Gene Busroe And Sue Busroe, Apps. v. Dreamers Rod, Res.

       IN THE COURT OF APPEALS OF THE STATE OF WASHINGTON

GENE BUSROE and SUE BUSROE,
husband and wife,                                No. 74212-4-1


                     Appellants,                 DIVISION ONE



                                                 UNPUBLISHED OPINION
DREAMERS ROD, CUSTOM &
PICK-UPS N.W., INC.,

                     Respondents.                FILED: January 17, 2017


       Leach, J. — Gene Busroe appeals the dismissal of his lawsuit against a

business that did some restoration work on his classic pickup truck.      Because

substantial evidence supports the trial court's challenged findings of fact and

those findings support its conclusions of law, we affirm.

                                      FACTS


       According to unchallenged findings of fact entered after a 2015 bench trial,

Gene Busroe purchased a 1955 Chevrolet pickup truck, planning to restore it as

a retirement project.   When he purchased the truck, it had a heavily rusted

exterior body and needed virtually all parts and mechanical systems replaced.

Busroe enrolled in classes on body and electrical work at a local technical

college.
NO. 74212-4-1/2




       Dreamers Rod, Custom & Pick-ups N.W. Inc. operates two shops where it

performs restoration work and fabricates vehicle parts.    Its owners agreed to

allow Busroe to store his vehicle and to use shop space to do his own restoration

work. Busroe did this for several years. During the same time, he also hired

Dreamers to perform specific tasks. The arrangement with Dreamers amounted

to a series of oral contracts.


       During this period, Busroe took the disassembled body of the truck to

another business, Alternative Blasters, for "bead blasting," a process that

prepares metal for painting by removing existing paint, primer, and rust, leaving

only bare metal.      When Alternative Blasters completed that work, Busroe

transported the body pieces on a flatbed trailer to Dreamers' shop.     Later, an

employee of Dreamers prepared them for painting, and a Dreamers'

subcontractor painted the truck.

       The restoration work was complete in 2009. Busroe then participated in

car shows and other events, winning some awards.

       In 2011, Busroe noticed defects in the paint. On some areas of the truck

body, small bubbles and blisters appeared on the surface of the paint. Since

then, the bubbling and blistering has spread and become increasingly more

pronounced.
NO. 74212-4-1/3




        In August 2013, Busroe and his spouse (collectively "Busroe") sued

Dreamers.1     Busroe contended that Dreamers' employees failed to "properly

paint the vehicle" and that he incurred damages as a result. His complaint did

not identify a specific legal cause of action.

        During a two-day trial, the court considered the testimony of ten witnesses

and several exhibits. The trial court entered a judgment in favor of Dreamers that

dismissed Busroe's complaint with prejudice. Busroe appeals.

                                     ANALYSIS


        Busroe challenges finding of fact 6 insofar as it specifies September 28,

2006, as the date he delivered the truck parts from Alternative Blasters after

bead blasting to Dreamers' shop.       He also challenges the finding, included in

both findings of fact 11 and 17, that a "three year gap" occurred between the

bead blasting process and the eventual priming and painting of the vehicle in

2009.


        Busroe contends no evidence in the record supports the finding that the

bead blasting took place in 2006. He further claims that without this finding, the

record contains no factual support for several conclusions of law.        In these

conclusions, the court explained that Busroe failed to establish that Dreamers'

conduct proximately caused the deterioration of the paint:

        1 The record on review includes only the amended complaint filed in
November 2013.
                                          -3-
NO. 74212-4-1/4




      3.   Plaintiff's general theory of the case is that Defendant took
           some action, which they did not specify, that caused rust to
           form on the truck, thereby causing Plaintiff damage. Here
           the Court concludes that the metal body of the truck was in a
           rusted condition at the time it was purchased by Plaintiff as
           shown by the photos introduced into evidence. Plaintiff
           sought to remove that rust by having the metal pieces
           beadblasted by a third party. This work was ineffective to
           remove all of the rust as shown by Defendant in Invoice
           1428. (Exhibit 52).      The Plaintiff did not prove that it
           contracted with Defendant to remove any, let alone all of the
           rust on the truck. Further, the evidence showed the Plaintiff
           introduced water on the truck parts in delivering [them to the]
           Defendant. Defendant was not responsible for causing the
           metal to be in a wet condition. The evidence proved that
           Defendant was not responsible for causing the metal parts to
           rust. The Plaintiff failed to show that Defendant proximately
           caused the rust damage to the truck. Accordingly, the Court
           finds in favor of the Defendant as to this claim and dismisses
           the complaint with prejudice.

     4.    As an alternative theory of liability, viewing the Complaint
           more narrowly, it is possible that Plaintiff's complaint,
           although not specifically [pleaded], refers to the particular
           oral contract in which he hired Defendant [to] apply sealant
           to the truck after the beadblast work, and that Defendant's
           action in sealing the truck while it was in a wet and/or rusted
           condition breached a duty to Plaintiff to perform the sealant
           work in a "workmanlike manner." There is no dispute that
           this work was performed in 2006. However, the court finds
           that this argument must fail as well. Defendant put Plaintiff
           on notice of its actions ("removed the rust as best they
           could"), in Invoice 1428. Plaintiff had actual knowledge or
           should have known from the notation on the invoice that he
           had a rust problem under the sealant. Plaintiff seems to
           argue that he was ignorant to the significance of that
           problem because he was a novice. He claims he discovered
           the truck had a rust problem in 2011, when it became visible
           due to the bubbling of the paint job.



