Filed 11/17/23 State Water Board Cases CA3
NOT TO BE PUBLISHED
California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions not certified for
publication or ordered published, except as specified by rule 8.1115(b). This opinion has not been certified for publication
or ordered published for purposes of rule 8.1115.
IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA
THIRD APPELLATE DISTRICT
(Sacramento)
----
STATE WATER BOARD CASES C096511
(JCCP No. 5013)
In December 2018, respondent State Water Resources Control Board (the Board)
adopted amendments to the water quality control plan for the San Francisco
Bay/Sacramento-San Joaquin Delta Estuary (the Bay-Delta Plan) and certified a
substitute environmental document (SED) supporting the amendments. No fewer than 13
separate lawsuits were filed against the Board challenging its adoption of the
amendments and the SED on various grounds. Appellant — the San Joaquin Tributaries
Authority, or SJTA — filed one of those 13 lawsuits. The lawsuits were filed in six
different counties. At the request of the Board, the lawsuits were coordinated in
Sacramento County as State Water Board Cases, Judicial Council Coordination
1
Proceeding No. 5013 (hereafter the coordination proceeding), and this court was
designated as the court having appellate jurisdiction.
SJTA thereafter filed a motion to intervene in all of the cases that were part of the
coordination proceeding. The trial court denied the motion, SJTA appeals, and we
affirm.
FACTUAL AND PROCEDURAL BACKGROUND
In December 2018, the Board adopted amendments to the Bay-Delta Plan (which
are hereafter referred to as the Plan Amendments) and certified the SED. Among other
things, the Plan Amendments include new “flow objectives” for the lower San Joaquin
River to protect fish and wildlife beneficial uses.1 The new flow objectives are to
“[m]aintain inflow conditions from the San Joaquin River watershed to the Delta at
Vernalis sufficient to support and maintain the natural production of viable native San
Joaquin River watershed fish populations migrating through the Delta.” Numerically, the
objectives are to “[m]aintain 40% of unimpaired flow, with an allowed adaptive range
between 30% - 50%, inclusive, from each of the Stanislaus, Tuolumne, and Merced
Rivers from February through June.” “Unimpaired flow represents the natural water
production of a river basin, unaltered by upstream diversions, storage, or by export or
import of water to or from other watersheds.”
As the Board recognized in the SED, “The use of a percent of unimpaired flow
assigns an explicit percent of unimpaired flow to fish and wildlife, with the remaining
percent of unimpaired flow available for other uses. . . . For example, if the flow
1 The Plan Amendments also include relaxed “salinity objectives” for the southern
Delta. SJTA’s lawsuit originally contained one cause of action (the 26th) challenging the
adoption of the salinity objectives, but that cause of action was dismissed by the trial
court. Thus, although SJTA briefly mentions the salinity objectives in its opening brief,
its primary challenge is to the flow objectives.
2
requirement is 40 percent of unimpaired flow from February through June, the remaining
60 percent is available for all other uses.” Thus, under the new flow objectives,
40 percent of the unimpaired flow of the Stanislaus, Tuolumne and Merced Rivers will
remain in the rivers to support and maintain native fish populations, leaving the
remaining 60 percent available for other uses. The Board also recognized, “The primary
effect of the flow proposal is that it would decrease the quantity of surface water
available for diversion for other uses compared to the current condition.” (Italics
added.)
The Board estimated that implementation of the flow objectives will reduce
surface water available for other uses by anywhere from 7 to 23 percent. It also noted
that “[t]his reduction in availability of surface water could affect water users who obtain
their water from . . . anywhere within the Stanislaus, Tuolumne, and Merced River
Watersheds,” including, in particular, the South San Joaquin Irrigation District, the
Turlock Irrigation District, and the City and County of San Francisco.
SJTA is a joint powers authority comprised of, among others, the South San
Joaquin Irrigation District, the Turlock Irrigation District, and the City and County of San
Francisco, all of whom hold water rights on the Tuolumne or Stanislaus Rivers. They
fear that implementing the flow objectives will decrease the quantity of water available
for their use.
The Plan Amendments do not actually implement the flow objectives. They
explain, “Most of the objectives in this ongoing plan are being, and will continue to be,
implemented by assigning responsibilities to water right holders because the parameters
to be controlled are primarily impacted by flows and diversions. This plan, however, is
not to be construed as establishing the responsibilities of water right holders. Nor is this
plan to be construed as establishing the quantities of water that any particular water right
holder or group of water right holders may be required to release or forego to meet the
objectives in this plan. The State Water Board will consider, in a future water rights
3
proceeding or proceedings, the nature and extent of water right holders’ responsibilities
to meet these objectives.”
