[PUBLISH]
IN THE UNITED STATES COURT OF APPEALS
FILED
FOR THE ELEVENTH CIRCUIT U.S. COURT OF APPEALS
________________________ ELEVENTH CIRCUIT
SEPTEMBER 19, 2005
No. 03-16424 THOMAS K. KAHN
________________________ CLERK
D. C. Docket No. 90-01331-CV-BE-E
STATE OF ALABAMA,
Plaintiff-Appellee,
STATE OF FLORIDA,
Intervenor-Plaintiff-Appellee,
versus
UNITED STATES ARMY CORPS OF ENGINEERS,
ROBERT B. KEYSER, Colonel, in his capacity
as District Engineer, Mobile District,
United States Army Corps of Engineers,
RANDALL R. CASTRO, Major General, in his
capacity as Division Engineer, South
Atlantic Division, United States Army
Corps of Engineers,
ROBERT B. FLOWERS, Lt. General, in his
capacity as the Chief of Engineers, United
States Army Corps of Engineers,
Defendants-Appellants,
STATE OF GEORGIA,
in its individual capacity as Trustee of its
natural resources and in its representative
capacity as parens patriae for the citizens of
the State of Georgia,
Intervenor-Defendant-Appellant,
GWINNETT COUNTY,
Intervenor-Appellant,
ATLANTA REGIONAL COMMISSION,
Intervenor-Defendant-Intervenor.
________________________
No. 05-11123
________________________
D. C. Docket No. 90-01331-CV-BE-E
ALABAMA, STATE OF,
Plaintiff-Appellee,
FLORIDA, STATE OF,
Intervenor-Plaintiff-Appellee,
2
versus
UNITED STATES ARMY CORPS OF ENGINEERS,
PETER F. TAYLOR, Colonel, in his
capacity as District Engineer, Mobile
District, United States Army Corps of
Engineers,
MICHAEL J. WALSH, Brigadier General, in
his capacity as Division Engineer, South
Atlantic Division, United States Army
Corps of Engineers,
CARL A. STROCK, Lt. General, in his
capacity as the Chief of Engineers,
United States Army Corps of Engineers,
Defendants-Appellants,
GEORGIA, STATE OF, in its individual
capacity as Trustee of its natural
resources and in its representative
capacity as parens patriae for the
citizens of the State of Georgia,
ATLANTA REGIONAL COMMISSION,
Water Supply Intervenor,
Intervenor-Defendant-Appellant,
LAKE LANIER ASSOCIATION,
Intervenor-Defendant.
3
________________________
Appeals from the United States District Court
for the Northern District of Alabama
_________________________
(September 19, 2005)
Before BARKETT and MARCUS, Circuit Judges, and GEORGE *, District Judge.
BARKETT, Circuit Judge:
These two interlocutory appeals arise out of one lawsuit pertaining to the
allocation of water stored in Georgia’s Lake Lanier, which is controlled by the
Army Corps of Engineers (“Corps”). The dispute involves the Corps, the States of
Georgia, Florida, and Alabama, which are all affected by the amount of water
flowing out of Lake Lanier through the Apalachicola-Chattahoochee-Flint river
basin (“ACF Basin”), and several local governmental bodies in Georgia seeking a
greater allocation of water from Lake Lanier for municipal and industrial water
supply use. These bodies include the Atlanta Regional Commission (“ARC”) and
Gwinnett County.
There are two ancillary proceedings which are relevant to these appeals.
The first is a lawsuit which involves similar water allocation issues filed in the U.S.
District Court for the District of Columbia (“D.C. court”) by the Southeastern
*
Honorable Lloyd D. George, United States District Judge for the District of Nevada, sitting by
designation.
4
Federal Power Customers (“SeFPC”), who are purchasers of hydropower generated
at the dam which formed Lake Lanier. Southeastern Federal Power Customers,
Inc. v. United States Army Corps of Engineers, 00-CV-2975 (D.D.C.) (the “D.C.
case”). The second is a lawsuit filed by Georgia against the Corps in the Northern
District of Georgia, seeking to compel the Corps to increase the amount of water
Georgia can withdraw from Lake Lanier for water supply. Georgia v. U.S. Army
Corps of Engineers, 2:01-CV-00026-RWS (the “Georgia case”). The Georgia
district court abated those proceedings pending resolution of the Alabama case
appealed here. We affirm that decision in a separate opinion.
In appeal No. 03-16424 (“Alabama I”), the Corps,1 Georgia, Gwinnett
County, and the ARC,2 pursuant to 28 U.S.C. § 1292(a)(1), appeal an interlocutory
order (which the district court has termed a “preliminary injunction”) granting the
motion of Alabama and Florida to bar the Corps and Georgia from implementing a
settlement agreement reached in the D.C. case. In interlocutory appeal No. 05-
11123 (“Alabama II”), the Corps, Georgia, and the ARC appeal the district court’s
1
Three Corps officers were parties to the suit in their official capacity, and are Appellants in
both these cases: Peter F. Taylor, Colonel, in his capacity as District Engineer, Mobile District,
United States Army Corps of Engineers; Michael J. Walsh, Brigadier General, in his capacity as
Division Engineer, South Atlantic Division, United States Army Corps of Engineers; and Carl A.
Strock, Lt. General, in his capacity as the Chief of Engineers, United States Army Corps of
Engineers.
2
In both cases, the ARC is an intervenor on appeal.
5
denial of their motion to vacate or dissolve that order, likewise pursuant to 28
U.S.C. § 1292(a)(1).
I. BACKGROUND
In order to resolve the issues in this case it is necessary to review the history
of Lake Lanier and the ACF Basin, the procedural histories of the Alabama and
D.C. lawsuits, and the nature of the orders appealed here to determine if they meet
the requirements of 28 U.S.C. § 1292(a)(1) for an interlocutory appeal.
A. Lake Lanier and the ACF Basin
Pursuant to congressional authority in the River and Harbors Act of 1945,
Pub. L. No. 79-14, 59 Stat. 10, 10-11, the Corps built Buford Dam across the
Chattahoochee River approximately fifty miles northeast of Atlanta. The Dam
forms the reservoir known as Lake Sidney Lanier. The Chattahoochee River flows
from North Georgia into and out of Lake Lanier, then across the state and along the
border between Alabama and Georgia. At the Florida-Georgia border the
Chattahoochee joins the Flint River and they become the Apalachicola River,
which eventually flows into the Apalachicola Bay and the Gulf of Mexico. The
three rivers, their tributaries, and the associated drainage area form the ACF Basin.
Lake Lanier was created for the explicitly authorized purposes of flood
control, navigation, and electric power generation. To fulfill the latter purpose,
6
hydropower generated at Buford Dam is sold to suppliers, which re-sell the
electricity to their customers. Flood control, navigation, and electric power
generation are “flow-through” uses that do not reduce the amount of water
available downstream from Lake Lanier.
