Electromotive Division of General Motors Corp. v. Transportation Systems Division of General Electric Co.

United States Court of Appeals for the Federal Circuit

                                        04-1412


       ELECTROMOTIVE DIVISION OF GENERAL MOTORS CORPORATION,

                                                             Plaintiff-Appellant,

                                           v.


  TRANSPORTATION SYSTEMS DIVISION OF GENERAL ELECTRIC COMPANY,

                                                             Defendant-Appellee,
                                          and

                        DAIDO INDUSTRIAL BEARINGS, LTD.,

                                                             Defendant-Appellee.


        Ernie L. Brooks, Brooks Kushman P.C., of Southfield, Michigan, argued for
plaintiff-appellant. With him on the brief were Frank A. Angileri and Thomas W.
Cunningham.

       Martin R. Lueck, Robins, Kaplan, Miller & Ciresi L.L.P., of Minneapolis,
Minnesota, argued for defendant-appellee Transportation Systems Division of General
Electric Company. With him on the brief was Jan M. Conlin. Of counsel on the brief
were David P. Swenson, of Washington, DC, and David G. Mangum, C. Kevin Speirs,
and Catherine A. Agnoli, Parsons Behle & Latimer, of Salt Lake City, Utah.

Appealed from: United States District Court for the Eastern District of Michigan

Judge John Corbett O’Meara
     United States Court of Appeals for the Federal Circuit

                                       04-1412


       ELECTROMOTIVE DIVISION OF GENERAL MOTORS CORPORATION,

                                                       Plaintiff-Appellant,

                                           v.

  TRANSPORTATION SYSTEMS DIVISION OF GENERAL ELECTRIC COMPANY,

                                                      Defendant-Appellee,

                                        and

                       DAIDO INDUSTRIAL BEARINGS, LTD.,

                                                      Defendant-Appellee.

                           __________________________

                              DECIDED: July 28, 2005
                           __________________________



Before MICHEL, Chief Judge, PLAGER, Senior Circuit Judge, and LINN, Circuit Judge.

MICHEL, Chief Judge.

      The Electromotive Division of General Motors Corporation (“EMD”) appeals the

United States District Court for the Eastern District of Michigan’s grant of summary

judgment of invalidity of United States Patent Nos. 5,169,242 and 5,567,056 (“the ’242

and ’056 patents,” respectively) under the on-sale bar of 35 U.S.C. § 102(b).

Electromotive Div. of Gen. Motors Corp. v. Transp. Sys. Div. of Gen. Elec. Co. & Daido

Indus. Bearings, Ltd., No. 03-70940 (E.D. Mich. May 4, 2004).        The ’242 patent is

generally directed to compressor bearings for use in turbochargers for diesel locomotive
engines. The ’056 patent relates generally to planetary bearings for use in turbocharger

planetary drive trains. The appeal was submitted after oral argument on March 8, 2005.

Because the patented compressor and planetary bearings were subject to pre-critical

date sales that were commercial and not primarily experimental, we agree with the

district court that the ’242 and ’056 patents have been proven invalid as a matter of law

under the on-sale bar of § 102(b). Accordingly, we affirm the district court’s grant of

summary judgment of invalidity of both patents in favor of the Transportation Systems

Division of General Electric Company and Daido Industrial Bearings, Ltd.

                                 I.     BACKGROUND

                A.     EMD’s General Design and Testing Procedures

       EMD is a division of General Motors Corporation focused on the design and

production of locomotives. As part of that business, EMD designs and manufactures

component parts for locomotive engines, including the two kinds of bearings at issue in

this case. Both types of bearings are embedded in turbochargers, which are in turn

embedded in the engines of locomotives that EMD sells.

       After developing a new bearing, EMD typically initiates a two-phase testing

program before releasing the new bearing for commercial production. In the first phase,

termed Reliability Growth Testing, EMD tests its new bearings indoors at its engineering

facilities on multiple unit turbocharger cells (“in-house program”). The purpose of the

in-house program is to ascertain the durability and reliability of the new bearings.

       Upon completion of the in-house program, EMD commences the second phase

of testing, termed Reliability Verification Testing (“field program”). This testing occurs

outdoors under actual use conditions. That is, after EMD integrates the new bearings




04-1412                                      2
into existing orders, the customer railroads use the new bearings in their routine

operations. The purpose of this second phase is to verify durability.

       During the field program, EMD does not engage in ongoing monitoring or

periodic inspections of its new bearings because they are buried inside turbochargers

and cannot readily be examined by visual inspection. Rather, EMD inspects the new

bearings only if a particular turbocharger fails and is sent back to EMD. In such case,

EMD disassembles the failed turbocharger to assess whether the failure was caused by

the new bearings or some other part.

               B.     Events Involving the New Compressor Bearings

       In the late 1980s, EMD developed a new compressor bearing for use in diesel

locomotive turbochargers. On July 17, 1989, James L. Blase, an EMD employee and

one of the named inventors on the two asserted patents, reported during an internal

meeting that he had tested the new compressor bearings for approximately 3000 hours

in a twelve-cylinder multiple unit locomotive engine.      The minutes of that meeting

document that the in-house program had been completed.            Thus, EMD decided to

proceed with the field program by substituting the new compressor bearings into

locomotive orders previously placed by Norfolk Southern, Go Transit, and LXO

railroads.1

       EMD contacted Norfolk Southern, Go Transit, and LXO for permission to

substitute the prior art bearings, originally to be used in the purchased locomotives, with

the new compressor bearings. According to Mr. Blase, the three railroads agreed to
       1
             In the fall of 1988 and spring of 1989, EMD sold a total of forty-six
locomotives to Norfolk Southern, Go Transit, and LXO, scheduling delivery for late 1989
and early 1990. Norfolk Southern ordered thirty-three locomotives, Go Transit ordered
twelve locomotives, and LXO ordered one locomotive.