Two of the 13 cases challenging the Plan Amendments and SED have since been
dismissed, leaving 11 coordinated cases. All petitioners seek a writ of mandate ordering
the Board to vacate, rescind and set aside its approval and adoption of the Plan
Amendments and the SED.2 However, not all petitioners agree on why the Plan
Amendments must be vacated. To give one example, some petitioners contend the flow
objectives are too low, and more water should be allocated to fish; and some, including
SJTA, contend the flow objectives are too high and less water should be allocated to fish.
In June 2021, SJTA filed a motion to intervene in all of the coordinated cases
(except for its own), along with a proposed complaint in intervention that was
substantively identical to its original petition and complaint.3 SJTA argued it had a right
to intervene because it had an interest relating to the transaction that is the subject of the
consolidated cases, disposition of those cases could impair its ability to protect its
interests, and its interests were not adequately represented by existing parties.
Alternatively, SJTA argued it should be permitted to intervene because it had a direct and
immediate interest in the other cases, intervention would not enlarge the issues, and its
2 In addition to SJTA, petitioners in the coordinated cases include: California Farm
Bureau Federation; Merced Irrigation District; City of Modesto; Westlands Water
District; Modesto Irrigation District; North Coast Rivers Alliance et al.; Stockton East
Water District; San Francisco Baykeepers et al.; the United States of America; and South
Delta Water Agency et al.
3 Four other motions to intervene were filed: three by existing parties to the
coordinated cases (Bay Area Water Supply and Conservation Agency, Stockton East
Water District, and Westlands Water District) seeking to intervene in some or all of the
others; and one by a nonparty (State Water Contractors) seeking to intervene in four of
the coordinated cases. The court granted State Water Contractors’ motion to intervene,
but denied the other motions. Those orders are not at issue here.
4
reasons for intervention outweighed any opposition thereto. The Board opposed the
motion.4
The trial court denied the motion, finding SJTA had no right to intervene because
it failed to show it had an interest in the Board’s adoption of the Plan Amendments. The
trial court also declined to give SJTA permission to intervene, finding intervention was
“unnecessary and redundant” because its proposed complaint in intervention simply
duplicated claims it already raised in its own petition. The denial of permissive
intervention was “without prejudice,” and the trial court noted SJTA could seek
permissive intervention at a later date “should previously unforeseen circumstances
supporting intervention become known.”
SJTA filed a timely appeal challenging the trial court’s order. (See Hodge v.
Kirkpatrick Development, Inc. (2005) 130 Cal.App.4th 540, 547 [“An order denying a
motion for leave to intervene is directly appealable because it finally and adversely
determines the moving party’s right to proceed in the action”].)
The trial court did one more thing that is potentially relevant to this appeal: it
allowed all petitioners to brief and argue the merits of all claims and issues raised by any
of the pleadings in the coordinated cases. In particular, it allowed each petitioner to file
both (1) a 50-page opening brief on the merits of its petition, and (2) a 20-page brief
responding to any issues addressed in the opening briefs of the other petitioners that were
not pled in its petition and thus not addressed in its opening brief. For example, if San
Francisco Baykeepers et al. addressed an issue in its opening brief that SJTA did not
4 North Coast Rivers Alliance et al. filed a joinder in the Board’s opposition. No
other party opposed the motion. Petitioners San Francisco Baykeepers et al., filed a
response to the motion suggesting the trial court should allow all parties to brief all issues
in the coordination proceeding, which it contended would “obviate[] the need for
intervention”; otherwise, it took “no position on the requests for intervention, provided
that . . . intervention does not duplicate issues already before the Court in this coordinated
proceeding or expand the scope of Petitioners’ case.”
5
plead or address in its opening brief, SJTA could file a response to that issue. There was
one exception. SJTA’s petition asserted several California Environmental Quality Act
(CEQA) (Pub. Resources Code, § 21000 et seq.) causes of action, but those causes of
action were dismissed for failure to comply with Public Resources Code section 21167.4,
subdivision (a), which provides, “In any action or proceeding alleging noncompliance
with [CEQA], the petitioner shall request a hearing within 90 days from the date of filing
the petition or shall be subject to dismissal on the court’s own motion or on the motion of
any party interested in the action or proceeding.” Because SJTA’s CEQA causes of
action were dismissed, the trial court ruled it was not permitted to address CEQA issues
either in its own opening brief, or in its brief responding to issues raised in other
petitioners’ opening briefs.