In addition to these uses, and although not explicitly authorized by
Congress, the Corps has historically maintained that water supply use is an
“incidental benefit” flowing from the creation of the reservoir. Thus, the Corps has
allowed some of the Lake capacity to be used for municipal and industrial water
supply use. Unlike flood control, navigation and power generation, allocating
water stored in the Lake for water supply may diminish the quantity of water
flowing downstream.
Beginning in the 1970s, in accordance with the Corps’ view that water
supply was an appropriate “incidental benefit” of the creation of the Lake, the
Corps entered into interim contracts with local government entities in Georgia to
allocate storage capacity in the Lake for local water supply for a specified period of
time.3 As demand for water increased and the local governmental entities desired
3
When the Corps allocates storage capacity in the Lake for water supply use, it does not actually
allocate water rights. Water rights are controlled by state law. A user who contracts with the
Corps to draw from the Lake’s storage capacity must have a pre-existing right, in accordance
with state law, to extract and use the water.
7
an assured permanent supply, the Corps in 1989 announced plans to seek
congressional approval in accordance with the Water Supply Act of 1958
(“WSA”), 43 U.S.C. § 390b (2003), to enter into permanent water storage contracts
with the local governmental bodies, proposing a draft allocation plan (the “Post
Authorization Change (“PAC”) Notification Report”) for congressional approval.4
B. Alabama Suit
In June of 1990, Alabama sued the Corps in the Northern District of
Alabama for declaratory and injunctive relief. The specific relief sought was, first,
a declaration that the Corps had failed to comply in several respects with the
National Environmental Policy Act (“NEPA”), 42 U.S.C. §§ 4321 et seq. (2003),
before entering into existing contracts for water withdrawal from Lake Lanier.5
Second, Alabama asked for a preliminary and permanent injunction requiring the
4
In the Georgia case, Georgia maintains that the Corps has the authority to reallocate use
without further congressional approval.
5
Alabama asserted that the Corps had violated NEPA:
(1) by preparing only an Environmental Assessment (“EA”) regarding the PAC
Notification report for Lake Lanier, rather than a full Environmental Impact Statement
(“EIS”) as required by NEPA, and by failing to assess the cumulative impacts of the
proposed increased withdrawals of water from ACF Basin;
(2) by failing to conduct an environmental review prior to entering into any interim
contracts;
(3) by failing to “utilize a systematic, interdisciplinary approach” in allocating water
from Lake Lanier, as mandated by NEPA; and
(4) by failing develop methods and procedures to ensure that “presently unquantified
environmental amenities and values” are considered in assessing the environmental
impacts of withdrawing water from Lake Lanier, as mandated by NEPA.
8
Corps “to comply with the provisions and regulations of NEPA” and “to recall and
to refrain” from executing proposed contracts for withdrawals of water from Lake
Lanier and prohibiting any increase in withdrawals of water until a requested
Comprehensive Studies Plan 6 was completed.
In September 1990, Alabama and the Corps jointly moved for a stay of the
proceedings (“1990 Joint Stay”), to attempt to negotiate an agreement, with
proposed intervenors7 Florida (plaintiff) and Georgia (defendant) participating in
those negotiations. In the Joint Stay, the Corps “agreed not to execute any
contracts or agreements which are the subject of the complaint in this action unless
expressly agreed to, in writing, by [Alabama] and Florida.” However, either party
could unilaterally terminate the 1990 Joint Stay upon written notice,8 but had to
abide by the terms of the stay for an eighty-day period after notice of termination.
The Court entered an order granting the motion for a stay.
However, in 1992, the same parties entered into another agreement – the
6
In November 1989, Congressman Tom Bevill from Alabama requested that the Corps perform
an in-depth study of the economic and environmental impacts on the ACF Basin from the
proposed reallocations.
7
When the case was moved to an inactive docket in 1992, Florida and Georgia’s motions to
intervene were dismissed without prejudice. Both parties renewed their motions to intervene in
September 2003, and the motions were granted.
8
Alabama and the Corps agreed to file jointly for termination of the stay, if either Florida or
Georgia withdrew from the negotiations and requested such termination in writing.
9
“Memorandum of Agreement” (“1992 MOA”) – that allowed existing withdrawals
of water from Lake Lanier to continue or to increase in response to reasonable
demand. In accordance with the 1992 MOA, the Corps abandoned the PAC
Notification Report.
In 1997, Congress and each of the three states passed the Apalachicola-
Chattahoochee-Flint River Basin Compact (“ACF Compact”), intended to govern
the process for developing a solution to water allocation issues in the ACF Basin.
The ACF Compact incorporated the provision in the 1992 MOA that allowed
existing withdrawals to continue and to increase in response to reasonable demand.
The states negotiated and extended the Compact several times, but were unable to
reach agreement on an allocation formula under the Compact, which terminated on
August 31, 2003.
C. District of Columbia Suit
In December of 2000, the Southeastern Federal Power Customers, Inc.
(“SeFPC”), a consortium of electric power suppliers who purchase hydropower
generated at Buford Dam on Lake Lanier, sued the Corps in the District of
Columbia. Se. Fed. Power Customers, Inc. v. U.S. Army Corps of Eng’rs, 00-CV-
2975 (D.D.C.). SeFPC argued that the Corps was overcharging for hydropower
from Buford Dam, because price calculations had not been adjusted to reflect the
10
increased withdrawals for water supply which had diminished the flow-through
that generates hydropower. The Corps and SeFPC, along with proposed
intervenors Georgia and the local water supply providers, reached a settlement
agreement providing that the Corps would conduct all tests and analysis required
by NEPA, and if not prohibited thereby, would execute interim twenty-year9
contracts with the local water supply providers. The interim contracts would
convert to permanent contracts if Congress authorized them (or if a competent
court ruled that no congressional authorization was required), and the Corps agreed
to seek the necessary congressional authorization.10
D. The Interaction Between the Alabama and the D.C. Cases.
After the Settlement Agreement was filed in the D.C. court, Alabama
revived the Alabama case in January 2003, by filing a “Motion For Temporary
Restraining Order, Preliminary Injunction, And To Have Settlement Agreements
Entered Into By Defendant Declared Null And Void.” The specific request for
relief in this motion was limited to:
(A) Enjoining Defendant . . . from initiating the NEPA process, initiating
9
The contracts are actually ten-year contracts, but the water supply providers will have an option
to renew for ten years if the contracts do not roll over to permanent storage contracts.
10
Florida and Alabama were ultimately permitted to intervene in the D.C. suit, in which they
opposed the settlement and requested a stay of the proceedings or a transfer of the case to the
Alabama court. Both requests were denied. In September 2003, Florida and Georgia formally
intervened in Alabama I.
