IN THE SUPREME COURT OF MISSISSIPPI
NO. 2007-CA-01383-SCT
BERNIE WINKEL AND RACHEL WINKEL
v.
WINDSOR WINDOWS AND DOORS
DATE OF JUDGMENT: 07/16/2007
TRIAL JUDGE: HON. ALBERT B. SMITH, III
COURT FROM WHICH APPEALED: COAHOMA COUNTY CIRCUIT COURT
ATTORNEY FOR APPELLANTS: DANA J. SWAN
ATTORNEY FOR APPELLEE: WILLIAM O. LUCKETT, JR.
NATURE OF THE CASE: CIVIL - PROPERTY DAMAGE
DISPOSITION: REVERSED AND REMANDED - 06/12/2008
MOTION FOR REHEARING FILED:
MANDATE ISSUED:
BEFORE WALLER, P.J., DICKINSON AND RANDOLPH, JJ.
WALLER, PRESIDING JUSTICE, FOR THE COURT:
¶1. Bernie and Rachel Winkel filed suit against a window manufacturer, a synthetic
stucco producer, and a contractor who installed the stucco exterior at their residence. They
alleged several causes of action.1 The window manufacturer, Windsor Windows and Doors,
moved the circuit court for summary judgment in its favor. The circuit court granted the
motion on the basis that the statute of repose for bringing claims against Windsor Windows
1
The claims were for breach of express warranty, breach of implied warranty,
negligent failure to warn, design defect, negligent installation and construction, negligent
supervision, general negligence, negligent and intentional misrepresentation, fraudulent
concealment, fraud, breach of warranty of habitability, agency, and “Mississippi Extended
Manufacturer’s Liability Doctrine.”
had expired. See Miss. Code Ann. § 15-1-41 (Rev. 2003). The Winkels now appeal. Miss.
R. App. P. 4.
FACTS
¶2. The Winkels moved into their new home in March 1995. After several years passed,
they noticed water was infiltrating the home’s exterior, damaging the house. They filed suit
against Windsor Windows, among other defendants, alleging the windows installed in their
home were defective and contributed to the damage to the house. Their original complaint
was filed on December 31, 2002. After the parties began discovery, Windsor Windows
moved the circuit court for summary judgment. The court granted the motion on the basis
that the claims against Windsor Windows were subject to the six-year statute of repose, and
the time for bringing the claims expired prior to December 31, 2002.
STANDARD OF REVIEW
¶3. This Court conducts a de novo review of matters on summary judgment. Its familiar
standards when reviewing summary judgment orders can be found within the rules of civil
procedure as well as in this Court’s previous opinions. Miss. R. Civ. P. 56; Fruchter v.
Lynch Oil Co., 522 So. 2d 195, 198 (Miss. 1988).
DISCUSSION
¶4. The Winkels raise only one issue on appeal: Whether their claim is barred by Section
15-1-41 of the Mississippi Code. This statute provides, in pertinent part:
No action may be brought to recover damages for injury to property,
real or personal, or for an injury to the person . . . more than six (6) years after
the written acceptance or actual occupancy or use, whichever occurs first, of
such improvement by the owner thereof. This limitation shall apply to actions
against any . . . firms and corporations performing or furnishing the design,
2
planning, supervision of construction or construction of such improvement to
real property . . . for any private or nongovernmental entity.
Miss. Code Ann. § 15-1-41 (Rev. 2003). 2 The Winkels argued Windsor Windows, a
manufacturer, fell outside the class of entities covered by this statute of repose. See
McIntyre v. Farrel, 680 So. 2d 858, 865 (Miss. 1996). Windsor Windows argued that it is
not merely a manufacturer and is protected by this statute because it “planned the
construction of the windows” in the Winkels’ house. The circuit court granted summary
judgment, distinguishing McIntyre, and finding Windsor Doors “was a manufacturer, not a
mere supplier, and designed the window specifically to be installed in a home following its
guidelines for installation.” The same arguments are made on appeal.
¶5. We find no genuine issue of material fact was contested before the circuit court,
presenting it with a simple question of law. Windsor Windows designed the windows and
supplied a general service bulletin on the installation of its windows on homes with stucco
exteriors. Although there is a question whether Bernie Winkel knew of the existence of these
instructions, the carpenter who installed these windows into his home did so “according to
the directions provided by Windsor.” Therefore, half of the requirement for summary
2
The parties do not contest that the windows were an “improvement to real property.”
According to Mississippi law, an improvement to real property is “[a] valuable addition
made to property (usually real estate) or an amelioration in its condition, amounting to more
than mere repairs or replacement of waste, costing labor or capital, and intended to enhance
its value, beauty or utility or to adapt it for new or further purposes.” Phipps v. Irby Constr.
Co., 636 So. 2d 353, 368 (Miss. 1993) (quoting Black's Law Dictionary 682 (5th ed. 1979)).
See also Ferrell v. River City Roofing, Inc., 912 So. 2d 448, 454 (Miss. 2005).
3
judgment has been met. The discussion now turns to whether Windsor Windows is entitled
to judgment as a matter of law. We hold it is not.