DISCUSSION
I
Relevant Law
Intervention is governed by Code of Civil Procedure section 387.5 There are two
types of intervention: mandatory intervention (sometimes called intervention as of right)
and permissive intervention. (§ 387, subd. (d).) Mandatory intervention is governed by
section 387, subdivision (d)(1), which provides, in relevant part, “The court shall, upon
timely application,[6] permit a nonparty to intervene in the action or proceeding if . . . .
[¶] . . . [¶] (B) The person seeking intervention claims an interest relating to the property
or transaction that is the subject of the action and that person is so situated that the
disposition of the action may impair or impede that person’s ability to protect that
5 Further undesignated statutory references are to the Code of Civil Procedure.
6 The trial court did not find, and the Board does not contend, that SJTA’s
application was untimely. We thus do not discuss timeliness further.
6
interest, unless that person’s interest is adequately represented by one or more of the
existing parties.” Permissive intervention is governed by section 387, subdivision (d)(2),
which provides, “The court may, upon timely application, permit a nonparty to intervene
in the action or proceeding if the person has an interest in the matter in litigation, or in the
success of either of the parties, or an interest against both.”
“California cases are not settled on whether we review the denial of a request for
mandatory intervention . . . de novo or for abuse of discretion.” (Edwards v. Heartland
Payment Systems, Inc. (2018) 29 Cal.App.5th 725, 732 (Edwards).) Because section
387’s provision regarding mandatory intervention “is in substance an exact counterpart”
to rule 24(a) of the Federal Rules of Civil Procedure, we may look to federal cases
interpreting rule 24 when interpreting section 387. (Hodge v. Kirkpatrick Development,
Inc., supra, 130 Cal.App.4th at p. 556.) “Federal courts review de novo the denial of a
motion for mandatory intervention under Federal Rules of Civil Procedure rule 24,”
which suggests we should as well. (Edwards, supra, at p. 732.) Ultimately, however,
“[w]e need not decide which standard is correct under state law because we find no error
in denying mandatory intervention under any standard.” (Id. at p. 733.)
Whether to allow permissive intervention in a particular case “ ‘is best determined
by a consideration of the facts of that case’ [citation], and the decision is ordinarily left to
the sound discretion of the trial court.” (Fireman’s Fund Ins. Co. v. Gerlach (1976)
56 Cal.App.3d. 299, 302.) “We therefore review an order denying leave to
[permissively] intervene under the abuse of discretion standard.” (City and County of
San Francisco v. State of California (2005) 128 Cal.App.4th 1030, 1036; see also
Edwards, supra, 29 Cal.App.5th at p. 736 [“We review the denial of permissive
intervention for abuse of discretion”]; Siena Court Homeowners Assn. v. Green Valley
Corp. (2008) 164 Cal.App.4th 1416, 1428 [“The standard of review for an order denying
leave to intervene [permissively] is abuse of discretion”].) Despite this clear authority,
SJTA argues we should review the trial court’s denial of permissive intervention de novo,
7
because the trial court misapplied the law. As we explain below, we find the trial court
did not misapply the law. We thus apply the abuse of discretion standard when reviewing
the trial court’s order denying permissive intervention. “Under this standard of review, a
reviewing court should not disturb the trial court’s exercise of discretion unless it has
resulted in a miscarriage of justice.” (City and County of San Francisco, supra, at
p. 1036.)
With this in mind, we turn to whether the trial court erred when it denied SJTA’s
motion for mandatory intervention and for permissive intervention, and we conclude the
answer is no.
II
Mandatory Intervention
In order to establish a right to mandatory intervention, SJTA must meet three
requirements: (1) it must have “an interest relating to the property or transaction that is
the subject of the action”; (2) it must be “so situated that the disposition of the action may
impair or impede [its] ability to protect that interest”; and (3) its interest must not be
“adequately represented by one or more of the existing parties.” (§ 387, subd. (d)(1)(B);
see also Edwards, supra, 29 Cal.App.5th at p. 732.) The trial court denied SJTA’s
motion based solely on the first requirement and did not discuss the other two. In
analyzing that requirement, the trial court found the transaction that is the subject of the
consolidated proceeding is the Board’s adoption of the flow and salinity objectives (or,
perhaps more accurately, its adoption of the Plan Amendments).7 As relevant here, the
trial court also found SJTA did not show the requisite interest relating to this transaction
because adopting the Plan Amendments did not determine any particular entity’s water
7 SJTA argues the trial court viewed the transaction too narrowly, but we need not
decide whether it is correct.
8
rights.
