Opinion filed September 29, 2017
In The
Eleventh Court of Appeals
__________
No. 11-14-00206-CV
__________
GREAT WESTERN DRILLING, LTD., Appellant
V.
PATHFINDER OIL & GAS, INC. AND CATHLIND ENERGY,
LLC, Appellees
On Appeal from the 142nd District Court
Midland County, Texas
Trial Court Cause No. CV-45,031
MEMORANDUM OPINION
This appeal arises out of a dispute over whether a contract to participate in an
oil and gas lease existed between Great Western Drilling, Ltd. and Pathfinder Oil &
Gas, Inc.1 Great Western sought a declaratory judgment that a letter dated June 1,
1
We note that Pathfinder’s successor in interest is Cathlind Energy, LLC and that the trial court
referred to Pathfinder and Cathlind interchangeably. In this opinion, we refer to both as Pathfinder.
2004, was unenforceable as a contract. Pathfinder counterclaimed, and alleged that
the letter resulted in a contract and that Great Western had breached the contract,
and Pathfinder sought specific performance.
After a trial, the jury found (1) that the letter was an enforceable contract
between the parties and (2) that Great Western breached that contract. As a result,
the trial court granted Pathfinder’s requested relief of specific performance and
ordered Great Western to fulfill its part of the contract, namely, to convey to
Pathfinder a 25% working interest in the oil and gas lease. The trial court also
ordered Great Western to pay the net proceeds of that interest, $3,053,023.40, to
Pathfinder and to pay Pathfinder’s attorneys’ fees. In this appeal from that adverse
judgment, Great Western asserts three issues. We reverse and render judgment that
Pathfinder take nothing.
I. Background Facts
Great Western and Pathfinder were participants in several oil and gas
prospects in Hockley County; the parties had a joint operating agreement (the Latigo
JOA) among themselves and other parties for those areas of mutual interest. Seismic
data indicated that an area outside the area of mutual interest could be profitable, and
Great Western acquired leases for itself in the new area.
On June 1, 2004, Great Western sent a letter to Pathfinder and offered it a 25%
working interest in the new leases it acquired from “CH Foundation, et al” and asked
Pathfinder to reply to its offer within forty-eight hours. Within the 48-hour time
frame, Pathfinder checked an “elects to participate” box on the letter, signed it, and
returned it to Great Western. The letter purported to give Pathfinder a 25% interest
but stated that (1) the working interest included any obligations that Pathfinder might
owe to third parties (the Kennedys) and that (2) Pathfinder could not assign any
portion of the interest to anyone other than the Kennedys without Great
2
Western’s written consent. The letter further provided that Great Western would bill
Pathfinder for its share of the costs associated with drilling and that the details of a
participation agreement for these leases would be worked out “as soon as reasonably
possible.”
Later, Great Western and Pathfinder disagreed on several issues. First,
Pathfinder attempted to renegotiate the working interest offered from 25% to 28%,
but that was not approved by Great Western’s management.
Next, there were disputes between the parties over the joint operating
agreement (JOA) and the Authorization for Expenditure (AFE) documents that Great
Western created and asked Pathfinder to sign. In the June 1 letter, Great Western
promised to draft a JOA and to provide Pathfinder with one, but Great Western did
not give the JOA and AFE to Pathfinder until September 20. Pathfinder did not sign
and return the documents. A second copy of the AFE was forwarded to Pathfinder
on October 6, 2004.2 Pathfinder did not sign the documents until October 29.
Finally, Pathfinder disagreed over the meaning of consent on assignments, as
outlined in the June 1 letter. The June 1 letter required that Pathfinder obtain Great
Western’s consent before Pathfinder assigned or sold any portion of its interest.
Great Western expanded this right in the proposed JOA sent to Pathfinder on
September 20, which gave Great Western a preferential right to purchase that interest
in the event of Pathfinder’s attempted assignment.
In an attempt to resolve these disputes, Great Western’s representatives,
Carter Muire and Mike Heathington, and Pathfinder’s representative, Ted Ashford,
had a conference call on October 28; they did not reach an understanding. At trial,
Muire and Heathington testified that Heathington withdrew Great Western’s offer at
2
The letter is incorrectly dated October 6, 2005; the correct and true date was October 6, 2004.