¶6. The United States Court of Appeals for the Fifth Circuit interpreted this statute of
repose to cover a manufacturer of asbestos-containing fireproofing because it furnished the
design for its application to buildings. Trust Co. Bank v. United States Gypsum Co., 950
F.2d 1144, 1151 (5th Cir. 1992). That court relied, in part, on this Court’s opinion upholding
summary judgment in favor of a manufacturer of a heat exchange unit that was installed in
an oil refinery. Id. at n.15 (citing Smith v. Flour Corp., 514 So. 2d 1227 (Miss. 1987)). It
must be noted that the issue before the court in Smith was whether the heat exchanger was
an “improvement to real property,” not whether the Fluor Corporation, the manufacturer of
the heat exchanger, was protected because it was a manufacturer. Smith, 514 So. 2d at 1230.
For this reason, coupled with the fact that the Fluor Corporation also installed the heat
exchanger (or performed the “construction of such improvement”), we find the Trust
Company Bank case is not very persuasive as authority on the issue.
¶7. This Court, on the other hand, has found, on certified question from the Fifth Circuit,
that the manufacturer of a piece of industrial machinery which became incorporated into a
factory was not covered by the statute of repose simply because it manufactured the
equipment. McIntyre v. Farrel Corp., 680 So. 2d 858, 862-63, 866 (Miss. 1996), remanded
to district court sub nom, McIntyre v. Farrell Corp., 97 F.3d 779 (5th Cir. 1996). While
admitting the statute could be read to cover manufacturers, the Court concluded the
Legislature “did not intend for manufacturers to be within the protected class of parties”
under this statute of repose. Id. at 862. In analyzing the issue, this Court addressed the Fifth
4
Circuit’s opinion in Trust Company Bank. Id. It criticized that court’s assertion that
Mississippi’s statute of repose covered a larger group than similar statutes in other states.
Id. This Court took the opposite view of the Fifth Circuit, and did not interpret the statute
of repose to cover a manufacturer “that designs, manufactures, and ships a completed piece”
of equipment. Id. at 858, 862, 866. We quoted with favor an opinion of the Massachusetts
Supreme Judicial Court which states:
We think that the Legislature, by enacting (the statute of repose) meant to
protect providers of ‘individual expertise’ in the business of designing,
planning, constructing, and administering improvements to real estate. We
reiterate that (the statute of repose) was not intended to apply to mere suppliers
of standardized products, but only to the kinds of economic actors who
perform acts of ‘individual expertise’ akin to those commonly thought to be
performed by architects and contractors–that is to say, to parties who render
particularized services for the design and construction of particular
improvements to particular pieces of real property.
Id. at 863 (quoting Dighton v. Federal Pac. Elec. Co., 399 Mass. 687, 696, 506 N.E.2d 509,
cert. denied, 484 U.S. 953, 98 L. Ed. 2d 371, 108 S. Ct. 345 (1987)). Though we did not
specifically adopt this reasoning as the rule in this state, we find it persuasive.
¶8. We reaffirm the precepts discussed in the McIntyre opinion again today and find the
evidence in this record does not demonstrate Windsor Windows either supplied windows
designed specifically for the Winkels’ home or furnished specific instructions for the
windows’ installation into the Winkels’ home. On the contrary, the evidence in the record
indicates the windows were mass-produced, and the instructions generally indicated how to
install the windows into stucco homes in general. Windsor Windows argues that several
opinions from the United States district courts within this state found manufacturers of
improvements to real property were protected by this statute. We find these cases
5
distinguishable or unpersuasive. See Wolfe v. Dal-Tile Corp., 876 F. Supp. 116, 121 (S.D.
Miss. 1995)3 (the question whether the manufacturer furnished the design of the tile or
planned the construction of the tile so that it was protected by the statute of repose was a
question for the jury); Theunissen v. GSI Group, 109 F. Supp. 2d 505, 512 (N.D. 2000)4 ;
Jones v. Neema, Inc., 2007 U.S. Dist. LEXIS 53880, *7 (S.D. Miss. July 24, 2007)
(unpublished opinion) 5 (the glass supplier also installed the doors in the hotel).
¶9. Massachusetts continues to interpret its statute of repose in light of Dighton, and its
interpretation is not unique. See Fine v. Huygens, 57 Mass. App. Ct. 397, 402 (Mass. App.
Ct. 2003) (quoting Dighton, 506 N.E.2d at 515). See also Ball v. Harnischfeger Corp., 1994
OK 65, 877 P.2d 45, 50 (1994) (manufacturer of crane improvement to real property
customized to meet the unique needs of the building covered by statute of repose) (collecting
authorities). “It is the specialized expertise and rendition of particularized design which
separates those protected from mere manufacturers and suppliers.” Id. These cases illustrate
the fundamental difference which controls the outcome of this case: a manufacturer of a
mass-produced window which supplied general instructions on its installation into a large
class of homes (e.g. those with stucco exteriors) did not furnish the required particularized
design of an improvement to real property which will result in the manufacturer’s protection
under the statute of repose as a corporation “furnishing the design, planning, supervision of
construction or construction of such improvement to real property.”
3
Pickering, J.
4
Davidson, J.
5
Gex, J.
6
CONCLUSION
¶10. Consistent with this Court’s previous opinion in McIntyre, we hold that the trial court
erred in finding Windsor Windows covered under Section 15-1-41 as an entity which designs
or plans the construction of an improvement to real property. For the reasons discussed
above, we reverse the judgment of the circuit court and remand this matter for further
proceedings.
¶11. REVERSED AND REMANDED.
SMITH, C.J., DIAZ, P.J., EASLEY, CARLSON, GRAVES, DICKINSON,
RANDOLPH AND LAMAR, JJ., CONCUR.
7