SJTA argues it has an interest in the adoption of the Plan Amendments (as
evidenced, in part, by the fact that it has standing to challenge those amendments in its
own petition), and the trial court erred in finding otherwise. SJTA also argues it meets
the other two requirements for mandatory intervention as well, and we should hold it is
entitled to intervene as of right. The Board agrees with the trial court’s finding that SJTA
did not show the requisite interest in the adoption of the Plan Amendments.
Alternatively, the Board argues we should affirm the trial court’s ruling because SJTA
did not meet the other two requirements. We agree that SJTA did not meet the other two
requirements, and thus need not decide whether SJTA has the type of interest in the
adoption of the Plan Amendments that would support mandatory intervention.
We begin by noting that section 387 allows a “nonparty” to intervene in an “action
or proceeding” if certain requirements are met. (§ 387, subd. (d)(1), (2), italics added;
see also Carlsbad Police Officers Assn. v. City of Carlsbad (2020) 49 Cal.App.5th 135,
147 (Carlsbad Police Officers Assn.) [“ ‘An intervention takes place when a nonparty,
deemed an intervenor, becomes a party to an action or proceeding between other
persons’ ”]; Cal. Civil Procedure Before Trial (Cont.Ed.Bar 4th ed. 2023) § 43.15
[“Intervention is intended to protect the rights of nonparties . . . . It may be invoked only
by a nonparty, not by existing parties or the court”].) The rub here is that SJTA, while
technically a nonparty as to each of the coordinated cases except its own, is itself a party
to the coordination proceeding in which those cases are now being litigated. (See, e.g.,
Prescription Opioid Cases (2020) 57 Cal.App.5th 1039, 1048 [“a coordination
proceeding includes multiple coordinated actions”].) If we view the coordination
proceeding as a whole, rather than focusing solely on the separate actions that are part of
that proceeding, SJTA is not entitled to intervene either as of right or permissively
because it is not a nonparty. Similarly, if we view SJTA as a party to the coordination
proceeding, there is no need for it to intervene in each of the cases that are part of that
9
proceeding. The purpose of intervention is “ ‘to obviate delay and multiplicity of actions
by creating an opportunity to those directly interested in the subject matter to join in an
action already instituted.’ ” (Marc Bellaire, Inc. v. Fleischman (1960) 185 Cal.App.2d
591, 595; see also Carlsbad Police Officers Assn., supra, 49 Cal.App.5th at p. 152 [“the
intervener of right has ‘an interest at stake which the other parties will not fully protect,
and which the intervenor can fully protect only by joining the litigation’ ”].) SJTA is
already part of, and a party to, the coordination proceeding that will determine all
challenges to the Board’s adoption of the Plan Amendments, and it thus does not need to
join in that proceeding in order to protect its interests.
Even if we do not decide this appeal based solely on SJTA’s status as a party, we
find mandatory intervention is not appropriate because that status means SJTA cannot
meet the second and third requirements of mandatory intervention — namely, that it is
“so situated that the disposition of the action may impair or impede [its] ability to protect
that interest,” and its interest cannot be “adequately represented by one or more of the
existing parties.” (§ 387, subd. (d)(1)(B).) Although we are aware of no California cases
discussing whether a party to a coordination proceeding may intervene in some or all of
the coordinated cases, several federal cases have denied mandatory intervention in similar
circumstances, and we look to these cases as persuasive authority. (Carlsbad Police
Officers Assn., supra, 49 Cal.App.5th at p. 151 [“section 387 is modeled in part after rule
24 of the Federal Rules of Civil Procedure,” and “[i]t follows that the Legislature must
have intended that the two mandatory intervention statutes should have the same
meaning, and we may look to authorities construing the parallel federal rule for
guidance”].)
In McDonnel Group, LLC v. Starr Surplus Lines Ins. Co. (E.D.La. 2019) 2019
U.S.Dist. LEXIS 51578, for example, two separate actions were filed against the same
group of insurers, and the plaintiff (Mechanical) in one of those actions filed a motion to
intervene in the other. The claims in Mechanical’s complaint in intervention were
10
identical to the claims in its own complaint. The district court consolidated the two
actions with one other, and then denied the motion to intervene, explaining, “I find that
Mechanical has a direct, substantial, legally protectable interest in the proceedings.
