These proceedings arose under the Clean Air Act Amendments of 1970,1 which represented a drastic revision of earlier federal air quality control legislation.2 In enacting the Amendments, Congress was seeking to “make possible the more' expeditious imposition (and enforcement both nationally and locally) of specific emission standards” for air pollutants by substantial revisions in the “cumbersome and time-consuming procedures” of the earlier statutes in the field.3 To achieve this purpose, it sought to involve both state and federal governments by establishing two methods of control, one federal and one state, each complementary of the other, and the two combining and cooperating to assure a healthy air environment throughout the nation under plans specially adapted to the unique conditions of the various states.4 By national action the Amendments proposed to regulate the amount of pollution in the ambient air and by state action it sought to control the amount of polluting emissions at their source.5
The federal agency charged with responsibility under the Amendments was the Environmental Protection Agency. The first responsibility of the Administrator of such Agency is to prepare, from time to time, a list of all air pollutants which have an adverse effect on public health or welfare and to issue air quality criteria for these pollutants, reflecting “the latest scientific knowledge useful in indicating the kind and extent of all identifiable effects on public health or welfare which may be expected from the presence of such pollutant [s] in the ambient air, in varying quantities.” 6 He is then directed by the Amendments to promulgate national primary and secondary ambient air quality standards for each air pollutant for which air quality criteria had been issued.7 In the promulgation of these national standards, the Administrator, it is argued, is to be
The state plan was to cover existing sources and to take into account new stationary and moving sources. It is expected that states, in exercising their authority under the Amendments, would consider local factors such as “meteorological conditions, topographical context, and economic and social demands.”12
Judicial review of the action of the Administrator in approving or disapproving a state plan is authorized before the Circuit Court of Appeals for the Circuit in which the state submitting the plan is located. Application for such judicial review is to be filed within thirty days from the date of the Administrator’s approval. Unless reversed on such review, the state implementation plan remains enforceable as federal law under procedures spelt out in the Amendments and is not “subject to judicial review in [federal] civil or criminal proceedings for enforcement.”15
The petitioners are all seeking judicial review of the approval by the Administrator of a state implementation plan submitted under the Amendments. In two of the proceedings, the operators of electric generating plants assail the approval of plans submitted by the States of West Virginia and Virginia. In the third proceeding, Bethlehem Steel Corporation challenges the approval of the plan of the State of Maryland. In approving the state plans involved in all three proceedings, the Administrator held no “hearings”, i. e., he granted no opportunity, after public notice, for either comment or testimony on the proposed state plans. Interested parties had, however, been given notice and hearing before the state authorities on the state plans under review. The Administrator did not file, in connection with his approval, either an environmental impact statement or a finding that one was unnecessary.16
The matter presently before us does not concern the merits of the petitioners’ challenge to the Administrator’s ae
The initial dispute between the parties centers on the nature or character of the Administrator’s action or approval. The petitioners would catalogue that action as rulemaking, as defined in the Administrative Procedure Act, and subject to the hearing requirement fixed in that Act.17 The Administrator, on the other hand, asserts that “Congress did not intend that this approval process be treated as traditional rulemaking, subject to APA requirements” of a hearing.18 It is idle, and fruitless, to boggle over the appropriate classification of the Administrator’s action, though we cannot avoid observing that the Administrator, in his order of approval, described his action as “rule-making”. Modern precedent has discarded such classifications as criteria for determining the type of hearing to which the parties affected by administrative action are entitled. The leading text on administrative law puts it that the “best solution of the problem of classifying borderline activities is to avoid classifying them * * * [I]f the problem is to determine appropriate procedure for a particular activity, the practical procedural needs may be studied without calling the activity either rule making or something else * * *." 