This was an action by appellees to recover damages for a trespass upon their lands alleged to have been committed by appellant in lowering the grade of its tracks on an established right of way across those lands and in doing other reconstruction work on its railroad. There was a trial by jury which returned a general verdict for appellees for $1,000. With the general verdict the jury also found the existence of certain material facts by their answers to interrogatories which had been submitted to them by the court. Prom a judgment on the general verdict this appeal is brought.
The errors assigned and not waived are: (1) the action of the court in granting leave and permitting appellees to file a supplemental complaint on oral motion after the jury had been sworn, the statements of counsel made and part of the evidence for appellees introduced; (2) in ovei’ruling appellant’s motion to strike out the supplemental complaint; (3) in overruling appellant’s motion to set aside the submission and continue the cause upon the filing of the supplemental complaint; and (4) in overruling ap>pellant’s motion for a new trial.
1.
3. Nor is there anything in the substance of the supplemental complaint which establishes the correctness of the contention made in behalf of appellant that the court erred in refusing to strike it out or to set aside the submission and continue the cause. It in no sense changed the theory or nature of the cause of action set out in the original complaint. The complaint was filed while the work of reconstruction of appellant’s road across appellees’ lands was being carried out and in it certain wrongful acts were alleged as being committed resulting in certain elements of damage. The supplemental complaint alleged the continuance of the same wrongs charged in the complaint and the completion of the work, and counted upon the same elements of damage as having been fully accomplished. Schmoe v. Cotton (1906), 167 Ind. 364, 79 N. E. 184, and cases there cited.
There is no vital difference between appellant and appellees over the facts involved in the ease. But their controversy grows out of essentially different views of the law which should be applied to these facts and the controversy is involved in several causes for a new trial which appellant contends the trial court erred in overruling. It appears that in 1869 appellant’s predecessor acquired by appropriation proceedings under statutory authority a strip of ground 99 feet wide for a permanent right of way for a railroad through a large tract of ground now owned by appellees.
Following this second appropriation appellant’s reconstruction work was carried out. The ditch was deepened and widened as contemplated, and grades were reduced by cuts to a maximum depth of about 30 feet or, about 15 feet deeper than the former cuts. This increased depth of cut was substantially all within the limits of the old right of way, the newly-acquired ground being used for a part of the slope of the north side of the cut.
Appellees’ complaint sought compensation for the following elements of damage to their land which it was alleged resulted from this reconstruction work: (1) excavating and removing great quantities of earth, rock and gravel from the old right of way in increasing the cut thereon from 15 feet to 30 feet in depth, to the amount of 60,000 cubic yards and converting and using it for fills and embankments for appellant’s roadbed at other places on appellees’ or other lands; (2) injury by washing and falling of appellees’ lands along the south side of the old right of way caused by the greater depth of the cut thereon; (3) injury by increased volumes of water gathered on the old right of way by the greater depth of the cut, and cast on appellees’ lands; (4) injury to a farm crossing by the greater depth of the cut on the old right of way; (5) injury to springs and wells by the additional excavation on the old right of way; (6) injury to the lands of appellees by depositing thereon along the line of the ditch the earth removed in the process of deepening and widening it as described in the warrant to appraisers in the condemnation proceeding of 1906.
It affirmatively appears from the answers to interroga
The verdict for appellees for $1,000 must, therefore rest upon the first, fifth and sixth elements of damage. Relating to these elements of damage the evidence shows that 60,000 cubic yards of materials were removed from the old right of way in the process of lowering the grade of appellant’s railroad and used at other places in the reconstruction work. It also shows that prior to this reconstruction work a concrete water conduit of large dimensions extended across and underneath the railroad and had for its outlet a ditch or perhaps natural waterway running southward across that part of appellees’ lands lying south of the railroad. From the side of this ditch near the bottom, at a point on appellant’s old right of way about midway between the track and the south line of the old right of way, there issued the waters of a spring which flowed through the lands of appellees and served the stock in the pasture on the place. The ditch was the same which appellant, through the appropriation of 1906, acquired the right to deepen and widen. In
Appellant’s motion for a new trial which it is insisted the trial court erred in overruling assigns for causes that the assessment of the amount of recovery is erroneous, being too large; that the damages assessed by the jury are excessive; that the verdict is contrary to law; that the verdict is not sustained by sufficient evidence.