11
any other process by which information relevant to water allocation
decisions is gathered, and from making any decision or determination
regarding the allocation of water resources within the ACT and ACF
Basins without the consent and involvement of the Plaintiff;
(B) Declaring any and all other provisions of the Settlement Agreement
that are contrary to the parties’ agreement as reflected in the Joint
Motion To Stay Proceedings null and void.
The Alabama district court, on January 31, 2003, granted the motion to the extent
of issuing an order directing the parties to “take no actions that would violate this
court’s September 19, 1990 Order granting the parties’ Joint Motion to Stay
Proceedings,” and set a hearing to consider whatever remaining relief was
requested in the motion for the subsequent week. The parties, however, stipulated
several times to delay a hearing while the states and the Corps unsuccessfully
attempted to negotiate settlement in both the D.C. and Alabama lawsuits.
Early in September, 2003, Alabama renewed its original “Motion For
Temporary Restraining Order, Preliminary Injunction, And To Have Settlement
Agreements Entered Into By Defendant Declared Null And Void,” and requested
an emergency hearing on the first available date. The hearing was set for
September 24, 2003.11
11
Prior to the hearing, on September 12, 2003, Florida filed an intervenor complaint advancing
the same NEPA claims as Alabama but also adding counts asserting that the Corps’ existing and
proposed water supply contracts violated the Water Supply Act of 1958 (“WSA”), 43 U.S.C. §
390b (2003), the Flood Control Act (“FCA”), 33 U.S.C. § 708 (2003), the Water Resources
Development Act of 1988 (“WRDA”), 33 U.S.C. § 2312 (2003), the Endangered Species Act
(“ESA”), 16 U.S.C. §§ 1531 et seq. (2003), and the Corps’ own implementing regulations. (We
12
On September 22, 2003, the Corps gave the required notice to trigger the end
of the 1990 Joint Stay on January 21, 2004. Two days later, the Alabama district
court held the hearing resulting in the order appealed here in Alabama I. The
pleadings before the court at this time were Alabama’s original complaint and its
“Motion For A Temporary Restraining Order, Preliminary Injunction, And To
Have Settlement Agreements Entered Into By The Defendant Declared Null And
Void.” Although Florida’s First Amended Complaint, which had added counts
alleging the violation of other statutory acts, had been filed a few days earlier, at
the hearing the district judge specifically stated that the question of the other
statutory acts claims “is not before me at this time.” The district court made clear
that the only issue to be resolved by the claim for preliminary injunction was
whether the 1990 Joint Stay had been violated.12 Based on the Alabama complaint
will refer to these legislative acts collectively as “Other Statutory Acts”). The relief sought was
a judicial determination that in allowing water supply for municipal use in Lake Lanier as
described above, the Corps had violated NEPA and the Other Statutory Acts; a preliminary
injunction “enjoining the defendants, at a minimum, from entering into any contracts or
agreements for storage or withdrawal of water for municipal and industrial water supply;” and
injunctive relief to compel the Corps to comply with NEPA and the Other Statutory Acts.
The day before the hearing on September 23, 2003, Alabama moved to amend its
complaint to add claims, like Florida’s, pertaining to the purported violation of the Other
Statutory Acts. The motion to amend was granted after the hearing on the October 15 order
which is the basis for this appeal.
12
The district court stated: “It was my understanding that the challenges in the D.C. court, if
[Alabama and Florida] are allowed to intervene, go more to the merits of the settlement and
whether it is in violation of federal law as opposed to the challenge here which is whether it
violates prior orders of this court” (emphasis added).
13
and its motion, the district court entered the following order on October 15, 2003,
which Georgia and the Corps now appeal (Alabama I):
[T]he court GRANTS IN PART plaintiffs’ motion to the extent it hereby
ORDERS the defendants enjoined from (1) filing the settlement agreement
in [the D.C. case]; (2) implementing any part of this settlement agreement,
and (3) entering into any other new storage or withdrawal contracts affecting
the Apalachicola-Chattahoochee-Flint river basin without approval of this
court. . . .
Notwithstanding this order, the district court, on November 24, 2003, ordered as
follows:
Reflecting the decisions made on the record at the scheduling
conference held in this case on Friday, November 21, 2003, the court
hereby ORDERS that all activity in this case be STAYED until Judge
Thomas Penfield Jackson makes an order in [the D.C. case], deciding
the validity of the proposed settlement in that case.
The Alabama district court expressly granted the Corps permission to participate in
the D.C. district court hearing and to advocate in favor of the settlement agreement.
Accordingly, the D.C. court held a hearing on whether to approve the D.C.
settlement. All parties to this lawsuit participated. The hydropower customers,
water supply providers, the Corps and Georgia argued in favor of the settlement
agreement. Alabama and Florida, which had been permitted to intervene, opposed
the settlement, arguing that the settlement violated NEPA, the Water Supply Act of
1958 (“WSA”), 43 U.S.C. § 390b (2003), the Flood Control Act (“FCA”), 33
14
U.S.C. § 708 (2003), the Water Resources Development Act of 1988 (“WRDA”),
33 U.S.C. § 2312 (2003), and the Endangered Species Act (“ESA”), 16 U.S.C. §§
1531 et seq. (2003). At the hearing, Alabama conceded that it would be bound by
the D.C. court’s determination. Ultimately, the D.C. court approved the settlement
agreement, as follows:
[T]his Court concludes that the Settlement Agreement is fair and reasonable,
and neither illegal nor contrary to public policy. Execution of the Settlement
Agreement, and any implementation thereof, is however, subject to Judge
Bowdre’s injunction, and to that end, before they may act under the
Settlement Agreement, the parties to it must first obtain dissolution of the
injunction in N.D. Ala.13
Se. Fed. Power Customers, Inc. v. Caldera, 301 F.Supp.2d 26, 35 (D.D.C. 2004).
Because the D.C. court’s order was issued during the pendency of this
appeal from the Oct. 15, 2003 Alabama court order (Alabama I), in April 2004 this
Court, stayed the appeal to permit the Corps, Georgia, and Gwinnett County to file
a motion in the Alabama district court seeking “dissolution or modification of the
preliminary injunction based upon the D.C. [court’s] order.” After a hearing on
these motions to dissolve the injunction, the Alabama district court, on February
18, 2005, declined to “dissolve the injunction on the basis of the D.C. order.’”
13
On February 12, 2004, notwithstanding that the settlement had been approved contingent upon
the Alabama court’s approval, which had not been obtained, the D.C. case was dismissed as
moot, in light of the settlement. The dismissal was ultimately reversed by the D.C. Circuit,
because the settlement had been only conditionally approved. Se. Fed. Power Customers, Inc. v.
