ingenious reasoning, nor diminished by strained construction. The construction must be reasonable, and such as will give effect to the intention of congress. This is to be ascertained from the terms employed, the situation of the parties, and the nature of the grant. If these terms are plain and unambiguous, there can be no difficulty in interpreting the act; but if they admit of different meanings, the one of extention and the one of limitation, they must be accepted in the sense most favorable to the grantor.” Counsel for defendant in error say “that the mortgage act of 1871 is only declaratory of the common law right to mortgage, and was enacted for the sole purpose of removing all doubt on that subject, to thereby aid the company to proceed with construction; and it was not intended by said act to enlarge the rights of the company, or limit the power of congress to declare the grant forfeited, or to subordinate the interests of the government in the lands to the rights of future mortgagees.” We do not perceive how this can be the ease unless the words, “at the time of foreclosure of said mortgage,” at the conclusion of the mortgage act, are stricken out, and in their place inserted, “at the time of the breach of condition,” or something equivalent to them. By no conceivable process of reasoning can it be made out that the two phrases above quoted mean the same thing. Nor can we see, if the latter meaning were given to the proviso, what was the occasion for the passage of the mortgage act at all. The company had already a common law right to mortgage whatever title it had and the mortgagee would take his lien subject to whatever conditions and resulting penalties attached under the original act of 1866. If the act of 1871 did not offer to mortgagees something more than they could get without it, there was certainly neither sense nor reason in its passage. If it was not the purpose of the act to extend the time for completion to roads coterminous with the mortgaged lands, then why was anything said about date of foreclosure. If the intention of congress was only to give the mortgagees a lien subject to the breach of conditions as already specified in the act of 1866, how is it possible ' to explain the omission of the plain, direct, and easy words to express that intention, and the insertion of other words which bear no possible relation to it, or under certain contingencies would be absolutely inconsistent with it? The words used are not obscure. They have a well understood meaning, both technically and in common use. If used in an ordinary conveyance or transaction, nobody would hesitate for a moment to say what they mean. They are, both by themselves and in connection with the subject-matter and context, plain and unambiguous. This fact, together with the entire absence of reason or purpose in the act which would follow from giving it the forced and unnatural construction contended for, leads us to conclude that the proviso means simply what it says, and that it was intended and does operate to enlarge the condition of the grant as to the mortgaged lands. We do not see that it made any change as to the effect of a breach of the conditions of the grant. What the United State might or could do in the way of steps toward thfe completion of the road in case of a breach and continuance thereof for one year remained as uncertain as before, but it nevertheless remained. But whatever this right or power was, the mortgage act amounted to a declaration by the United States to prospective mortgagees, having all the force of a contract, that the company, or they for it, should have until the date of the foreclosure to complete the road before such power could be exercised.

The word “only,” in ordinary use, is a term of restriction, and not of extension; and its use, in this proviso seems to imply that under an express general power to mortgage the rights and lien of the mort•gagees, might have been even more extensive, if it had not been limited in this way to the time of foreclosure. From these considerations, it is our- opinion that the act of April 20, 1871, together with the act of 1866, as altered or amended by it, constituted a contract, under which the mortgagees acquired vested rights in the lands covered by their mortgages to have them preserved as to title and possession for their ultimate security to the extent they may be found applicable on account of construction at the date of foreclosure of the mortgages; and that any legislation which withdraws from them the security of the lands, devotes them to other purposes, and turns over their possession to hostile hands, is destructive of those rights. Said Mr. Justice Stbong, in the Sinking Fund Cases, 99 U. S. 727: “There is no technicality about vested rights. Most of them grow out of contracts; and, no matter how they arise, they are equally sacred, equally beyond the reach of legislative interference.” , Mr. Justice Field, in the same case, said: “Contracts are property, and a large portion of the wealth of the country exists in that form. Whatever impairs their value diminishes, therefore, the property of the owner; and if that be effected by direct legislative action operating on the contract, forbidding its enforcement or transfer, or otherwise restricting its use, the owner is as much deprived of his property without due process of law as if the contract were impounded, or the value it represents were in terms wholly or partially confiscated.” And Mr. Justice Beadley, in the same case, to a similar purport, said: “A contract is property. To destroy it wholly or to destroy it partially is to take it; and to do this by arbitrary legislative action is to do it without due process of law.” Is such legislation, which thus impairs or destroys vested rights, valid or effectual, and should it be upheld by the courts? The supreme court of the United States, in the Sinking Fund cases, above cited, which arose upon the grant in aid of the Union and Central Pacific Railroads, has answered the question in the negative, saying: “It is our duty; when required by the regular course.of judicial proceedings, to declare an act of congress void if not within the legislative power of the United States; but this declaration should never be made except in a clear case.” “The United States can not, any more thah a state, interfere with private rights, except for legitimate governmental purposes. They are not included within the constitutional prohibition which prevents states from passing laws impairing the obligation of contracts, but, equally with the states, they are prohibited from depriving persons or corporations of property without due process of law. They can not legislate back to themselves, without making compensation, the lands they have given this corporation to aid in the construction of its railroad. * * * United States are as much bound by their contracts as individuals. If they repudiate their obligations, it is as much repudiation, with all the wrong and reproach that term implies, as it would be if the repudiator had been a state or a municipality or a citizen. No change can be made in the title created by the grant of the lands, or in the contract for the subsidy bonds, without the consent of the corporation. All this is indisputable.” This authority from the highest court in the government is conclusive, and there is no necessity for further citations on this proposition.