19 Another commentator, who has described attempts at classifying administrative actions as formal, rulemaking or adjudicatory as “largely an unprofitable one,” suggests that, “[T]he most constructive way to eliminate many of the inequities and inadequacies which appear from time to time in administrative proceedings is to pay less attention to theoretical, conceptual, and largely artificial lines between adjudication and rule making, and to devote more attention to the task of fashioning, out of the available arsenal of procedural techniques, hybrid modes of procedure most appropriate to the issues and circumstances of particular cases or classes of cases.” 20 Following these principles, the firm direction of recent decisions is that “Procedural requirements (dealing with the requirement of hearings in administrative proceedings) depend in part
Naturally, the parties differ sharply in their construction of both the power and the effect of the Administrator’s approval. The petitioners which are operating electric generating plants state that the plans challenged by them, if enforced, will require the closing of their steam generating plants and the petitioner Steel Company asserts that the enforcement will compel it to incur large expenses which will result in no real diminution in either air or smoke pollution in its plant. It is the petitioners’ construction of the Amendments that not simply the state authorities but also the Administrator, in his evaluation and approval of the state plans, must consider, among other factors, the technological and economic feasibility of those provisions of the state plan which impose such onerous and “condemnatory” burdens on them. For these reasons, they urge that they should be accorded a right to be heard by the Administrator in an evidentiary proceeding.30 The
We are, however, disposed to agree with the Administrator that, if the state hearings were adequate, he was not required, prior to approving the state plans, to extend to the petitioners or other interested parties, an opportunity to be heard. An opportunity to be heard on the proposed state plans had presumably already been given all interested parties, after appropriate notice, by the respective state authorities. It is to be presumed that at such hearings all objectors had a reasonable opportunity to present, in an appropriate type of hearing, their objections to the proposed plans. To provide them a second opportunity merely to reiterate the claims made by them before the state authority, at a hearing before the Administrator, would normally be a useless exercise wasteful and time-consuming and “unnecessary”, whether the Administrator’s action be deemed “rulemaking” or otherwise.31 It would seem particularly unwarranted, too, in a situation, where Congress had determined that expedition was demanded by urgent considerations of health and the general welfare. That Congress intended that such a hearing before the Administrator on the state plan was to be avoided in the interest of expediting action is persuasively suggested by the statutory language. Thus, the Amendments in express words enjoin the state authorities to afford, after notice, a hearing to all interested parties, but, in providing for the subsequent approval by the Administrator, it omitted any prior hearing requirement. This omission would seem to have been purposeful, in keeping with the Congressional intent to expedite the promulgation of state enforcement plans, without encumbering the administrative procedures with two hearings on the same plan.32 That this was so, the Ad
This conclusion, however, is based on the assumption that at the state hearing interested parties were afforded full opportunity to present their contentions with respect to the proposed plan. Because of the nature of the regulations and their drastic impact, such opportunity might well include the right to more than merely the opportunity to comment. See International Harvester Co. v. Ruckelshaus (D.C.Cir.1973) 478 F.2d 615, at 630-631. What is required in all instances, whatever the character of the administrative action, is “the reality of an opportunity to submit an effective presentation,” and, if in the context of the issues involved, “cross-examination on the crucial issues” is found proper, such right should be recognized and upheld. Walter Holm & Company v. Hardin (1971), 145 U.S.App.D.C. 347, 449 F.2d 1009, 1016.32a The record of those state hearings has not been as yet certified to this Court and it is not possible for us to determine whether those hearings provided the petitioners with the type of hearing the importance of their rights required. Should it appear, after the state hearings have been certified to this Court, that an adequate right of hearing at the state level was not afforded the petitioners, a motion to remand as requested by the petitioners might be in order.