Harvey, 400 F.3d 1 (D.C. Cir. 2005).
15
The district court found that the D.C. court’s order had not caused any change in
circumstances that would justify lifting the injunction. The district court
specifically noted that:
This court entered the injunction at issue because Alabama and
Florida succeeded on the merits of demonstrating that negotiations
that led to the D.C. agreement violated this court’s September 19,
1990 stay Order and, therefore, was unenforceable as against public
policy; the injunction was necessary to prevent irreparable injury; the
potential harm caused by the settlement agreement outweighed any
harm the injunction might cause the defendants; and the injunction
was not adverse to the public interest.
The court recognized that the 1990 Joint Stay was vacated by the Corps’ unilateral
notice to that effect in September 2003, but accorded that fact no weight because
the Corps’ “transgression” had already occurred, and the D.C. court had left to the
Alabama court the question of whether the 1990 Stay Order had been violated and,
“if so, what consequences should attach . . . .” The Alabama court then found that
the “negotiations that led to the [D.C.] settlement . . . did violate the 1990 Stay
Order, and the appropriate consequence was a preliminary injunction” continuing
until the “case is resolved on the merits” or further order of the court. In addition,
the Alabama court rejected Georgia and the Corps’ argument that the doctrines of
claim and issue preclusion would bar the Alabama court from re-litigating the
Other Statutory Claims before the Alabama court because the D.C. court had
already determined that the Corps had not violated NEPA or any other federal law.
16
Accordingly, the Alabama court declined to dissolve its order of October 15, 2003,
and the Corps and Georgia appeal that ruling as well (Alabama II), with the ARC
intervening on appeal.
II. INTERLOCUTORY APPEALS
Both of these cases are appeals from interlocutory orders of the Alabama
district court, pursuant to 28 U.S.C. § 1292(a)(1), which provides that the courts of
appeals shall have jurisdiction over appeals from:
Interlocutory orders of the district courts of the United States . . .
granting, continuing, modifying, refusing or dissolving injunctions, or
refusing to dissolve or modify injunctions . . . .
28 U.S.C. § 1292(a)(1).
Black’s Law Dictionary defines an “injunction” as: “A court order
commanding or preventing an action.”14 Black’s Law Dictionary 788 (7th ed.
1999). There are, of course, many orders entered by a trial court during the
pendency of a suit, requiring the parties to act or refrain from acting in a particular
way. However, not all such orders, regardless of how they are characterized by the
14
In the context of Rule 65 of the Federal Rules of Civil Procedure, the Court has similarly
defined an injunction as simply “an equitable decree compelling obedience under the threat of
contempt.” Int’l Longshoremen's Ass'n, Local 1291 v. Phila. Marine Trade Ass'n, 389 U.S. 64,
75 (1967); see also 1 Howard C. Joyce, A Treatise on the Law Relating to Injunctions § 1, at 2-3
(1909) (“In a general sense, every order of a court which commands or forbids is an injunction;
but in its accepted legal sense, an injunction is a judicial process or mandate operating in
personam by which, upon certain established principles of equity, a party is required to do or
refrain from doing a particular thing.”)
17
parties or the district courts, are “injunctions” for the purposes of 28 U.S.C. § 1292
(a)(1). See Wright, Miller & Kane, Federal Practice and Procedure: Civil 2d §
3922 (“It is not enough to qualify for appeal under [§ 1292(a)(1)] that a requested
order be addressed to a party and command action, or even that it be enforceable
by contempt.”). Thus, we review several principles of law relating to injunctions
in general to determine whether the order before us is subject to an interlocutory
appeal under § 1292(a)(1).
First, any motion or suit for either a preliminary or permanent injunction
must be based upon a cause of action, such as a constitutional violation, a trespass,
or a nuisance. “There is no such thing as a suit for a traditional injunction in the
abstract. For a traditional injunction to be even theoretically available, a plaintiff
must be able to articulate a basis for relief that would withstand scrutiny under Fed.
R. Civ. P. 12(b)(6) (failure to state a claim).” Klay v. United Healthgroup, Inc. 376
F.3d 1092, 1097 (11th Cir. 2004). An injunction is a “remedy potentially available
only after a plaintiff can make a showing that some independent legal right is being
infringed – if the plaintiff's rights have not been violated, he is not entitled to any
relief, injunctive or otherwise.” Id. at 1098. However, because it is an
extraordinary remedy, it is available not simply when the legal right asserted has
been infringed, but only when that legal right has been infringed by an injury for
18
which there is no adequate legal remedy and which will result in irreparable injury
if the injunction does not issue. Beacon Theatres, Inc. v. Westover, 359 U.S. 500,
506 (1959); see also Newman v. Alabama, 683 F.2d 1312, 1319 (11th Cir. 1982).
Thus, to obtain a permanent injunction, a party must show: (1) that he has
prevailed in establishing the violation of the right asserted in his complaint; (2)
there is no adequate remedy at law for the violation of this right; and (3)
irreparable harm will result if the court does not order injunctive relief. Newman,
683 F.2d at 1319 (relying on Rizzo v. Goode, 423 U.S. 362, 377 (1976), and
Beacon Theatres, 359 U.S. at 506).
It has been recognized, however, that if a court does not act until a trial on
the merits of the cause of action, the party seeking relief might be irreparably
harmed in the meantime. Moreover, the judicial process can be rendered futile by
a defendant’s action or refusal to act during the pendency of the suit. Thus, in
order to protect a party “from irreparable harm and to preserve the court’s power to
render a meaningful decision after a trial on the merits” a preliminary injunction
can issue even though the right to permanent relief is still uncertain. Wright,
Miller & Kane, Federal Practice and Procedure: Civil 2d § 2947. However, in
issuing such an order before the entire case has been fully and fairly heard, great
care must be taken to assure that the power of a court to require or deter action
19
does not result in unwarranted harm to the defendant or the public. See id.
Accordingly, a district court may grant preliminary injunctive relief when
the moving party shows that: (1) it has a substantial likelihood of success on the
merits of the underlying case when the case is ultimately tried; (2) irreparable
injury during the pendency of the suit will be suffered unless the injunction issues
immediately; (3) the threatened injury to the movant outweighs whatever damage
the proposed injunction may cause the opposing party; and (4) if issued, the
injunction would not be adverse to the public interest. Klay, 376 F.3d at 1097
(quoting Siegel v. Lepore, 234 F.3d 1163, 1176 (11th Cir. 2000) (en banc) (per
curiam)).
Because of the extraordinary nature of a preliminary injunction, and the
possibility of error when an action is predicated on less than a full and complete
trial, Congress by passing 28 U.S.C. § 1292 created an exception to the rule that an
appeal will lie only after final judgment. See also Balt. Contractors, Inc. v.