However, now that Mechanical’s separately filed lawsuit has been consolidated with the
related matters, intervention is no longer necessary to protect that interest and would
merely be redundant and duplicative. As a consolidated plaintiff in this matter,
Mechanical will suffer no impairment or impediment to its ability to protect and represent
its interests, especially because Mechanical’s complaint in these consolidated matters
includes the same allegations it[] seeks to bring in its complaint of intervention. For
these reasons, I find that Mechanical is not entitled to intervene as of right.” (Id. at
pp. *5-6; see id. at pp. *2-*3.)
Vistar Techs. Corp. v. Tavory (S.D.Fla. 2010) 2010 U.S.Dist. LEXIS 165908 is
similar. There, Vistar, a corporation, sued its former president in 2006, and in 2009 the
former president sued two Vistar executives. Vistar moved to consolidate the two
actions, and to intervene in the 2009 action. The trial court consolidated the two actions
because it found they “[u]ndoubtedly . . . involve common issues of law and fact,” but it
denied the motion to intervene, reasoning, “While Vistar is clearly permitted to intervene
in this action under Federal Rule of Civil Procedure 24(a), Vistar no longer needs to
intervene in the 2009 . . . action because that action has been consolidated with the 2006
. . . action, to which Vistar is already a party plaintiff. Accordingly, the motion to
intervene is moot.” (Id. at p. *8; see id. at pp. *3-*5.)
Finally in Schneider v. U.S. (D.Neb. 2000) 197 F.R.D. 397, a magistrate judge
recommended that four cases be consolidated, and also that the plaintiff in one case
(Schneider v. U.S.) be allowed to intervene in two of the other cases (Seger v. U.S. and
Gray v. U.S.). Nobody objected to the magistrate judge’s recommendation on
consolidation, but Seger and Gray objected to the magistrate judge’s recommendation on
intervention. The district court found “Schneider should not be allowed to intervene into
11
the Seger and Gray cases as a plaintiff,” and it denied the motion accordingly. (Id. at
p. 402.) It explained, “Rule 24(a) provides that a party may intervene if the party has an
interest in the litigation that is not adequately protected by the existing parties. [Citation.]
However, where consolidation has already been ordered, common questions of fact and
law do not require intervention. [Citation.] The reason for consolidation as opposed to
intervention, despite a liberal construction of the intervention requirements, is that a party
whose action is nearly identical to the action with which it has been consolidated cannot
satisfy the requirement that his/her interests are not adequately protected.” (Id. at
pp. 402-403.) “He has every opportunity to vindicate his rights without intervention. In
addition, intervention would result in duplicative actions essentially initiated by the same
individual.” (Id. at p. 403.)
We find these cases persuasive. What they demonstrate is that when multiple
cases have been coordinated or consolidated,8 a party to one of those cases cannot meet
the requirements for mandatory intervention into the other cases, either because it is not
“so situated that the disposition of the action may impair or impede [its] ability to protect
[its] interest,” or because it is one of the “existing parties” and thus can “adequately
represent[]” its own interest, or both. (§ 387, subd. (d)(1)(B); see also McDonnel Group,
LLC v. Starr Surplus Lines Ins. Co., supra, 2019 U.S.Dist. LEXIS at p. *5 [“As a
consolidated plaintiff in this matter, Mechanical will suffer no impairment or impediment
to its ability to protect and represent its interests, especially because Mechanical’s
8 Coordination and consolidation are similar. Coordination is governed by section
404, and is allowed if the actions share “a common question of fact or law.” (§ 404.)
Although there is no direct analog to coordination in the Federal Rules of Civil Procedure
(see Mussat v. IQVIA, Inc. (7th Cir. 2020) 953 F.3d 441), it is similar to consolidation
under rule 42(a) of the Federal Rule of Civil Procedure (28 U.S.C.), which is only
allowed if actions share “a common question of law or fact,” and pursuant to which the
consolidated cases retain their independent character and do not merge into one case.
(See Hall v. Hall (2018) 584 U.S. ___, ___ [138 S.Ct. 1118, 1125].)
12
complaint in these consolidated matters includes the same allegations it[] seeks to bring
in its complaint of intervention”]; Schneider v. U.S., supra, 197 F.R.D. at pp. 402-403
[where cases have been consolidated, party seeking to intervene in other cases “cannot
satisfy the requirement that his/her interests are not adequately protected” by existing
parties].)