04-1412                                     3
accept the new bearings.            None of the three companies, however, signed a

confidentiality agreement or any other contract consenting to participate in the field

program.    They likewise were not given any design details or other documentation

regarding the new compressor bearings. Further, Norfolk Southern, Go Transit, and

LXO were not restricted or supervised in their use of the new compressor bearings and

were not under any obligation to collect data, keep progress records, or even operate

the subject locomotives during the time of the field program.

      After arranging for the substitution, EMD prepared internal memos documenting

the change to be made in the Norfolk Southern, Go Transit, and LXO orders. For

example, a July 19, 1989 internal memo stated: “Orders 887007 [for Norfolk Southern],

C484 [for Go Transit], and 899110 [for LXO] are to have Turbocharger 40014638

replaced by Turbocharger 40021524. . . . The turbocharger and EMD make component

schedules must be revised to reflect this change.” A different July 19, 1989 memo

stated that “[t]he drawings and bills of material for these orders must be changed to

include this new bearing.     This will be accomplished with an expedited RFC.           Jim

Korenchan     will   write   this    RFC   and   get   it   to   the   drafting   room   by

7-19-89.”   Similarly, a July 25, 1989 internal memo stated:           “This new bearing

addresses all known failure modes and MUST be included in upcoming 12-710GA

engines. The orders affected are the [Norfolk Southern] GP59 order No. 887007, Go

Transit order no. C484, and LXO no. 899110.”

      On August 28, 1989, EMD modified its original specification of February 1, 1989

for the Norfolk Southern order, agreeing to supply more new compressor bearings to

Norfolk Southern than originally planned for in its prior locomotive order. In particular,




04-1412                                      4
EMD noted that it “will provide spare parts for [Norfolk Southern]’s GP59 locomotives,”

including the “Turbo” of part number 40021531. The specified Turbo included the new

compressor bearings.

       Between January 1989 and November 1989, EMD purchased a total of 303 new

compressor bearings from Allison Gas & Turbine (“Allison”), another division of General

Motors Corporation, for a price of $298.80 each. Allison manufactured these bearings

according to specifications provided by EMD.      After receiving the new compressor

bearings from Allison, EMD substituted them into locomotives previously sold to Norfolk

Southern, Go Transit, and LXO. Thereafter, EMD shipped the subject locomotives to

the three railroads.

       On November 27, 1990, EMD filed a patent application for its new compressor

bearings. Based upon this filing date, the critical date for applying the on-sale bar for

the ’242 patent is November 27, 1989. The ’242 patent issued on December 8, 1992.

Claims 1 through 7 of the ’242 patent are directed to a turbocharger assembly, and

claims 8 through 18 are directed to the new compressor bearings.

       On August 19, 1991, EMD released the new compressor bearings for production.

All locomotive sales involving diesel engines after August 1991 included the new

compressor bearings. Before this release, however, EMD employed prior art bearings

in all customer orders, except the Norfolk Southern, Go Transit, and LXO orders

discussed above.       EMD likewise did not advertise, market, or create promotional

materials for the new compressor bearings prior to the August 1991 release.




04-1412                                    5
                 C.     Events Involving the New Planetary Bearings

       In September 1992, EMD designed a new planetary bearing for use in

turbocharger planetary drive trains.     In January 1993, EMD initiated the in-house

program for this new bearing type. In March 1993, EMD decided to proceed with the

field program. To do so, EMD approached Union Pacific railroad for permission to

substitute its new planetary bearings for prior art bearings in an order for two

locomotives that Union Pacific placed earlier in 1992. Union Pacific allegedly agreed.

Nevertheless, it did not sign a confidentiality agreement or any other type of a contract

consenting to participate in the field program. Union Pacific also was not placed under

any restrictions or supervision regarding the use of the locomotives containing new

planetary bearings.    Nor was Union Pacific given any design details for the new

planetary bearings or required to monitor or document its usage of the subject

locomotives during the field program.

       On July 6, 1993, EMD ordered 105 new planetary bearings at $88.87 per bearing

from its supplier Glacier, now Daido Industrial Bearings, Ltd. (“Daido”). On August 6,

1993, EMD installed six planetary bearings that it had purchased from Daido into

turbochargers for the two locomotives destined for Union Pacific. EMD shipped those

locomotives to Union Pacific that same day. On September 7, 1994, EMD released the

planetary bearings for production, meaning that the new planetary bearings were

included in all future locomotive sales involving turbocharger planetary drive trains.

       On September 29, 1994, EMD filed a patent application for its new planetary

bearings. Based upon this filing date, the critical date for the ’056 patent is September

29, 1993. The ’056 patent issued on October 22, 1996. Claims 1 through 6 of the ’056




04-1412                                      6
patent are directed to the new planetary bearings, while claim 7 is directed to a

turbocharger planetary drive train.