Bodinger, 348 U.S. 176, 181 (1955) (“No discussion of the underlying reasons for
modifying the rule of finality appears in the legislative history, although the
changes seem plainly to spring from a developing need to permit litigants to
effectually challenge interlocutory orders of serious, perhaps irreparable
consequence.”). Thus, we turn to an examination of the requirements for an appeal
20
under § 1292(a)(1).
First, the interlocutory order appealed must have the first two elements of an
injunction, that is, it must be: (1) a clearly defined and understandable directive by
the court to act or to refrain from a particular action; and (2) enforceable through
contempt, if disobeyed. However, merely establishing that the order under
consideration is a court order commanding or preventing an action, and
enforceable by contempt, does not make it “an injunction” under § 1292(a)(1).15
As noted earlier, an injunction in the traditional sense must be an order that gives
some or all of the substantive relief sought in the complaint. Thus, “[t]he §
1292(a)(1) exception [to the final judgment rule] does not embrace orders that have
no direct or irreparable impact on the merits of the controversy.” Gardner v.
Westinghouse Broad. Co., 437 U.S. 478, 482 (1978); see also Switz. Cheese Ass’n,
Inc. v. E. Horne’s Mkt., Inc., 385 U.S. 23, 25 (1966) (“Orders that in no way touch
on the merits of the claim but only relate to pretrial procedures are not in our view
‘interlocutory’ within the meaning of § 1292(a)(1)”);16 Int'l Prods. Corp. v. Koons,
15
See Cohen v. Bd. of Tr. of Univ. of Med. and Dentistry of N.J., 867 F.2d 1455, 1464 (3d Cir.
1989) (“Not every order which may be enforced against a party by civil contempt is [an
injunction for the purposes of §1292(a)(2)]”).
16
Thus, the Supreme Court has refused to allow parties to characterize the denial of a “motion
for a summary judgment granting a permanent injunction” as an interlocutory “refusal” of a
request for injunction, appealable under § 1292(a)(1), because “the denial of a motion for a
summary judgment because of unresolved issues of fact does not settle or even tentatively decide
anything about the merits of the claim.” Switz. Cheese, 385 U.S. at 25. Likewise for the denial
of class certification under § 1292 (a)(1), where that order did not have “irreparable effect;”
21
325 F.2d 403, 406-07 (2d Cir.1963)17; In re Lorrilard Tobacco, 370 F.3d 982, 986
(9th Cir. 2004); Cohen v. Bd. of Tr. of Univ. of Med. and Dentistry of N. J., 867
F.2d 1455, 1464 (3d Cir. 1989); Wright, Miller & Kane, Federal Practice and
Procedure: Civil 2d § 3922.
Once we have jurisdiction to review a preliminary injunction, we determine
whether the district court abused its discretion in determining that the moving party
has shown: (1) a substantial likelihood of prevailing on the merits of the underlying
case when the case is ultimately tried; (2) irreparable injury during the pendency of
the suit will be suffered unless the injunction issues immediately; (3) the
threatened injury to the movant outweighs whatever damage the proposed
injunction may cause the opposing party; and (4) if issued, the injunction would
not be adverse to the public interest. See Haitian Refugee Ctr., Inc. v. Baker, 949
“could be reviewed both prior to and after final judgment;” “did not affect the merits of
petitioner’s own claim;” and “did not pass on the legal sufficiency of any claims for injunctive
relief.” Gardner, 437 U.S. at 481-82.
17
As noted in Koons:
We think it better . . . to continue to read § 1292(a)(1) as relating to injunctions
which give or aid in giving some or all of the substantive relief sought by a
complaint . . . and not as including restraints or directions in orders concerning
the conduct of the parties or their counsel, unrelated to the substantive issues in
the action, while awaiting trial. . . . [S]uch a construction provides a better fit with
the language of the statute . . . and with the policy considerations which led
Congress to create this exception to the federal final judgment rule.
325 F.2d at 406-07 (emphasis added) (internal quotations omitted).
22
F.2d 1109, 1110 (11th Cir. 1991). Although our review is for abuse of discretion,
we review and correct errors of law without deference to the district court. Id.
III. APPLICATION OF THE LAW TO THIS CASE
A. Interlocutory Appellate Jurisdiction
We first find that we have jurisdiction to review the orders appealed here
under § 1292(a)(1). There is no question that the October 15, 2003 order is
directed to a party and enforceable by contempt. Moreover, although the October
15 order is couched as enjoining the Corps’ participation in the D.C. settlement,18
the essence of the directive provides the relief sought in the complaint, that is, it
precludes the execution of any further water supply contracts or any agreements
regarding water supply contracts. Thus, we find that the relevant order is an
“injunction” within the meaning of §1292(a)(1), and that we have jurisdiction over
both of these interlocutory appeals.
B. Arguments On Appeal
1. Jurisdiction Of The District Court
Initially, we reject the argument that neither this court nor the district court
has jurisdiction to consider this case because the Supreme Court has exclusive
18
We note that in addition, “an order that prohibits a party from pursuing litigation in another
forum unquestionably is an injunction for purposes of § 1292(a)(1).” AmSouth Bank v. Dale,
386 F.3d 763, 773 (6th Cir. 2004) (quoting Wright, Miller & Kane, Federal Practice and
Procedure: Civil 2d § 3923) (surveying cases from seven Circuit Courts of Appeal, finding
“weight of authority” in agreement, and rejecting Third Circuit decision to the contrary).
23
jurisdiction over controversies between two or more states. See 28 U.S.C. §
1251(a). We conclude that 28 U.S.C. § 1251(a), which provides that only the
Supreme Court has exclusive jurisdiction over “all controversies between two or
more States,” does not deprive the district court of jurisdiction here. In Georgia v.
United States Army Corps of Engineers., 302 F.3d 1242 (11th Cir. 2002), a case
involving the same issues as those we consider here, we recognized that
[T]o constitute ‘a justiciable controversy between the States . . . it
must appear that the complaining State has suffered a wrong through
the action of the other State, furnishing ground for judicial redress, or
is asserting a right against the other State which is susceptible of
judicial enforcement according to the accepted principles of the
common law or equity systems of jurisprudence.’
Id. at 1256 n.11 (quoting Massachusetts v. Missouri, 308 U.S. 1 (1939)). We
believe that case controls.
In Georgia, this Court considered whether Florida’s intervention in
Georgia’s suit to compel the Corps to allocate water from Lake Lanier would
transform that suit into a controversy within the exclusive jurisdiction of the
Supreme Court, and determined that it would not. We noted that to invoke the
Supreme Court's original and exclusive jurisdiction, “a plaintiff State must first
demonstrate that the injury for which it seeks redress was directly caused by the
actions of another State.” Id. (quoting Pennsylvania v. New Jersey, 426 U.S. 660,
663 (1976))(internal quotations omitted). As was the case in Georgia, the States
24
here do not seek relief from each other or from harm caused by another State;
rather, each has a different view of how the Corps should fulfill its obligations
under both federal law and the agreements it has entered in the Alabama and D.C.
cases.