There remains the question whether, under due process, the state hearing (assuming its adequacy) would be a valid justification for the Administrator’s failure to afford a hearing on his part prior to his approval of the state plans. This generally turns on the traditional balancing of public and private interests, though, again, some courts would resolve it in terms of whether the administrative action is adjudicative, i. e., is directed at an identifiable party. Note, Federal Administrative Law Developments — 1971, Duke L. J. (1972), supra, at 158-67; cf., Langevin v. Chenango Court, Inc. (2d Cir. 1971) 447 F.2d 296, 300. As expressed in the Amendments,
While perhaps not at issue now, it might be indicated that, even though the Administrator may have been authorized (subject to the caveats already indicated) to dispense with a hearing before him on the state plans, this in no way precludes or prejudices the right of the petitioners, under proper circumstances, to move before this Court for an opportunity to adduce additional evidence. In Citizens to Preserve Overton Park v. Volpe (1971) 401 U.S. 402, 91 S.Ct. 814, 28 L.Ed.2d 136 for instance, it was held that the Secretary of Transportation was not bound to hold a public hearing prior to his administrative action in those proceedings (which action, incidentally, the Court found to be “plainly not a rulemaking function”) but, nonetheless, as an incident of judicial review of that action, the Court found that a hearing was necessary.34 As a matter of fact, the Amendments with which we are concerned expressly provide that, in connection with judicial review of the order of approval of a state plan by the Administrator, the reviewing court may remand the proceedings to the Administrator to take additional testimony “in such manner and upon such terms and conditions as to the court may deem [sic] proper,” upon a showing by the moving parties that “such additional evidence is material and that there were reasonable grounds for the failure to adduce such evidence in the proceeding before the Administrator.” Section 1857h-5(c), 42 U.S.C.;35 Getty Oil Company v. Ruckelshaus (3d Cir. 1972) 467 F.2d 349, 357.
Whether the petitioners would be entitled to an order to remand to the Administrator to receive additional testimony in connection with judicial review would depend largely on the issues to be resolved in that review. The Amendments, in authorizing judicial review, do not prescribe in specific terms the scope of that review. In Getty Oil Company v. Ruckelshaus (D.C.Del.1972) 342 F.Supp. 1006, 1015, it was assumed that the review of the action of the Administrator
But the Administrator argues that, in the exercise of judicial review of his action in approving the state plans, the Court shall look simply to his order of approval and the state plan itself and make its determination on those two documents as the sole record in the case. He goes farther and asserts that his authority in this area is largely ministerial. It is suggested that he makes no review of either the economic or technological feasibility of the plan in exercising his power to approve or disapprove the state plan. He argues that, even if the Court concludes that it is not confined in its review to the Administrator’s order and the state plan, it can go no farther in its review of his action than to consider (1) whether a hearing was had before the state authority and (2) whether the mathematical determination by the Administrator that the national standards will be achieved under the state plans is arbitrary and unreasonable. This is so, he says, because those are the sole matters considered and determined by the Administrator in his action. We take no such narrow view of either our own role in connection with the judicial review of the Administrator’s action 37 or of the Administrator’s role in evaluating the state plan in connection with his exercise of the power to approve or disapprove.
Certainly, the Administrator’s connection with the proceedings before the state authority is considerably more intimate than he suggests and certainly may not fairly be characterized as substantially ministerial. At the outset he provided the state authorities with the guidelines to be used by them in preparing state plans and in identifying the factors to be weighed by them. And, in those guidelines, he admonished the state authorities that “nothing in this part shall be construed in -any manner * * * to encourage a State to prepare, adopt or submit an implementation plan without taking into consideration * * * impact or availability of fuels, energy, transportation and employment.” He went further in Regulations issued by
“In the coming months we will be examining the adequacy of State implementation plans. We will be working very closely with other Federal agencies and we anticipate that the interagency review process will be an invaluable asset in determining the availability of fuels, transportation programs, and public and private sector investment.” 40
The review by these other agencies and by the interagency committee is not a perfunctory review of the state plans. Their review, under the procedure established by the Administrator, covers half the time allowed the Administrator himself by law to act on the plans. It is inconceivable that these agencies, acting with the Administrator, in determining “the aggregate impact” of the plans and “in determining the availability of fuels, transportation programs, and public and private sector investment,” do not consider and evaluate the technological and economic aspects of the plans under review. Nor is such evaluation inappropriate under the Amendments. After all, the Administrator’s responsibility is to determine whether the proposed plan is practical and reasonably likely to achieve the results required under the Amendments; and, if he finds it reasonably unlikely to achieve such results within the fixed time-tables, whether for technological or economic reasons, or otherwise, he should reject the plan and return it to the state authorities with instructions to consider alternative procedures that might meet the statutory requirements as established by the Administrator.
