State ex rel. DeWine v. Osborne Co., Ltd.

[Cite as State ex rel. DeWine v. Osborne Co., Ltd., 2017-Ohio-8284.]


                                    IN THE COURT OF APPEALS

                                ELEVENTH APPELLATE DISTRICT

                                         LAKE COUNTY, OHIO


STATE OF OHIO ex rel.                                    :             OPINION
MICHAEL DEWINE,
OHIO ATTORNEY GENERAL,
                                                         :
                 Plaintiff-Appellee,                                   CASE NO. 2016-L-091
                                                         :
        - vs -
                                                         :
OSBORNE CO., LTD., et al.,
                                                         :
                 Defendants-Appellants.


Civil Appeal from the Lake County Court of Common Pleas, Case No. 2014 CV 000166.

Judgment: Affirmed in part and reversed in part; remanded.


Mike DeWine, Ohio Attorney General; Gregg H. Bachmann, Nicole Candelora-Norman,
and Amy Factor, Assistant Attorneys General, State Office Tower, 30 East Broad
Street, 25th Floor, Columbus, OH 43215 (For Plaintiff-Appellee).

Richard N. Selby, II, Dworken & Bernstein Co., 60 South Park Place, Painesville, OH
44077 (For Defendants-Appellants).



TIMOTHY P. CANNON, J.

        {¶1}     Appellants, Osborne Co., Ltd. and the Executors of the Estate of Jerome

T. Osborne, appeal from an August 1, 2016 judgment of the Lake County Court of

Common Pleas. The trial court ordered appellants to pay a civil penalty for violating

Ohio Revised Code Chapter 6111 and ordered injunctive relief in favor of appellee,
State of Ohio ex rel. Michael DeWine, Ohio Attorney General. This judgment is affirmed

in part and reversed in part for the reasons that follow.

       {¶2}   On May 29, 2012, appellee filed a complaint, in Case No. 12 CV 001459,

against Defendants Jerome T. Osborne (“Mr. Osborne”) and Osborne, Inc. Appellee

subsequently filed an amended complaint, which substituted Osborne Co., Ltd.

(“Osborne Co.”) for Osborne, Inc. The trial court denied a motion for partial summary

judgment filed by appellee on January 17, 2014. On January 22, 2014, Osborne Co.

was voluntarily dismissed from Case No. 12 CV 001459, and appellee filed a complaint

against Osborne Co. in Case No. 14 CV 00166. The trial court consolidated the two

cases on January 30, 2014. On August 15, 2014, the trial court granted a motion to

substitute the Executors of Jerome T. Osborne’s Estate as defendants, following Mr.

Osborne’s death.       The executors are identified as Richard M. Osborne, Sr.;

Georgeanne Osborne Gorman; Michael E. Osborne; Jacqueline Osborne Fisher;

William V. Krug; Jerome T. Osborne, III; William L. Mackey; and Jeremy Cash Osborne.

       {¶3}   The complaints against each appellant—Osborne Co. and Mr. Osborne’s

estate—set forth three causes of action, each alleging violations of Ohio’s Water

Pollution Control Laws as found in Revised Code Chapter 6111.

       {¶4}   Count One alleges appellants violated R.C. 6111.04(A) and R.C.

6111.07(A) by failing to obtain a certification from the Ohio Environmental Protection

Agency (“Ohio EPA”) under Section 401 of the Clean Water Act or a Section 404 permit

from the U.S. Army Corps of Engineers before engaging in certain activities within and

along the East Branch Chagrin River that resulted in “(1) the placement of dredged or fill

material and/or wastes into waters of the State; and (2) degradation of certain portions




                                             2
of the East Branch Chagrin River and the threatened degradation of other portions [of]

these waters of the state.”

       {¶5}   Count Two alleges appellants violated R.C. 6111.04(A) and R.C.

6111.07(A) by failing to obtain a construction storm water discharge permit before

engaging in construction activities that resulted in “disturbing one or more acres of land

within and along two miles of stream channel of the East Branch Chagrin River.”

       {¶6}   Count Three alleges appellants violated R.C. 6111.04(A) and R.C.

6111.07(A) because they polluted the East Branch Chagrin River, without a permit, by

discharging storm water from land within and along two miles of stream channel of the

East Branch Chagrin River, and thereby created a public nuisance.