                                     -4-
NO. 74212-4-1/5



       5.    Even if one could argue Plaintiff lacked actual knowledge of
             the spreading rust until 2011, the 2006 invoice at least put
             him on "inquiry notice" and he should have done further
             investigation about the rust issue at that time. This was not
             done. Assuming arguendo that Plaintiff had a cause of
             action for breach, it accrued on the date when he could have
             sought relief from the courts. Here, that date was on
             October 5, 2006. According to RCW 4.16.080, the statute of
             limitations ran on the oral contract three years later in
             October of 2009. The Complaint in this case was not filed
             until August of 2013, four years after the statute of limitations
             ran. Accordingly, under this theory, the Court finds in favor
             of the Defendant and dismisses the Plaintiffs claim with
             prejudice.

      We review a trial court's decision after a bench trial to determine whether

substantial evidence supports the trial court's findings of fact and whether the

findings of fact adequately support the conclusions of law.2 Substantial evidence

is the quantum of evidence sufficient to persuade a rational, fair-minded person

that the premise is true.3 We treat unchallenged findings of fact as verities on

appeal.4

      The record amply supports the court's finding that the bead blasting

occurred in 2006. The testimony at trial established that Dreamers' employees

recorded tasks performed, time spent on each task, and parts used on a daily

basis. Dreamers used this information to generate customer invoices. Dreamers




      2 Endicott v. Saul, 142 Wn. App. 899, 909, 176 P.3d 560 (2008).
      3 Endicott, 142 Wn. App. at 909.
      4 Kitsap County v. Kitsap Rifle & Revolver Club, 184 Wn. App. 252, 267,
337 P.3d 328 (2014), review denied, 183 Wn.2d 1008 (2015).
                                        -5-
NO. 74212-4-1/6




presented evidence of an invoice it created for Busroe that included the following

entry dated September 28, 2006:

          Steve helped Gene unload the bare metal from the trailer, into the
          shop. (Note) Some of the parts that were exposed to the morning
          moist air. These parts were wet with morning fog and water spray
          off the tires. Steve tried to dry those areas he could see and get to
          with a torch and a rag.

          The next entry on the same invoice, dated October 5, 2006, also records

work performed by the same Dreamers' employee, Steve Strabeck. The entry

states,

          Lay out parts and mask areas to be metal worked by owner at later
          time, one stepped deep pits that still had rust in them after the
          blast. One stepped the frame as best as we could, there was deep
          rust pits and heavy rust was laying in the shallowed parts of these
          areas.


The final entry on this invoice, dated the following day, October 6, 2006, again

records work performed by Strabeck: "Seal frame/fenders/doors and steps with

D.P. Sealer materials."


          These entries support the court's finding that the bead blasting took place

in 2006. The entry describes the parts that Busroe delivered to the shop in

September 2006 as "bare metal," indicating that the delivery occurred after bead

blasting. Busroe's testimony also corroborates this inference. Although he did

not specify a date, Busroe said that after bead blasting he transported the parts

to Dreamers' shop on a flatbed trailer and covered them with only a tarp. He
NO. 74212-4-1/7




acknowledged that the parts "very well" may have become wet in transit. The

September 2006 entry also reflects Strabeck's concern that the bare metal parts

had been exposed to moisture and water.

      Strabeck testified that he remembered the delivery because the metal was

exposed to water, which caused him to be concerned about rust. Busroe also

confirmed that Strabeck helped him unload the parts and performed the sealing

work to prepare the truck body for painting.     Strabeck left his employment at

Dreamers sometime around 2006. The October 5 entry further indicates that the

bead blasting occurred on or before September 28 because it describes

Strabeck's attempt to seal the metal despite rust remaining "after the blast."

      Still, Busroe claims that he brought the vehicle parts to the shop in

September 2006 before they had been bead blasted. He points to the testimony

of one of the owners of Dreamers who indicated that the September 2006 entry,

also designated as work order number 1 ("WO#1"), was the first invoice

Dreamers generated for Busroe and therefore reflected the "first time that the

project showed up at the shop."       But this testimony does not undermine or

contradict the court's finding that bead blasting occurred on or before September

28, 2006. Busroe also relies on his own testimony that he believed two weeks to

a month elapsed between bead blasting and painting.         But the court was not

required to credit Busroe's unsubstantiated and vague recollection instead of

                                        -7-
NO. 74212-4-1/8




documents containing information recorded simultaneously with the events in

question.

       Busroe does not challenge the court's finding that according to several

experts who testified at trial, "the truck should have been primed and painted

within 2-3 days after the sealant was applied, to protect the metal." Busroe's

testimony about timing fails to establish compliance with this protocol. Perhaps

more importantly, Busroe's argument fails to appreciate that there were multiple

reasons why the court determined that Dreamers was not responsible for the

eventual deterioration of the paint under either a tort of contract theory of liability.

The court found that the proper procedure before painting is to "blast the parts to

bare metal with all rust removed, and then to apply sealer as soon as possible

without allowing any moisture onto the metal." Regardless of when the bead

blasting took place,'the court found that the process failed to remove all rust and

Busroe allowed the metal parts to be exposed to moisture and become wet.

These findings alone provide sufficient support for the court's conclusion that

Dreamers' conduct did not proximately cause the damage to the paint.

       Substantial evidence supports the court's finding about the timing of the

bead blasting work.      This finding, together with other unchallenged findings,

supports the court's conclusions of law. Because Busroe's challenges to the

sufficiency of the evidence to support the trial court's findings fail, we need not

                                           -8-
NO. 74212-4-1/9




address his alternative arguments about the former "economic loss rule" and the

statute of limitations.5

       Affirmed.




WE CONCUR:




 S^^n^T *-'                                 ^Q^v^g,a^




      5 See Eastwood v. Horse Harbor Found., Inc.. 170 Wn.2d 380, 393-94,
241 P.3d 1256 (2010).
                                      -9-