The theory of appellees’ complaint, as to the work done on the old right of way, is that by the condemnation proceedings of 1869 the appellant acquired an easement for railroad purposes across the farm involved, in and to a strip of land 99 feet wide and from zero to 15 feet in depth and not more. This theory is founded on the assumption that the mere fact that appellant’s predecessor filed in the clerk’s office at the same time it instituted its proceeding to condemn, the map and profile required by §5194, supra,, placed a limitation on its use of the easement and prohibited it or a successor from making a change of grade on the old right of way which would require excavation deeper than 15 feet. Or, to state the claim of appellees in another way, they contend that the right or easement of appellant, under the appropriation of 1869 was as definitely fixed as to depth as it was as to width, and that appellant had no more right to excavate below the profile line of 15 feet in depth than it had to take for its use the surface of additional land
On the other hand appellant contends that the filing of the map and profile was not. required by §5194, supra, to precede or accompany the condemnation of 1869, but only to precede the construction of the railroad, and that it was no part of the appropriation proceedings. And, it is contended, as the complaint or instrument of appropriation did not seek to limit the compensation for the easement by limiting the depth of it, appellant’s predecessor must be deemed to have acquired the right to build its road or change it to the best advantage to any depth of cut or height of fill which the width would support, and to use materials removed in making deeper cuts for making fills at other points and that for all damages growing out of the exercise of that right in a proper manner the owners of the land must be deemed to have been compensated by the award in the condemnation of 1869. If appellant’s contention is correct, the court erred in overruling its motion for a new trial.
5. 6. In 2 Lewis, Eminent Domain (3d ed.) §712, it is said “In the absence of any statute, it may be doubted whether the condemnor can be compelled to limit itself to any particular plan of construction. But the authorities fully sustain the position that the condemnor may impose this limitation upon itself by stipulating to construct the work in a specified manner. That is, it may condemn the right to improve and use generally according to the powers conferred or it may condemn the right to improve and use in a specified manner. Where a limited right is desired, the limitation should be made a part of the record, by being embodied in the petition or order of condemnation or otherwise. * * * When a-particular manner of construction has been stipulated for or agreed upon, the damages should be assessed on the basis of such construction. ’' Where there is no stipulation or agreement as to the manner of construction the rule is that the condemning party will acquire the right to construct its works in any way it pleases, which is not negligent or unlawful and which does not violate the rights of adjacent landowners, and it will have the right to change the mode of construction at pleasure, subject to the same limitations. And as the damages must be assessed once for all, and as the taker may obviate all difficulty by stipulating to construct the works in a specified way, the rule is that the
8. 9. 10. It is, as claimed by counsel for appellees, generally considered that the owner of the fee retains the ownership of minerals such as coal, oil and others and may remove such as can be taken out without interfering with the operation of the road. But it does not follow that the owner retains title to earthy materials left underlying the road as first built and which it may afterwards be necessary to remove in making a desirable change of grade. In the absence of any limitations by statute or the condemnation proceedings a railroad company, although it takes only an easement, acquires by the appropriation, the absolute right to take so much of the earth and materials within the width and length of the right of way as it may be necessary or convenient to remove in constructing and repairing its road bed and use it at other points. 