3
the end of the call because the parties could not agree on the disputed issues: the
JOA, the AFE, and the working interest amount. Ashford, on the other hand, did not
recall Great Western’s withdrawal during this conference call. The following day,
Great Western sent a withdrawal letter to Pathfinder. Meanwhile, according to
Ashford’s testimony, he sent Great Western the required check, the signed JOA, and
the signed AFE.
Great Western brought suit seeking a declaratory judgment that the June 1
letter was not an enforceable contract. In response, Pathfinder counterclaimed and
alleged that Great Western had breached the June 1 contract.
Prior to trial, the parties entered into a stipulation. The stipulation provided
that Pathfinder had to prove that Great Western had an enforceable contract and that
Great Western breached the contract. The stipulation also outlined that, if Pathfinder
proved that it was entitled to recover from Great Western’s breach, then its remedy
would be specific performance. The stipulation also specified in paragraph (d) that,
if the jury finds that Pathfinder is entitled to recover for Great Western’s breach,
Great Western would provide two accountings: one for out-of-pocket expenses, done
in accordance with COPAS accounting procedures, and another one for revenue
received by Great Western. Paragraph (f) of the stipulation further required that
Great Western provide a simple calculation of the revenue and expenses, as listed in
paragraph (d), from inception to the most recent accounting period before trial. Once
that was provided to Pathfinder, Great Western would forward the representative
proceeds in the amount of Pathfinder’s 25% interest for all historical production
within 15 days of the judgment, subject to any appeal and bond.
At trial, Great Western asked the trial court to submit a jury question on
whether Pathfinder met the “ready, willing, and able” element of specific
performance in the event that the jury found a breach; however, the trial court refused
4
to submit this question. The jury found that the June 1 letter was an enforceable
contract and that Great Western breached that contract. The trial court entered
judgment in Pathfinder’s favor, and this appeal followed.
II. Analysis
In its first issue, Great Western contends that the trial court erred when it failed
to grant Great Western’s motion for judgment notwithstanding the verdict because
(1) conditions precedent to the formation of a contract had not been satisfied; (2) the
offer was withdrawn prior to the acceptance; and (3) there was insufficient evidence
to support an enforceable contract. In its second issue, Great Western argues that,
even if a contract existed, the trial court’s order of specific performance was
improper because Pathfinder failed to demonstrate that it was ready, willing, and
able to fulfill its contractual obligations. Finally, Great Western asserts in its third
issue that the trial court improperly awarded damages and prejudgment interest to
Pathfinder because the award violated the parties’ stipulation and because the
evidence did not support the award. Because the resolution of Great Western’s
second issue is dispositive, we begin there.
A. Issue Two: The trial court erred when it refused to submit a jury
question on specific performance because the stipulation provided
that if Pathfinder was entitled to recover for Great Western’s
breach, then its remedy was specific performance.
In its second issue, Great Western argues that the trial court erred when it
denied Great Western’s request to submit a jury question concerning Pathfinder’s
readiness, willingness, and ability to perform the obligations of the contract.
Pathfinder asserted that the stipulation eliminated the need for that question because
the stipulation only required Pathfinder to prove that an enforceable contract existed
and that Great Western had breached it.
5
We review a challenge to the trial court’s jury charge under an abuse of
discretion standard. Tex. Dep’t of Human Servs. v. E.B., 802 S.W.2d 647, 649 (Tex.
1990); Moss v. Waste Mgmt. of Tex., Inc., 305 S.W.3d 76, 81 (Tex. App.—Houston
[1st Dist.] 2009, pet. denied). A trial court abuses its discretion when it acts in an
arbitrary or unreasonable manner, without reference to any guiding rules or
principles. Turner v. NJN Cotton Co., 485 S.W.3d 513, 522 (Tex. App.—Eastland
2015, pet. denied) (citing Walker v. Gutierrez, 111 S.W.3d 56, 62 (Tex. 2003)).
Given the parties’ differing positions on the effect of the stipulation, we must first
ascertain the meaning of the stipulation.
We interpret a stipulation the same way that we interpret a contract because a
stipulation constitutes a contract. First Nat’l Bank in Dallas v. Kinabrew, 589
S.W.2d 137, 143 (Tex. Civ. App.—Tyler 1979, writ ref’d n.r.e.). We apply the rules
for interpreting contracts to the interpretation of stipulations. Fid. & Cas. Co. of
N.Y. v. Horton & Horton Custom Works, Inc., 462 S.W.2d 613, 618 (Tex. Civ.