SJTA contends it is so situated that the disposition of one or more of the individual
consolidated cases may impair or impede its ability to protect its interests because of the
risk that parties to those cases could settle with the Board on terms that would somehow
be adverse to SJTA’s interests. We are not persuaded, for two reasons. First, the one
case that SJTA cites to support its argument that the risk of an adverse settlement is
sufficient to support mandatory intervention — Ziani Homeowners Assn. v. Brookfield
Ziani LLC (2015) 243 Cal.App.4th 274 — is inapplicable because the only issue in that
case was whether a motion to intervene was timely. In Ziani, a homeowners association
(HOA) that managed a condominium development sued the builder for construction
defects in both the common areas and the individual units. (Id. at p. 276.) The HOA’s
board of directors and its attorney told the individual unit owners they would not settle
the case unless they obtained sufficient recovery to pay for repairs to both the common
areas and the individual units. (Id. at pp. 276-277.) The HOA ultimately agreed to settle
the lawsuit on terms that some of the owners claimed would leave them with out-of-
pocket expenses for repairs to their individual units, a special HOA assessment, and
depleted HOA reserves. These owners thus filed a motion to intervene in the lawsuit.
They argued they had a right to intervene because they had a direct financial interest in
the litigation, the proposed settlement would impair their ability to protect their interest,
and the HOA was no longer adequately representing their interest. (Id. at pp. 277-278.)
The parties agreed that the owners had an interest in the property that was the subject of
the action, and that the first requirement for mandatory intervention was thus met, and the
trial court found the third requirement was met as well because the HOA was not
13
adequately representing the owners’ interests. (Id. at pp. 279-280.) As relevant to
SJTA’s argument, the trial court also found “ ‘that the disposition of the action may
impair or impede the prospective interveners’ interest — for example, if the HOA settled
for too little the individual homeowners may have to pay for necessary repairs out of their
own pockets.’ ” (Id. at p. 280.) Ultimately, however, the trial court denied the motion to
intervene on the ground that it was untimely, and the sole issue on appeal was whether
the trial court erred in determining timeliness. (Id. at pp. 275-276, 280.) The appellate
court held the trial court used the wrong date as the starting point for determining
timeliness,9 and it remanded the case to the trial court to reconsider whether the motion
was timely, and, if so, to decide whether the motion should be granted. (Ziani, at p. 282.)
Ziani thus did not consider whether the possibility of an adverse settlement is sufficient to
demonstrate a would-be intervener “is so situated that the disposition of the action may
impair or impede [its] ability to protect [its] interest” (§ 387, subd. (d)(1)(B)), and it is
axiomatic that “ ‘cases are not authority for propositions not considered.’ ” (People v.
Superior Court (Zamudio) (2000) 23 Cal.4th 183, 198.)
Second, SJTA gives us no concrete examples of how the Board could settle with
parties to the other cases on terms that would impair SJTA’s ability to protect its
interests. SJTA theorizes the Board could settle a case by agreeing to make changes to
the Bay-Delta Plan or the Plan Amendments that might be satisfactory or beneficial to a
settling party, but adverse to SJTA. As the trial court found, however, the Board cannot
make changes to the Bay-Delta Plan or amendments thereto by settlement agreement.
Instead, the Board “is obligated to make any changes to the Plan Amendments pursuant
9 The issue was whether timeliness should be determined based on the date the
complaint was filed, or the date the owners knew or should have known their interests
were not being adequately represented. The trial court used the former, and the appellate
court ruled it should have used the latter. (Ziani Homeowners Assn. v. Brookfield Ziani
LLC, supra, 243 Cal.App.4th at pp. 280-282.)
14
to public processes prescribed in provisions of the Porter-Cologne Act.” SJTA does not
dispute that the Board can only make changes to the Bay-Delta Plan through a public
process, but it contends this fact is “irrelevant.” We disagree. Assume, for example, that
the Board were to settle with San Francisco Baykeepers et al. by agreeing to revise or
reconsider the flow objectives based on new scientific studies showing further declines in
salmon populations. In that case, SJTA would be entitled to fully participate in the public
process by which the Board reconsidered the flow objectives, up to and including
litigation challenging any new objectives, and could thus fully protect its interests.
Moreover, SJTA fails to explain how intervening in the other cases would actually allow
it to protect itself against the risk of an adverse settlement. After all, even if SJTA
intervened in the other cases, the petitioners in those other cases could still settle their
claims against the Board, and SJTA would be left litigating its complaint in intervention,
which, as noted, is identical to its own petition.
As for SJTA’s argument that its interest is not adequately represented by one or
more of the existing parties, we disagree. SJTA is a party to the coordination proceeding,
and we presume it is fully capable of adequately representing its own interest, particularly
where, as here, it was allowed to respond to issues raised by other petitioners in their
opening briefs.
We thus find the trial court did not err in denying SJTA’s request for mandatory
intervention.
III
Permissive Intervention
SJTA next contends the trial court erred in denying its request for permissive
intervention. Again, we disagree.
