RECOMMENDED FOR FULL-TEXT PUBLICATION
Pursuant to Sixth Circuit I.O.P. 32.1(b)
File Name: 13a0146p.06
UNITED STATES COURT OF APPEALS
FOR THE SIXTH CIRCUIT
_________________
X
-
EXACT SOFTWARE NORTH AMERICA, INC.,
Plaintiff, --
f/k/a Macola, Inc.,
-
No. 12-3538
,
>
-
INFOCON SYSTEMS, INC.,
Defendant-Appellant, -
-
-
-
-
v.
-
Intervenor-Appellee. -
J. FOX DEMOISEY,
N
Appeal from the United States District Court
for the Northern District of Ohio at Toledo.
No. 3:03-cv-07183—James G. Carr, District Judge.
Argued: April 24, 2013
Decided and Filed: May 23, 2013
Before: GILMAN, ROGERS and SUTTON, Circuit Judges.
_________________
COUNSEL
ARGUED: Kevin C. Burke, Louisville, Kentucky, for Appellant. Thomas E. Clay,
THOMAS E. CLAY, P.S.C., Louisville, Kentucky, for Appellee. ON BRIEF: Kevin
C. Burke, Louisville, Kentucky, Peter Ostermiller, Louisville, Kentucky, for Appellant.
Thomas E. Clay, THOMAS E. CLAY, P.S.C., Louisville, Kentucky, for Appellee.
_________________
OPINION
_________________
SUTTON, Circuit Judge. This software-licensing dispute became more
intriguing after the parties settled it. On the eve of settlement, Infocon, a software
distributor, fired its lawyer, J. Fox DeMoisey. Hoping to ensure that he got paid for his
1
No. 12-3538 Exact Software N. Am., Inc. v. Infocon Sys., Inc. Page 2
work, DeMoisey placed a charging lien on the settlement proceeds. Exact delivered the
$4 million settlement to the district court, which distributed most of it to Infocon and
placed the remaining $1.2 million in escrow pending resolution of the fee dispute. Nine
months later, Infocon sued DeMoisey in Kentucky state court for malpractice. After that
case ended with a summary judgment ruling in favor of the lawyer, the district court took
on the fee dispute, held a bench trial and awarded DeMoisey $1.4 million in quantum
meruit relief. Infocon complains that this was too much, that it had a right to a jury trial
over the issue and, for the first time on appeal, that the district court lacked jurisdiction
over the fee dispute because DeMoisey and Infocon both hail from Kentucky. We
affirm.
I.
Since 1971, Exact, using this corporate name and one other, has developed
software for small and mid-sized businesses. Infocon began distributing Exact’s
software in 1998. When Exact upgraded its software, Infocon also made money selling,
installing and training users on the upgrades. A foreign company entered into talks to
acquire Exact, and it suggested to distributors like Infocon that it would continue
providing new versions of the software. But Exact abandoned its next upgrade, leaving
distributors like Infocon out to dry.
Exact sued Infocon in Ohio state court in 2003. To hear Exact tell it, Infocon
owed unpaid software maintenance fees it had collected from its customers and was
supposed to pass on to Exact. Infocon stopped making those payments in December
2002, and they totaled $143,031.77.
To hear Infocon tell it, the company stopped making the payments because Exact
misled Infocon about the plans to develop new upgrades. As a result, Infocon claimed,
it had no obligation to turn over maintenance fees, indeed had already turned over more
maintenance fees than it should have, and it had incurred a host of other expenses.
Infocon removed the case to federal court on the basis of diversity jurisdiction, 28 U.S.C.
§ 1332, and filed counterclaims there. Exact is an Ohio corporation, and Infocon is a
Kentucky corporation. At that point, DeMoisey and his law firm represented Infocon.
No. 12-3538 Exact Software N. Am., Inc. v. Infocon Sys., Inc. Page 3
Before long, the case entered an intractable phase of discovery. Exact, says the
district court, showed “persistent noncompliance with” the court’s “ever more stringent”
discovery orders. R.397 at 2. Those orders came to a head in August 2006, when the
district court threatened Exact that it might allow Infocon to seek a default judgment.
Exact continued to drag its feet, and Infocon moved for a default judgment. At that
point, Exact apparently got the message: It fired its lawyer, hired new counsel and asked
the court to hold off on ruling on the motion.
The parties entered settlement negotiations. Infocon’s two owners, Robert
Hughes and Deepak Nijhawan, and DeMoisey mediated the case with Exact. At a
meeting on February 28, 2007, Hughes and an Exact representative agreed on a
$4 million figure. DeMoisey urged Infocon to hold out for more—at least
$5.3 million—apparently so that he, Hughes and Nijhawan could receive equal
$1 million shares (after taxes).