       {¶7}   The parties submitted a joint stipulation of facts with regard to many

issues in the case.    With regard to remaining disputed facts, the matter ultimately

proceeded to a bench trial in January 2016.

       {¶8}   This case arose after an employee of the Ohio EPA observed William

Franz, an employee of Osborne Co., operating a track hoe in the middle of the East

Branch Chagrin River. In his deposition, Mr. Franz testified that he was removing silt so

the river would flow. The parties stipulated that Mr. Osborne instructed Mr. Franz to use

the track hoe to remove sand and gravel from the stream bed and relocate this material

along the edge of the stream, on the stream banks, and in the middle of the river. The

parties also stipulated that, on certain occasions when the track hoe’s bucket could not

reach the river bank, Mr. Franz would place piles in the river, then relocate the track hoe

and move those piles to the bank of the river. Another stipulation was that Mr. Osborne

personally observed some of Mr. Franz’s work and that he would usually call Mr. Franz




                                            3
the night before or first thing in the morning and tell him what project to work on each

day and what to do for the project. After work was completed, Mr. Osborne would

usually call Mr. Franz to ask how the work for the day went.

        {¶9}    The parties stipulated that appellants were performing the work on the

river pursuant to agreements with the Village of Kirtland Hills, reached in 1983 and

1990, to maintain the river banks. In exchange for the work performed on the river, Mr.

Osborne was allowed to farm certain property owned by the Village of Kirtland Hills.

The work was done throughout the years from River Mile 4.30 to River Mile 6.15.1 Most

of the work performed in or near the river was on property owned either by the Village of

Kirtland Hills or Mr. Osborne.

        {¶10} The parties stipulated that the East Branch Chagrin River is a “water of the

state,” as that term is defined in R.C. 6111.01; that it was designated as a State Scenic

River by the Ohio Department of Natural Resources (“ODNR”) on July 2, 1979; that it is

designated as an Outstanding State Water for Ecological Value; and that its beneficial

use designations are cold water habitat,2 seasonal salmonid habitat, primary contact

recreation, and agricultural/industrial water supply.

        {¶11} The parties stipulated that Mr. Franz, at the direction of Mr. Osborne,

operated the track hoe in the river on 24 separate occasions from 2001 through 2007.

Each of these occasions involved dredging the river and placing dredged material along

the river bank or in the middle of the river. Evidence was introduced at trial that the

1. Testimony at trial explained that a “river mile” is similar to a mile marker on a highway. Here, it is
measured by the distance from Lake Erie (R.M. 0) to the source of the river. R.M. 6.15 is upstream of
R.M. 4.30 and is just upstream of St. Hubert’s Church, located at 8870 Baldwin Road, Village of Kirtland
Hills, Ohio. R.M. 4.30 is near the western boundary of property owned by the Village of Kirtland Hills.

2. Testimony at trial explained that cold water streams in Ohio are generally small, with small drainage
systems. A cold water stream such as the East Branch Chagrin River is unique due to its size. It
provides a large cold water habitat the State of Ohio seeks to preserve.


                                                   4
dredged material formed nine piles, anywhere from eight- to twenty-feet high, for

extended distances along the river bank. At least 25,656 cubic yards of river bottom

were dredged. Most of the dredged material was piled on property owned by either the

Village of Kirtland Hills or Mr. Osborne. One pile, referred to as “the Oliva pile,” was

located on private property near St. Hubert’s church.

        {¶12} According to trial testimony, the river had been excavated down to the

bedrock in many areas between R.M. 4.30 and R.M. 6.15, which resulted in the river

losing access to its floodplain and caused significant bank erosion. The state also

introduced testimony that appellants’ activities resulted in a loss or degradation of the

habitat for fish and macro invertebrates.

        {¶13} Paul Anderson, an environmental specialist in the surface water division of

the Ohio EPA, became aware of the work being done in the river on July 13, 2007, at

which time it ordered appellants to cease work in the river. Appellants complied. The

Ohio EPA immediately performed a site survey and concluded the site was severely

impacted by substrate removal and reworking and by placement of removed material in

the floodplain and bankfull area:3 the habitat was severely simplified, siltation was high,

and erosion was potentially high.