Section 387, subdivision (d)(2), provides, “The court may, upon timely
application, permit a nonparty to intervene in the action or proceeding if the person has
15
an interest in the matter in litigation, or in the success of either of the parties, or an
interest against both.” (Italics added.) Case law adds the following gloss: “[T]he trial
court has discretion to permit a nonparty to intervene where the following factors are
met: (1) the proper procedures have been followed; (2) the nonparty has a direct and
immediate interest in the action; (3) the intervention will not enlarge the issues in the
litigation; and (4) the reasons for the intervention outweigh any opposition by the parties
presently in the action.” (Reliance Ins. Co. v. Superior Court (2000) 84 Cal.App.4th 383,
386, italics added.) In analyzing SJTA’s request for permissive intervention, the trial
court noted SJTA “may” be able to meet all four factors, but it nonetheless denied the
request because it found intervention would be duplicative, unnecessary, and redundant
because SJTA’s complaint in intervention was identical to its own petition. In other
words, SJTA’s own petition was sufficient to protect its interests, and it did not need to
file that same petition in each of the consolidated cases.
SJTA argues that “whether intervention would be unnecessary, duplicative, or
redundant . . . is irrelevant and cannot form the basis of a denial of intervention as it did
here,” and the trial court thus committed legal error by denying its motion on an
impermissible basis. We disagree. Case law teaches that courts may consider whether
intervention would be unnecessary, duplicative, or redundant when denying a motion to
permissively intervene. In South Coast Air Quality Management Dist. v. City of Los
Angeles (2021) 71 Cal.App.5th 314, 321 (South Coast Air Quality Management Dist.),
for example, the court affirmed an order denying a motion for permissive intervention
where the would-be intervener’s “participation would be largely cumulative and would
unduly complicate an already complicated case.” Similarly, McDonnel Group, LLC v.
Starr Surplus Lines Ins. Co., supra, 2019 U.S. Dist. LEXIS 51578, the court denied
permissive intervention because “permissive intervention is unnecessary, redundant and
duplicative.” (Id. at p. *6.) That is precisely why the trial court denied SJTA’s motion
for permissive intervention, and we find it committed no legal error in doing so.
16
SJTA cites King v. Pacific Gas & Electric Co. (2022) 82 Cal.App.5th 440, 456,
for the proposition that “[i]ntervention cannot be denied solely on the basis that [the
would-be intervener] might be able to protect [its] interests in separate litigation,” and it
suggests the trial court denied its motion for a similar, and impermissible, reason. King is
inapplicable, however, because it dealt solely with mandatory intervention.10 (King, at
p. 448.) As indicated above, the Legislature has specified four requirements for
mandatory intervention (i.e., a timely application, an interest in the transaction that is the
subject of the action, the nonparty is so situated that the disposition of the action may
impair or impede its ability to protect that interest, and no existing party adequately
represents the nonparty’s interest). (§ 387, subd. (d)(1).) A nonparty who meets those
four requirements has a right to intervene, and it necessarily follows that trial courts
cannot create additional requirements. (King, at p. 449.)
Here, however, we are dealing with permissive intervention, not mandatory
intervention. SJTA suggests that a trial court faced with a motion for permissive
intervention may only consider the four factors noted above, and it may not consider any
other factors. It cites no authority to support its argument, and we are aware of none.
Section 387 gives the trial court discretion to permit intervention in certain
circumstances. (§ 387, subd. (d)(2) [court “may” permit intervention if a person “has an
interest in the matter in litigation, or in the success of either of the parties, or an interest
against both”]; Reliance Ins. Co. v. Superior Court, supra, 84 Cal.App.4th at p. 386
[court “has discretion to permit” intervention if four factors are met].) Discretion is just
that — discretionary. That means that even if the trial court determines a would-be
intervener has an interest in the matter in litigation, intervention will not enlarge the
10 The other case SJTA cites — Carlsbad Police Officers Assn. — also dealt with
mandatory intervention. (Carlsbad Police Officers Assn., supra, 49 Cal.App.5th at p. 149
[“We agree that the . . . interveners qualified for intervention of right”].)
17
issues, and the reasons for intervention outweigh any opposition thereto by the parties, it
still has discretion to deny intervention. If this were not the rule, then permissive
intervention would essentially become another type of mandatory intervention.
Once a trial court exercises its discretion and denies permissive intervention, we
review that decision under the deferential abuse of discretion standard of review. (City
and County of San Francisco v. State of California, supra, 128 Cal.App.4th at p. 1036.)