Hughes and Nijhawan saw things differently and worried that DeMoisey was
getting greedy. According to them, DeMoisey started demanding 50 percent of any
settlement (a premium on an oral 33-percent contingency fee arrangement), which would
include bonuses for his co-counsel. Hughes and Nijhawan were concerned that Exact
might bring another lawsuit, that it might pull its $4 million offer and that DeMoisey was
pushing too hard. That left the clients and their lawyer, in the words of the district court
(and Strother Martin), with a “failure to communicate.” R.397 at 6.
Hughes and Nijhawan hired new counsel, Peter Ostermiller. They formalized the
settlement with Exact on March 12, and two days later told DeMoisey about the
settlement. The district court ordered the parties to file a notice of dismissal by August
31. The order said: “any dispute re. terms of settlement to be submitted to the [Court]
for final adjudication.” R.207. On August 12, Infocon fired DeMoisey, who filed a
motion for leave to withdraw on August 13. That same day, DeMoisey filed a “Notice
of Charging Lien,” “hereby notify[ing] the Court and parties of the existence of an
equitable charging lien in favor of himself and his law office for unpaid services,
attaching to the settlement proceeds payable by Exact Software to Infocon Systems,
No. 12-3538 Exact Software N. Am., Inc. v. Infocon Sys., Inc. Page 4
Inc.” R.211. After a status conference, the district court postponed the deadline for the
parties to file a stipulated dismissal. That order said that the “court [was] to retain
jurisdiction re. charging lien.” R.214. The court ordered Exact and Infocon to pay the
settlement proceeds into a court registry and transferred $2.5 million to Infocon and
$200,000 to DeMoisey, leaving the balance subject to the fates of further litigation.
Exact filed a joint stipulation of dismissal, and on September 21 the district court signed
the stipulation under the heading “It is so ordered.” R.233.
DeMoisey and Infocon engaged in discovery over the fee dispute, after which
they filed motions for summary judgment with the district court. On May 29, 2008,
Infocon took things one step further and filed a legal malpractice action against
DeMoisey in Kentucky state court. Concerned about the risk of claim preclusion,
DeMoisey filed counterclaims for attorney’s fees in the state action. He explained this
to the district court in December and withdrew a number of his claims from the federal
court—all of them in fact except his claim based on quantum meruit. Due to the state
court action, DeMoisey asked the district court to “remand and reschedule the hearing
now set for January 20, 2009” on his fee request. R.311. He “proposed that [the] Court
continue to supervise the overall settlement or resolution of the pending Charging Lien
matter,” id. at 2, and “preserve[]” the “status quo . . . until all matters pending in the
[state court] have been resolved,” id. at 7. The district court “vacated and continued” its
trial date. R.332.
The state court granted summary judgment against Infocon based on the
expiration of the statute of limitations. As for DeMoisey’s counterclaims, the court ruled
as a matter of law against him on all but the quantum meruit claim because there was
never an enforceable contingency fee agreement. Before the state court could go to trial
on the quantum meruit question, DeMoisey “moved to transfer the case back to” the
federal district court, and the state court granted the motion. R.348-1. DeMoisey
claimed that, in view of the state court’s ruling, the district court “should now make its
determination as to [the] quantum meruit value of [his] services.” R.348. In December
2011, the court presided over a three-day bench trial, at the end of which it awarded
No. 12-3538 Exact Software N. Am., Inc. v. Infocon Sys., Inc. Page 5
DeMoisey $1.4 million (inclusive of the $200,000 he received in 2007). Infocon
appealed the fee award, and DeMoisey intervened on appeal to protect the award.
II.
We start as we must with jurisdiction. And we ignore as we must Infocon’s
failure to preserve the issue until it had lost in the district court. The jurisdiction of the
federal courts is set by the Constitution and Congress, and may not be created by the
consent (or forfeiture) of the parties, requiring us to police jurisdiction for ourselves,
whether Infocon deserves the inquiry or not. Two potential jurisdictional defects exist.
A.
The first arises from the parties’ stipulation of dismissal. It “stipulate[s] and
give[s] notice that the within action and all claims and counterclaims therein are
dismissed with prejudice, each party to bear its own costs.” R.225. The parties
submitted the order under Civil Rule 41(a)(1)(A)(ii), which permits a plaintiff to
“dismiss an action without a court order by filing . . . a stipulation of dismissal signed
by all parties who have appeared” and to do so with prejudice if the parties say so, as
they did here. At first glance, this order looks like the kind of unconditional, with
prejudice, final resolution of a case that precludes later involvement of the federal court.
See Kokkonen v. Guardian Life Ins. Co. of Am., 511 U.S. 375 (1994).