                             D.       Trial Court Proceedings

       In March 2003, EMD filed a patent infringement action against the Transportation

Systems Division of General Electric Company and Daido, asserting infringement of the

’242 and ’056 patents.      In December 2003, GE and Daido separately moved for

summary judgment that the ’242 and ’056 patents are invalid under the on-sale bar of

35 U.S.C. § 102(b). EMD filed a cross-motion for summary judgment that neither the

’242 nor the ’056 patent is invalid under the on-sale bar. EMD contended that its sales

of the new compressor and planetary bearings did not raise the on-sale bar provision of

§ 102(b) because those sales were for purposes of experimentation.

       In May 2004, the district court granted GE’s and Daido’s motions and denied

EMD’s cross-motion. The district court held that EMD’s purchase of new compressor

bearings from Allison before the critical date was a commercial sale within the meaning

of § 102(b). The district court also held that both EMD’s substitution of new compressor

bearings in place of prior art bearings in sales made to Norfolk Southern, Go Transit,

and LXO prior to the critical date and its sale of spare compressor bearings to Norfolk

Southern prior to the critical date separately raised the on-sale bar. As for the planetary

bearings, the district court concluded that Daido’s sale of the planetary bearings to EMD

prior to the critical date and EMD’s substitution of two sets of new planetary bearings for

prior art bearings in locomotives sold to Union Pacific prior to the critical date were each

invalidating sales under § 102(b).




04-1412                                      7
       The district court considered whether the objective indicia suggesting

experimentation precluded the on-sale bar for either the ’242 or ’056 patent, ultimately

concluding that they did not.    The district court found that the various transactions

between EMD, Allison, Daido, and EMD’s four railroad customers were no different than

normal commercial sales. The district court also found that EMD exercised no control

over its customers’ use of the new bearings after they were sold. The district court

further found that there was little evidence of experimentation given that (1) neither

EMD nor its customers maintained any test data, progress reports, or other records;

(2) EMD sold a large number of new compressor and planetary bearings during the

periods of alleged experimentation; and (3) EMD inspected failed turbochargers in the

ordinary course of business, not as part of any experimental protocol. Lastly, the district

court found that the field program was unnecessary because EMD had established that

both types of new bearings were durable through the in-house program.

       EMD timely appealed.       We have jurisdiction over this appeal pursuant to

28 U.S.C. § 1295(a)(1).

                                  II.    DISCUSSION

       We review a district court’s grant of summary judgment de novo, and its denial of

summary judgment for abuse of discretion. Intel Corp. v. Via Techs., Inc., 319 F.3d

1357 (Fed. Cir. 2003) (internal citations omitted). Whether an invention was on sale

within the meaning of § 102(b) is a question of law that we review de novo based upon

underlying facts, which we review for clear error. See Pfaff v. Wells Elecs., 124 F.3d

1429, 1432 (Fed. Cir. 1997), aff’d, 525 U.S. 55 (1998).




04-1412                                     8
       A.      Whether the Sales Were Sufficient to Raise the Bar of § 102(b)

       A person is entitled to a patent unless, inter alia, “the invention was . . . on sale in

this country, more than one year prior to the date of the application for patent in the

United States.” 35 U.S.C. § 102(b) (2000). In order for a patent claim to be held invalid

under the on-sale bar of § 102(b), two conditions must be satisfied before the critical

date. First, the claimed invention must be the subject of a commercial sale. Second,

the claimed invention must be ready for patenting. Pfaff, 525 U.S. at 67-68. “Before the

Supreme Court’s decision in Pfaff, this court used a multifactor, ‘totality of the

circumstances’ test to enforce the on-sale bar.” EZ Dock, Inc. v. Schafer Sys., Inc., 276

F.3d 1347, 1351 (Fed. Cir. 2002). Following Pfaff, we now apply the two-part test

“‘without balancing various policies [of the bar] according to the totality of the

circumstances.’” Id. (quoting Weatherchem Corp. v. J.L. Clark, Inc., 163 F.3d 1326,

1333 (Fed. Cir. 1998)).

       EMD did not challenge below, and does not challenge on appeal, that its bearing

inventions were “ready for patenting” at the time of the alleged commercial sales. Thus,

the relevant inquiry here concerns only the first prong of the Pfaff test.

       We have recognized that the first prong “involves a determination of whether a

commercial offer for sale [or sale] has occurred, applying traditional contract law

principles.” Allen Eng’g Corp. v. Bartell Indus., Inc., 299 F.3d 1336, 1352 (Fed. Cir.

2002). In this case, the district court found several invalidating sales for the ’242 and

’056 patents. We need not consider whether the district court was correct as to all of

these sales because a single sale or offer for sale suffices to bar patentability. Atl.

Thermoplastic Co. v. Faytex Corp., 970 F.2d 834, 836 (Fed. Cir. 1992) (citing In re




04-1412                                       9
Caveney, 761 F.2d 671, 676 (Fed. Cir. 1985)); A.B. Chance Co. v. RTE Corp., 854 F.2d

1307, 1311 (Fed. Cir. 1988). Thus, for each type of bearing, we restrict our analysis to

the question of whether any one of EMD’s alleged sales is sufficient to invoke § 102(b).

       Before addressing this question, we observe that the first prong of the Pfaff test

entails an assessment of whether the circumstances surrounding a pre-critical date sale

objectively show that it was primarily made for experimentation.