And when this Court reviews the action of the Administrator, it does not confine itself to the order of the Administrator or to the bare language of the state plan, nor will it seek to determine from the four corners of those two documents whether the action taken was
(■Overton Park, supra, 401 U.S. at 415-416, 91 S.Ct. at 823-824)42 since “it is ‘arbitrary or capricious’ for an agency not to take into account all relevant factors in making its determination.” 43 As applied to these proceedings, in order for the Court to make a rational determination, to make that “substantial inquiry” demanded of it in these cases calling for review of the validity of the Administrator’s action, the Court must have before it the record of expert views and opinions, the technological data and other relevant material, including the state hearings, on which the Administrator himself acted. Cf., Walter Holm & Company v. Hardin, supra, at 1015-1016 of 449 F.2d. No such record is now before the Court. The Administrator should promptly certify the “full record” that was before him at the time he approved the state plans involved in these actions.
When the records of the proceedings resulting in the approval of the state plans under review have been certified to this Court, the petitioners may, if they feel so entitled, apply to this Court for an order of remand, either because of the inadequacy of the state hearing or to take additional testimony as authorized under Section 1857h-5(c), 42 U.S.C., and, if they are able to satisfy the Court with the propriety of their motions, to secure a remand for that purpose. But the present motions are, in our judgment, premature until the Administrator has certified to this Court the full administrative record since, without that record, the Court cannot intelligently pass on the motions and determine either the adequacy of the state hearings or the right to take additional
Finally, the petitioners challenge the approvals for failure to include an environmental impact statement. We are convinced that, while NEPA applies to “all agencies of the Federal Government” and requires an impact statement for every major federal action “significantly affecting the quality of the human environment,” 44 it is inapplicable to the action of the Administrator in seeking, through the approval of state implementation plans, to improve “the quality of the human environment.” As the Court said in Getty Oil Co. v. Ruckelshaus, supra, at 359 of 467 F.2d, “It is apparent that the Clean Air Act itself contains sufficient provisions for the achievement of those goals sought to be attained by NEPA.”
Motions denied without prejudice to the right to renew.
1.
Section 1857c-2 et seq. 42 U.S.C.
2.
The history of federal clean air legislation is detailed in 116 Cong.Rec., 91st Congress, 2d Sess., p. S16103 (daily ed. Sept. 21, 1970); see, also, Note, Clean Air Act Amendments of 1970: A Congressional Cosmetic, 61 Geo.L.J. 153, 154-6 (1972).
3.
See H.Rept. No. 91-1146, 91st Cong., 2d Sess., (1970), U.S.Code Cong. & Admin. News, p. 5360 (1970); Kennecott Copper Corp. v. Environmental Protection Agcy. (D.C.Cir. 1972), 462 F.2d 846, 849.
4.
Note, Clean Air Act Amendments of 1970: A Congressional Cosmetic, 61 Geo. L.J. 153, 159 (1972):
“The Clean Air Act Amendments of 1970 represent a compromise between the need for effective national control and the desire to mold the air pollution program around state and local needs.”
5.
These proceedings are concerned with the control of air pollution from stationary sources. The Amendments also deal with moving sources but those provisions are not involved in the claims of the petitioners.
6.
Section 1857c-3, 42 U.S.C.
7.
Section 1857c-4, 42 U.S.C.
At the time of the enactment of the Amendments, criteria had been issued for six pollutants but it was stated in the Congressional debates that the Administration “is currently studying 30 different pollutants to determine their potential effects on health.”
116 Cong.Rec., 91st Cong., 2d Sess., p. S16104 (daily ed., Sept. 21, 1970).
8.