App.—Fort Worth 1971, writ ref’d n.r.e.). We construe contracts as a whole and
use an interpretation that gives effect to every part of the agreement so that no
provision is rendered meaningless. See J.M. Davidson, Inc. v. Webster, 128 S.W.3d
223, 235 (Tex. 2003). We apply a de no review to a trial court’s interpretation of an
unambiguous contract. See Heil Co. v. Polar Corp., 191 S.W.3d 805, 809–10 (Tex.
App.—Fort Worth 2006, pet. denied).
Pathfinder argues that, in accordance with paragraph one, it only had to prove
the existence of a contract and a breach by Great Western. Paragraph one of the
stipulation provided:
1. At the trial of this cause, which is currently set for December
2, 2013, the only issues that will be submitted to the Court and/or jury
will be (a) whether the June 1, 2004 Letter Agreement between Great
Western Drilling, Ltd. (“Great Western”) and Pathfinder Oil & Gas,
6
Inc. (“Pathfinder”) (the “Letter Agreement”) is an enforceable
agreement; (b) whether Great Western or Pathfinder breached the Letter
Agreement; and (c) Great Western’s affirmative defenses of estoppel,
failure of consideration, statute of frauds, mutual mistake, anticipatory
repudiation, unclean hands, material breach and revocation. . . .
Pathfinder’s position is that the meaning of the agreement is clear and
unambiguous and that, in it, the parties stipulated that Pathfinder did not have to
prove that it was ready, willing, and able to perform because the overall remedy of
specific performance was stipulated.
The elements that Pathfinder refers to in paragraph one are part of the
four elements of a breach of contract claim, namely: (1) the existence of a valid
contract; (2) performance by the plaintiff; (3) breach of the contract by the defendant;
and (4) damages to the plaintiff resulting from that breach. McCulley Fine Arts
Gallery, Inc. v. “X” Partners, 860 S.W.2d 473, 477 (Tex. App.—El Paso 1993, no
writ). In contrast, specific performance is an equitable remedy that may be awarded
upon a showing of breach of contract. Stafford v. S. Vanity Magazine, Inc., 231
S.W.3d 530, 535 (Tex. App.—Dallas 2007, pet. denied). “Specific performance
is not a separate cause of action, but rather it is an equitable remedy used as a
substitute for monetary damages when such damages would not be adequate.” Id.
(citing Scott v. Sebree, 986 S.W.2d 364, 368 (Tex. App.—Austin 1999, pet. denied)).
The remedy of specific performance is purely equitable in nature and is governed by
the general rules that prevail in the administration of equitable remedies.
Ferguson v. von Seggern, 434 S.W.2d 380, 384 (Tex. Civ. App.—Dallas 1968, writ
ref’d n.r.e.).
We further note that, in paragraph three, the stipulation provided:
3. In the event that the Court or a jury finds that the Letter
Agreement is an enforceable agreement, that Great Western breached
7
the Letter Agreement, and that Pathfinder is entitled to recover for
Great Western’s breach, the following will control . . . .
(Emphasis added).
When we review a contract, our goal is to determine the parties’ true intentions
as expressed in the instrument. See Coker v. Coker, 650 S.W.2d 391, 393 (Tex.
1983). We do not read any provision in isolation, but consider each provision with
reference to the whole. See id. If the language in the contract can be given a definite
legal meaning or interpretation, then it is not ambiguous and we will construe the
contract as a matter of law. See El Paso Field Servs., L.P. v. MasTec N. Am., Inc.,
389 S.W.3d 802, 806 (Tex. 2012) (citing Italian Cowboy Partners, Ltd. v. Prudential
Ins. Co. of Am., 341 S.W.3d 323, 333 (Tex. 2011)). A contract is ambiguous if, after
applying the principles of contract construction, it is subject to more than one
reasonable interpretation. See Plains Expl. & Prod. Co. v. Torch Energy Advisors
Inc., 473 S.W.3d 296, 305 (Tex. 2015).
In this case, the stipulation provides that Pathfinder had to prove the first and
third elements of a breach of contract action and that it had to show that it was
entitled to relief as a result of the breach, which encompasses not only a causation
element but also the element that it was ready, willing, and able to perform its
contractual obligations. See DiGiuseppe v. Lawler, 269 S.W.3d 588, 596 (Tex.
