Board of County Commissioners v. Duluth, Red Wing & Southern Railroad

COLLINS, J.2

The defendant company built its railway in the year 1888 through a valley in which ran a very sinuous stream, known as “Hay Greek.” The creek was crossed by a county road, and the public authorities had built and maintained a bridge over it for many years. To avoid the construction of two bridges over the creek, defendant company cut a ditch about 100 feet long on the easterly side of, and within, its right of way, from a point above to a point below the highway, whereby the waters of the creek were *215turned from tlie natural channel into an artificial one, wholly on the right of way. Along the highway the new channel was about 150 feet from the old, and at the point where the highway intersected the raihvay the latter was on a 15-foot grade; the creek, in its new channel, running close to the embankment. The company made an approach to the top of the grade by building a bridge, commencing at a point about 19 feet from the center of the track, and extending it easterly along the center of the highway, across the creek, to the high land, a few feet east of the easterly line of its right of way. It did nothing with the old bridge, and two or three years afterwards the public authorities removed it, and put in a box culvert and some earth in the old bed of the stream.

The approach and bridge built by defendant were partly or wholly destroyed by a flood in 1890, and were then rebuilt by it. They were again destroyed by a flood in 1895, and, although duly notified and required to rebuild by the authorities, the defendant refused so to do. The approach and bridge were then put in by the county, and this was an action to recover the cost of the same. The verdict was in favor of the plaintiff for the full amount, and defendant appeals from an order denying its motion for a new trial.

The cause seems to have been tried and submitted to the jury upon the theory that constructing its railway across the public road, and changing the course of the stream so that the waters ran in another channel, without first securing the right by condemnation proceedings, and locating and building a bridge at a point on the highway not theretofore occupied for that purpose, changing the location of the “bridge,” as it was called upon the trial, without first entering into an agreement with the public authorities, rendered the defendant a trespasser, to be treated as a wrongdoer, and liable in damages to the public for the consequences of its wrongful acts. The jury was charged that the defendant was a trespasser, to which counsel duly excepted, and was charged that, under the pleadings and proofs, plaintiff was at least entitled to recover nominal damages, and might recover actual damages, not to exceed the cost to the county of rebuilding the bridge. To this counsel did not except.

It is assigned that the court erred in not granting defendant’s motion to dismiss when plaintiff rested, and in charging that de*216fendant was a trespasser, and in holding that the verdict was supported by the evidence. Counsel for appellant stated in his brief, and admitted in his oral argument, that the first question for consideration is, was it the duty of his client to reconstruct, replace, and maintain the bridge? The other questions stated by counsel to be involved in the appeal cannot be, if the absolute duty was imposed upon his client to maintain the bridge, for in such event they became immaterial.

By G. S. 1894, § 2685, it is required of all railway companies that they build, or cause to be built, and kept in repair, good and sufficient crossings of their railway lines, at all points where any public highway is now, or may hereafter be, intersected by such lines of railway. And in section 2686 a “sufficient crossing” is defined as a grade of earth on each side of the track, 32 feet in width, and of such slope as the officers having charge of the highway shall deem necessary. It was therefore incumbent upon the defendant to build and keep in repair a sufficient crossing at the point where its road intersected this highway; in other words, to construct and keep in repair approaches to its 15-foot embankment (on the top of which was its track), 32 feet wide, of such a slope along the public road, and on each side of the embankment, as was satisfactory to the authorities. This was a statutory duty, under all circumstances. It could not be evaded by intersecting the highway in such close proximity to the stream that a bridge became necessary as a part of the approach and crossing, nor could it be evaded by changing the channel of the creek so that the waters flowed at the bottom of the defendant’s embankment, and wholly upon its right of way.

The duty of the defendant to build and to keep this crossing in repair was precisely as if defendant had, for some other reason, excavated a ditch across the highway, along the base of its embankment, and had never turned the waters of the creek into it. In such a case no one would contend that the duty rested upon the public either to build the approaches, or to repair them, if they became impassable. And, while the statute requires the approaches to be of earth*, it is to be reasonably construed. It would not require the filling up of a stream, or the filling of a necessary excavation for tlie collection and safe conduct of surface waters. Nor would sec*217tion 2685 be inapplicable because tbe natural conditions made it necessary tbat a bridge or culvert be erected as a part of the approach and crossing.

From tbe undisputed facts here, it conclusively appeared tbat tbe bridge in question was, by tbe defendant’s act when changing tbe channel of tbe stream, made necessary as a part of tbe crossing and approach on tbe east side, and was in fact a part of it when washed out by tbe flood. This was fully shown by tbe plaintiff prior to tbe motion to dismiss, and it was not error to deny the motion. Tbe duty to repair or reconstruct tbe crossing remained with defend*ant, and was not' cast upon tbe public. And as it conclusively appeared from tbe evidence tbat it was defendant’s duty to keep tbe bridge in a condition for public use, as a part of tbe crossing at tbe intersection of tbe highway with the railway, and as it stood admitted tbat, if this was defendant’s duty, this action could be maintained, tbe error in charging tbe jury — if error it was — tbat defendant was a trespasser upon tbe highway was not prejudicial. It follows from what has been said tbat upon tbe evidence tbe verdict could not have been otherwise than for plaintiff.

Order affirmed.

Buck, J., took no part.