Case: 22-11213 Document: 00517030621 Page: 1 Date Filed: 01/11/2024
United States Court of Appeals
for the Fifth Circuit
____________ United States Court of Appeals
Fifth Circuit
No. 22-11213
FILED
January 11, 2024
____________
Lyle W. Cayce
The Pointe Dallas, L.L.C., Clerk
Plaintiff—Appellant,
versus
Underwriters at Lloyd’s London; Ironshore Europe
DAC,
Defendants—Appellees.
______________________________
Appeal from the United States District Court
for the Northern District of Texas
USDC No. 3:21-CV-855
______________________________
Before Wiener, Willett, and Douglas, Circuit Judges.
Per Curiam: *
Plaintiff–Appellant The Pointe Dallas, L.L.C. (“The Pointe”) brings
contract, tort, and statutory claims against Defendant–Appellees
Underwriters at Lloyd’s London and Ironshore Europe DAC
(“Underwriters”), in conjunction with Underwriters’ denial of insurance
benefits after The Pointe suffered a fire. The district court granted summary
_____________________
*
This opinion is not designated for publication. See 5th Cir. R. 47.5.
Case: 22-11213 Document: 00517030621 Page: 2 Date Filed: 01/11/2024
No. 22-11213
judgment in favor of Underwriters on all claims. We reverse in part and
remand for further proceedings.
--
The Pointe owns and operates a seventy-one-unit apartment complex
in Dallas, Texas. Each of the units is equipped with at least three ceiling-
mounted smoke detectors. When a detector senses smoke, that particular
device emits an alarm, but no other alarms are triggered. The detectors do
not send a signal to any public or private fire monitoring system upon alarm.
In September 2018, The Pointe worked with an insurance broker to
submit a Commercial Insurance Application for coverage of its apartment
building to Underwriters Underwriters negotiated with the broker and issued
Policy No. B1180D170895-084, with an effective date of October 16, 2018.
An underwriting inspection occurred in early 2019. The Pointe was notified
that, in order to maintain coverage, it needed to provide proof that its
electrical panels had been inspected and that fire extinguishers had been
installed. The Pointe complied with these requests. After the initial policy
expired, Underwriters issued another policy to The Pointe, No.
B1180D190004-043 (“the Policy”), effective October 16, 2019.
Both policies included a Protective Safeguards Endorsement
(“PSE”), which looked like this, in relevant part:
2
Case: 22-11213 Document: 00517030621 Page: 3 Date Filed: 01/11/2024
No. 22-11213
Also attached to both policies was a Commercial Property Insurance
Schedule (“the CPI Schedule”), which included the following:
On April 16, 2020, The Pointe submitted a Property Loss Notice to
Underwriters, indicating that the building had suffered a fire which had
damaged twelve units. Underwriters investigated the loss and found that The
Pointe had individual smoke detectors in each apartment, but no automatic
fire alarm connected to a central station. It concluded that The Pointe had
failed to satisfy the PSE’s requirements, and therefore refused to cover the
losses. The Pointe filed suit in Texas state court, bringing claims for breach
of contract, equitable estoppel, fraud, and violations of the Texas Prompt
Payment of Claims Act and Chapter 541 of the Texas Insurance Code.
3
Case: 22-11213 Document: 00517030621 Page: 4 Date Filed: 01/11/2024
No. 22-11213
Underwriters removed the case pursuant to 28 U.S.C. § 1332(a), and then
moved for summary judgment, contending that The Pointe’s failure to
employ the appropriate protective safeguards precluded its recovery on all
claims as a matter of law. The district court agreed and granted
Underwriters’ motion. The Pointe filed a timely notice of appeal.
--
On appeal, a district court’s grant of summary judgment is reviewed
de novo. United States ex rel. Schweizer v. Canon, Inc., 9 F.4th 269, 273 (5th
Cir. 2021). Summary judgment is proper where the record shows that “there
is no genuine dispute as to any material fact and that the movant is entitled
to judgment as a matter of law.” Fed. R. Civ. P. 56(a). All facts and reasonable
inferences are construed in favor of the nonmovant. Trammell v. Fruge, 868
F.3d 332, 338 (5th Cir. 2017) (quoting Hanks v. Rogers, 853 F.3d 738, 743 (5th
Cir. 2017)). A genuine dispute of material fact exists where “the evidence is
such that a reasonable jury could return a verdict for the nonmoving party.”
Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248 (1986).
--
The district court concluded that Underwriters were entitled to
judgment as a matter of law because The Pointe did not employ the protective
safeguards required by the Policy. The Pointe asserts that this was error,
because (1) the PSE table is empty and thus the Policy does not require any
safeguards, or, in the alternative, (2) the language of the Policy’s
requirements is ambiguous and therefore it must be construed in favor of
coverage.
Texas courts apply the general rules of contract construction to
insurance policies. Int’l Ins. Co. v. RSR Corp., 426 F.3d 281, 291 (5th Cir.
2005) (citing Kelley–Coppedge, Inc. v. Highlands Ins. Co., 980 S.W.2d 462, 464
4
Case: 22-11213 Document: 00517030621 Page: 5 Date Filed: 01/11/2024
No. 22-11213
(Tex. 1998)). 1 In interpreting an insurance policy, our “primary concern” is
to “ascertain the parties’ intent as expressed in the language of the policy”
and to “give effect to all contractual provisions so that none will be rendered
meaningless.” Id. A policy is ambiguous if it is “reasonably susceptible [to]
more than one meaning.” Id. Ambiguous policies should be construed in
favor of the insured. Id. “The policy of strict construction against the insurer
is especially strong when the court is dealing with exceptions and words of
limitation.” Am. Nat’l Gen. Ins. Co. v. Ryan, 274 F.3d 319, 323 (5th Cir. 2001)
(quoting Blaylock v. Am. Guar. Bank Liab. Ins. Co., 632 S.W.2d 719, 721 (Tex.
1982)).
The PSE states that, “[a]s a condition of this insurance, you are
required to maintain the protective devices or services listed in the Schedule
above.” But, as shown above, there is nothing filled out in the indicated table.
The Pointe contends that the Policy thus does not require any protective
safeguards, meaning that Underwriters erred in denying coverage on that
basis. Alternatively, it asserts that its interpretation of the empty table is at
least reasonable, rendering the Policy ambiguous and unenforceable.
An insurance policy, like a contract, should be read as a whole. Am.
Mfrs. Mut. Ins. Co. v. Schaefer, 124 S.W.3d 154, 159 (Tex. 2003). A review of
The Pointe’s Policy as a whole reveals that at least some protective safeguards
were required. At the bottom of the table, the PSE states, “[i]nformation
required to complete this Schedule, if not shown above, will be shown in the
Declarations or the Commercial Property Insurance Schedule.” Then, the
CPI Schedule requires the property to have P–2 and P–9 as protective
safeguards. Given that the PSE directs the reader to the CPI Schedule, it is
_____________________
1
In this diversity case, we apply the law of the forum state. Liberty Mut. Fire Ins.
Co. v. Copart of Conn., Inc., 75 F.4th 522, 528 (5th Cir. 2023).
5
Case: 22-11213 Document: 00517030621 Page: 6 Date Filed: 01/11/2024
No. 22-11213
unreasonable for an insured—charged with knowing and understanding the
terms of its policy—to fail to flip to that second document to see if anything
is required. See Aspen Specialty Ins. Co. v. Muniz Eng’g, Inc., 514 F. Supp. 2d
972, 983 (N.D. Tex. 2007) (citing Heritage Manor of Blaylock Props., Inc. v.
Petersson, 677 S.W.2d 689, 691 (Tex. App.–Dallas 1984, pet. denied)).
Further, the language at the bottom of the table (“if not shown above”)
anticipates the table not being completed. And if protective safeguards were
not required simply because the table in the PSE was not filled out, then the
CPI Schedule would be made meaningless. The Pointe’s interpretation thus
goes against the fundamental rule of contract construction, which mandates
that no policy language be rendered superfluous. See Int’l Ins. Co., 426 F.3d
at 291. Looking at the Policy as a whole “in light of the circumstances present
when the contract was entered,” the empty table in the PSE does not
establish that no safeguards are required. See id. Additionally, because this
construction of the PSE is not reasonable, the Policy is not ambiguous on this
basis. See In re Deepwater Horizon, 470 S.W.3d 452, 468 (Tex. 2015) (“The
ambiguity rule comes into play only if there is more than one reasonable
interpretation of an insurance policy.”).