2 Lewis, Eminent Domain (3d ed.) §849; Preston v. Dubuque, etc., R. Co. (1860), 11 Iowa 15; Earlywine v. Topeka, etc., R. Co. (1890), 43 Kan. 746, 23 Pac. 940; Chapin v. Sullivan Railroad (1859), 39 N. H. 564, 75 Am. Dec. 237; Taylor v. New York, etc., R. Co. (1875), 38 N. J. L. 28; Hendler v. Lehigh Valley R. Co. (1904), 209 Pa. St. 256, 58 Atl. 486, 103 Am. St. 1005; Aldrich v. Drury (1867), 8 R. I. 554, 5 Am. Rep. 624; Lime Rock R. Co. v. Farnsworth (1893), 86 Me. 127, 29 Atl. 957. As the condemnation of 1869 gave to appellant’s predecessor the right to use, on other parts of its road, the materials removed from the right of way in making its grade when the road was constructed, it follows that appellant had the same right to the materials removed in making the change of grade in the absence of a limitation either by statute or the appropriation proceeding which excluded it. It is manifest, therefore, that to the extent of the sum of $600, awarded for the removal of 60,000 cubic yards of earthy materials, the verdict cannot be sustained. Another
7. Appellees attempt to sustain the verdict so far as it gave $350 for injury to the well and the spring on the theory that the evidence shows the impairment of the first and the destruction of the latter were caused by the excavation to the lower level on the old right of way elsewhere than in the ditch. If this were conceded, under the rules of law which have hereinbefore been given consideration, the damages would be deemed to have been included in the award of 1869 in the absence of evidence to the contrary. That the spring was destroyed by the deeper cut on the old right of way, is wholly inferential if not, indeed, mere speculation. The outlet of the spring was, it is true, within the bounds of the old right of way but not at the point of the deepest excavation. It was within the ditch which, in the condemnation of 1906, appellant secured and paid for the right to deepen and widen. In doing this work the place where the waters of the spring emerged from the earth was cut away. If this work destroyed the spring then it is obvious that appellees have been paid the damages by the award of 1906, for its presence in the way of excavation would suggest the possible if not probable destruction of it and give a basis for damages. To the claim that the greater depth of the cut of the old right of way cut off the subterranean stream of which the spring was an outlet and also impaired the well, it may be further answered that when appellant acquired the additional strip along the north side of the old right of way by the appropriation of 1906 it was with the right to excavate on this newly-acquired strip to a depth of 30 feet, and for the damages resulting appellees were compensated in that proceeding. It would seem that the exercise of that right would, on appellees’ theory, have been as potential in destroying the spring and impairing the well as the same depth of cut on the old right
Counsel for appellees concede appellant’s right to deepen and widen the ditch and that the work of doing this was in accordance with the right secured by the condemnation of 1906. It is conceded now that appellant had the right to deposit the materials removed from the ditch on appellees’ lands along the sides of the ditch if it did so in a careful and proper manner. But it is now claimed that the evidence shows that appellant negligently scattered the materials and thereby committed unnecessary damage to the lands. Appellees’ complaint as to this element of damages, does not appear to proceed upon the theory of negligence but rather on the theory that appellant could not lawfully deposit the materials-removed on appellees’ lands in any manner.
Other causes for a new trial are based on alleged errors on the part of the court in giving and refusing to give instructions and in admitting and excluding evidence. So far as they are of any importance they involve the questions of law which have been considered. Judgment reversed with instructions to sustain appellant’s motion for a new trial.
Note.—Reported in 101 N. E. 473. Reported and annotated in 45 L. R. A. (N. S.) 796 See, also, under (1) 31 Cyc. 500; (2) 31 Cyc. 501; (3) 31 Cyc. 502; (4) 15 Cyc. 817; (5) 15 Cyc. 1025; (6, 7) 15 Cyc. 895; (8) 15 Cyc. 1021, 1025; 33 Cyc. 166; (9) 33 Cyc. 227; (10) 13 Cyc. 213, 218. As to damages or injuries for which, compensation must be given landowners in eminent domain proceedings, see 31 Am. Dec. 372; 88 Am. Dec. 113; 4 Am. St. 399; 9 Am. St. 144; 19 Am. St. 459; 22 Am. St. 50; 85 Am. St. 291. As to eminent domain proceedings with reference to railroad right of way, see 19 Am. St. 459.