The House version had required the consideration of economic feasibility and costs in setting national ambient standards. The Senate version, which was later adopted, “deleted all wording as to economic feasibility and cost in setting national ambient standards which appear in the original bill with the single exception of new source performance standards.” 61 Geo.L.J., supra, 179, n. 157. For the reasoning behind such deletion, see Kennecott Copper Corp. v. Environmental Protection Agcy., supra, at 850, n. 16 (462 F.2d).
9.
Section 1857c-6, 42 U.S.C.
10.
The effectiveness of this program of joint control has been seriously questioned. In 61 Geo.L.J., supra, at 161, n. 57, it is observed:
“Derivation of emission standards from ambient standards, while determined by complex computer programming, ultimately rests on assumptions, which, if incorrect, undermine the entire control program.”
See, also, the testimony of Sussman, Director, Bureau of Air Quality and Noise Control, Pennsylvania Department of Environmental Resources at the Hearings, Senate Subcommittee on Air and Water Pollution, Committee of Public Works, 92d Cong., 2d Sess. (1972), at 719.
11.
One commentator has stated that this requirement of federal approval of state implementation plans “was intended to cramp the style of authorities that might be inclined to wink at pollution for the sake of attracting industry and expanding their local economies.” 246, The Economist (London), at 23 (January 20, 1973).
12.
61 Geo.L.J., supra, at 157.
See, also, Baum, The Federal Program for Air Quality, 5 National Resources Lawyer 165, 169 (1972) :
“But, as I said, when the ambient air quality standards were promulgated, there was no consideration given to economics or feasibility. It is at the implementation plan stage that a state will consider these things. In devising their control strategy, the states will determine who can do what, how much it is going to cost, if we should require sixty per cent reduction for this industry and forty per cent for this one or vice versa, and when these things will be applied.”
Mr. Baum is Assistant General Counsel of EPA. He also prepared for the Administrator a memorandum submitted to the Senate Oversight Committee, in which this statement is made with reference to state plans:
“It was expected that, at the (state) hearings, persons responsible for adoption of the plan would be made aware of the feasibility and impact of various possible strategies on all segments of the public. To expect States to evaluate the impact of various alternatives open to them without considering the economic and social impact of their decisions would deprive them of the flexibility and initiative Congress intended that they retain.” Hearings, Senate Subcommittee on Air and Water Pollution, Committee on Public Works, 92d Cong., 2d Sess. (1972), at 312. See,Page 499also, p. 308 of same Hearings under heading “Economic Feasibility.”
Senator Cooper, in explaining the provision for state plans, said:
“And these plans must accomplish the air quality standards within 3 years. It is at this point that States and communities must make economic decisions, and decisions on the future growth of their areas and the kind of life they want, in considering alternative means of achieving clean air.” 116 Cong.Rec., 91st Cong., 2d Sess., at S16107.
13.
New sources required consideration of both economic and technological factors. As Sussman, Director, Bureau of Air Quality and Noise Control, Pennsylvania Department of Environmental Resources, has observed, however, “It is obvious that these standards (of ‘the best available technology’) will be incorporated in state regulations for existing sources (especially since federal regulations will cover ‘modifications’ to existing sources).” Hearings, Senate Subcommittee on Air and Water Pollution, Committee of Public Works, 92d Cong., 2d Sess. (1972), at 719.
14.
It was held in Sierra Club v. Ruckelshaus (D.C.Cir. 1972), filed November 1, 1972, cert. granted 93 S.Ct. 941, that the Administrator could not approve any plan that permitted any degradation in the air quality in the state, without regard to whether its provisions were “adequate to prevent” any pollution exceeding the national standards.
15.
42 U.S.C. 1857h-5(b) (2).
This requirement that judicial review should follow immediately upon the Administrator’s approval or disapproval of the plan and not when enforcement was sought represented a change from the House version of the Amendments. As initially adopted by the House, the Amendments provided for a judicial review, described in the House Report thus :
“The court may enter such judgment and orders as it deems necessary in the public interest and the equities of the case. In so doing the court must give due consideration to the practicability and to the technological and economic feasibility of complying with the provisions of the plan.” U.S.Cong. & Admin.News, 91st Cong., 2d Sess., p. 5364.