       [T]he question posed by the experimental use doctrine, assessed under
       the first prong of the two-part on-sale bar test of Pfaff, is not whether the
       invention was under development, subject to testing, or otherwise still in
       its experimental stage at the time of the asserted sale. Instead, the
       question is whether the transaction constituting the sale was not incidental
       to the primary purpose of experimentation, i.e., whether the primary
       purpose of the inventor at the time of the sale, as determined from an
       objective evaluation of the facts surrounding the transaction, was to
       conduct experimentation.

Allen Eng’g, 299 F.3d at 1353 (citing EZ Dock, 276 F.3d at 1356-57 (Linn, J.,

concurring)) (internal citations and quotations omitted). If the sale was primarily for

experimentation rather than commercial gain, then the sale is not invalidating under

§ 102(b). Monon, 239 F.3d at 1258 (“[E]vidence that the . . . sale of the patented device

was primarily experimental may negate an assertion of invalidity.”).          Although we

proceed in a step-wise fashion, analyzing first whether EMD made any pre-critical date

sales of its compressor and planetary bearings and then whether any such sales were

negated by EMD’s experimentation, we emphasize for sake of clarity that we are

considering only one legal question, namely, the first prong of the Pfaff test.

       As to compressor bearings, Transportation Systems Division of General Electric

Company and Daido (collectively “GE”) argue that EMD’s agreement to supply spare

compressor bearings to Norfolk Southern constituted a commercial sale under § 102(b).




04-1412                                     10
The district court agreed, and so do we.         In July 1989, some months after EMD

arranged to substitute its new compressor bearings into locomotives ordered by Norfolk

Southern, EMD contracted with Norfolk Southern to supply spare compressor bearings

not included in the original deal.       To reflect this transaction, EMD prepared a

“Specification Supplement H,” dated August 28, 1989, three months before the critical

date, stating that EMD “will provide spare parts for [Norfolk Southern]’s GP59

locomotives,” including the turbocharger part number 40021531.        The July 1989

assembly list for turbocharger part number 40021531 reveals that this particular

turbocharger contained the new compressor bearings. Based upon this evidence, we

can only conclude that EMD’s new compressor bearings were the subject of a sale prior

to the critical date.

       Turning to planetary bearings, GE asserts that EMD’s purchase of more than one

hundred planetary bearings from Daido was a pre-critical date sale within the meaning

of § 102(b). We agree. Daido’s sale to EMD was plainly a sale of the new planetary

bearings prior to the critical date.

                           B.      Evidence of Experimentation

       GE contends that EMD’s sale of spare compressor bearings cannot be the

subject of experimentation. We are persuaded by this contention, noting in particular

that the record does not reveal when or how Norfolk Southern intended to use the spare

compressor bearings.       There also was no evidence showing that Norfolk Southern

replaced even one of the compressor bearings found in locomotives that EMD

considered part of its field program with one of the spare compressor bearings. Such

replacement must have occurred prior to the production release of the new compressor




04-1412                                     11
bearings in August 1991. Any replacement after that date certainly could not qualify as

experimentation because EMD incorporated the new compressor bearings into all diesel

engine locomotive orders following production release. Therefore, for the reasons set

forth below, we conclude that EMD’s sale of spare compressor bearings to Norfolk

Southern was not primarily for experimentation and thus that the district court did not err

in holding the ’242 patent invalid under § 102(b).

       Regarding planetary bearings, EMD argues that, at a minimum, a genuine issue

of fact exists as to whether the sale of the new planetary bearings was primarily for

experimentation, pointing out that (1) completion of the field program was required

under EMD’s policy before releasing a new bearing for production; (2) neither

monitoring nor inspection was necessary because the purpose of the field program was

merely to verify durability; (3) inspection was not even possible because the new

planetary bearings were embedded in the turbochargers housed inside locomotive

engines; and (4) failed turbochargers were returned to EMD for teardown and

inspection. EMD also analogizes the facts here to those in Manville Sales Corp. v.

Paramount Systems, Inc., 917 F.2d 544 (Fed. Cir. 1990), and EZ Dock, 276 F.3d 1347.

In both cases, which involved durability testing, we rejected an assertion of the on-sale

bar.

       GE responds that the field program was unnecessary because the new planetary

bearings had already been shown to work for their intended purpose during the

in-house program. GE also asserts that durability testing under actual use conditions

was not required because durability is not a claim limitation in the ’056 patent.

Additionally, GE contends that the district court correctly found, despite EMD’s




04-1412                                     12
subjective intent to experiment, that the objective evidence revealed that EMD’s sale to

Union Pacific was not primarily for experimentation, noting, inter alia, that EMD did not

control Union Pacific’s use of the new planetary bearings and that the field program

lacked the customary objective indicia associated with experimentation such as test

records.

       At the outset, we observe that EMD purchased the new planetary bearings from

Daido to use in filling Union Pacific’s pre-critical date locomotive order, which was to

contain new planetary bearings instead of prior art bearings. Thus, we reason that the

sale from Daido to EMD (“upstream sale”) and the sale from EMD to Union Pacific

(“downstream sale”) are so inextricably linked that we cannot identify the purpose for

the Daido’s upstream sale without examining the purpose for EMD’s downstream sale.

Our analysis concerning whether the new planetary bearings were the subject of an

invalidating sale under § 102(b), consequently, hinges on the purpose for the sale from

EMD to Union Pacific.