In Kokkonen, after the parties settled their dispute, they filed a “Stipulation and
Order of Dismissal with Prejudice” and also did so under Civil Rule 41(a)(1)(A)(ii). Id.
at 377–78. The settlement agreement required one party to return some files, which it
never did. The other party asked the district court for help, and the court ordered
compliance with the settlement agreement. The Supreme Court held that the district
court lost any authority to do so when the parties unconditionally dismissed the case.
A court has “power to protect its proceedings and vindicate its authority” by
investigating a potential “violation of a court’s order.” Id. at 380. But backing out of
an agreement is not the same thing as violating a court order. Had the stipulation
contained a “separate provision” that retained the district court’s jurisdiction over the
No. 12-3538 Exact Software N. Am., Inc. v. Infocon Sys., Inc. Page 6
settlement or had the district court “incorporat[ed] the terms of the settlement
agreement” in an order, “ancillary jurisdiction to enforce the agreement would . . . exist.”
Id. at 381. That way, “[i]f the parties wish to provide for the court’s enforcement of a
dismissal-producing settlement agreement, they can seek to do so. . . . Absent such
action, however, enforcement . . . is for state courts, unless there is some independent
basis for federal jurisdiction.” Id. at 381–82. No such limitation existed in Kokkonen.
In the absence of any provisions or orders retaining jurisdiction, the Court concluded that
the case was over, leaving the district court no authority to enforce the settlement.
Although today’s case raises a Kokkonen issue, it does not raise a Kokkonen
jurisdictional defect. Read in context, the parties’ stipulation of dismissal did not
eliminate the court’s authority to resolve the fee dispute between Infocon and DeMoisey.
The stipulation does not appear alone. It is preceded by two recent orders that expressly
reserved jurisdiction over the fee dispute and that were entered after the parties had
settled the underlying case. The July 31 order said: “any dispute re. terms of settlement
to be submitted to the [Court] for final adjudication.” R.207. And the August 27 order,
which directed the parties to file a joint stipulation of dismissal, was more explicit:
“court to retain jurisdiction re. charging lien.” R.214. All that the September 14 order
did was end the underlying dispute between Exact and Infocon. But, as contemplated,
it permitted Infocon and DeMoisey to return to court to determine the amount of money
protected by the charging lien. The September 14 order says nothing about that dispute,
and in view of the two prior orders the most reasonable interpretation of the last order
is that it did not divest the court of its expressly reserved jurisdiction to resolve the fee
dispute while allowing Exact to move on. Taken together, the three orders give a
“reasonable indication” that the district court would take care of the attorney’s lien
dispute. Re/MAX Int’l, Inc. v. Realty One, Inc., 271 F.3d 633, 643 (6th Cir. 2001).
Keep in mind that Civil Rule 41(a)(1)(A)(ii) orders, generally speaking, are “self-
executing” and do “not require judicial approval.” Green v. Nevers, 111 F.3d 1295,
1301 (6th Cir. 1997). It thus is not even clear that the court could have conditioned entry
of the order on reservation of jurisdiction over the fee dispute, and in view of Kokkonen
No. 12-3538 Exact Software N. Am., Inc. v. Infocon Sys., Inc. Page 7
it could not have preserved jurisdiction over the fee dispute by entering an order to that
effect after the parties had submitted the stipulated dismissal. That left two
unobjectionable options, one controlled by the court, one controlled by the parties. The
court could reserve jurisdiction over the fee dispute before the Rule 41 submission with
the parties’ consent, which it did and which the parties agreed it would do at a status
conference. See R.214, R.227 at 8–12. And the parties could have added suspenders to
this belt with comparable language in the stipulation of dismissal, which they did not do.
But neither Kokkonen nor Rule 41 required them to echo the court’s reservation of
jurisdiction with a reservation of their own, so long as the Rule 41 order is fairly read not
to divest jurisdiction over the charging lien dispute. It is.
One other thing supports this interpretation of the orders, both from the
perspective of the court and the parties. A contrary view would require us to assume that
the parties, DeMoisey and the court agreed to place $1.2 million in escrow in the court’s
registry, all while leaving the court without existing power to disburse it or the parties
and DeMoisey without existing authority to get it back. Nothing in the record indicates
that this is what the parties, DeMoisey or the court had in mind. Far better, we think, to
read the stipulation’s silence about the fee dispute as consistent with the prior two
reservations of jurisdiction to resolve the dispute and as consistent with the court’s
ongoing jurisdiction over, indeed possession of, the res. All of this led counsel for
Infocon to concede at oral argument that no Kokkonen defect exists, and for the reasons
just stated we independently agree.
B.
The second potential jurisdictional defect stems from the reality that this fee
dispute, like most fee disputes, concerns non-diverse parties—Infocon, a Kentucky
corporation, and its lawyer, DeMoisey, a Kentucky resident. A few basics of diversity
jurisdiction offer a starting point.
Federal courts have “original jurisdiction of all civil actions . . . between citizens
of different States” when the amount in controversy exceeds $75,000. 28 U.S.C.
