(dissenting). I disagree with the majority's analysis, especially their interpretation of sec. 144.445(5), Stats. Because I believe that the trial court did not abuse its discretion in granting a temporary injunction, I dissent.
Although the facts have, for the most part, been adequately stated in the majority opinion, I feel compelled to explain the context in which the sec. 144.445(5), Stats., issue arose. The Milwaukee Metropolitan Sewerage District (MMSD) let bids for disposal of trash. All bidders were supposed to provide proof that local landfill regulations would not conflict with the operation of the contract. GO Inc., one of the bidders, entered the low bid but failed to provide the proper proof. GO premised its proposal on the assumption that sec. 144.445(5) supersedes and repeals any local regulation such that proof of unconflicting local regulations is immaterial. MMSD, accepting the theory that the violation was of little moment, accepted GO'S bid. The trial court disagreed, holding that sec. 144.445(5) does not supersede and repeal local regula*546tions. The trial court then held that the failure to provide proof of unconflicting local regulations was a material term and found it probable that the bidding procedures were violated. It then ordered a temporary injunction.
The majority now rules that sec. 144.445(5), Stats., unambiguously supersedes all preexisting zoning authority respecting existing landfills. The majority simply underscores that part of sec. 144.445(5)(b) which states that: "An existing facility is not subject to any local approval. . . ." The majority concludes that because the Town of Mount Pleasant ordinance is a form of local approval and the statute unambiguously renders local approval obsolete, reversal is mandated. I disagree.
My analysis begins with a maxim every bit as strong as the "clear and unambiguous" rule cited by the majority. The maxim I use holds that a statutory subsection may not be considered in a vacuum but must be considered in reference to statutes addressing the same subject matter. Standard Theatres, Inc. v. Department of Transportation, 118 Wis. 2d 730, 744, 349 N.W.2d 661, 669 (1984) (citation omitted). If the majority had analyzed sec. 144.445, Stats., as a whole, rather than limiting its analysis to subsec. (5)(b), then I believe a different result would have been obtained. The broader analysis shows that instead of manifesting an intent to preempt local zoning ordinances and regulations, the legislature intended local controls to remain very much a part of Wisconsin landfill law. Section 144.445(1)(e) and (f) makes this clear. Subsections (1)(e) and (f) read as follows:
(e) The legislature further finds that whenever a site is proposed . . . the nearby residents and the *547affected municipalities may have a variety of legitimate concerns. . . and that these facilities must be established with consideration for the concerns of nearby residents and the affected municipalities.
(f) The legislature further finds that local authorities have the responsibility for promoting public health, safety, convenience and general welfare, encouraging planned and orderly land use development. . . and that the reasonable decisions of local authorities should be considered in the siting of solid waste disposal facilities and hazardous waste facilities.
Likewise, the expression of legislative intent in sec. 144.445(2)(b) also shows no intention to preempt or nullify local regulations respecting solid waste disposal facilities.
Because the above sections conflict with the language contained in sec. 144.445(5)(b), Stats., ambiguity thus exists and clarification is necessary by further construction of the statute. A statutory term is ambiguous if reasonable persons could disagree as to its meaning. Standard Theatres, 118 Wis. 2d at 740, 349 N.W.2d at 667 (citation omitted). Such is the case here.
In a timely and well-considered article, Messrs. Peter J. Ruud and Dean M. Werner discuss sec. 144.445, Stats. Ruud and Werner, Wisconsin's Landfill Negotiation/Arbitration Statute, Wis. Bar. Bull., Nov. 1985, at 17. They point out that this section is a relatively new law having been promulgated in 1981; they synopsize both the history of the statute and the intent of the legislature in formulating this statute. The authors observe that one of the most difficult policy considerations in the area of solid waste disposal is political — the extent to which local citizens and units *548of government should have a say as to whether or not, and how, a proposed facility should be built and operated. Id. Prior to the new law, this issue had been resolved in Nelson v. Department of Natural Resources, 88 Wis. 2d 1, 276 N.W.2d 302 (Ct. App. 1979), summarily aff'd 96 Wis. 2d 730, 292 N.W.2d 655 (1980). In that case, both the court of appeals and the supreme court held that the Department of Natural Resources did not have preemptive authority under then existing law to authorize construction of a landfill at a location where local zoning ordinance prohibited landfill use.
The Nelson decision spurred concern that there would be a statewide proliferation of local "anti-landfill" ordinances which might effectively make it impossible to locate new facilities anywhere in the state, regardless of need or technical feasibility. Ruud and Werner at 17.
In a clear attempt to prevent the anticipated consequences of the Nelson decision and to strike a balance between a need for new and expanded waste disposal facilities and the valid concerns of local interests in the siting of those facilities, the legislature in 1981 amended ch. 144, Stats. Id.; see ch. 374, Laws of 1981.