        {¶14} The U.S. Army Corps of Engineers thoroughly inspected the river one

week later. The parties stipulated that Mr. Osborne received a letter from the Corps in

August 2007, stating the work in the river was an unauthorized activity and in violation

of the Federal Clean Water Act. The letter stated, in part:



3. Testimony at trial explained that the “bankfull area” is the portion of the stream channel that is large
enough to contain the stream under most flow conditions. This area is either bare or has aquatic and
annual vegetation; perennial vegetation cannot grow there because its roots are too wet or its seedlings
get swept away. The floodplain lies above the bankfull area.


                                                    5
              The inspection found that gravel and natural stone were
              excessively dredged from the stream at several locations, and
              disposed or stockpiled in the floodway and below the ordinary high
              water elevation, and also in the stream channel. No Department of
              the Army authorization was issued for this activity. Therefore, this
              work is an unauthorized activity and in violation of the Clean Water
              Act.

The letter directed Mr. Osborne not to perform any additional activities in the river and

advised that any further work would be considered a knowing and willful violation of

federal law, subjecting him to civil penalties.

        {¶15} The parties stipulated that Mr. Osborne also received a notice of violation

from the Ohio EPA in August 2007, alleging violations of Ohio Revised Code Chapter

6111. The notice also alleged violations of O.A.C. 3745-1-04. This notice stated, in

part:

              The illegal activity began upstream of St. Hubert’s Church on the
              East Branch of the Chagrin River and continued downstream
              approximately 8,700 feet. The inspection team observed that
              materials had been and were being side cast from the river bed
              onto various sections of the river bank. This activity constitutes a
              violation of [R.C.] 6111.04, which prohibits any person from causing
              pollution to any waters of the State without a valid unexpired permit
              issued by the Director of Ohio EPA. [R.C.] 6111.07 states that no
              person shall violate or fail to perform any duty imposed by rules
              adopted by Ohio EPA. The activities observed caused violations of
              [O.A.C.] 3745-1-04, which contains criteria applicable to all waters
              of the State. Please be advised that failure to comply with the
              above laws may be cause for enforcement action pursuant to [R.C.]
              Section 6111 and subject you to civil penalties identified in [R.C.]
              6111.09(A).

              Please inform this office in writing, within ten days of receipt of this
              notification, of the description of the action(s) proposed to address
              these violations. Please provide all documentation associated with
              this activity including the intent of the activity, contracts with others
              to perform the activity, and a record of when this activity had been
              previously performed.




                                              6
         {¶16} Mr. Osborne responded by letter, through his attorney, on September 10,

2007. Mr. Osborne noted he began utilizing the land located in Kirtland Hills pursuant to

an oral agreement in the late 1970s; this oral agreement was confirmed by written

agreements in 1983 and 1990. Pursuant to these agreements, Mr. Osborne undertook

erosion control and bank stabilization measures on the property on an intermittent

basis.    He indicated there were no records or documentation associated with said

erosion control and bank stabilization measures.       The letter ended by stating, “Mr.

Osborne proposes no actions at this time to address the alleged violations” and that

nothing in the letter shall be deemed an admission as to any unlawful activities; “in fact,

for the record, Mr. Osborne denies any unlawful activities[.]”

         {¶17} On November 1, 2007, Randall Keitz, a floodplain engineer with ODNR,

surveyed the disturbed area of the river. He testified that he concluded, as a result of

this survey, that the river was highly unstable with considerable ongoing erosion of the

river banks due to the limited channel width and increased velocity of the water. Trees

along the banks were being undermined, and access to the floodplain was very limited.

         {¶18} On November 2, 2007, the U.S. Army Corps of Engineers sent a letter to

the director of the Ohio EPA, noting the work was done without authorization and in

violation of the Clean Water Act. It authorized the Ohio EPA to immediately begin

remedial and restoration measures without needing to obtain any further approval or

permits from the Corps.

         {¶19} Over the next two years, the Ohio EPA met with appellants and the Village

of Kirtland Hills to negotiate remediation of the river. On April 29, 2009, the Ohio EPA

provided a proposed draft of a settlement, titled “Director’s Final Findings and Orders,”




                                             7
to appellants in an attempt to administratively settle the violations of R.C. Chapter 6111.