Even if the Policy contemplates some required safeguards, The Pointe
asserts that it is unclear what exactly those safeguards are. It interprets the
Policy to require a “Fire Alarm: Local,” meaning that the alarm needs to
sound only at the place of detection, which did occur on the day of the fire.
In contrast, Underwriters urge us to view the Policy as requiring an alarm
“connected to a central station,” or an offsite fire monitoring facility, which
was not present at The Pointe. Simply advancing “conflicting
interpretations” of a policy does not establish ambiguity. TIG Specialty Ins.
Co. v. Pinkmonkey.com Inc., 375 F.3d 365, 370 (5th Cir. 2004) (citing Forbau
v. Aetna Life Ins. Co., 876 S.W.2d 132, 134 (Tex. 1994)). Instead, to defeat
6
Case: 22-11213 Document: 00517030621 Page: 7 Date Filed: 01/11/2024
No. 22-11213
summary judgment, The Pointe’s interpretation of the Policy must be shown
to be reasonable. See In re Deepwater Horizon, 470 S.W.3d at 468.
As to The Pointe’s construction, it was reasonable for The Pointe to
consult the CPI Schedule to determine its responsibilities under the Policy.
Underwriters themselves agree, earlier contending that it would have been
unreasonable for The Pointe not to look to the CPI Schedule to find the
Policy’s requirements, given the empty PSE table. The CPI Schedule
requires The Pointe to maintain “P2 – Fire Alarm: Local.” We give contract
terms their plain, ordinary meaning. Puckett v. U.S. Fire Ins. Co., 678 S.W.2d
936, 938 (Tex. 1991). “Local” means “having a definite spatial form or
location” or “of, relating to, or characteristic of a particular place: not
general or widespread.” Local, Merriam–Webster Online
Dictionary, http://www.merriam-webster.com/dictionary/local (last
visited Nov. 15, 2023). We therefore interpret the plain language of “Fire
Alarm: Local” as requiring an alarm that sounded in the particular place that
it alerted. This is a reasonable construction of the CPI Schedule’s language
and the Policy’s overall requirements. 2
Underwriters instead focus on the PSE’s definition of P–2 as requiring
a connection to a central station. It asserts that the CPI Schedule’s reference
to “P2 – Fire Alarm: Local” is shorthand, and that it would have been
unreasonable for the insured not to refer back to the full definition in the PSE,
which requires a connection to a central station. As the district court found,
_____________________
2
The Pointe also contends that, even if the definition of P–2 in the PSE controls
over that in the CPI Schedule, it is impermissibly ambiguous because it does not define the
terms “central station” and “private fire alarm station.” Because we hold that The
Pointe’s interpretation of the Policy to require only a “Fire Alarm: Local” was reasonable,
we do not reach this argument. We note, however, that undefined terms do not in
themselves render policies ambiguous. Nat’l Union Fire Ins. Co. of Pittsburgh, Pa. v.
McMurray, 342 F. App’x 956, 959 (5th Cir. 2009).