The act of July 6, 1886, is upon its face an absolute legislative forfeiture. It can not be said to be a measure designed in any way to promote the construction or completion of the road. Its declared purpose is to “forfeit the lands granted to the Atlantic & Pacific Railroad Company, * * * and to restore the same to settlement.” It contains no suggestion of any intention to devote the lands to the completion of the road in some other way, or by some other agency, such as granting them to another company that would finish the road, or setting • apart the proceeds of their sale as a fund or subsidy therefor. Nor, though seven years have elapsed since its passage, has any step in that direction been taken. The act contains no provision for the protection, preservation, or reservation of the vested rights of the mortgagees, nor makes the disposition of the lands subject to these rights. By opening the lands to settlement it is evident that congress entirely ignored the rights of the mortgagees to any of the land, or any interest or security therein; since in no way could the government more completely take the lands away from the reach of the mortgagee than by disposing of them to others under a United States patent, as in this case. If our contention as to the rights of the mortgagees and of the company for their benefit is correct, then they constitute property which can not be thus taken away by legislative act. The forfeiture can not be justified under the power of repeal contained in section 20 of the act of 1866. The power of alteration, amendment, or repeal reserved by that section was by the same section expressly declared to be “with due regard for the rights of the Atlantic & Pacific Railroad Company,” and, furthermore, such power was reserved, in the language of that section, “the better to accomplish the object of this act, namely, to promote the public interest and' welfare by the construction Of said railroad and telegraph line, and keeping the same in working order, and to secure to the government at all times, but particularly in time of war, the use and benefits of the same for postal, military, and other purposes.” A forfeiture of the lands, however strong the reasons therefor which restores them to settlement, can not be held to fall within any of the purposes of this section; and, whatever its intention, the power of alteration or repeal is by its own terms, and would be anyhow, subject to the rights, which have become vested under the grantingact and the mortgage act.

The question is a very extensive one, and we might discuss the arguments presented on both sides at greater length, but, as the conclusion at which we have arrived is decisive of the ease with us, we do not think it necessary to prolong this opinion. It is our opinion that the act of July 27, 1866, was a grant in praesenti to the Atlantic & Pacific Railroad Company of the odd numbered sections within forty miles on each side of the line when located; that upon filing plats of definite location, March 12, 1872, the grant became definite, and attached to specific lands, and the legal title passed to the grantee by relation as of the date of the act, with a condition subsequent attached that, if the company failed to complete the road by July 4, 1878, the United States might do such acts as it might deem needful to insure the speedy completion of the road; that by the act of 1871 the company was authorized to mortgage the land so granted to it, and as to lands so mortgaged the condition of completion was enlarged until the time of foreclosure of such mortgage, and the estate created by the- granting act in such lands could not be divested by any act or means until that timó; that the act of July 6, 1886, did not operate to divest the estate as to such lands vested in the mortgagees, and can only be construed as a declaration of the government to resume the granted lands at such time and by such means as it lawfully can by some due process of law, which has not yet been provided. As the land in controversy falls within the above category, it follows that the plaintiff’s title must prevail, and the judgment of the district court must be reversed.

It only remains to consider what judgment should be rendered. The case, as it involves the construction of a United States statute, is one which can be appealed to the supreme court of the United States, and we suppose will be. If the cause were remanded for a new trial, the district court, under our decision, could do nothing else than direct a verdict and enter judgment for the plaintiff. The facts are not in dispute, and are fully exhibited in the record, and in no possible aspect of the case could there be any other judgment than such as above stated by direction of the court. It would be imposing useless expense and delay to remand the case simply to go through these idle forms. It is well settled that in such a case the appellate court may properly direct the lower court to enter a specific judgment, or may render final judgment itself. In Elliott on Appellate Procedure (section 567), it is stated that “when the facts are not in. controversy, and are fully exhibited by the record, the appellate tribunal may direct the specific judgment that shall be rendered. As the object of the law is to put an end to litigation, the power, to direct what specific judgment shall be entered is one to be liberally exercised in furtherance of justice. It has been often exercised.” And in section 564 the same author says: “The appellate tribunal may pronounce the ultimate judgment without remanding the ease, where the facts are not in dispute, unless the statute requires that the case should be remanded. In Insurance Co. v. Scammon, 123 Ill. 601, 14 N. E. Rep. 666, the court says: “Where the evidence given at the trial, with all the inferences which the jury could justifiably draw from it, was so insufficient to support the verdict, that the trial court would have been warranted in directing them to find for the defendant, but failed to do so, then, and then only, can the appellate court reverse without remanding; because, in such case, it merely renders the judgment that should have been rendered in the trial court.” In Pennington v. Underwood, 19 S. W. Rep. 108, the supreme court of Arkansas, under a statute authorizing it to remand, dismiss, or render such other judgment as the court in its discretion might deem just, said: “Where there is on the record an affirmative showing upon facts undisputed that the plaintiff has no right to recover, the supreme court should not order a new trial, which would only protract the litigation, increase the costs, and needlessly occupy the time of the courts. In such case injustice would be done by remanding the cause, while justice would be done by determining it now.77 And the court entered final judgment. We have a statute which directly authorizes such a course. Section 2190 of the Compiled Laws of 1884 provides as follows: “The supreme court in appeals or writs of error shall examine the record, and on the facts therein contained alone shall award a new trial, reverse or affirm the judgment of the district court, or give such other judgment as to them shall seem agreeable to law.77 For these reasons we think it would serve no good purpose to remand the case for further proceedings in conformity with this opinion, but that it will be better for all parties, and tend to secure a more speedy and conclusive determination of the questions of law involved, if judgment is entered in this court in favor of the plaintiff for the possession of the land described in the declaration.

Seeds, J., concurs.