The draft states, in Paragraph 3 of the Findings, that appellants altered approximately

two miles of the stream channel in violation of R.C. Chapter 6111 and the Clean Water

Act by dredging from and depositing fill material in the river. Paragraph 8 states that

constriction of the floodplain remains a significant concern; lowering of the stream

channel elevation and stockpiling of material along the stream banks significantly limits

the amount of energy dissipation that can occur during flood events. Paragraphs 9 and

10 state that placement of dredged substrates directly upon the stream bank has

increased the risk of flood damage, and lowering of the channel bed has caused bank

erosion problems.       Paragraph 11 states the river is not meeting certain biocriteria

outlined in O.A.C. 3745-1-07 due to habitat modification and disturbance.

       {¶20} The draft then outlines several Orders directing appellants to implement a

plan designed to fully remediate the river.      It states that “[t]he Plan shall focus on

facilitating the natural recovery of the river. Where appropriate, the plan may include

replacement of the stockpiled substrates within the stream channel to provide enhanced

habitat, to expedite the stream channel recovery process or to stabilize streambanks at

specified locations.”

       {¶21} A section of the draft, titled “Reservation of Rights,” provides, in part:

              Ohio EPA reserves the right to take any action, including but not
              limited to any enforcement action for civil or administrative penalties
              against Respondent for violations specifically cited in these Orders,
              action to recover costs, or action to recover damages to natural
              resources, action to compel further remediation pursuant to any
              available legal authority as a result of past, present, or future
              violations of state or federal laws or regulations or the common law,
              and/or as a result of events or conditions arising from, or related to,
              the Site. Upon termination pursuant to the Termination Section of




                                             8
             these Orders, Respondent shall have resolved their liability to Ohio
             EPA only for the Work performed pursuant to these Orders.

      {¶22} Larry Reeder, enforcement supervisor of the surface water division at the

Ohio EPA, testified that it did not intend to pursue a civil penalty against appellants at

the time they were negotiating.       Cynthia Paschke also testified regarding these

negotiations. Ms. Paschke was qualified as an expert witness, limited to the collection

and analysis of habitat data in the river, and she also represented appellants during

their negotiations with the Ohio EPA.       Ms. Paschke testified that appellants were

prepared to move forward with the negotiated restoration project had the Ohio EPA

waived its reservation of rights regarding future administrative and civil penalties, as it

had done with the Village of Kirtland Hills. The Ohio EPA did not waive its reservation

of rights, and Mr. Reeder testified he was notified in May 2009 that appellants would not

sign the draft agreement and would not move forward with the restoration project. As a

result, on June 25, 2009, the director of the Ohio EPA requested in writing that the Ohio

Attorney General initiate civil proceedings against appellants.

      {¶23} On July 27, 2009, the Village of Kirtland Hills signed a settlement

agreement with the Ohio EPA (i.e., the final version of the Director’s Final Findings and

Orders). The village agreed, in part, to do the following: (1) remove the piles placed on

the floodplain and redistribute the material into and along the river channel; (2) develop

a plan to construct bank stabilization where appropriate to reduce bank erosion and

stress; (3) develop a plan to re-vegetate exposed areas following excavation and

construction activities; (4) develop a plan for storm water pollution prevention; (5)

provide a schedule for implementing the plans and submitting reports to the Ohio EPA;

(6) submit a plan to monitor river channel morphology, habitat quality, and biological



                                            9
water quality; and (7) submit a plan for the creation of a riparian buffer along the river

that provides for permanent protection through a conservation easement or

environmental covenant.       The “Reservation of Rights” section of this agreement,

Section XI, simply provided that the “Ohio EPA and Respondent each reserve all rights,

privileges and causes of action, except as specifically waived in Section XI of these

Orders.” Mr. Reeder testified that the Ohio EPA was not seeking a financial penalty

against the Village of Kirtland Hills.

       {¶24} The Village of Kirtland Hills hired Oxbow River and Stream Restoration,

Inc. (“Oxbow”) to perform the remedial work in the river.      In January 2011, Oxbow

developed a storm water pollution prevention plan, a stream restoration plan, and a

stream restoration project summary of work.        The remediation work outlined in the

settlement agreement was largely completed by November 2013.                 Oxbow had

redistributed approximately 25,000 cubic yards of previously dredged material into

approximately 5,260 linear feet of active channel; stabilized approximately 1,240 feet of

stream bank; and planted native grasses, sedges, shrubs, and trees on approximately

11.5 acres of land. Mr. Anderson testified that the river bed had been raised one to two

feet in most locations, which improved access to the floodplain.         The Oliva pile,

however, was not removed and redistributed; apparently, the Village of Kirtland Hills

refused to authorize work on property not under its control.