7
Case: 22-11213 Document: 00517030621 Page: 8 Date Filed: 01/11/2024
No. 22-11213
The Pointe had “a duty to read and comply with the policy terms,” and the
language of “Fire Alarm: Local” did not “eliminat[e] that obligation.” But
the PSE’s definition of P–2 seems to conflict with the definition in the CPI
Schedule: “P-2 Automatic Fire Alarm” differs from “P2 - Fire Alarm:
Local.” For example, a local alarm could sound at the premises but not at a
central or private station. We find that fire alarms may sound and connect to
a variety of locations at one time, but absent further information in the Policy,
these fire alarms are mutually exclusive. Although Underwriters claim that
the CPI Schedule was complementary to the PSE, the PSE is not merely a
longer version, but rather a conflicting requirement. When provisions in a
contract are internally contradictory, we “attempt to harmonize the two
provisions and assume the parties intended every provision to have some
effect.” Nexstar Broad., Inc. v. Fidelity Commc’ns Co., 376 S.W.3d 377, 381–
82 (Tex. App.–Dallas 2012, no pet.) (citation omitted). But there is no way
to harmonize two terms that embody conflicting requirements. Although
Underwriters contend that The Pointe’s interpretation “fails to satisfy the
basic rules of contract interpretation” by reading the PSE language out of the
Policy, their own construction would do the same to the CPI Schedule. And,
as long as The Pointe’s interpretation “is not itself unreasonable,” it matters
not that Underwriters’ own interpretation is also reasonable and even
possibly “the more likely reflection of the parties’ intent.” Certain
Underwriters at Lloyds, London v. Law, 570 F.3d 574, 577 (5th Cir. 2009)
(citation omitted). Given the two different descriptions of P–2, the Policy is
not “worded [such] that it can be given a certain or definite legal meaning or
interpretation.” Coker v. Coker, 650 S.W.2d 391, 393 (Tex. 1983). 3
_____________________
3
Underwriters also maintain that The Pointe’s interpretation is unreasonable
because, even if “Fire Alarm: Local” supplants the more expansive definition in the PSE,
the Policy unambiguously required the presence of two protective safeguards (P–2 and P–
8
Case: 22-11213 Document: 00517030621 Page: 9 Date Filed: 01/11/2024
No. 22-11213
Because the Policy is “reasonably susceptible of more than one
meaning,” depending on whether the PSE or the CPI is given more weight,
we conclude that it is ambiguous. See Int’l Ins. Co., 426 F.3d at 291. And
because we must adopt “the construction that favors the insured,” the
district court’s grant of summary judgment was in error. See id.
--
The district court held that, in the absence of contractual coverage,
The Pointe’s statutory claims failed as a matter of law. It declined to engage
with these causes of action on the merits because it saw coverage—success
on the breach of contract claim—as a prerequisite to recovery. This was
incorrect as a matter of law. See USAA Tex. Lloyds Co. v. Menchaca, 545
S.W.3d 479, 489 (Tex. 2018) (detailing multiple exceptions to the general
rule that an insured may not recover statutorily without a contractual right to
benefits). Regardless, because we have found that the court’s grant of
summary judgment on The Pointe’s contract claim was in error, we will
remand the case to the district court for consideration of these claims as well.
See U.S. ex rel. Branch Consultants v. Allstate Ins. Co., 560 F.3d 371, 381 (5th
Cir. 2009) (“The district court did not reach this ground. Because the district
court should have the opportunity to address the facts underpinning the
claim . . . and make any necessary findings in the first instance, we do not
reach this ground.”).
The Pointe also brought tort claims against Underwriters for equitable
estoppel and fraud. It alleges the inspector’s failure to warn it about the need
for a central alarm system was a material misrepresentation as to its coverage.
The district court granted Underwriters’ motion for summary judgment as
_____________________
9), and The Pointe only had one: smoke detectors. However, it is possible that a single
device might serve as both a smoke alarm and a fire alarm.
9
Case: 22-11213 Document: 00517030621 Page: 10 Date Filed: 01/11/2024
No. 22-11213
to these claims because it found that Underwriters had made no such
misrepresentations. As an initial matter, we note that equitable estoppel is
not a cause of action, as asserted by The Pointe, but instead a bar against a
defendant raising a particular defense. Torres–Aponte v. JP Morgan Chase
Bank, N.A., 639 F. App’x 272, 274 (5th Cir. 2016) (quoting Doe v. Roman
Cath. Archdiocese of Galveston–Hous., 362 S.W.3d 803, 810 (Tex. App.–
Houston [14th Dist.] 2012, no pet.)). Nevertheless, we will affirm the district
court’s holding because (1) the inspection occurred in conjunction with the
2019 Policy, not the 2020 Policy operative at the time of the fire; (2) the
inspector had no duty to inform The Pointe of all possible issues with its
coverage; and (3) The Pointe is charged with knowledge of its policy. See
Jeffries v. Pat A. Madison, Inc., 269 S.W.3d 689, 692 (Tex. App.–Eastland
2008, no pet.) (“[A] misrepresentation claim cannot stand when the party
asserting the claim is legally charged with knowledge of the true facts.”).
--
The district court erred in granting summary judgment in favor of
Underwriters on the Pointe’s contract and statutory claims, but not on its
tort claims. We therefore REVERSE IN PART and REMAND the case
for further proceedings consistent with this opinion.
10