The new process provides for the resolution of the concerns of local interests through negotiation between the locality and the person desiring to establish the facility. If necessary, there is an arbitration process available. Ruud and Werner at 17. The express legislative intent is that the negotiation/arbitration process could lead to the preemption of local zoning or other regulations but not without first taking into account and making some accommodation for the legitimate concerns of local residents and municipalities. Id. See also sec. 144.445(2), Stats.
*549With the history and legislative intent in place, I see an anomaly occurring if the majority's interpretation is to be accepted. On the one hand, new and expanded facilities have state-of-the-art technology. Yet, before constructing a new or expanded solid waste disposal or hazardous waste facility, applicants are subject to preexisting local zoning ordinances and regulations unless these regulations are negotiated or arbitrated away. On the other hand, if we accept the majority's interpretation, all existing landfills (as opposed to new and expanded landfills) are not subject to any local regulation whatsoever. Thus, while new and expanded facilities with state-of-the-art design are subject to preexisting ordinances unless negotiated away, older less-engineered and constructed facilities are totally released from local controls. In my view, this is absurd. We must avoid unreasonable or absurd construction contrary to legislative intent. DILHR v. Coatings, Inc., No. 84-1493, slip op. at 10 (Wis. Nov. 26, 1985).
I believe that sec. 144.445(5)(b), Stats., can be construed in a manner consistent with legislative intent and the history of the statute so that this absurdity will not endure. The basis for consistency can be found in the manner in which the legislature defined its terms.
When the legislature promulgated the statute, it defined the term "local approval" as follows:
"Local approval" includes any requirement for a permit, license, authorization, approval, variance or exception or any restriction, condition of approval or other restriction, regulation, requirement or prohibition imposed by a charter ordinance, general ordinance, zoning ordinance, resolution or regulation by a town, city, village, county or special *550purpose district, including without limitation because of enumeration any ordinance, resolution or regulation. . . .
Section 144.445(3)(d), Stats. The legislature made a policy decision that local approvals, "anti-landfill" in nature, are disfavored. See generally sec. 144.445.
Yet, the legislature also determined that some local approvals are acceptable. These the legislature termed "preexisting local approvals," defined as follows:
"Preexisting local approval" means a local approval in effect at least 15 months prior to the submission to the department of either a feasibility report under s. 144.44(2) or an initial site report, whichever occurs first.
Section 144.445(3)(fm), Stats. Thus, the legislature separated "good" local approvals from "bad." The "good" local approvals remain in place unless they are negotiated or arbitrated away upon application for a new or expanded facility. See sec. 144.445(5). The "bad" — those last minute (within fifteen months) anti-landfill ordinances — are ordinarily nullified.1
Thus, as I read sec. 144.445(5)(b), Stats., "local approvals" must be construed to mean all non-preexisting local approvals. Where the legislature uses similar but distinct terms in juxtaposition, it is presumed that the legislature understood the difference in the terms. See In re Athans, 107 Wis. 2d 331, 335, 320 N.W.2d 30, 32 *551(Ct. App. 1982). By defining the term thus, the legislative intent is fulfilled.
It can be concluded that the legislature intended to continue the status quo with respect to existing facilities that were and are being operated under preexisting local regulations and permits. This construction makes sense. Existing facilities were already required to be established and operated in a manner consistent with local regulations existing at that time. However, the legislature has now acted to prevent municipalities from implementing new "local approvals," to impose additional, arbitrary or unreasonable regulation upon existing facilities that might be so onerous as to make the continuation of existing facilities impossible or impractical. Thus, although sec. 144.445(5)(b), Stats., speaks to "local approval," it is completely silent as to "preexisting local approvals."
I conclude that because sec. 144.445(5), Stats., does not preempt existing facilities from preexisting local regulations, the majority's interpretation is incorrect. Their interpretation, therefore, should not be used as a basis for MMSD and GO to avoid their obligations under the prescribed bidding procedures. I consider the violation to be material and important. Thus, I think there is a substantial probability that Best would succeed on the merits of the case; since Best was the only bidder that produced an error-free bid, it would be irreparably harmed if a temporary injunction were not granted.
The trial court found that the plaintiffs would probably succeed on the merits and that they had produced evidence intending to establish the allegations of the complaint which, if unrebutted, would result in a verdict in their favor. The trial court also found that *552the plaintiffs would be irreparably injured and that it was appropriate to preserve the status quo in order to prevent a final judgment from being rendered ineffectual. Because I agree with the trial court, I would find that it did not abuse its discretion in ordering a temporary injunction.
I say "ordinarily" because even local approvals enacted "at the last minute" can be considered valid as long as the applicant for a new or expanded facility agrees to it as part of a negotiated agreement. See sec. 144.445(5)(f), Stats.