       {¶25} William Zawiski, a water quality supervisor with the Ohio EPA, testified

that he conducted a habitat evaluation on November 19, 2013. The restoration work

had improved the habitat, but the river still needed more cover and pools; the river had

not fully recovered from the unauthorized activities.




                                            10
       {¶26} Mr. Keitz testified that he conducted a stream channel classification

survey in December 2013. The river remained moderately entrenched and could barely

reach its floodplain; the river remained highly unstable with no bank protection. He

recommended planting trees and other vegetation to stabilize the banks and further

raising the bed, by adding rocks and other material, to slow river velocity and create

habitats.

       {¶27} The parties submitted post-trial briefs at the conclusion of the bench trial.

Appellants repeated the defenses they had raised at various stages throughout the

case. First, appellants argued the statutory framework under which the complaint was

brought (R.C. 6111.04 & R.C. 6111.07) does not prohibit dredging; thus, the only

alleged violations at issue relate to the unauthorized discharge of dredged materials into

the river. Second, appellants argued the statutes at issue do not require one to obtain a

permit; rather, obtaining a permit “provides a safe harbor, whereby individuals or

companies who obtain a permit are exempted from these pollution laws.” With regard to

the imposition of a civil penalty, appellants argued the State had mischaracterized its

failure to perform any remediation on the river as a result of recalcitrance, instead of

recognizing it as a result of the Ohio EPA’s refusal to waive civil penalties.

       {¶28} On August 1, 2016, the trial court found in favor of the State of Ohio on all

three counts.

       {¶29} Regarding Count One—which alleged that defendants violated R.C.

6111.04(A) and R.C. 6111.07(A) by failing to obtain Section 401 and Section 404

permits prior to commencing work in the river—the trial court found appellants’ activities

along the East Branch Chagrin River resulted in the placement of dredged material in




                                             11
the river in excess of one cubic yard, thus triggering the requirement to obtain the

permits.

       {¶30} Regarding Count Two—which alleged appellants violated R.C. 6111.04(A)

and R.C. 6111.07(A) by failing to obtain a construction storm water discharge permit

before engaging in construction activities—the trial court found the State had shown that

appellants disturbed one or more acres of land along the East Branch Chagrin River,

thus triggering the requirement to obtain the permit. The trial court stated appellants’

claim that the permitting process merely provides a safe harbor exemption from Ohio’s

water pollution laws has no basis in law.

       {¶31} Regarding Count Three—which alleged that appellants violated R.C.

6111.04(A) and R.C. 6111.07(A) because they polluted the river by discharging storm

water from land within and along two miles of stream channel of the river—the trial court

stated it was closely related to Counts One and Two and, “[a]pplying the factors and

analysis applied in count two,” it found in favor of the State.

       {¶32} The trial court found that Mr. Osborne was subject to personal liability on

all three counts and therefore held his Estate jointly and severally liable along with

Osborne Co.

       {¶33} The trial court found that significant harm to the river environment was

caused by appellants’ dredging; appellants were aware of the requirement to at least

obtain a National Pollutant Discharge Elimination System permit, but failed to do so;

appellants avoided the costs of various permits and obtained an economic benefit from

farming the land owned by the Village of Kirtland Hills; and the State incurred




                                             12
extraordinary enforcement costs. As a result, the trial court imposed a civil penalty of

$404,240.00, plus post-judgment statutory interest.

             This amount consists of $180,000 for 24 days of active dredging of
             the East Branch Chagrin River with each day being assessed a
             $7,500 penalty. This amount also includes $184,080 for creating a
             public nuisance by leaving spoil piles along the river from July 13,
             2007 to November 1, 2013 (the date the Village of Kirtland Hills
             completed its portion of remediation) for a total of 2,301 days at $80
             per day and an additional $40,160 for creating a public nuisance by
             allowing the remaining spoil pile to exist from November 2, 2013 to
             the present (July 29, 2016) for a total of 1,004 days at $40 per day.