       It is important to recognize that this court has limited experimentation sufficient to

negate a pre-critical date public use or commercial sale to cases where the testing was

performed to perfect claimed features, or, in a few instances like the case here, to

perfect features inherent to the claimed invention. See, e.g., EZ Dock, 276 F.3d at 1353

(experimentation focused on durability of claimed polyethylene floating dock in turbulent

water of the Mississippi River, although durability was not a claim limitation); Seal-Flex,

Inc. v. Athletic Track & Court Constr., 98 F.3d 1318, 1320 (Fed. Cir. 1996)

(experimentation focused on durability of claimed all-weather activity mat under harsh

weather conditions, but durability was not a claim limitation); Manville, 917 F.2d at 550-




04-1412                                      13
51 (experimentation focused on durability of claimed self-centering, lightpole luminaire

under severe winter conditions in Wyoming, even though durability was not a claim

limitation). Here, EMD designed its field program to verify durability, a feature, although

unclaimed, we hold is inherent to the new planetary bearings.            Hence, evidence

showing that EMD’s field program has the requisite objective indicia of experimentation

may negate EMD’s pre-critical date sale of the new planetary bearings to Union Pacific.2

       Few decisions address how to determine if a pre-critical date public use or sale is

experimental rather than a public use or sale under § 102(b), even though the doctrine

has been in existence since City of Elizabeth v. Pavement Co., 97 U.S. 126 (1878).3

But certain things are settled. Significantly, an inventor’s subjective intent to experiment

cannot establish that his activities are, in fact, experimental.

       When sales are made in an ordinary commercial environment and the
       goods are placed outside the inventor’s control, an inventor’s secretly held
       subjective intent to “experiment,” even if true, is unavailing without
       objective evidence to support the contention. Under such circumstances,
       the customer at a minimum must be made aware of the experimentation.

LaBounty Mfg., Inc. v. U.S. Int’l Trade Comm’n, 958 F.2d 1066, 1072 (Fed. Cir. 1992)

(citing In re Brigance, 792 F.2d 1103, 1108 (Fed. Cir. 1986)). Thus, while EMD officials

may have subjectively believed they were conducting experimentation under actual use




       2
              It is well-settled that an accused infringer carries the burden of proving
invalidity by clear and convincing evidence. When the accused infringer alleges
invalidity under § 102(b) based upon a pre-critical date public use or commercial sale,
however, an inventor may introduce evidence showing that his public use or sale was
primarily for purposes of experimentation, thus neutralizing the accused infringer’s
showing.
       3
             Although City of Elizabeth involved a pre-critical date public use of the
claimed invention, we have applied experimentation not only in that context but also in
the on-sale context. See In re Hamilton, 882 F.2d 1576, 1580 (Fed. Cir. 1989).


04-1412                                       14
conditions, their beliefs cannot establish that EMD’s sales were primarily for

experimentation.

       We have generally looked to objective evidence to show that a pre-critical date

sale was primarily for experimentation.      For example, in T.P. Laboratories, Inc. v.

Professional Positioners, Inc., 724 F.2d 965, 972 (Fed. Cir. 1984), we indicated that

various objective indicia may be considered in determining whether the inventors

engaged in experimentation:

       The length of the test period is merely a piece of evidence to add to the
       evidentiary scale. The same is true with respect to whether payment is
       made for the device, whether a user agreed to use secretly, whether
       records were kept of progress, whether persons other than the inventor
       conducted the asserted experiments, how many tests were conducted,
       how long the testing period was in relationship to tests of other similar
       devices.

Id. at 971-72; see also Baker Oil Tools, Inc. v. Geo Vann, Inc., 828 F.2d 1558, 1564

(Fed. Cir. 1987) (listing similar types of objective evidence to be considered in

determining if a public use or sale is experimental).

       Recently, we catalogued and consolidated all these considerations into a list of

thirteen objective factors: (1) the necessity for public testing; (2) the amount of control

over the experiment retained by the inventor; (3) the nature of the invention; (4) the

length of the test period; (5) whether payment was made; (6) whether there was a

secrecy obligation; (7) whether records of the experiment were kept; (8) who conducted

the experiment; (9) the degree of commercial exploitation during testing; (10) whether

the invention reasonably requires evaluation under actual conditions of use;

(11) whether testing was systematically performed; (12) whether the inventor continually

monitored the invention during testing; and (13) the nature of the contacts made with




04-1412                                     15
potential customers. Allen Eng’g, 299 F.3d at 1353 (citing EZ Dock, 276 F.3d at 1357

(J. Linn, concurring)). This list is not exhaustive, and all of the experimentation factors

may not apply in a particular case. See Brigance, 792 F.2d at 1108. They simply

represent various kinds of evidence relevant to the question of whether pre-critical date

activities involving the patented invention – either public use or sale– were primarily

experimental and not commercial.

       This court, however, has held or at least suggested that certain evidentiary

showings can be dispositive of the question of experimentation. In In re Hamilton, 882

F.2d 1576 (Fed. Cir. 1989), we stated:

       First, we may agree with [the inventor] that control is not the “lodestar” test
       in all cases involving experimental use. It is nonetheless an important
       factor. The experimental use doctrine operates in the inventor’s favor to
       allow the inventor to refine his invention or to assess its value relative to
       the time and expense of prosecuting a patent application. If it is not the
       inventor or someone under his control or “surveillance” who does these
       things, there appears to us no reason why he should be entitled to rely
       upon them to avoid the statute.