§ 1332(a)(1). “[C]omplete diversity between all plaintiffs and all defendants” is
No. 12-3538 Exact Software N. Am., Inc. v. Infocon Sys., Inc. Page 8
required; no plaintiff can be the citizen of the same State as any defendant. Lincoln
Prop. Co. v. Roche, 546 U.S. 81, 89 (2005).
A federal court has “supplemental jurisdiction” over related claims that arise
from the same core of operative facts that prompted the lawsuit over which the court has
original jurisdiction. Thus:
in any civil action of which the district courts have original jurisdiction,
the district courts shall have supplemental jurisdiction over all other
claims that are so related to claims in the action within such original
jurisdiction that they form part of the same case or controversy under
Article III of the United States Constitution.
28 U.S.C. § 1367(a). So long as a court has original jurisdiction over a civil action,
§ 1367(a) provides a “broad grant of supplemental jurisdiction over other [related]
claims.” Exxon Mobil Corp. v. Allapattah Servs., Inc., 545 U.S. 546, 558–59 (2005).
Subsection 1367(b) cuts back on some of the supplemental jurisdiction that
subsection (a) creates:
In any civil action of which the district courts have original jurisdiction
founded solely on section 1332 of this title, the district courts shall not
have supplemental jurisdiction under subsection (a) over claims by
plaintiffs against persons made parties under Rule 14, 19, 20, or 24 of the
Federal Rules of Civil Procedure, or over claims by persons proposed to
be joined as plaintiffs under Rule 19 of such rules, or seeking to
intervene as plaintiffs under Rule 24 of such rules, when exercising
supplemental jurisdiction over such claims would be inconsistent with
the jurisdictional requirements of section 1332.
28 U.S.C. § 1367(b). In a diversity action, district courts thus may not hear
supplemental claims when doing so would be “inconsistent” with § 1332.
How do these principles apply here? This action started as a § 1332 diversity
case, and complete diversity existed over the underlying dispute. The fee dispute arose
out of, and was thus related to, the underlying action, making it eligible for supplemental
jurisdiction under § 1367(a), which is what our case law seems to say and what the
lawyer and client here assume. See Kalyawongsa v. Moffett, 105 F.3d 283, 287–88 (6th
No. 12-3538 Exact Software N. Am., Inc. v. Infocon Sys., Inc. Page 9
Cir. 1997). (More on this point below.) The rub under this framing of the issue is
whether the fee dispute between Infocon and DeMoisey, both Kentucky residents, runs
into the § 1367(b) bar.
We think it does not for three reasons. First, the words of § 1367(b) themselves
suggest that the carve-out does not apply. When it comes to new plaintiffs, the
subsection blocks supplemental jurisdiction “over claims by persons proposed to be
joined as plaintiffs under Rule 19 of such rules, or seeking to intervene as plaintiffs
under Rule 24 of such rules.” DeMoisey neither joined the case as a plaintiff under Rule
19 nor intervened as a plaintiff under Rule 24. To the contrary, his efforts after the
settlement amounted to an exit strategy—filing a motion to withdraw as counsel, and
filing a charging lien over the settlement proceeds to make sure he got paid for his prior
work when he left the case. Not once did he mention Rule 24, and the district court
never treated him as an intervening party. Efforts to receive a contingency fee earned
in a case do not necessarily require a lawyer to sue a client; they usually require the
attorney only to ask the court to allocate some of the settlement/judgment to the lawyer.
That is all DeMoisey did. By its terms, the statutory limitation does not apply.
Second, there is a good reason why Congress would not apply § 1367(b) to run-
of-the-mine fee disputes between a party and its (usually in-state) lawyer over the
distribution of settlement proceeds. For years, indeed since the early years of the
republic, federal courts have resolved fee disputes between lawyers and their clients
when those disputes arise out of the underlying case, whether by conditioning the
withdrawal of a lawyer on the fair payment of the lawyer’s fees or by conditioning the
final distribution of settlement proceeds or judgments on the fair payment of the lawyer’s
fees. See, e.g., Sloo v. Law, 22 F. Cas. 365, 366 (C.C.S.D.N.Y. 1859) (No. 12,958)
(“The court will consent that a solicitor be substituted in the place of Mr. Sargeant, when
his fees are paid, and not before.”); Woodbury v. Andrew Jergens Co., 69 F.2d 49, 51 (2d
Cir. 1934) (L. Hand, J.); see also Doggett v. Deauville Corp., 148 F.2d 881, 883 (5th Cir.
1945) (collecting cases and observing that “[i]n the federal courts the power of the court
to fix a fee has often been asserted”); cf. Hoffman v. McClelland, 264 U.S. 552, 558
No. 12-3538 Exact Software N. Am., Inc. v. Infocon Sys., Inc. Page 10
(1924) (“[W]here in the progress of a suit in a federal court property has been drawn into
the court’s custody and control, third persons claiming interests in or liens upon the
property may be permitted to come into that court for the purpose of setting up,
protecting and enforcing their claims.”).
