Morgan Buildings & Spas, Inc. v. Humane Society of Southeast Texas

OPINION

DAVID GAULTNEY, Justice.

Morgan Buildings and Spas, Inc. appeals a judgment in favor of the Humane Society of Southeast Texas based on breach of contract, breach of warranty, fraud, and violations of the Texas Deceptive Trade Practices Act (DTPA). We conclude Morgan breached the contract, but there is insufficient evidence of the amount of damages, and the recoverable attorney fees were not segregated from non-recoverable fees. We conclude the DTPA, fraud, and warranty claims have no merit. The judgment is reversed and the cause is remanded for a new trial on the contract claim.

The Sale

The dispute arose from the purchase of a Morgan steel frame building. Cynthia Meyers, the former board president of the Humane Society of Southeast Texas, went to Morgan and identified a carport. Carey Sonnier, a Morgan assistant branch manager, approached Meyers and offered assistance. Meyers told Sonnier the Humane Society wanted to buy a building in which to store animal food and lawn equipment, and she told him the carport would be ideal if Morgan could add sides, a front and back, and double doors on both ends. She also told Sonnier that the Humane Society planned to install its pre-existing shelves inside against the walls.

Meyers told Sonnier the building needed to be secure. She wanted to prevent rodents from entering the building. Sonnier told her Morgan could add sides and doors, making the building secure. Morgan had a special insulation “to make sure that nothing could get into the building. [H]e said there was a certain way that the slab would be built to secure it so that rodents couldn’t enter the building under the metal.” Sonnier told her the slab should be built with a “rat lip.”

After obtaining funding, Meyers returned to Morgan and told Sonnier the Humane Society was ready to buy the building. The building would have almond-colored sides with a green top and green trim. Meyers reiterated the Humane Society’s other requests from the first meeting. Meyers testified that, by writing the check for the down payment, *484she “was relying on Morgan Buildings and their sales person to satisfy the needs that we had stated, and he said he could satisfy.” 1 The price of the building was $4,495.

The WRITTEN Purchase Agreement

The purchase agreement provided that the Humane Society agreed to purchase, and Morgan agreed to “manufacture, deliver and erect,” a steel frame building. The nominal “eave height” was listed as “6.” In Sonnier’s handwriting, the “comments and specifications” section of the purchase agreement described the structure as: “14 x 32 x 6' SFB (4-WALL) W/DBL SWING OPEN CUSTOM DOORS ON BOTH 14' ENDS. ALMOND W/GREEN TRIM AND GREEN ROOF. ♦CUST.SLAB NEEDS TO BE 13' 9" x 31,⅞.”2 A sketch below this description depicted the width and length of the building. The actual width was to be 13' 9", and the actual length was to be 31'.

Above the signature line, the contract stated in larger uppercase letters: “read both sides before signing[.]” Below that statement, the agreement provided:

I acknowledge that the additional terms and conditions printed below and on the back of this agreement are agreed to as part of this agreement the same as if printed above my signature. By signing below, I am agreeing to purchase the described product, together with the optional equipment and accessories described hereon. This agreement contains the entire understanding between you and Morgan and no other representation or inducement, verbal or written, has been made which is not written hereon.

At the bottom of the first page of the contract was a second statement that the reverse side of the contract was part of the agreement. The contract contained a provision in larger bold uppercase letters, disclaiming express or implied warranties, and any incidental or consequential damages.

The purchase agreement disclaimed the authority of any agent, employee, or representative to bind Morgan to any affirmations, representations, or warranties not contained in the agreement. A merger and integration clause stated that the contract contained the entire agreement of the parties, there were no other promises, agreements, or warranties, and all previous contracts, offers, solicitations, bids, proposals, or communications were superseded unless expressly incorporated in the contract.3 Any modifications had to be in .writing and were only binding if signed by all the parties to the contract.

*485On the date Meyers signed the purchase agreement, Meyers and Sonnier both signed a document entitled “Clear Span Steel Buildings Specifications and Drawing” that referenced the purchase agreement. The specifications indicated that the Humane Society was to provide the slab, and Morgan was to supply a base rail and install a 13' 9" x 31' building with almond-colored siding and green roof and trim. The wall height was described as “6 foot.”