Id. at 1581 (internal citation omitted and emphasis in original).        We observed that

nothing in the record showed that the Hamilton inventor knew what, if anything, the

customer was doing in terms of testing the invention. As a result, we concluded that the

inventor’s purpose in making the sale was not primarily experimental.

       Following Hamilton, this court again emphasized the importance of control in

Lough v. Brunswick Corp., 86 F.3d 1113 (Fed. Cir. 1996). In particular, this court said

that an inventor must show control over the alleged testing to establish experimentation.

Id. at 1120. Additionally, the Lough court placed critical emphasis on experimental

records. After listing various objective indicia of experimentation, which included both

whether records or progress reports were made concerning the testing and the extent of



04-1412                                      16
control the inventor maintained over the testing, this court stated: “The last factor of

control is critically important, because, if the inventor has no control over the alleged

experiments, he is not experimenting. If he does not inquire about the testing or receive

reports concerning the results, similarly, he is not experimenting.” Id. The Lough court

also stated:   “When one distributes his invention to members of the public under

circumstances that evidence a near total disregard for supervision and control

concerning its use, the absence of these minimal indicia of experimentation require a

conclusion that the invention was in public use.” Id. at 1122 (emphasis added). Hence,

this court held, based primarily upon the absence of control and records, that the

inventor’s public use of the claimed invention was not experimental.

      Two years after Lough, in a concurring opinion in C.R. Bard, Inc. v. M3 Systems,

Inc., 157 F.3d 1340 (Fed. Cir. 1998), Judge Bryson urged that control and

recordkeeping are vital to a showing of experimentation.4 “Certain factors, such as the

requirement that the inventor control the testing, that detailed progress records be kept,

and that the purported testers know that testing is occurring, are critical to proving

experimental purpose.” Id. at 1380 (citing Lough, 86 F.3d at 1120; 2 Donald S. Chisum,

Chisum on Patents § 6.02[7][c] (1998)).      Judge Bryson stressed awareness by the

purported testers that testing is occurring.    He suggested or at least implied that

consideration of these three factors form the first, and potentially decisive, step in

determining whether a public use or sale was primarily experimental.          Indeed, we




      4
              This court was divided in Bard with Judges Bryson and Mayer concurring
as to the invalidity of one of the asserted patents under § 102(b), but each presented a
different analytical path to that conclusion. Judge Newman dissented with respect to
the on-sale bar.


04-1412                                    17
discern that Judge Bryson applied only these three factors to conclude that the on-sale

bar applied.

       The facts of this case are analogous to those in U.S. Environmental
       Products, Inc. v. Westall, 911 F.2d 713 (Fed. Cir. 1990). In Westall, this
       court affirmed a district court’s conclusion that a patent was invalidated by
       a sale more than one year before the filing date. That conclusion was
       based primarily on (1) the lack of written progress records and the failure
       to adhere to a testing schedule; (2) the inventor’s failure to maintain
       control over the testing; and (3) promotion of the invention during the
       testing. In this case, as in Westall, the evidence shows that neither the in-
       house tests . . . nor the field tests . . . were under the control of the
       inventor or his company. There is little or no evidence of any written
       progress records; indeed, the inventor was apparently never provided with
       any test results. Finally, the communications between [a company with
       which the inventor was associated] and [the customer] throughout the
       purported testing period emphasized commercial sales and projections,
       not controlled experimentation.

Id. at 1381 (internal citation omitted).

       We agree with Judge Bryson that a customer’s awareness of the purported

testing in the context of a sale is a critical attribute of experimentation. If an inventor

fails to communicate to a customer that the sale of the invention was made in pursuit of

experimentation, then the customer, as well as the general public, can only view the

sale as a normal commercial transaction. Indeed, our predecessor court recognized in

In re Dybel, 524 F.2d 1393, 1401 (C.C.P.A. 1975), that “[an inventor’s] failure to

communicate to any of the purchasers or prospective purchasers of his device that the

sale or offering was for experimental use is fatal to his case.” And, “we have held that

the assertion of experimental sales, at a minimum, requires that customers must be

made aware of the experimentation.” Paragon Podiatry Lab., Inc. v. KLM Labs., Inc.,

984 F.2d 1182, 1186 (Fed. Cir. 1993) (citing LaBounty, 958 F.2d at 1072; Dybel, 524




04-1412                                     18
F.2d at 1401). Accordingly, we hold not only that customer awareness is among the

experimentation factors, but also that it is critical.

       Our precedent has treated control and customer awareness of the testing as

especially important to experimentation. Indeed, this court has effectively made control

and customer awareness dispositive. See, e.g., Lough, 86 F.3d at 1120; Hamilton, 882

F.2d at 1581. Accordingly, we conclude that control and customer awareness ordinarily

must be proven if experimentation is to be found.

       We now consider the facts of this case. First, the record, as the district court

noted, is devoid of any evidence that EMD, or Union Pacific under EMD’s direction,

controlled the field program for its new planetary bearings. EMD did not provide any

protocols to Union Pacific directing their use of locomotives containing the new

planetary bearings. EMD likewise neither supervised nor restricted Union Pacific’s use

of the new planetary bearings in any way. Mr. Blase testified that the railroads involved

in the field testing were not required to run the subject locomotives under any specific

conditions.