16.
See Section 1857h-7, 42 U.S.C.
17.
Section 551(4), 5 U.S.C. defines a rule as “an agency statement of general or particular applicability and future effect * * *." And Section 551(5), 5 U.S.C. defines rulemaking as an “agency process for formulating, amending, or repealing a rule.” Rulemaking is “typically concerned with broad policy considerations rather than review of individual conduct.” American Airlines v. Civil Aeronautics Board (1966), 123 U.S.App.D.C. 310, 359 F.2d 624, 629 cert. denied, 385 U.S. 843, 87 S.Ct. 73, 17 L.Ed.2d 75. It is generally contrasted with adjudication. The distinction between the two types is illustrated by classifying “any aspect of it [the administrative action] that declares generally applicable policy as ‘rulemaking’ and any aspect applying the policy to identified persons as ‘adjudication’.” Shapiro, The Choice of Rulemaking or Adjudication in the Development of Administrative Policy, 78 Harv.L.Rev. 921, 924 (1965).
18.
See, Section 553(b)(3)(B), 5 U.S.C.
19.
1 Davis, Administrative Law Treatise, sec. 5.01, at 286.
20.
Clagett, Informal Action — Adjudication —Rule Making: Some Recent Developments in Federal Administrative Law, 1971 Duke L.J. 51, 53, 85; see, also, Boyer, Alternative to Administrative Trial Type Hearings for Resolving Complex Scientific, Economic and Social Issues, 71 Mich.L.Rev. 111, 112-4 (1972); Robinson, The Making of Administrative Policy:- Another Look at Rule Making and Adjudication and Administrative Procedure Reform, 118 U.Pa.L.Rev. 485, 500 (1970).
21.
Marine Space Enclosures, Inc. v. Federal Maritime Com’n. (1969) 187 U.S.App.D.C. 9, 420 F.2d 577, 586, n. 22.
22.
Walter Holm & Company v. Hardin (1971), 145 U.S.App.D.C. 347, 449 F.2d 1009, 1015.
23.
American Airlines, Inc., v. Civil Aeronautics Board, supra, at 631 of 359 F.2d.
24.
National Air Carrier Association v. C.A.B. (1970), 141 U.S.App.D.C. 31, 436 F.2d 185, 191.
25.
International Harvester Co. v. Ruckelshaus, (D.C.Cir. 1973), 478 F.2d 615.
26.
Retail Store Employees U., Local 880, R.C.I.A. v. F.C.C. (1970), 141 U.S.App.D.C. 94, 436 F.2d 248, 254-255, n. 39.
27.
Citizens for Allegan County, Inc. v. Federal Power Com’n. (1969), 134 U.S.App.D.C. 229, 414 F.2d 1125, 1128.
28.
City of Lafayette, Louisiana v. Securities & Exch. Com’n. (1971), 147 U.S.App.D.C. 98, 454 F.2d 941, 953.
29.
An illustration of such a procedure exists in these very Amendments. In Kennecott Copper Corp. v. Environmental Protection Agcy., supra, 462 F.2d 850, n. 16, the Court said:
“ * * * The legislative history of the ‘Clean Air Amendments of 1970’ (Pub.L. 91-604) makes it dear that Congress felt public hearings on the national standards were unnecessary in light of the implementation plan hearings and would unduly delay achievement of air quality protective of the public health and welfare * * *".
See, also, Citizens for Allegan County, Inc. v. Federal Power Com’n., supra, at 1128 of 414 F.2d in which the Court said that “the right of opportunity for hearing does not require a procedure that will be empty sound and show, signifying nothing. The precedents establish, for example, that no evidentiary hearing is required where there is no dispute on the facts and the agency proceeding involves only a question of law.”
30.
“The right to a full trial-type hearing in administrative proceedings is generally limited to the situation where adjudicatory facts — that is, facts pertaining to a particular party — are in issue.” Note, Federal Administrative Law Developments — 1971, Duke L.J., (1972) 115, 171, n. 24. However, it is the recent rule that classifications such as rulemaking (as distinguished from adjudication) do not automatically foreclose a right to an evidentiary hearing. It is the basic scope of the proceeding, rather than its classification, that determines the right.