The DeliveRY

Morgan delivered a steel frame structure and completed its construction. Meyers explained that when she saw the building, “the sides were the wrong color, the roof was brought down all the way on the sides. There was no sides. It was roof all the way from the tiptop to the ground.” Meyers testified the metal on the north and south sides of the building was very rusted, the doors fit poorly, the locks did not work, the door on the south side of the building did not have a heavy-duty steel frame around it, the insulation was not present, there were gaps under the door and between the wall and the ceiling, there were holes in the roof where the builders had “missed” the rafter and had instead drilled into the roof, portions of the metal did not meet properly, and the building was the wrong color.

Meyers explained that the building was too short, and it contained internal bracing, which made it impossible to store anything over four-and-a-half feet tall against the walls on either side. The building she selected during her visit to Morgan did not contain this bracing. Meyers testified the Humane Society’s shelving would not “even come close to fitting” inside the building Morgan provided because there are only about four-and-a-half feet on the side of the building before the internal bracing begins, and the building contains “bracing every 4 feet ... that was not on the original carport that we looked at there at Morgan Buildings.”

Because the building Morgan provided was not secure, the Humane Society could not store its lawn mower and lawn equipment in the building. The Humane Society ultimately purchased another building for $4,300, and eventually paid $5,500 to convert its cat patio into a food storage room. It attempted to store animal food in the Morgan building, but had to discard approximately one hundred bags of food due to rodent infestation. According to Meyers, the Morgan building has zero market value for storing animal food and the Humane Society could not store lawn equipment in the building.

Meyers immediately called Sonnier and told him the building Morgan installed was not the building the Humane Society ordered. Sonnier came to the Humane Society and assured Meyers “that everything would be fixed and would be made right, that they would come back and fix it.”

Meyers explained that Morgan cut the roof off so that sides could be put on the building, corrected the color by placing almond-colored sides on the building, and replaced the metal on the rusty doors. According to Meyers, there was a one to two-inch gap underneath the doors, allowing rodents to enter the building. The sides of the building did not fit properly onto the “rat lip” of the slab, and Morgan never installed heavy-duty metal for the locking mechanism.

Sonnier testified that he was the salesperson who assisted the Humane Society. He sold the Humane Society a steel frame carport. Sonnier discussed with Meyers the Humane Society’s concerns regarding infiltration by weather and pests, and Son-nier knew the building was to be used to store animal food. Sonnier testified that *486part of the agreement with Meyers was for the building to be weatherproof. He did not tell Meyers the building would be rodent proof or rodent resistant. The Humane Society had budgetary constraints. Morgan provided a building with six-foot walls instead of eight-foot walls because of those constraints. Sonnier testified the building Meyers saw at Morgan and the building Morgan installed at the Humane Society are different, because the one is a carport, and the other is a four-walled structure.

Paul Morrell, Morgan’s operations manager, visited the building site several times. The third time Morrell went to the site, he discovered that the metal had been cut too short and did not reach the slab, the building was not watertight, and parts were missing from the building. He saw light coming in from the top of the building. He replaced the metal that was cut too short.

Morrell explained that a “Clear-Span building is a building that has no center supports, like a pole.” Morrell also testified that some of Morgan’s carports do not require diagonal braces along each side, and that carports can be converted into buildings.

The Findings, Conclusions, and Judgment

The trial court made findings of fact and conclusions of law on the causes of actions asserted by the Humane Society. The court ordered Morgan to pay the Humane Society $4,495 for the cost of the Morgan building, $1,000 for the cost of lost animal food, $4,300 for the cost of the replacement building purchased to store the lawn equipment, $5,500 for the eost of remodeling existing structures to store animal food, statutory damages of $2,000, and attorney fees of $20,000 through trial, $11,000 should the case be appealed to the court of appeals, and $5,000 should the case be appealed to the Supreme Court.