2008). We do not read the clear and unambiguous language of the stipulation to
obviate elements two and four of Pathfinder’s breach of contract claim, and we agree
with Great Western that the parties’ stipulation provided that if Pathfinder proved
there was an enforceable contract, proved a breach, and proved it was entitled to
recover because of Great Western’s breach, then Pathfinder’s sole remedy was
specific performance. The stipulation might have limited recovery to specific
performance, but the stipulation did not obviate the necessity that Pathfinder prove
8
its entitlement to it. Therefore, even if we assume, without deciding, that Pathfinder
proved an enforceable contract with Great Western and proved a breach of that
contract by Great Western, Pathfinder had the burden to plead and prove all of the
elements of the remedy of specific performance. Id.
Great Western asserts that the issue of whether Pathfinder was ready, willing,
and able to perform the contract was a contested fact issue that should have been
submitted to the jury. If the parties present a factual dispute on the element of
“ready, willing, and able to perform,” then the jury must resolve that issue. Id. Great
Western argues that Pathfinder was not ready, willing, and able because Pathfinder
(1) continued to renegotiate its working interest; (2) failed to denounce any interest
that a third party, the Kennedys, might have in the underlying agreement; and (3) was
experiencing a cash shortage.3 Pathfinder asserts that, under the terms of the
stipulation, it only had to prove an enforceable contract and a breach—the stipulation
provided that it was entitled to specific performance.
Determining whether a party is “ready, willing, and able” to tender
performance should be adjudicated by a jury when the issue is disputed—but can be
adjudicated as a matter of law when the issue is not contested. See Lawler, 269
S.W.3d at 596. The Texas Supreme Court held in Lawler that a party seeking
specific performance does not satisfy the “ready, willing, and able” element by
simply stating so in their pleadings. Id. at 600 (“A plaintiff’s pleading that he is
ready, willing, and able to perform at the time the lawsuit is filed says nothing about
whether he was ready, willing, and able to perform at the time required by the
contract.”). Lawler controls in this case because the parties’ stipulation required
3
Given our assumptions on the contract’s existence and breach, we need not address the first two
points of Great Western’s argument.
9
Pathfinder to prove that it was entitled to equitable relief as a result of Great
Western’s breach. Pathfinder acknowledged this issue from the beginning when it
told the jury, “all we have to demonstrate is that we were ready, willing, and able to
move forward.” In short, Pathfinder’s burden was to prove that it was ready, willing,
and able to perform on “the original date for performance under the contract,” 17090
Parkway, Ltd. v. McDavid, 80 S.W.3d 252, 259 (Tex. App.—Dallas, 2002, pet.
denied), and “at the time the defendant breached.” John Gannon, Inc. v. Gunnarson
Outdoor Advertising, Inc., No. 03-08-00404-CV, 2010 WL 3192536, at *4 (Tex.
App.—Austin Aug. 11, 2010, pet. denied) (mem. op.).
In order to succeed upon its request for specific performance of the June 1
letter, Pathfinder had an obligation to demonstrate its financial ability to pay the
acquisition costs and drilling costs. Pathfinder sent a check in the amount of
$9,968.98 to Great Western on October 29, 2004, approximately 39 days after Great
Western’s September 20 letter that detailed the actual costs of the lease bonus and
brokerage expenses to date and indicated that Pathfinder’s 25% share of those costs
was $9,968.98. Drilling costs for the first well were nearly $800,000, and a 25%
share of those costs would have been about $200,000 based on the initial Drilling
Cost Estimate and the revised AFE.
The record reflects that Great Western sent a Drilling Cost estimate and AFE
and a revised AFE for costs associated with the first well. Pathfinder signed the
second AFE and returned it to Great Western. Ashford testified that, in 2004, as the
Airfield wells in Latigo were being completed prior to development of Labors 1 and
10, he sold off part of his Latigo interest to “lighten up a little bit.” Pathfinder
presented evidence that the Airfield 2 well, which was its first offset well, produced
100 barrels of oil daily. However, Pathfinder did not provide any evidence of a line
of credit, cash reserves, escrowed funds, or any other source of funds to show that it
10
was ready, willing, and able to perform the requirements of the proposed contract.
Because Pathfinder did not conclusively prove that it was ready, willing, and able to
pay the costs associated with the AFE, we hold that the trial court should have
submitted a jury question on the issue and that it abused its discretion when it failed
to do so.