2. Standing
The next threshold issue we must resolve is Georgia’s challenge to Alabama
and Florida’s standing as plaintiffs. The Supreme Court has identified three
constitutional requirements for standing, all of which must be satisfied: (1) an
injury in fact, meaning an injury that is concrete and particularized, and actual or
imminent; (2) a causal connection between the injury and the conduct; and (3) a
likelihood that the injury will be redressed by a favorable decision. See Granite
State Outdoor Advertising, Inc. v. City of Clearwater, Fla., 351 F.3d 1112, 1116
(11th Cir. 2003).
Contrary to Georgia’s assertion, Alabama and Florida are not attempting to
litigate their right to a certain amount of the water in the ACF Basin. Rather,
Alabama and Florida seek to ensure the Corps’ compliance with federal law
governing its management of projects in the ACF Basin, particularly Lake Lanier.
Corps management of Lake Lanier that violates federal law may adversely impact
the environment and economy downstream in the ACF Basin, thereby injuring
Alabama and Florida. A favorable decision in this case could provide redress for
25
that injury. Thus, we readily conclude that Florida and Alabama have standing to
pursue this action.
3. Mootness
Under Article III of the United States Constitution, courts may adjudicate
“only actual, ongoing cases or controversies.” Brooks v. Ga. State Bd. of
Elections, 59 F.3d 1114, 1118 (11th Cir. 1995). A case must be viable at all stages
of the litigation; it is not sufficient that the controversy was live at inception. Id. at
1119.
Georgia argues that the Corps’ withdrawal of the PAC Notification report in
1992 rendered this case irredeemably moot. We disagree. Alabama’s initial
complaint challenged the Corps’ management of Lake Lanier and its ongoing and
proposed actions reallocating storage capacity in that Lake to water supply use.
While Alabama specifically challenged the reallocations proposed in the PAC
Notification report, its complaint was not limited to the reallocations proposed in
that report.19 Thus, the Corps’ subsequent withdrawal of the PAC Notification
report has not mooted the case.
Moreover, a defendant’s voluntary cessation of a challenged practice does
not deprive the federal courts of power to determine the legality of the practice.
19
Nor was the PAC Notification the only “final agency action” identified by Alabama in support
of federal question jurisdiction under 28 U.S.C. § 1331 and the judicial review provisions of the
Administrative Procedure Act, 5 U.S.C. § 706.
26
See Friends of the Earth, Inc. v. Laidlaw Envtl. Serv., Inc., 528 U.S. 167, 189
(2000); Coal. of Airline Pilots Ass’ns v. F.A.A., 370 F.3d 1184, 1189-90 (D.C. Cir.
2004) Voluntary cessation of a challenged practice will only moot a case if
“subsequent events made it absolutely clear that the allegedly wrongful behavior
could not reasonably be expected to recur.” Laidlaw, 528 U.S. at 189 (quoting
United States v. Concentrated Phosphate Exp. Ass’n., 393 U.S. 199, 203 (1968)).
Here, by entering into water supply contracts as reflected in the D.C. settlement,
the Corps is engaging in the challenged conduct, reallocating storage capacity in
Lake Lanier to water supply use.
4. The Merits of the Preliminary Injunction
We turn now to whether the district court abused its discretion in finding
that Alabama and Florida had met the requirements for the issuance of a
preliminary injunction. As noted earlier, a preliminary injunction may issue only
when the petitioner demonstrates: (1) a substantial likelihood of prevailing on the
merits of the underlying case when the case is ultimately tried; (2) irreparable
injury will occur during the pendency of the suit unless the injunction issues
immediately; (3) the threatened injury to the movant outweighs whatever damage
the proposed injunction may cause the opposing party; and (4) if issued, the
injunction would not be adverse to the public interest. Haitian Refugee Ctr., Inc. v.
Baker, 949 F.2d 1109, 1110 (11th Cir. 1991).
27
Initially, we reject the argument of Alabama and Florida - made for the first
time at oral argument – that the injunction at issue was an injunction issued under
the All Writs Act, 28 U.S.C. § 1651(a), and that pursuant to Klay v. United
Healthgroup, Inc., 376 F.3d 1092 (11th Cir. 2004), the requirements of a traditional
injunction do not apply. Klay indeed stated that “[t]he requirements for a
traditional injunction do not apply to injunctions under the All Writs Act because a
court’s traditional power to protect its jurisdiction, codified by the Act, is grounded
in entirely separate concerns.”20 Id. at 1100. However, assuming we deem it
appropriate even to address an argument that was conspicuously absent from the
briefs,21 Klay fails to advance Plaintiffs’ case for two reasons.
First the injunction in this case was simply not an All Writs Act injunction.
20
It bears noting that this statement appears to be dictum, since the Klay Court struck down the
challenged injunctions on the ground that they were not needed to protect the district court’s
jurisdiction. The Court’s decision in no way turned on the applicability of the traditional
preliminary injunction requirements to injunctions issued pursuant to the All Writs Act.
Moreover, even if it were a holding rather than dictum, there would be some doubts as to the
validity of Klay’s abrogation of the traditional injunction requirements, since our Circuit’s case
law is deeply inconsistent on this issue. Klay itself lays out the divergent resolutions of this
question in a footnote. See id. at 1100 n.12.
21
Alabama and Florida do argue in their brief that they cited the All Writs Act in answer to the
district court’s question as to “whether this court has jurisdiction to enjoin a settlement
agreement between a party to this lawsuit and non-parties that has been effectuated and approved
by a sister federal court in another jurisdiction.” However, a finding that the court had
“jurisdiction to enjoin” the settlement agreement is distinct from a finding that the October 15,
2003 order was “necessary or appropriate in aid of” the court’s exercise of jurisdiction. It is the
latter finding that would be required to invoke the court’s authority under the All Writs Act.
Neither the appellate briefs of Alabama and Florida, the October 15 order, nor the record below
establish that this standard is met in this case.
28
That is, the district court issued the injunction pursuant to its traditional equitable
powers, without ever invoking the All Writs Act. In Klay, by contrast, the district
court explicitly granted the challenged injunctions pursuant to its All Writs Act
power, but even that was not enough to sustain the injunctions since the court’s
opinion “did not even begin to explain” how its jurisdiction was threatened by the
conduct it enjoined. Id. at 1110.