More recently and more locally, Kalyawongsa v. Moffett illustrates the practice
and offers an explanation for it. In holding that a lawyer-client fee dispute was part of
the same case or controversy as the original lawsuit and came within § 1367(a)’s grant
of supplemental jurisdiction, we explained: “Lawyers are officers of the court. Their
fees are part of the overall costs of the underlying litigation. Resolution of related fee
disputes is often required to provide a full and fair resolution of the litigation.” 105 F.3d
283, 287–88 (6th Cir. 1997). In reaching this conclusion, Kalyawongsa relied on several
cases that came to a similar conclusion. See Curry v. Del Priore, 941 F.2d 730, 731–32
(9th Cir. 1991) (stating that the practice allows a court to “render an efficacious
judgment,” to “control the litigation before it” and “to regulate members of its own
bar”); Jenkins v. Weinshienk, 670 F.2d 915, 918 (10th Cir. 1982) (stating that a court
retains power to “decide collateral matters necessary to render complete justice”);
Novinger v. E.I. DuPont de Nemours & Co., 809 F.2d 212, 217 (3d Cir. 1987) (stressing
the “ability of the court to dispose of cases before it in a fair manner”); see also, e.g.,
Nat’l Equip. Rental, Ltd. v. Mercury Typesetting Co., 323 F.2d 784, 786 n.1 (2d Cir.
1963) (“The termination of relations between a party in litigation in a federal court and
his attorney is a matter relating to the protection of the court’s own officers.”); Marino
v. Pioneer Edsel Sales, Inc., 349 F.3d 746, 753 (4th Cir. 2003) (arguing that
“preventing” a district court “from deciding whether [a lawyer] is entitled to attorney’s
fees for work she allegedly performed in connection with [a lawsuit] would thwart [the
court’s] ability to manage” the case).
Third, we do not lightly presume that Congress would alter such an established
practice. We know of no case before Congress added § 1367(b) in 1990 in which a court
held that a district court could not determine a contingency fee owed to an attorney for
his or her work on the case, whether at the end of the litigation or at the time the attorney
No. 12-3538 Exact Software N. Am., Inc. v. Infocon Sys., Inc. Page 11
asked to withdraw from the case. In this area, the legislature thus did “not write upon
a clean state, [and i]n order to abrogate a common-law principle, the statute must speak
directly to the question addressed by the common law.” United States v. Texas, 507 U.S.
529, 534 (1993) (citations and quotation marks omitted).
Congress did no such thing. Section 1367 does not speak to fee disputes, and
nothing in the statute suggests that Congress meant otherwise. It refers to supplemental
jurisdiction over “claims” that would be “inconsistent” with the requirements of § 1332
as understood at that time. No pre-1990 case was inconsistent with what the district
court did here. And the amendment does not speak with the kind of clarity needed to
end this practice. See Karen Nelson Moore, The Supplemental Jurisdiction Statute: An
Important But Controversial Supplement to Federal Jurisdiction, 41 Emory L.J. 31, 51
(1992) (noting the ambiguity of the “inconsistent with” clause); 13D Charles Alan
Wright, Arthur R. Miller, Mary Kay Kane & Richard L. Marcus, Federal Practice and
Procedure § 3567.2 (3d ed. 2008) (calling the “inconsistent with” clause “curious” and
noting that “its effect on the more specific terms of § 1367(b)—those referring to claims
under specific rules—is far from clear”).
Instead of ending the traditional authority of district courts over the lawyers in
front of them for better (payment of their fees) or for worse (contempt), the statute
pursued two other ends. It overruled Finley v. United States, 490 U.S. 545 (1989), by
allowing courts to continue exercising jurisdiction in federal question cases over pendent
state law claims, see Exxon Mobil Corp., 545 U.S. at 558; and it prevented plaintiffs
from “evad[ing]” the complete-diversity requirement by filing a lawsuit against diverse
defendants and promptly joining new non-diverse plaintiffs or defendants, Viacom Int’l,
Inc. v. Kearney, 212 F.3d 721, 727 (2d Cir. 2000) (Sotomayor, J.) (quoting H.R. Rep.
No. 101-734, at 29 (1990), reprinted in 1990 U.S.C.C.A.N. 6860, 6875); see Owen
Equip. & Erection Co. v. Kroger, 437 U.S. 365, 374–75 (1978) (rejecting supplemental
jurisdiction over state law claim by plaintiff against non-diverse third-party defendant
because a contrary rule would allow plaintiffs to “evade[]” complete diversity).