      {¶34} The trial court also ordered extensive injunctive relief, as follows:

             (A) Defendants are permanently enjoined from discharging any
                 pollution, other wastes, and dredge and fill material to waters of
                 the State on or from the banks of the East Branch Chagrin River
                 except in compliance with Chapter 6111 and any necessary
                 permits and/or Section 401 certifications issued pursuant to
                 Chapter 6111 and the rules adopted thereunder;

             (B) Defendants shall submit a plan to the Ohio EPA to redistribute
                 and/or remove the remaining pile in the East Branch Chagrin
                 River within ninety days from the date of this judgment entry;

             (C) Defendants shall implement and           execute   the   approved
                 redistribution and/or removal plan;

             (D) Defendants shall submit a monitoring plan to characterize the
                 current channel morphology, habitat quality, and biological
                 water quality in the East Branch Chagrin River within ninety
                 days from the date of this judgment entry;

             (E) Defendants shall implement and           execute   the   approved
                 monitoring plan;

             (F) Defendants shall submit a plan for the creation of a riparian
                 buffer along the East Branch Chagrin River to bar construction
                 activities and stream channel modifications except as
                 authorized by the Ohio EPA within one hundred and twenty
                 (120) days from the date of this judgment entry;

             (G) Defendants shall implement and execute the approved riparian
                 buffer plan; and



                                           13
                 (H) Defendants shall submit a post-construction report to the Ohio
                     EPA after completion of the remediation work and creation of
                     the riparian buffer.

          {¶35} Appellants filed a timely notice of appeal from the trial court’s judgment

entry and assert four assignments of error for our review. Their first assignment of error

states:

          {¶36} “The trial court erred in interpreting the state of Ohio’s statutory claims to

encompass all work performed in the East Branch Chagrin River without a permit, as

opposed to limiting the state of Ohio’s claims to the discharge of dredged materials into

the East Branch/Chagrin River.”

          {¶37} All three counts alleged in the complaint are premised on violations of the

Water Pollution Control Act, found in Revised Code Chapter 6111. Appellants first

assert that the deposit of dredged materials into the East Branch Chagrin River, rather

than the excavation of material out of the river, is the only conduct the trial court should

have considered in determining whether appellants violated the relevant statutes. They

also argue the trial court improperly relied on federal permit requirements to find liability

under state statutes.

          {¶38} Issues of statutory interpretation are questions of law, which we review de

novo. Riedel v. Consol. Rail Corp., 125 Ohio St.3d 358, 2010-Ohio-1926, ¶6 (citations

omitted).

          {¶39} The Water Pollution Control Act provides that “[n]o person shall violate or

fail to perform any duty imposed by sections 6111.01 to 6111.08 of the Revised Code or

violate any order, rule, or term or condition of a permit issued or adopted by the director




                                               14
of environmental protection pursuant to those sections.      Each day of violation is a

separate offense.” R.C. 6111.07(A) (emphasis added).

      {¶40} Appellants are charged with violating R.C. 6111.04(A), which provides that

“[n]o person shall cause pollution or place or cause to be placed any sewage, sludge,

sludge materials, industrial waste, or other wastes in a location where they cause

pollution of any waters of the state.”    “Pollution” is defined as “the placing of any

sewage, sludge, sludge materials, industrial waste, or other wastes in any waters of the

state.” R.C. 6111.01(A). “Other wastes” is defined as “garbage, refuse, decayed wood,

sawdust, shavings, bark, and other wood debris, lime, sand, ashes, offal, night soil, oil,

tar, coal dust, dredged or fill material, or silt, other substances that are not sewage,

sludge, sludge materials, or industrial waste, and any other ‘pollutants’ or ‘toxic

pollutants’ as defined in the Federal Water Pollution Control Act that are not sewage,

sludge, sludge materials, or industrial waste.”    R.C. 6111.01(D) (emphasis added).

“Dredged material” means “material that is excavated or dredged from waters of the

state.” O.A.C. 3745-32-01(H) (formerly (E)). At the time appellants conducted their

activity in the river, “discharge of dredged material” was recognized only when it was in

excess of one cubic yard in a single or incidental operation. See former O.A.C. 3745-

32-01(C).

      {¶41} Pursuant to R.C. 6111.04(A), any such action is declared to be a public

nuisance, except in cases where the director of environmental protection has issued a

valid and unexpired permit or renewal thereof, as provided in R.C. 6111.01 to R.C.

6111.08.    Although these sections authorize the director to issue permits in certain

circumstances, none of them require a permit be obtained.