Second, an All Writs Act injunction would simply have been inappropriate
in this case, since the All Writs Act gives courts the power to “issue all writs
necessary or appropriate in aid of their respective jurisdictions.” 28 U.S.C. §
1651(a). The All Writs Act confers on courts “extraordinary powers” that are
“firmly circumscribed.” ITT Cmty. Dev. Corp. v. Barton, 569 F.2d 1351, 1358
(5th Cir. 1978). An injunction under the All Writs Act invokes the equitable
power of the court; thus, as is similarly the case for traditional injunctions, a court
may not issue an injunction under the All Writs Act if adequate remedies at law are
available. See Rosen v. Cascade Int’l, Inc., 21 F.3d 1520, 1526 n.13 (11th Cir.
1994); Klay, 376 F.3d. at 1100-01. Generally, if a party will have opportunity to
raise its claims in the concurrent federal proceeding sought to be enjoined, that
concurrent proceeding is deemed to provide an adequate remedy at law. See Porto
Rico Tel. Co. v. Puerto Rico Commc’n Auth., 189 F.2d 39, 41 (1st Cir. 1951);
Wright, Miller & Kane, Federal Practice and Procedure: Civil 2d § 2942. “The
29
simple fact that litigation involving the same issues is occurring concurrently in
another forum does not sufficiently threaten the court's jurisdiction as to warrant an
injunction under [the All Writs Act].” Klay, 376 F.3d at 1102-03.22
We turn, then, to whether the district court erred in granting a traditional
preliminary injunction, and conclude that on this record it is abundantly clear that
Alabama and Florida did not establish either an imminent threat of irreparable
harm in the absence of a preliminary injunction nor a substantial likelihood of
prevailing on the merits of their case. Thus, the orders of October 15, 2003 and
February 18, 2005 appealed herein constitute an abuse of discretion and must be
vacated.
First, we note that an injunction is limited to prospective relief. See
Dombrowski v. Pfister, 380 U.S. 479, 485 (1965) (“Injunctive relief looks to the
future.”). Preliminary injunctive relief derives from the necessity to restrain or
22
The exceptional circumstances that have supported injunctions against related proceedings
under the All Writs Act are not present here. The district court is not proceeding in rem, and has
not asserted jurisdiction over any property. See Klay at 1103-04. Nor is the court acting to
protect the integrity of its judgment, as none has issued. See id. at 1104. Finally, this case is not
a class action, and does not present those unique considerations that support enjoining
proceedings related to a complex class action. See Liles v. Del Campo, 350 F.3d 742, 746-47
(8th Cir. 2003) (upholding All Writs Act injunction enjoining related federal proceedings in
order to preserve a settlement fund, eliminate the risk of inconsistent or varying adjudications
that would deplete the fund, avoid confusion among the class members, and save scarce judicial
resources); In re Managed Care Litig., 236 F.Supp.2d 1336 (S.D.Fla. 2002) (enjoining related
proceedings where Judicial Panel on Multidistrict Litigation had consolidated action before the
court and where court had managed consolidated case for over two years and issued orders on
several major issues, including class certification).
30
compel conduct in those extraordinary situations where irreparable injury might
result from delay or inaction. United Bonding Ins. Co. v. Stein, 410 F.2d 483,
486-87 (3d Cir. 1969). Indeed, preventing irreparable harm in the future is “the
sine qua non of injunctive relief.” Ne. Fla. Chapter of Ass'n of Gen. Contractors
of Amer. v. City of Jacksonville, 896 F.2d 1283, 1285 (11th Cir. 1990) (quoting
Frejlach v. Butler, 573 F.2d 1026, 1027 (8th Cir. 1978)). Thus, a preliminary
injunction is completely at odds with a sanction for past conduct that may be
addressed by adequate remedies at law. “The sole function of an action for
injunction is to forestall future violations. It is so unrelated to punishment or
reparations for those past that its pendency or decision does not prevent concurrent
or later remedy for past violations by indictment or action for damages by those
injured.” U.S. v. Or. State Med. Soc., 343 U.S. 326, 333 (1952).
Alabama and Florida make clear that all of the harm they claim has already
occurred. In their brief to this Court, the plaintiffs describe their injury as follows:
Rather than receiving notice of the proposed settlement 94 days prior
to the Corps’ signature on the document, Alabama and Florida were
not informed of the Settlement Agreement until after it was fully
executed. This difference in the timing of notice is critical. When the
Corps failed to provide the mandated notice period, it forever
deprived Alabama and Florida of the ability to 1) move for an
injunction against the proposed agreement prior to its execution; 2)
move for intervention in the D.C. case prior to execution; 3) demand
participation in the D.C. mediation prior to its culmination; 4) attempt
to resolve the disputed issues of the Corps’ management through the
then existing ACF Compact negotiations; and 5) seek a resolution that
31
accommodated all of the myriad interests impacted by the Corps’
operation of Lake Lanier, instead of only those which were
represented in the confidential mediation. In short, the legal options
available to Alabama and Florida were seriously impaired by
execution of the Settlement Agreement.
(Emphasis added). These past injuries are, by the movants’ own admission,
irremediable – which renders injunctive relief inappropriate. This Court has
previously explained that because the purpose of a preliminary injunction is
“merely to preserve the relative positions of the parties until a trial on the merits
can be held,” United States v. Lambert, 695 F.2d 536, 539 (11th Cir. 1983), “the
harm considered by the district court is necessarily confined to that which might
occur in the interval between ruling on the preliminary injunction and trial on the
merits.” Id. at 540. Past harm like that claimed by Alabama and Florida does not
fall within this window, and therefore cannot serve as a basis for granting a
preliminary injunction.23 Indeed, the district court specifically stated that “[w]hat
effect the Corps’ unilateral notice [to terminate the agreement] may have had on
subsequent events is irrelevant because the transgression had already occurred that
resulted in this court’s action” (emphasis added). Where the harm to the movant’s
23
This is not to say that there was no recourse for the Corps’ asserted violation of the 1990 stay
order. Florida and Alabama could have -- but did not -- petition the district court to order the
Corps to show cause why they should not be held in contempt of court. We have explained
repeatedly that injunctions are enforced through the district court’s civil contempt power. See,
e.g., In re Grand Jury Proceedings, 142 F.3d 1416, 1424 (11th Cir. 1998); Reynolds v. Roberts,
207 F.3d 1288, 1298 (11th Cir. 2000); Reynolds v. McInnes, 338 F.3d 1201, 1208 (11th Cir.
2003).
32
interests has already occurred, that harm is neither imminent nor irreparable at law
and is not the appropriate subject matter for injunctive relief. Thus, to the extent
that the district court relied on the past “violation” of the 1990 Joint Stay as a basis
for an injunction, the district court clearly erred.