“ ‘Discretion is abused whenever, in its exercise, the court exceeds the bounds of reason,
all of the circumstances before it being considered. The burden is on the party
complaining to establish an abuse of discretion, and unless a clear case of abuse is shown
and unless there has been a miscarriage of justice a reviewing court will not substitute its
opinion and thereby divest the trial court of its discretionary power.’ ” (Id. at p. 1037.)
SJTA fails to convince us that the trial court’s decision to deny permissive intervention
exceeded the bounds of reason or resulted in a miscarriage of justice.
We end with a closer look at a case we find helpful to our analysis: South Coast
Air Quality Management Dist., supra, 71 Cal.App.5th 314. In that case, a labor union
moved to intervene in an environmental lawsuit filed by the South Coast Air Quality
Management District (the Air District) to challenge the City of Los Angeles’s decision to
permit the China Shipping Container Terminal (the Terminal) to operate in the Port of
Los Angeles. (Id. at p. 316.) The Air District argued the city failed to comply with
CEQA when it approved the Terminal project because (among other things) the
Terminal’s emissions would have significant adverse impacts on air quality and the city
failed to impose or enforce sufficient measures to mitigate those impacts. The Air
District sought to set aside the city’s approvals and to disallow the continued operation of
the Terminal. (Id. at p. 318.) The Terminal handled a significant percentage of the port’s
cargo, and the labor union moved to intervene in the action because it claimed a large
number of its members stood to lose their jobs if the Air District prevailed in its lawsuit,
which would result in indefinite closure of the Terminal. (Ibid.) The trial court denied
18
the motion, ruling the union had no interest in the CEQA issues raised in the lawsuit and
was only interested in the potential loss of jobs if the Terminal was closed, and allowing
intervention would complicate the litigation. The union appealed, and the appellate court
affirmed. (Id. at p. 319.) We quote its reasoning at length because we find it is equally
applicable here:
“The trial court denied the Union a seat at a table. Seating at that table already
was crowded. The court’s exercise of its discretion was proper. [¶] . . . [¶] Much of the
briefing focuses on the second factor of the permissive intervention test — that is,
whether the Union’s interest suffices. [¶] We affirm based on the fourth factor: the trial
court reasonably concluded the Air District’s interest in litigating the case without Union
involvement outweighed the Union’s reasons for intervening. Even if the interest is
direct, denying permissive intervention in such circumstances is proper. [Citation.] [¶]
This consolidated environmental case is complex. It has an impressively large cast of
characters. The trial court aptly noted this case ‘already has a lot of lawyers in it.’ With
the addition of the Attorney General and the [State Air Resources] Board,[11] we count
eight petitioners, four respondents, and four real parties in interest. [¶] The Union admits
its position on the merits is duplicative: it supports the City Entities, seeks to defend their
actions concerning the Terminal . . . . [¶] The City Entities want the same thing.
[¶] . . . [¶] There is no claim the City Entities lack motivation to defend their approval of
the Terminal project and its continued operation. . . . [¶] It thus was reasonable for the
trial court to conclude that Union participation would be largely cumulative and would
11 The Attorney General was allowed to intervene in the case because it had a
statutory right to do so, and the trial court allowed the Board to intervene because it had
primary statutory jurisdiction to regulate air pollution emissions from mobile sources like
the Terminal. (South Coast Air Quality Management District, supra, 71 Cal.App.5th at
p. 319.)
19
unduly complicate an already complicated case.” (South Coast Air Quality Management
District, supra, 71 Cal.App.5th at pp. 319-321.)
Although the facts are different, we find much of the court’s reasoning is equally
applicable here. The table in this case here is even more crowded than it was in South
Coast Air Quality Management District. If we have counted correctly, there are around
20 petitioners, two interveners, one respondent, and a plethora of lawyers (the service list
has over 55 names on it). Even more importantly, SJTA has not been denied a seat at the
table. It has a seat at the table in the coordination proceeding, and it effectively seeks 10
additional seats in order to assert and litigate the same claims in each of the coordinated
cases. As in South Coast Air Quality Management District, we find it was entirely
reasonable for the trial court to conclude that granting SJTA’s motion to intervene would
be largely duplicative and would unduly complicate an already complicated case.
DISPOSITION
The trial court’s order denying SJTA’s motion to intervene is affirmed. The Board
shall recover its costs on appeal. (Cal. Rules of Court, rule 8.278(a)(1), (2).)
/s/
EARL, P. J.
We concur:
/s/
ROBIE, J.
/s/
MESIWALA, J.