       The record also shows that EMD made no attempt to monitor the conditions

under which Union Pacific used the “test” locomotives. EMD explains away its lack of

oversight by arguing that the field program was conducted solely to verify the durability

of its new planetary bearings as measured by the number of turbocharger failures, not

by the daily use of its new planetary bearings.          Such an argument is, however,

unconvincing.    EMD did not request or receive any comments or data from Union

Pacific concerning the operation or durability of its new planetary bearings. Without




04-1412                                        19
obligating Union Pacific to provide such feedback, it cannot be reasonably said that

EMD exercised any monitoring over the field program.

       That Union Pacific returned failed turbochargers to EMD for teardown and

inspection is insufficient to establish EMD’s control over the field program.      Union

Pacific voluntarily returned failed turbochargers under the basic warranty given by EMD

to all of its customers. It was not, however, under any obligation to do so. Mr. Blase

testified that EMD requested the return of failed components from all customers in the

ordinary course of business.      Union Pacific thus would have returned all failed

turbochargers whether it was participating in experimentation or was merely an ordinary

customer. What is more, EMD’s teardown reports focused only on the appearance and

features of the new planetary bearings without any correlation to the field conditions.

Nothing in the teardown reports thus distinguish them from any other failure reports

prepared outside the field program. Accordingly, the district court did not err in finding

that EMD exercised no control over Union Pacific’s use of the new bearings.

       Second, the record is insufficient, even on summary judgment, to objectively

establish Union Pacific’s awareness of the field program. The only evidence regarding

communications with Union Pacific concerning the field program comes from Mr.

Blase’s deposition testimony and an internal memo he prepared. In his deposition, Mr.

Blase testified:

       Q:     Okay. Now when you would generally send out or do field
              verification or reliability verification in the field, were there
              agreements that customers entered into in connection with those?
       A:     The customer would understand that – that the – that what they
              were receiving would be a reliability verification test.
       Q:     Would you tell them which components were associated with that?
       A:     We would indicate to them which components are under reliability –
              reliability verification test, yes.



04-1412                                    20
       Q:     You would tell them that.
       A:     Sure.
       Q:     Okay.      Did they sign any type of secrecy agreement or
              confidentiality agreement in connection with that?
       A:     I do not know that.
       Q:     Okay. Who would know that?
       A:     The – the correspondence with the customer would be handled
              through the sales department as far as I know.
       Q:     And who was in the sales department during this timeframe?
       A:     I don’t recall.

Similarly, in his memo, Mr. Blase stated under the heading “Status of Public Disclosure”

that “[u]pon applying for field test on a customer’s locomotive, the customer is made

aware that there is an experimental part in the turbochargers they are receiving, yet

details of the part are not fully disclosed.” Apart from this single sentence, Mr. Blase did

not otherwise describe EMD’s communications with any customer or state exactly what

Union Pacific was told, if anything.

       Neither Mr. Blase’s testimony nor his memo establishes awareness by Union

Pacific that the new planetary bearings were substituted into their pre-existing order for

the purpose of testing those bearings in actual use rather than as part of a commercial

sale. Mr. Blase’s testimony simply suggests the possibility that an unidentified EMD

employee may have engaged in a conversation with one or more unidentified

employees of Union Pacific about substituting the new planetary bearings.

       Further, the record fails to show any objective evidence supporting Mr. Blase’s

inference that Union Pacific was “aware” of the field testing. It does not contain even

the hint of a written agreement with Union Pacific, testimony from any representative of

Union Pacific describing the railroad’s awareness of the field program, or any other form

of corroborating documentation held by Union Pacific regarding the field program. The




04-1412                                     21
lack of such evidence to corroborate Mr. Blase’s conclusory testimony and memo thus

validates the lack of customer awareness.

       The facts here are closely analogous to those in Lough, where, as noted above,

this court rejected an inventor’s claim that a pre-critical date public use of his liquid seal

assembly invention was made for experimentation. In Lough, the inventor distributed

six prototypes of his liquid seal assembly invention to his friends for use in their boats.

After distribution, the Lough inventor did not maintain any supervision over his friends’

use of the liquid seal assemblies or follow-up with them for comments as to the

operability of the liquid seal assemblies.        Similarly, EMD allowed Union Pacific

unsupervised use of the new planetary bearings. EMD neither monitored the conditions

under which Union Pacific used the new planetary bearings nor solicited any feedback

from Union Pacific regarding the bearings’ performance. What is more, EMD, like the

inventor in Lough, did not maintain any records of the alleged testing or require Union

Pacific to do so. As we stated in Lough, “Lough’s failure to monitor the use of his

prototypes by his acquaintances, in addition to the lack of records or reports from those

acquaintances concerning the operability of the devices, compel the conclusion that, as

a matter of law, he did not engage in experimental use.” 86 F.3d at 1122. We are

equally compelled to conclude as a matter of law that EMD did not engage in any

experimentation on its new planetary bearings.

       Finally, contrary to EMD’s contention, Manville and EZ Dock do not control the

outcome here, even though both cases involve durability testing of inventions under

actual use conditions which we held to be experimental. EZ Dock and Manville are




04-1412                                      22
factually distinguishable, especially with respect to control, recordkeeping, and

customer awareness.