BREACH of Contract

Morgan’s first issue asserts the trial court erred in finding Morgan breached the contract. Morgan argues the written purchase agreement represents the parties’ complete, integrated contract, and any orally-agreed requirements for the structure are unenforceable. Morgan says it agreed to sell a 14' by 32' steel frame building with walls that were six feet high and double swing-open doors at both ends, and that is the building it delivered and installed.

An agreement is integrated if the parties intended a writing to be a final and complete expression of agreed terms. ISG State Operations, Inc. v. Nat’l Heritage Ins. Co., 234 S.W.3d 711, 719 n. 10 (Tex. App.-Eastland 2007, pet. denied). A fully integrated written agreement is a final and complete expression of all the terms agreed upon by the parties. Id. A partially integrated agreement is a final and complete expression of all the terms addressed in that written agreement, but is not a final and complete expression of all the terms the parties have agreed upon. Id. A court considers the surrounding circumstances in determining whether, and to what degree, an agreement is integrated. See generally Sun Oil Co. (Del.) v. Madeley, 626 S.W.2d 726, 731-32 (Tex.1981) (explaining that surrounding circumstances are considered in determining whether written agreement is complete and exclusive statement of terms).

The purchase agreement expressly provides that the writing includes all matters agreed upon. The inclusion of a merger or integration clause does not conclusively establish the written contract is fully integrated, however. See Bob Robertson, Inc. v. Webster, 679 S.W.2d 683, *487688-89 (Tex.App.-Houston [1st Dist.] 1984, no writ). In Bob Robertson, the court held that the written contract was not integrated despite a merger clause in the written agreement. Id. at 688-89. The court stated that the “merger clause is contradicted by the instrument itself, which refers to delivery numerous times and yet contains no delivery date. It cannot be said that an oral agreement regarding time of delivery is inconsistent with the terms of the integrated agreement[.]” Id. at 689.

The agreement here is a contract for the sale of goods and is governed by article 2 of the Uniform Commercial Code as codified in chapter 2 of the Texas Business and Commerce Code. See Tex. Bus. & Com.Code Ann. §§ 2.101-2.725 (Vernon 1994 & Supp.2007). Chapter 2 broadly defines “goods” to mean things that are moveable at the time of identification to the contract for sale. See id. § 2.105(a). The Morgan product meets that definition, as Morgan contends.

Section 2.202, the parol evidence rule applicable to the sale of goods, provides that a writing intended to be the final expression of an agreement may not be contradicted with evidence of any prior agreement or contemporaneous oral agreement. Id. § 2.202. The agreement may be explained or supplemented, however, by evidence of consistent additional terms, unless the court finds that the writing was intended to be the complete and exclusive statement of the terms of the agreement. Id. § 2.202(2). Comment 1 to Section 2.202 makes clear the section “definitely rejects: (a) [a]ny assumption that because a writing has been worked out which is final on some matters, it is to be taken as including all the matters agreed upon[.]” Id. § 2.202 cmt. 1.

In determining whether an agreement is integrated, the parol evidence rule does not bar the consideration of any evidence. See Sun Oil Co., 626 S.W.2d at 731-82; City of Pinehurst v. Spooner Addition Water Co., 432 S.W.2d 515, 518-19 (Tex.1968). Initially, a court must decide whether the parol evidence rule is applicable. See Sun Oil Co., 626 S.W.2d at 731-32. Only when the rule is applicable does the rule affect whether evidence will be admitted. See Foreca, S.A. v. GRD Dev. Co., Inc., 758 S.W.2d 744, 746 (Tex.1988).

Morgan’s brief to this Court explains that the Humane Society wanted to buy “a boxed-in carport.” The purchase agreement describes the structure with the letters “SFB,” a designation for “steel-frame building.” Morrell testified that “these buildings originated from carports. It’s a boxed in carport.” The prospect form Sonnier filled out on Meyers’s first visit to Morgan has the “carport” square marked with an “x” and the handwritten letters “SFB.”