No. 12-3538 Exact Software N. Am., Inc. v. Infocon Sys., Inc. Page 12
A fee dispute like this one implicates neither of these concerns. The dispute grew
out of the underlying litigation. It did not exist, and by its nature could not have existed,
at the time the lawsuit was filed. In view of the court’s oversight of the settlement
agreement, the court merely assumed responsibility for ensuring that the settlement
proceeds were distributed fairly to all of the relevant parties and lawyers, a job well
suited to the judge who oversaw the underlying litigation. Once Infocon fired DeMoisey
and once he asked to withdraw from the case, the court had two options: (1) condition
his withdrawal on full payment or (2) condition the distribution of the settlement
proceeds on resolution of the appropriate fee owed to him. Both approaches traditionally
have been available to a judge who has presided over the litigation without requiring the
lawyer to “intervene” as a plaintiff in the case, and more to the point the language of
§ 1367(b) does not remove either option from the district court’s traditional authority
over the parties and lawyers before it.
None of this means that district courts asked to determine a contingency fee or
appropriate attorney’s fees have authority to resolve every freestanding claim or defense
that arises from a fee dispute. See Wolfe v. Lewis, 60 U.S. 280, 283 (1857). But that is
not what Infocon and DeMoisey tried to do. They litigated their legal malpractice and
contract claims in state court. In contrast to a legal malpractice claim, a request for
quantum meruit relief merely offered a way of calculating the compensable work
DeMoisey did for his client. It did not require the district court to resolve legal
malpractice claims, where a strong case can be made that the district court would have
lacked any such authority. See Elusta v. City of Chicago, 696 F.3d 690, 694 (7th Cir.
2012) (“Attorney’s fee disputes are closely enough related to the underlying litigation
to be the basis for supplemental jurisdiction, even if other attorney-client disputes, such
as malpractice actions, are not.”). We need not resolve the point. For now, it suffices
to say that a fees-for-services claim does not automatically exceed the district court’s
jurisdiction when the lawyer and client come from the same State.
This last point suggests another way of looking at this dispute, one not joined by
the parties and one in some tension with our decision in Kalyawongsa v. Moffett. The
No. 12-3538 Exact Software N. Am., Inc. v. Infocon Sys., Inc. Page 13
premise of supplemental jurisdiction authorized by § 1367(a) and curbed by § 1367(b)
is that a new “claim” has been added to the case. Yet a district court’s traditional
authority to ensure that lawyers do not leave their clients in the lurch (by leaving the
case without permission from the court) or to ensure that the clients do not leave their
lawyers in the lurch (by failing to pay them) does not turn on new claims filed by
lawyers against clients or new claims filed by clients against lawyers. No intervention
is required for a lawyer to ask a district court to ensure that he be paid for his work. And
no complaint or claim need be filed against the client to ensure this happens. A motion
by the lawyer in the case and/or a charging lien will suffice. When all that the lawyer
seeks is payment for services performed, payment of a contingency fee or payment from
a common fund, all in a pending case, there is no reason to intervene, to file a new claim
or even to become a “party” to the case—leaving the resolution of this issue not to the
intricacies of § 1367 but to the traditional authority of a district court over the parties and
lawyers before it. Save at most until the parties ask the district court to resolve a legal
malpractice claim, in other words, § 1367 has nothing to do with it. Whether under this
way of looking at the case or under § 1367, the district court had authority to ensure that
DeMoisey was paid for his work in this case.
Infocon insists that Griffin v. Lee, 621 F.3d 380 (5th Cir. 2010) (per curiam),
requires a different outcome. Griffin was the beneficiary of a trust, and he sued the
trustees for fraud and reformation in Louisiana state court. The trustees removed the
case to federal court based on diversity jurisdiction, as Griffin hailed from Mississippi,
and the trustees hailed from Delaware, New York, Ohio and Louisiana. On the same day
that the district court granted summary judgment against Griffin, his lawyer, Lee, filed
a motion to intervene as a party under Civil Rule 24. Lee asked for unpaid fees from
Griffin, which he asked to be paid from the trust. The court awarded him over $16,000
and ordered the trustees to give him a cut on future payments to Griffin. But Lee, like
one of the trustees, was from Louisiana, and according to the Fifth Circuit the lack of
complete diversity deprived the court of supplemental jurisdiction over his claim under
§ 1367(b). Id. at 390.
No. 12-3538 Exact Software N. Am., Inc. v. Infocon Sys., Inc. Page 14
Whether the Fifth Circuit correctly applied § 1367(b) to the facts before it need
not detain us. DeMoisey, unlike Lee, never intervened in the action in the district court.
He instead took the orthodox approach of filing a lien on the proceeds before the case
was dismissed. And the district court took the orthodox approach of conditioning the
final distribution of the settlement proceeds on DeMoisey’s full payment. Whether
DeMoisey’s invocation of Civil Rule 24 here would have changed matters is not clear.