B. The trial court’s error was harmful because it probably resulted in
an improper judgment.
Great Western requests that this court reverse the trial court’s judgment
because the trial court failed to submit a jury question on an element of specific
performance. A trial court must submit jury questions, instructions, and definitions
that “are raised by the written pleadings and the evidence.” TEX. R. CIV. P. 278; see
Hyundai Motor Co. v. Rodriguez, 995 S.W.2d 661, 663 (Tex. 1999). Rule 272
provides that all objections to the charge that are not so presented shall be considered
as waived. See TEX. R. CIV. P. 272. Rule 279 provides that any issues excluded
from the charge that are “not conclusively established under the evidence and no
element of which is submitted or requested are waived.” See TEX. R. CIV. P. 279.
“If no element of an independent ground of recovery that is not conclusively
established by the evidence is included in the charge without request or objection,
the ground of recovery is waived.” Lawler, 269 S.W.3d at 598.
In reviewing alleged error in a jury submission, we consider “the pleadings of
the parties and the nature of the case, the evidence presented at trial, and the charge
in its entirety.” Columbia Rio Grande Healthcare, L.P. v. Hawley, 284 S.W.3d 851,
862 (Tex. 2009). The alleged charge error “will be deemed reversible only if, when
viewed in the light of the totality of these circumstances, it amounted to such a denial
of the rights of the complaining party as was reasonably calculated and probably did
cause the rendition of an improper judgment.” Island Recreational Dev. Corp. v.
11
Republic of Tex. Sav. Ass’n, 710 S.W.2d 551, 555 (Tex. 1986); see Reinhart v.
Young, 906 S.W.2d 471, 473 (Tex. 1995). Pathfinder stipulated to an election of
specific performance, which the trial court interpreted to only require proof of a
contract with and a breach by Great Western. But the stipulation clearly outlined
that, if Pathfinder proved those two items and proved that it was entitled to recover
because of Great Western’s breach, then its remedy was specific performance.
We have determined under the terms of the parties’ stipulation that Pathfinder
had to prove it was “ready, willing, and able” and that, because the evidence adduced
at trial created a fact question, the trial court should have submitted a question to the
jury on the issue. Because it probably resulted in an improper judgment, we cannot
say that the trial court’s error was harmless. See Lawler, 269 S.W.3d at 596. We
sustain Great Western’s second issue on appeal, and in light of that resolution, we
need not address Great Western’s first and third issues on appeal.
C. Render is the proper remedy in this case.
The Texas Supreme Court has held that, as a general rule, the “Court of Civil
Appeals” should not render judgment unless it appears that the case has been fully
developed. Lanford v. Smith, 99 S.W.2d 593, 594 (Tex. 1936). When we reverse
the judgment of a trial court, we must render the judgment that the trial court should
have rendered except when a remand is necessary for further proceedings or when
the interests of justice require a remand for another trial. TEX. R. APP. P. 43.3;
Fullwood v. Fullwood, No. 11-01-00186-CV, 2001 WL 34376863, at *2 (Tex.
App.—Eastland Dec. 20, 2001, no pet.) (not designated for publication). Where the
case was fully developed and not tried on an erroneous theory, rendition is
appropriate. Tex. Consol. Theatres, Inc. v. Slaughter, 143 S.W.2d 659, 663 (Tex.
Civ. App.—Eastland 1940, writ dism’d); see Lee C. Moore & Co. v. Jarecki Mfg.
Co., 82 S.W.2d 1002, 1006 (Tex. Civ. App.—Eastland 1935, writ ref’d). Because
12
this case was fully developed and tried to a jury and because the meaning of the
stipulation was argued at trial, including whether to include a jury question on the
“ready, willing, and able to perform” element, this case is not one that should be
remanded. Additionally, we note that the Texas Supreme Court in Lawler affirmed
those parts of the court of appeals’ judgment in which the court of appeals had
(1) held that the “ready, willing, and able” finding could not be deemed in that case
and (2) reversed the award of specific performance—without remanding that issue.
Lawler, 269 S.W.3d at 603.
III. This Court’s Ruling
We reverse the judgment of the trial court and render judgment that Pathfinder
take nothing.
MIKE WILLSON
JUSTICE
September 29, 2017
Panel consists of: Wright, C.J.,
Willson, J., and Bailey, J.
13