                                           15
       {¶42} While it may have been a violation of other statutory provisions, we agree

with appellants that it was not a violation of the statutes alleged in the complaint to

dredge the East Branch Chagrin River, nor was it a violation of these statutes to fail to

obtain permits. As pled, and under the facts of this case, appellants are only potentially

liable under R.C. 6111.04(A) for the discharge of dredged material into the river or any

other actions constituting pollution as defined above.        Obtaining permits for such

discharge would have provided appellants with an affirmative defense to these charges.

The complaint filed by the State apparently anticipated appellants’ inability to raise this

affirmative defense and, in so doing, alleged the same violation in three separate

counts. While the State alleges in the complaint a failure to obtain necessary permits, it

is clear that the only violation of law properly alleged is the unauthorized pollution of the

waters of the state based on R.C. 6111.04(A).

       {¶43} The State responds that appellants’ plan from the beginning was to alter

the river by controlling erosion and stabilizing the banks, which in isolation would be a

violation of federal and state law if done without a permit. Appellants may well have

violated other federal and state laws. See, e.g., R.C. 3767.13(C) (“No person shall

unlawfully obstruct or impede the passage of a navigable river, harbor, or collection of

water, or corrupt or render unwholesome or impure, a watercourse, stream, or water, or

unlawfully divert such watercourse from its natural course or state to the injury or

prejudice of others.”); see also 33 U.S.C. 1344(f)(2) (“Any discharge of dredged or fill

material into the navigable waters incidental to any activity having as its purpose

bringing an area of the navigable waters into a use to which it was not previously

subject, where the flow or circulation of navigable waters may be impaired or the reach




                                             16
of such waters be reduced, shall be required to have a permit under this section.”).

However, the State did not allege violations of any other laws in the complaint.

       {¶44} The trial court erred to the extent it found appellants liable for activity

outside the scope of R.C. 6111.04(A) and R.C. 6111.07(A). Appellants’ argument that

violations of these sections are the only properly alleged violations is well taken.

       {¶45} Appellants further assert that the only conduct the trial court should have

considered as a violation of R.C. 6111.04(A) is the discharge of dredged materials into

the water of the river, not the dredged materials deposited on the river banks.

Appellants contend the trial court erred in making a determination that the “waters of the

state,” as defined in Chapter 6111, includes all areas below the “ordinary high water

mark.” Appellants argue the concept of utilizing the “ordinary high water mark” to define

the “waters of the state,” thereby including dry land within the “waters of the state,” is

not supported by statutory or case law. This is, again, a statutory interpretation issue

we review de novo. Reidel, supra, at ¶6.

       {¶46} R.C. 6111.01(H) defines “waters of the state” as follows:

              [A]ll streams, lakes, ponds, marshes, watercourses, waterways,
              wells, springs, irrigation systems, drainage systems, and other
              bodies or accumulations of water, surface and underground, natural
              or artificial, regardless of the depth of the strata in which
              underground water is located, that are situated wholly or partly
              within, or border upon, this state, or are within its jurisdiction,
              except those private waters that do not combine or effect a junction
              with natural surface or underground waters.

       {¶47} The concept of the “ordinary high water mark” was introduced at trial by

Edward Wilk, a Section 401 coordinator at the Ohio EPA. Mr. Wilk testified that in

determining its jurisdiction, the Ohio EPA utilizes a December 7, 2005 Regulatory

Guidance Letter from the U.S. Army Corps of Engineers. The Letter provides that, for



                                             17
purposes of Section 404 of the Clean Water Act, the lateral limits of jurisdiction over

non-tidal water bodies, in the absence of adjacent wetlands, extend to the “ordinary high

water mark.” Corps regulations define the term at 33 C.F.R. 328.3(c)(6) (formerly (e)),

which states:

                The term ordinary high water mark means that line on the shore
                established by the fluctuations of water and indicated by physical
                characteristics such as a clear, natural line impressed on the bank,
                shelving, changes in the character of soil, destruction of terrestrial
                vegetation, the presence of litter and debris, or other appropriate
                means that consider the characteristics of the surrounding areas.

       {¶48} We are not aware of any case law that holds the area over which the U.S.