Moreover, to the extent that the injunction precludes the Corps from
implementing the settlement reached in the D.C. court in the future, it likewise fails
because the settlement agreement, by its own terms, negates the prospect of
imminent harm. In the agreement, the Corps agrees to perform all of the analysis
and otherwise comply with the requirements of NEPA before entering into any
contracts for water supply use. Nothing indicates that the Corps will fail to comply
with the NEPA process, how long that process will take, or whether, when the
process is completed, any viable claim of a violation of law will remain. Thus, for
a multitude of reasons, the requirement that irreparable harm is threatened has not
been met and the district court’s finding of irreparable harm was erroneous.
Finally, the district court abused its discretion in finding that Alabama and
Florida had shown a substantial likelihood of success on the merits of their case.
As noted earlier, injunctive relief must relate in some fashion to the relief requested
in the complaint. See Klay, 376 F.3d at 1097-98. To secure preliminary injunctive
relief, a petitioner must demonstrate a substantial likelihood of prevailing on at
least one of the causes of action he has asserted. Preliminary injunctions are a tool
33
appropriately used only to “grant intermediate relief of the same character as that
which may be granted finally.” Kamowitz v. Orlando, 122 F.3d 41, 43 (11th Cir.
1997) (emphasis added) (citing De Beers Consol. Mines v. United States, 325 U.S.
212, 220 (1945)). In this case, Alabama based its motion for preliminary
injunctive relief (which Florida subsequently joined) entirely on the Corps’ alleged
violation of the 1990 Stay Order, not on the merits of the underlying case. Indeed,
Alabama never even argued that it was likely to prevail on the merits of any cause
of action it had alleged. Rather, Alabama contended in the district court only that
the plaintiffs were likely to “succeed in persuading the Court that Defendants have
violated the terms of the stay” (emphasis added). The district court, in turn, based
its grant of preliminary injunctive relief primarily on this theory that the plaintiffs
were likely to succeed in proving a violation of the joint stay, concluding: “the
plaintiffs have shown a substantial likelihood of demonstrating the D.C. agreement
runs contrary to the orders of this court” (emphasis added). Granting a preliminary
injunction based on a showing that the plaintiffs were likely to succeed in
establishing a violation of an ancillary court order, rather than a showing that they
were likely to succeed on the merits of any of their claims, was a misapplication of
the legal standard for likelihood of success on the merits, and thus an abuse of
34
discretion.24 See, e.g., Solantic, LLC v. City of Neptune Beach, 410 F.3d 1250,
1253 (11th Cir. 2005) (“We review the district court’s findings of fact for clear
error, and its application of the law de novo, premised on the understanding that
application of an improper legal standard is never within a district court’s
discretion.” (citation and internal marks omitted)).
We do note that the district court’s order contains a statement that Alabama
and Florida are likely to succeed on their claims that the Corps had violated their
statutory obligations.25 However, we find no record basis for such a conclusion.
24
We also note in passing that the court has no authority to unilaterally modify an agreement of
the parties. The 1990 Joint Stay was essentially a promise by the Corps not to enter into any new
water-supply agreements without first giving notice to the plaintiffs of its intent to do so. Under
the 1990 Joint Stay, the Corps had a unilateral right to terminate the agreement at will under
certain conditions. The district court’s preliminary injunction, however, effectively rewrote the
terms of this stay, converting an agreement that the parties had crafted to be freely and
unilaterally terminable at any time into an indefinite and interminable bar. This Court has
explained repeatedly that in enforcing an order, “[a] district court may not expand the decree or
impose obligations that are not unambiguously mandated by the decree itself.” Abbott Lab. v.
Unlimited Beverages, Inc., 218 F.3d 1238, 1240 (11th Cir. 2000). In other words, the court may
not “frame[] relief that was beyond the contemplation of the [original order].” Newman v.
Alabama, 683 F.2d 1312, 1318 (11th Cir. 1982); see also id. at 1318-19 (explaining that
plaintiffs seeking enforcement of an order are not entitled to “new and extraordinary injunctive
relief that was beyond the scope of the [order]”). Here, the district court abused its discretion by
converting an obligation that was freely terminable with notice under the 1990 order into one
that is absolute and interminable, and thus far more burdensome than what the original stay order
encompassed.
25
Specifically, the October 15 order states as follows:
After reviewing the applicable law and the voluminous filings of the parties in
this case, the court finds that Alabama and Florida have demonstrated at least a
substantial likelihood of prevailing on the merits of its challenge to the Corps’
actions. The complaint details what all of the parties have known for at least
thirteen years: water allocation decisions are very complex, and the Corps’
decisionmaking process must reflect consideration of this complexity for the
35
On the contrary, this record does not make clear precisely what claims are being
asserted in this case. The parties have now submitted, as supplemental authority, an
August 10, 2005 order from the district court ruling on motions by Florida and
Alabama to further amend their complaints. The court stated, “Alabama’s original
complaint was very poorly drafted. Thus, the court sympathizes with the Federal
Defendants’ and Georgia’s difficulty in figuring out what agency actions Alabama
challenged in each count of the complaint.” In light of this confusion, the court
granted the motions to amend and “order[ed] Alabama and Florida to revise their
amended complaints to clarify exactly which agency actions they are challenging
under each claim, and to make other changes only as necessary to clearly articulate
the basis of this court’s jurisdiction” (emphasis in original). In light of the lack of
any evidence or argument on any statutory claims by the parties at the hearing for
the preliminary injunction, a conclusion that Florida and Alabama were
substantially likely to succeed on the merits of any of their claims is a “clear error
of judgment,” and therefore an abuse of discretion. See SunAmerica Corp. v. Sun
Life Assurance Co. of Can., 77 F.3d 1325, 1333 (11th Cir. 1996); see also All Care
Nursing Serv., Inc. v. Bethesda Mem’l Hosp., Inc., 887 F.2d 1535, 1537 (11th Cir.
public to feel secure in the Corps’ stewardship of our shared natural resources. At
this point, the court finds a substantial likelihood exists that the plaintiffs will
succeed in demonstrating the Corps failed to extend this due consideration, as
phrased into statutory requirements. These claims possess significant merit, and
are deserving of the immediate protection temporary injunctive relief provides.
36
1989) (“A preliminary injunction is an extraordinary and drastic remedy not to be
granted unless the movant clearly establishes the burden of persuasion as to the
four requisites.” (emphasis added)). The Supreme Court has emphasized that
“Rule 65(b) does not place upon the [non-moving party] the burden of coming
forward and presenting its case against a preliminary injunction.” Granny Goose
Foods, Inc. v. Bhd. of Teamsters & Auto Truck Drivers Local No. 70, 415 U.S.
423, 442 (1974).
For the foregoing reasons, the October 15, 2003 injunction order appealed in
Alabama I and the February 18, 2005 order denying the motion to dissolve
appealed in Alabama II are hereby vacated and this cause remanded for further
proceedings in accordance with this opinion.
VACATED and REMANDED.
37