Schoemaker v. Wallace

Ladd, J.

Durbin, was owner of lot 4 in block 5 in Ilawarden, and in 1892 erected a brick and stone building thereon. It fronted east. Immediately north was lot 3, then owned by Gehan. The center of the wall, extending back eighty-five feet, was on the line between the lots to a point thirty feet from the street line, then bulged or was set over on lot 3 either one and one-half feet, as estimated by the plaintiff, or twenty-six inches, as testified to by the defendants. The stairway, three and one-half feet wide, was next to this thirty-foot wall, and at the top of the stairway there was an arch, about six and one-half feet high and three and one-half feet wide, with brick laid therein. The wall is twenty-nine feet high and thirteen inches thick above the foundation, which is sixteen inches wide at the top, three feet at the bottom, and eight feet high. The plaintiff acquired Durbin’s title to lot 4 through his grantee, Gardner, in 1906, and the defendants obtained Gehan’s title to lot 3 the next year, and in 1910 extended’ the party wall back fifteen feet, and were erecting a brick building on their lot, when plaintiff instituted this suit to enjoin them from making use of the party wall before paying for it, and from removing the brick from the archway and inserting a door therein.

1. Party walls: use by adjoining owner: injunction. On the hearing it appeared that the parties had been unable to agree upon the value of the wall, and upon the filing of a bond, with conditions as prescribed by section 3002 of the Oode, and duly approved, the , . court dismissed the petition and taxed the x costs to defendants. This was in conformity with the provisions of the above statute that “no dispute between the adjoining owners as to the amount to be paid by one or the other, by reason of any matters provided in” the chapter of the Oode relating to party walls, “shall delay the execution of the provisions of the same,” and, of course, among them, that authorizing the *239use thereof by the adjoining- owner in constructing a building on his loti Chapter 10, title 14, Code.

2. Same: common stairway, evidence. But counsel contend that, even though the execution of the statutory bond may have obviated the objection to the appropriation of the wall without first paying therefor, this did not dispose of the issue concerning the opening through the archway. The evidence disclosed that defendants were intending to remove the brick from the archway, put in a door and make use of the stairway as a means of access to the second story of their building. The plaintiff testified that in a talk with defendant Wallace about the value of the party wall he had said, “ ‘There is another point in the stairway part.’ I said: ‘I will lump that; we will call it $75, $35 for your share’ — which I knew was not what it cost.” On cross-examination, he testified further: “My building faces east; my stairway is at the north wall, and at the front of the building. My wall jogs out enough to let the stairway up. I think about a foot and a half. Q. There is a place there in your wall where there was an arch put in at the time you bought the building, and that arch was there and filled in with brick, or arched over, so that there was a place there for a door into the adjoining room? (Plaintiff objects, as incompetent and immaterial.) A. I think there was an arch left there; it was my understanding with Mr. Gehan at the time it was left there he could use it if he ever built; but he had to pay for it. Q. In this wall was fixed an arch, filled in with brick, so that the brick could be taken out to provide a doorway that Gehan or his successors might hereafter erect? (Plaintiff objects, as incompetent and not binding on subsequent purchasers.) Court: Answer subject to objection. A. I don’t know what it was put in there for; I suppose so.” On redirect examination, he testified to making measurements, and that he “found, as to the jog in my wall, it was *240half on my lot and half on Gehan’s lot.” The defendant Vender swore that “the stairway is thirty feet long; the jog is twenty-six inches.” Whether there was any wall on the inside of the stairway was not disclosed. The only inference to be drawn from this testimony is that the front thirty feet of the wall was set over on lot 3, and the archway left, so that when a building should be constructed thereon access to the second story might be had by means of the stairway, through a door inserted in the arqhway in the place of the brick. Why the jog of twenty-six inches, or enough to provide for one-half the stairway, if this were not the design? For what purpose the archway, if to continue a part of an unbroken wall? Plaintiff understood this; for he had agreed with Gehan at the time the archway “was left there he could use it if he ever built,” and supposed it was constructed with a view of enabling Gehan and his successors to remove the brick and use the arch as a doorway. For what purpose, if not to pass to and from the second story of the building to be built through the stairway? The evidence in connection with the manner of construction leaves no doubt of the design that the archway be used as an entrance to and from the stairway, and that the stairway be used in common.

3. acquiescence: pleadings. But counsel argue that defendants and their grantors have acquiesced in the center of this wall out of line as the division line between their properties; and therefore they are without right to the archway and use of the stairway. But plaintiff alleged in his . . & petition that defendants are owners of lot 3, and the evidence leaves no doubt but that the front thirty feet of the wall is on that lot.. Moreover, any right because of acquiescence was not pleaded.

*2414. Same: openings in party wall: statutes. *240Section 2996 of the Code, providing that “no wall shall be built by any person on the land of another with any openings therein,” does not prohibit constructing such a wall, with a view to an opening therein in the fixture; and *241section 3001 recognizes the right of the adjoining owner to make openings therein upon taking “all necessary precautions -to guard against injury to the rights of the other, to be ascertained by persons skilled in building.”

5. Same: injunction: burden of proof. The burden was on plaintiff to show that defendants were proceeding in violation of his rights, and this he has failed to do. All he is entitled to is compensation for one-half the value of the party wall, which may be construed to include the stairway, and therein he is fully protected by the bond filed with the clerk of the district court. The petition was rightly dismissed. — Affirmed.