It is not even clear, indeed, whether we would put DeMoisey on the plaintiff’s side of
the “v,” as required to create a complete-diversity problem. If district courts for
generations have resolved fee disputes between lawyers and clients that grew out of the
underlying dispute, we would expect stronger signals from Congress before interpreting
the provision to scrap this time-honored and eminently useful practice. Either way,
DeMoisey did not take Lee’s path. He took the well-marked path of filing a notice of
a lien, not a motion to intervene, in an existing federal court case and of doing so before
the case was dismissed. The district court properly exercised jurisdiction over this fee
dispute.
C.
One last point on jurisdiction. Infocon argues that the district court gave up
authority over the claim under § 1367(c) when the case went to state court. We disagree.
That subsection allows a district court to disclaim supplemental jurisdiction in certain
circumstances, including when the original claims are dismissed. But the district court
here did no such thing. Once Infocon filed its state court action, the district court
“vacated and continued” its trial date and required the parties to submit status reports.
R.332. Once the state court dismissed everything but DeMoisey’s quantum meruit
claim, DeMoisey asked the court to “schedule a status conference” and to prepare to
“make its determination as to [the] quantum meruit value of Mr. DeMoisey’s services.”
R.349. This sequence shows that the district court held the case in abeyance while the
state litigation ran its course, as all of the parties seemed to assume (until one of them
lost).
No. 12-3538 Exact Software N. Am., Inc. v. Infocon Sys., Inc. Page 15
III.
The merits of the appeal are more straightforward. Infocon first argues that it
deserved a jury trial over the quantum meruit claim. “In Suits at common law, where
the value in controversy shall exceed twenty dollars,” the Seventh Amendment says, “the
right of trial by jury shall be preserved.” U.S. Const. amend. VII. The right principally
allows an individual to demand a jury when a lawsuit will resolve legal, as opposed to
equitable, rights. Granfinanciera, S.A. v. Nordberg, 492 U.S. 33, 41 (1989).
The problem for Infocon is that a lien on settlement funds implicates an
equitable, not a legal, function. Courts have long recognized that judges, not juries, have
responsibility for discharging liens, including attorney’s fee liens. In Wylie v. Coxe,
56 U.S. 415 (1854), a lawyer helped his client recover against Mexico. The lawyer had
a contingency fee contract, but he never got paid. The lawyer’s claim for fees
“constituted a lien upon the [recovery] fund,” and that lien was “a sufficient ground for
an equity jurisdiction.” Id. at 420. Barnes v. Alexander, 232 U.S. 117 (1914), came to
the same conclusion. Invoking equity, the Court determined that a contingency fee
agreement created a lien on the litigation proceeds. See also Sereboff v. Mid Atl. Med.
Servs., 547 U.S. 356, 363–67 (2006). “An action to foreclose a lien . . . is equitable in
nature.” 9 Wright & Miller, supra, § 2316. This conclusion applies equally to mortgage
liens, see, e.g., Rozelle v. Conn. Gen. Life Ins. Co., 471 F.2d 29, 31 (10th Cir. 1972); tax
liens, see, e.g., Damsky v. Zavatt, 289 F.2d 46, 53 (2d Cir. 1961) (Friendly, J.) (stating
that “[f]oreclosure of the mortgagor’s equity of redemption was an established head of
equity jurisdiction well before 1791,” and concluding that enforcement of tax liens is
“sufficiently akin to the historic equity practice to preclude successful contention for a
right to jury trial”); and judgment liens, see, e.g., Perera Co. v. Goldstone, 491 F.2d 386,
387 (9th Cir. 1974).
More recently, the Second Circuit came to this conclusion in a similar setting.
See Rosenman & Colin v. Richard, 850 F.2d 57 (2d Cir. 1988). Bernice Richard and
Julian Sherrier fought over the ownership of some sculptures, and the Rosenman law
firm represented Richard in the litigation. After trial, Richard refused to pay Rosenman
No. 12-3538 Exact Software N. Am., Inc. v. Infocon Sys., Inc. Page 16
because she thought it had charged too much, and Rosenman placed a lien on the
underlying judgment. The district court held a bench trial and awarded Rosenman fees
based on its quantum meruit claim. On appeal, Richard argued that she had a right to a
jury trial. Not so, the Second Circuit held: “In the context of both attorneys’ liens and
other liens, such actions have repeatedly been regarded as equitable in nature so that no
jury right attaches.” Id. at 60. Although Rosenman’s claim implicated legal issues like
“the contractual liability giving rise to the lien,” actions “to enforce a lien are inherently
equitable,” regardless of how the lien came about. Id. at 60–61. The same is true here.