Morrell explained that a boxed-in carport and a “historical” Morgan building are different. He testified that because customers wanted a carport configuration that rises up on the sides, closes in like a building, and has high ceilings, Morgan made boxed-in carports at customers’ requests. The steel frame building designated in the purchase agreement is a Morgan “boxed-in carport” product.

Considering the use of the term “steel-frame building,” and the meaning of that term as a “boxed-in carport,” it is apparent the parties intended the roof to be a carport roof.4 The purchase agree*488ment does not supply the agreed height of the steel frame building or otherwise describe the roof, however.

The height of the building delivered is a central issue in the parties’ contract dispute.5 The roof of a boxed-in carport, or steel frame building, has “eaves” that are extensions of the roof down the sides of the frame. The purchase agreement specifies the “eave height” is to be “6,” presumably 6 feet, as that is the designated height of the walls to be added. The purchase agreement does not specify how far the eaves are to extend down the side of the frame, and the agreed height of the structure cannot be determined from the purchase agreement.

The parties signed a separate document entitled “Clear Span Steel Building Specifications and Drawing.” Morgan argues this separate document was not part of the contract. Although the purchase agreement permitted a modification in writing signed by both parties, this document is not a modification of the purchase agreement. The specifications document references the purchase agreement number. The separate specifications document has a chart determining width and length dimensions, actual and nominal, and provides for a drawing of the location of “doors, windows or other features needed in building.” The document expressly reserves certain rights to Morgan, and is a further indication the written purchase agreement alone was not intended to be a complete and exclusive statement of all the terms of the parties’ agreement. The specifications document does not provide the intended height of the structure either, nor does it explain what “Clear Span” means and how the term defines the structure.

Considering the surrounding circumstances, we conclude the written purchase agreement was not intended to embody the complete and exclusive terms of the agreement of the parties, and is only partially integrated. See generally Magnolia Warehouse & Storage Co., v. Davis & Blackwell, 108 Tex. 422, 195 S.W. 184, 185 (1917) (written contract incomplete); see also Garner v. Redeaux, 678 S.W.2d 124, 128-29 (Tex.App.-Houston [14th Dist.] 1984, writ refd n.r.e.). Under the parol evidence rule, the trial court could consider evidence of consistent additional terms to explain or supplement the terms of the written agreement. See Tex. Bus. & Com. Code Ann. § 2.202(2). The height of the building, the meaning of “Clear Span,” and the roof type would be consistent terms that explain or supplement — and do not contradict — the terms of the written purchase agreement. The trial court could properly conclude the parties agreed the height of the building and the type of roof would be the same as the carport identified by Meyers at Morgan’s business. Meyers testified Morgan had to cut the roof off of the building that was delivered to cure the color problem. The extension *489of the eave on the carport that Meyers saw at Morgan was about 18 inches; the eave of the building delivered by Morgan was about 6 inches, after Morgan cut off the roof and installed almond-colored sidings. Morgan did not deliver the color building it agreed to deliver, and its effort to cure the color did not correct the height problem.6

Furthermore, the trial court could reasonably conclude the use of the word “building” in the contract meant the structure was intended to provide protection from the weather. See generally Heritage Res., Inc. v. NationsBank, 939 5.W.2d 118, 121 (Tex.1996) (terms are given their plain meaning unless the instrument shows the parties used them in a different sense); see also WebsteR’s ThiRD New INTERNATIONAL DICTIONARY OF THE ENGLISH Language 292 (2002). Consistently, Sonnier testified Morgan agreed to supply a weatherproof building. Morgan does not challenge the trial court’s finding that the building Morgan delivered was not weatherproof.7 After Morgan constructed the building, it attempted to address the Humane Society’s complaints, including the fact that the structure was not weatherproof. The roof had holes; the building had spaces that let in the rain.

The structure manufactured, delivered and erected was not the correct height or type, and was not weatherproof. Morgan did not deliver the structure it agreed to supply. Issue one is overruled.

FRAUD, DTPA, AND WARRANTY CLAIMS

Issues two, three, four and five assert that the trial court erred in ruling in favor of the Humane Society on the fraud, DTPA and breach of warranty claims.