      In EZ Dock, two inventors designed a floating dock made of polyethylene. They

later installed one at a customer’s fishing camp located in an area of the Mississippi

River that experienced heavy boat traffic and turbulent water flow. Unlike the inventors

in EZ Dock who routinely inspected the installed polyethylene floating dock over the

course of a summer, EMD did nothing to control, monitor, or systematize the field

testing of its new planetary bearings. EMD did not require Union Pacific to follow any

protocols when using the subject locomotives. EMD likewise did not examine the new

planetary bearings on any schedule. Instead, it did so only when a turbocharger failed.

      Additionally, while shopping at one of the inventor’s office supply stores to buy a

copier, the EZ Dock customer noticed the polyethylene floating docks being stored in

the window and approached that inventor requesting to purchase one. Here, EMD

approached Union Pacific, a long-time customer, requesting permission to substitute the

new planetary bearings into an order that Union Pacific had previously placed. The

customer in EZ Dock thus was aware that the polyethylene floating dock was not

commercially available, but instead experimental. The same cannot be said for Union

Pacific given that the record contains only vague, conclusory, and uncorroborated

testimony about Union Pacific’s awareness of the experimental nature of the field

program. Moreover, the sale in EZ Dock was an isolated, unexpected occurrence. The

EZ Dock inventor clearly was not intending to sell the polyethylene floating dock, much

less earn a profit from the sale, as evidenced by the fact he charged only 75 percent of

the final retail price. In contrast, there is no evidence to suggest that EMD discounted




04-1412                                   23
the price of the locomotive Union Pacific ordered to offset the risk that the new planetary

bearings might fail. Therefore, the record suggests that EMD made the substitution as

part of a commercial sale to make money, not primarily to experiment.

       Finally, the inventors in EZ Dock had not tested the polyethylene floating dock in

turbulent water for any length of time. They had only floated it in the Mississippi River

on occasion and installed several at a marina where the water conditions were fairly

stable. They did not know whether their polyethylene floating dock would be durable

under heavier water flow conditions, thus establishing a need for the turbulent water

testing. EMD, in comparison, had tested the new planetary bearings in the in-house

program and already knew they were durable.            In light of these significant factual

differences, it is clear that EMD’s reliance on EZ Dock is misplaced.

       Turning to Manville, the plaintiff’s employees invented a new, self-centering

lightpole luminaire and installed one in a rest area being built along an interstate

highway in Wyoming, but not yet open to the public. The Manville plaintiff directly

controlled the testing by installing the luminaire in the fall, removing it in the spring, and

thoroughly examining it following this testing period. By contrast, EMD did not control or

systematize Union Pacific’s use of the subject locomotives.          Union Pacific was not

placed under any restrictions or obligations concerning its use of the new planetary

bearings; it was free to use the subject locomotives daily or not at all, in hot, dry

climates or cold, wet climates, with maximum loads or load-free.

       Also, the State of Wyoming knew of the experimental and confidential nature of

Manville’s installation of the luminaire.      Indeed, Manville specifically informed a

Wyoming official that its use of one luminaire on one pole at one site in Wyoming was




04-1412                                      24
experimental.   The State of Wyoming likewise received a drawing of the luminaire

containing a confidentiality notice. Here, the situation was quite the reverse. Mr. Blase

gave only vague, conclusory, and uncorroborated testimony regarding Union Pacific’s

possible awareness of the experimentation. Such testimony, however, cannot establish

what Union Pacific really knew about the purpose of the sale, especially without

correspondence with Union Pacific or other documentation.

      In addition, Manville lacked confidence that the luminaire would perform in its

intended environment because Manville only tested a single luminaire on a pole in the

backyard of its Ohio factory for a few days, not under Wyoming winter conditions of high

wind and ice for any extended period of time. In contrast, EMD subjected its new

planetary bearings to the in-house program, which simulated actual use conditions over

extended periods of time. EMD also failed to point to any evidence, like the internal

memo written by a Manville employee, objectively explaining why actual conditions were

impossible to replicate through its in-house program.

      Finally, the State of Wyoming agreed to purchase the luminaire only if it proved

operable after the winter. As a result, the State of Wyoming withheld payment until the

results of the weather-related testing were known.         Here, Union Pacific neither

conditioned its purchase of the locomotive on the operability of the new planetary

bearings nor withheld payment in an amount corresponding to the cost of the new

planetary bearings pending the results of the field program.         Viewing all of the

differences between the facts in Manville and those implicated here, we conclude that

EMD’s reliance on Manville, like its reliance on EZ Dock, is misplaced.




04-1412                                    25
       Because the facts do not show the existence of control or customer awareness,

we do not consider the other experimentation factors. We conclude, as a matter of law,

that EMD’s sale to Union Pacific of the new planetary bearings was not made primarily

for experimentation. We, therefore, conclude that Daido’s sale to EMD could not have

been made primarily for experimentation, since the purpose for the upstream sale was

to make the downstream sale possible. Accordingly, the district court did not err in

holding the ’056 patent invalid under the on-sale bar of    § 102(b).

                                  III.    CONCLUSION

       We conclude, as a matter of law, that EMD’s sale of spare compressor bearings

to Norfolk Southern and Daido’s sale of planetary bearings to EMD were not primarily

experimental. Because the district court correctly held that EMD commercially sold the

patented compressor and planetary bearings prior to the critical date, raising the on-sale

bar of § 102(b) for the ’242 and ’056 patents, we affirm.

                                         AFFIRMED




04-1412                                     26