To counter this authority, Infocon makes one essential point: Quantum meruit
relief often rests on legal claims. True enough, if an attorney brings a breach of contract
claim against a former client, the client may ask for a jury. See Simler v. Conner,
372 U.S. 221, 223 (1963). But actions to enforce liens remain equitable actions, even
when the dispute that led to the lien implicates the meaning of the underlying contract.
Rosenman & Colin, 850 F.2d at 61.
Infocon next argues that, even if the district court had authority over this
quantum meruit claim, the court misjudged it by awarding more money to DeMoisey
than he deserved. To arrive at its $1.4 million award, the district court started by
assuming that DeMoisey and his associate worked at least a combined 3,500 hours on
the Exact/Infocon suit. Applying an average rate of $220/hour, it started with a base fee
of $750,000 (a little less than $220 times 3,500). It added $150,000 for the complexity
of the litigation, $300,000 for the extent to which the case precluded DeMoisey from
other work and $300,000 for the exceptional result DeMoisey reached, and docked
DeMoisey $100,000 for his ethical lapses. We review these calculations for an abuse
of discretion, keeping in mind the well-earned nature of this discretion given the district
court’s role in handling the underlying litigation. See Kalyawongsa, 105 F.3d at 289.
Infocon complains that the district court failed to account for DeMoisey’s alleged
violations of state rules of professional conduct—in truth, failed to account for them in
full, as the court deducted $100,000 for just this reason. The court faulted DeMoisey for
his “failure to confirm the existence of a signed fee agreement” and criticized how
No. 12-3538 Exact Software N. Am., Inc. v. Infocon Sys., Inc. Page 17
DeMoisey handled Nijhawan’s and Hughes’ request to share in a $45,000 sanction
award paid by Exact. R.397 at 25. But the court decided not to reduce DeMoisey’s fee
for his decision to start a business (Alocam) with his clients because this ethical lapse
had no bearing on the fee dispute, a choice that did not exceed the court’s discretion.
Infocon faults the court for taking a dim view of Peter Ostermiller (the lawyer
Infocon hired to replace DeMoisey) and drawing improper “inferences” from
Ostermiller’s representation. Br. at 49. But the district court did no such thing. The
court meaningfully referred to Ostermiller two times in calculating DeMoisey’s fee. In
analyzing the deteriorating professional relationship between DeMoisey and Infocon, the
court noted that Ostermiller’s failure to extend professional courtesies to DeMoisey
likely contributed to the problems. And in asking whether DeMoisey delivered
exceptional results, the court suggested that Infocon could have negotiated a higher
settlement, but that Infocon’s failure to do so was against DeMoisey’s advice and may
have stemmed from Ostermiller’s intervention. We see nothing wrong with either
consideration, and repeat that both are the kinds of things a judge with a ring-side view
of the dispute is apt to understand far better than judges with a cold paper record to go
by.
Infocon claims the court should not have found that DeMoisey and his associate
worked 3,500 hours. Because the pair thought they had a contingency fee agreement,
they did not carefully keep track of their time, and DeMoisey could point to only
1,947.25 hours in his reconstructed records. But DeMoisey testified that this estimate
was conservative, and the court found his testimony credible. DeMoisey’s expert
testified along the same lines, suggesting that the estimate might be “understated by
half.” R.397 at 20. The court accordingly assumed that the duo spent between 3,500
and 4,000 hours on the case. That was reasonable on this record.
That leaves a few other claims. Infocon argues that DeMoisey did not deserve
$300,000 for exceptional results. But when one considers, as the district court did, that
DeMoisey helped turn “a relatively modest collection action” into “a multi-million dollar
lawsuit, . . . result[ing] in a $4 million settlement” for Infocon, id. at 24, that argument
No. 12-3538 Exact Software N. Am., Inc. v. Infocon Sys., Inc. Page 18
melts away. Infocon argues that the court should have reduced the award because other
firms worked on the case and because Hughes helped with discovery. But neither point
goes to what DeMoisey’s work was worth and what the district court thought that work
was worth. Infocon argues that the court should have granted it a credit for the expenses
incurred in the state court proceedings. But DeMoisey’s conduct in post-settlement state
court litigation says nothing about the value of his pre-settlement services. Last of all,
Infocon argues that, because the district court previously sanctioned Exact and ordered
it to pay a portion of Infocon’s discovery expenses ($45,000), it should have received
a credit for the payment. But, as the district court explained, the $45,000 payment went
to DeMoisey. Nothing in the record shows that DeMoisey double-billed for this time,
obtaining $45,000 from Exact for this work and then seeking compensation from Infocon
for the same time. No doubt DeMoisey’s shabby billing records make it difficult to
prove any such thing, but that is where the district court’s discretion over this dispute
becomes paramount. The issue was brought to the court’s attention, and it reasonably
concluded that the two fees were separate, one to be paid by Exact, the other to be paid
by Infocon.
IV.
For these reasons, we affirm.