31.
Cf., Retail Store Employees U., Local 880, R.C.I.A. v. F.C.C., supra, at 254-255, n. 39 of 436 F.2d.
“We recognize, however, that when one federal agency has rejected factual charges after an adequate investigation a sister agency may be entitled to rely upon the prior investigation in dismissing factually identical allegations without hearing * * * * ”
32.
Cf., Law Motor Freight, Inc. v. C.A.B. (1st Cir. 1966) 364 F.2d 139, 144, cert. denied 387 U.S. 905, 87 S.Ct. 1683, 18 L.Ed.2d 622.
“Section 403(a) of the Federal Aviation Act, 49 U.S.C. § 1373(a), does not require a hearing, although other sections do. With such a statutory configuration, the clear indication is that the legislative omission was significant.”
The petitioners, however, urge that no particular inference of Congressional intent is to be drawn from the omission of any requirement of a hearing before the Administrator on the approval of a
32a.
An excellent statement of the reasons for this requirement of a hearing before ' administrative action, is set forth in Bonfield, Military and Foreign Affairs Function Rule-Making Under the APA, 71 Mich.L.Rev. 222-4 (1972).
33.
There is an intimation in the record— actually by the Administrator — that he does not review the hearings before the state authority and the presentations made thereat. This is contradictory to a substantial extent of his justification for a denial by him of a hearing and, in our judgment, would not accord with the legislative intent or with due process. A failure on his part to consider the state hearing record would mean that interested parties had had no hearing before him. Under those circumstances, the entire justification for a denial of a hearing before the Administrator would be undermined and it might well be that a court would be compelled to remand the proceedings for a hearing before the Administrator. For the moment and in connection with these motions as they now stand, we shall assume until otherwise established, after the certification of the entire record to this Court, that the Administrator did review the full state record.
34.
See, also, Walter Holm & Company v. Hardin, supra, at 1015-1016 of 449 F.2d.
35.
This Section corresponds with Section 2347 (c), 28 U.S.C., applicable to proceedings before the Federal Communications Commission, the Federal Maritime Commission, the Atomic Energy Commission and orders of the Secretary of Agriculture.
36.
See, also, Environmental Defense Fund, Inc. v. Ruckelshaus, 142 U.S.App.D.C. 74, 439 F.2d 584.
37.
Cf., Environmental Defense Fund, Inc. v. Environmental Protection Agency (1972) 150 U.S.App.D.C. 348, 465 F.2d 528, 540-541:
“Our own responsibility as a court is as a partner in the overall administrative process — acting with restraint, but providing supervision.”
38.
See, Hearings, Subcommittee on Air and Water Pollution, Committee on Public Works, 92d Cong., 2d sess. (1972), at 237.
39.
Section 51.4(c), 40 C.F.R.
40.
See, Hearings, Senate Subcommittee on Air and Water Pollution, Committee on Public Works, 92d Cong., 2d sess. (1972), at 230 and 236.
41.
See, First National Bank of Smithfield, North Carolina v. Saxon (4th Cir. 1965) 352 F.2d 267, 274 (Judge Sobeloff dissenting); Environmental Defense Fund, Inc. v. Ruckelshaus, supra, at 597-598 of 439 F.2d.
See, also, D. C. Federation of Civic Associations v. Volpe (1971) 148 U.S.App.D.C. 207, 459 F.2d 1231, 1237:
“Absent a record, judicial review of the Secretary’s action can be little more than a formality unless the District Court takes the disfavored step of requiring the Secretary to testify as to the basis of his decision.”
42.
Cf., Note, Federal Administrative Law Developments — 1971, Duke L.J. (1972), supra, at 317, 329.
43.
Hanly v. Mitchell (2d Cir. 1972) 460 F.2d 640, 648.
44.
Section 4332, 42 U.S.C.