The elements of a cause of action for common-law fraud are:

(1) that a material representation was made; (2) the representation was false; (3) when the representation was made, the speaker knew it was false or made it recklessly without any knowledge of the truth and as a positive assertion; (4) the speaker made the representation with the intent that the other party should act upon it; (5) the party acted in reliance on the representation; and (6) the party thereby suffered injury.

In re FirstMerit Bank, N.A., 52 S.W.3d 749, 758 (Tex.2001). Failure to perform as promised, standing alone, is no evidence of fraud, although it may be considered with other facts to establish fraudulent intent. Spoljaric v. Percival Tours, Inc., 708 S.W.2d 432, 435 (Tex.1986).

There is no evidence Morgan’s agents knowingly made false representations to the Humane Society. We have determined Morgan breached the contract, and did not deliver the structure it agreed to deliver, but the fraud claim cannot be based solely on a failure to perform contractual promises. See id. The purchase agreement expressly provided that Meyers acknowledged she did not rely on extra-*490contractual representations. Disclaimers of reliance on extra-contractual representations that arise from negotiated transactions between sophisticated parties are generally valid. See Schlumberger Tech. Corp. v. Swanson, 959 S.W.2d 171, 180-81 (Tex.1997). Because there is no evidence of reliance on any representation other than the terms of the agreement, and no evidence of any intentionally false statements, the trial court erred in finding that Morgan committed fraud. See In re First-Merit Bank, 52 S.W.3d at 758.

Reliance is an element of a cause of action for the alleged violations of the DTPA “laundry list.” See Tex. Bus. & Com.Code Ann. §§ 17.46(b), 17.50(a)(1)(B) (Vernon Supp.2007); Henry Schein, Inc. v. Stromboe, 102 S.W.3d 675, 693 (Tex.2002). The conduct must be a producing cause of the alleged injuries. Tex. Bus. & Com.Code Ann. § 17.50(a). The purchase agreement expressly disclaims the purchaser’s reliance on any extra-contractual representations. The trial court erred in awarding recovery under the DTPA. See Tex. Bus. & Com.Code Ann. §§ 17.46(b), 17.50(a); Prudential Ins. Co. of Am. v. Jefferson Assocs., Ltd., 896 S.W.2d 156, 161 (Tex.1995).

The purchase agreement disclaimed any warranties. The written disclaimer of warranties was preceded by a centered heading in bold print and uppercase letters, which stated, “No Warranty/No Consequential or Incidental Damages.” Section 2.316(b) of the Texas Business and Commerce Code provides that “to exclude or modify the implied warranty of merchantability ... the language must mention merchantability and in case of a writing must be conspicuous, and to exclude or modify any implied warranty of fitness the exclusion must be by a writing and conspicuous.” Tex. Bus. & Com.Code Ann. § 2.316(b). The disclaimer in this agreement was written in bold print, all uppercase letters, and included the word “merchantability.” The disclaimer was conspicuous. See id. § 1.201(b)(10) (Vernon Supp.2007) (definition of conspicuous). The purchase agreement adequately disclaimed warranties. The trial court erred in finding to the contrary. See id. §§ 1.201(b)(10), 2.316(b).

Issues two, three, four and five are sustained.

Damages and AttoRney Fees

Issues seven and eight assert the trial court erred in awarding the Humane Society damages and attorney’s fees. The Humane Society is entitled to recover damages from Morgan for breach of the contract. See Tex. Bus. & Com.Code Ann. § 2.714(a). The building is still in the Humane Society’s possession. If a buyer has accepted non-conforming goods, the buyer may assert damages under section 2.714 of the Business and Commerce Code. See id. §§ 2.602, 2.606, 2.714(a); Bowen v. Young, 507 S.W.2d 600, 603 (Tex.Civ.App.-El Paso 1974, no writ). Section 2.714(a) applies to any failure to perform according to the seller’s obligations. See 14 William V. Dorsaneo III, Texas Litigation Guide § 210.31[8][a] (2005); see also 12 John E. Krahmer, Texas Practice: Texas Methods of Practice § 25.133, at 214 (2005) (Section 2.714(a) “is general enough to include damage resulting from the seller’s failure to perform any contractual obligation^]”). Under that section, a buyer who has accepted goods and given notification may recover damages for any non-conformity and the loss resulting in the ordinary course of events from the seller’s breach, as determined in any manner that is reasonable. Tex. Bus. & Com.Code Ann. § 2.714(a).

*491It has been suggested that when non-conforming goods are delivered, a buyer may only assert damages for breach of warranty. See, e.g., Ellis v. Precision Engine Rebuilders, Inc., 68 S.W.3d 894, 896-97 (Tex.App.-Houston [1st Dist.] 2002, no pet.); Chilton Ins. Co. v. Pate & Pate Enters., Inc., 930 S.W.2d 877, 890 (Tex. App.-San Antonio 1996, writ denied). Comment 2 to Section 2.714 explains, however, “The ‘non-conformity’ referred to in subsection (1) includes not only breaches of warranties but also any failure of the seller to perform according to his obligations under the contract. In the case of such non-conformity, the buyer is permitted to recover for his loss ‘in any manner which is reasonable.’ ” Tex. Bus. & Com. Code Ann. § 2.714 cmt. 2. See, e.g., The Mead Corp. v. McNally-Pittsburg Mfg. Corp., 654 F.2d 1197, 1207 n. 14 (6th Cir. 1981); Jetpac Group v. Bostek, Inc., 942 F.Supp. 716, 720 (D.Mass.1996); Hooper Handling, Inc. v. Jonmark Corp., d/b/a Premium Wine and Spirits, 267 A.D.2d 1075, 1075-76, 701 N.Y.S.2d 577, 578 (N.Y.App.Div.1999). Section 2.714 allows the Humane Society to recover damages for Morgan’s contract breach with respect to the non-conforming goods “as determined in any manner which is reasonable.” Tex. Bus. & Com.Code Ann. § 2.714(a).

The damage award here is not supported by sufficient evidence, however, nor is it determined in a reasonable manner. Under the trial court’s judgment, the Humane Society was given its purchase money back, the continued use of the structure, compensation for the cost of another building, and compensation for the remodeling of a third building. Double recoveries are not ordinarily allowed under law. See Parkway Co. v. Woodruff, 901 S.W.2d 434, 441 (Tex.1995). Contract damage awards are not intended to be punitive, and a buyer generally must elect a remedy. See Amoco Prod. Co. v. Alexander, 622 S.W.2d 563, 571 (Tex.1981) (“Exemplary damages are not allowed for breach of contract.”); Foley v. Parlier, 68 S.W.3d 870, 882 (Tex.App.-Fort Worth 2002, no pet.) (explaining that plaintiff with inconsistent remedies must elect between them). It is not reasonable under the circumstances here to allow continued use of the purchased goods, recovery of the purchase money, and the cost of replacement goods in an amount twice the value of the goods purchased. See, e.g., Tex. Bus. & Com.Code Ann. §§ 2.607 (effect of acceptance), 2.712 (substitute goods), 2.714(a) (damages for acceptance of nonconforming goods).

Although the Humane Society argues and Meyers testified the building delivered has no value for the storage of food or lawn equipment, the Humane Society is making some other use of the building. The trial court refused to award damages for the cost of the concrete slab on which the building rests because the court found “the Humane Society is making some use of the slab, and will, in all likelihood continue to make some use of the slab.” The Morgan building on the slab is the “use” being made of the slab. The record does not include evidence of the value of the building as it is being used by the Humane Society.

Furthermore, the purchase agreement excludes consequential and incidental damages. See Tex. Bus. & Com.Code Ann. § 2.715 (incidental and consequential damages). The Humane Society argues and the trial court found that the exclusion was inconspicuous as a matter of law and unenforceable. The clause is in large conspicuous type, and although the clause is on the back of the agreement, immediately above the signature line was an instruction in large uppercase letters to read both sides of the contract. The provision is not un*492conscionable, is enforceable, and bars recovery of consequential and incidental damages. See id. § 2.719; Wade & Sons, Inc. v. Am. Standard, Inc., 127 S.W.3d 814, 823-24 (Tex. App.-San Antonio 2003, pet. denied).

The Humane Society is entitled to recover reasonable and necessary attorney fees incurred in pursuing breach of contract damages. See Tex. Civ. PRAC. & Rem. Code Ann. § 38.001(8) (Vernon 1997). Attorney fees incurred in pursuing the fraud claim are not recoverable, however, nor are attorney fees incurred in connection with the DTPA and breach of warranty claims that have no basis. See Tony Gullo Motors I, L.P. v. Chapa, 212 S.W.3d 299, 313-14 (Tex.2006). In the evidence presented at trial, the attorney fees incurred for breach of contract were not segregated from the non-recoverable attorney fees. Although evidence of non-segregated fees is some evidence of segregated fees, it is not sufficient evidence. See id. at 314.

The cause is remanded for a new trial. Issues seven and eight are sustained in part and overruled in part.8

Conclusion

We reverse the trial court’s judgment. Judgment is rendered that the Humane Society of Southeast Texas take nothing from Morgan Building and Spas, Inc. on the DTPA, fraud, and warranty claims. The cause is remanded for a new trial on the breach of contract claim.

REVERSED. RENDERED IN PART AND REMANDED IN PART.

. The purchase agreement stated that the building was number 1432YMTYGG1N. Son-nier explained only that the number "1432” described the width and length of the structure.

. Meyers hired a contractor to pour the concrete slab.

. Printed above the nominal dimensions of the width, length and eave height in the purchase agreement is a reference to "See Para. 19 on back[J” Paragraph 19 provides:

Dimension Variations. The overall size of the building(s) is referred to on the Contract in approximate "nominal” dimensions. Actual dimensions will always be somewhat different due to availability of materials, manufacturing and transportation considerations, and other factors. Purchaser agrees that all dimensions specified and materials furnished pursuant to this contract shall be considered as approximate "nominal” dimensions and shall be subject to customary manufacturing variations and tolerances, (emphasis added).

Sonnier testified that the "other factors” referred to in the purchase agreement would include the specific requirements of a customer.

. "[W]ords always need interpretation.” Stewart v. Selder, 473 S.W.2d 3, 7 (Tex.1971). When a word has a specialized meaning in a business, it is given the meaning it is under*488stood to have in that business. See Heritage Res., Inc. v. NationsBank, 939 S.W.2d 118, 121 (Tex.1996).

. The trial court found that the following defects were material breaches of the parties' agreement: (1) the building was significantly shorter than the model Meyers requested, (2) the building Morgan provided was not a Clear-Span steel building, (3) the building could not accommodate the Human Society’s pre-existing shelving, (4) the building contained bracing, which hindered its use by shortening its effective height, (5) the building was not waterproof, (6) the building was not weatherproof, (7) the building was not rodent-proof, (8) the building was not secure, (9) the building was the wrong color, and (10) the building was rusting. The trial court found that Morgan cured the problems with the rust and the color of the building. The trial court found that the "sample carport model Meyers first observed and requested” became part of the parties’ agreement.

. Additionally, although the concrete slab was as specified by Morgan, the structure delivered by Morgan did not fit on the "rat lip” of the slab. The court found that the walls did not reach the slab and a space existed "where rodents and other vermin are free to enter and exit[.]”

. There are thirty-four findings of fact, and many if not all contain numerous additional findings or subparts. Contained within finding of fact number six, for example, are approximately thirteen factual findings. A trial court is to make findings only on controlling issues raised by the pleadings and evidence. Limbaugh v. Limbaugh, 71 S.W.3d 1, 6 (Tex. App.-Waco 2002, no pet.); see also ASAI v. Vanco Insulation Abatement, Inc., 932 S.W.2d 118, 122 (Tex.App.-El Paso 1996, no writ). Morgan makes no objection to the large number of findings, however.

. Because issue six concerning admission of evidence would not result in greater relief than a new trial and its resolution is not necessary to the final disposition of this appeal, we need not address that issue. See Tex.R.App. P. 47.1.