Army Corps of Engineers has jurisdiction is synonymous with the term “waters of the

state” as used in R.C. 6111.04(A). Nor are we aware of any case law interjecting the

concept of an ordinary high water mark into the definition of what constitutes “waters of

the state.” We agree with the State, however, that to accept appellants’ argument

would be to ignore the purpose of Ohio’s Water Pollution Control Act and the problems

it intends to remedy. See, e.g., State v. Conley, 147 Ohio St. 351, 353 (1947) (“It is

fundamental in the construction and application of statutes that not only the purpose to

be served, but the object to be attained as well as the evil to be remedied, should be

considered.”). It defies all sense to conclude that the discharge of pollutants into a

portion of a river that is fortuitously dry at the time of such discharge, but is at other

times filled with water, falls outside the rubric of Ohio’s Water Pollution Control Act.

       {¶49} Further, in determining whether appellants violated R.C. 6111.04(A), it is

not necessary to define “waters of the state” in such a way that it equates to or includes

the “ordinary high water mark.” Again, R.C. 6111.04(A) provides that “[n]o person shall

cause pollution or place or cause to be placed any sewage, sludge, sludge materials,



                                              18
industrial waste, or other wastes in a location where they cause pollution of any waters

of the state.” (Emphasis added.) “Pollution” is defined, in relevant part, as “the placing

of * * * other wastes [including dredged material] in any waters of the state.” R.C.

6111.01(A)&(D).

       {¶50} Thus, pollution, in violation of R.C. 6111.04(A), can occur either directly or

indirectly. A direct violation occurs by placing dredged material in a water of the state.

An indirect violation occurs by placing, or causing to be placed, dredged material in a

location where it then causes pollution of a water of the state.

       {¶51} Here, there is evidence that appellants directly caused pollution by placing

dredged materials in the river, which is a water of the state. There is also evidence that

appellants indirectly caused pollution by placing dredged materials in a location that

resulted in some of that material ending up in the river, in excess of one cubic yard,

either due to storm water runoff or due to the river rising up to the location.       It is

irrelevant, under the terms of the statute, whether that location of placement is above or

below any ordinary high water mark.

       {¶52} Appellants’ argument that the trial court should not have considered the

depositing of dredged materials on the river banks is not well taken.

       {¶53} Appellants’ first assignment of error is with merit to the extent indicated.

We have no question, as previously discussed, that there were violations of numerous

statutory and administrative regulations. For whatever reason, however, the State did

not charge appellants with violations of those provisions. Appellants proceeded to trial

defending the allegations in the complaint. It would be unfair to require them to defend




                                            19
against violations alleged in letters and administrative orders that were not contained in

the complaint filed with the trial court.

           {¶54} Appellants’ second and third assignments of error state:

                 [2.] The trial court erred in assessing a civil penalty against
                 defendants in the amount of $404,200.00.

                 [3.] The trial court erred in awarding injunctive relief beyond the
                 scope necessary to address the current effects of dredged
                 materials into the East Branch/Chagrin River, as opposed to, any
                 impact of the overall work performed in the river without a permit.

           {¶55} Based on our disposition of the first assignment of error, we must remand

this matter to the trial court to make a finding specifically related to the violations alleged

in the complaint, to wit: discharge of materials into the East Branch Chagrin River, as

provided in R.C. 6111.04(A), and thereafter limit any civil penalty to the consequences

of that conduct and to fashion an order of injunctive relief that addresses only the

violations of R.C. 6111.04(A) as alleged in the complaint.

           {¶56} Appellants’ fourth assignment of error states:

           {¶57} “The trial court erred in finding the Estate of Jerome T. Osborne personally

liable.”

           {¶58} Appellants contend in order to find Mr. Osborne personally liable, the

State must “pierce the corporate veil.” They assert there was no evidence Mr. Osborne

conducted any of the unauthorized activity in his personal, rather than corporate,

capacity.

           {¶59} The State responds that Ohio law is clear that individuals may be held

liable when a court finds “personal participation” in the unlawful act and that it is not

necessary to pierce the corporate veil. The State did not allege in its complaint that Mr.




                                               20
Osborne was responsible as an officer or owner of Osborne Co. It alleged that Mr.

Osborne, individually, violated R.C. 6111.04(A) and R.C. 6111.07(A).             The State

contends the plain language of the statute establishes the personal liability of Mr.

Osborne. Appellants argue in response that the State’s “personal participation” theory

is an attempt to expand its enforcement powers beyond its statutory authority.

       {¶60} R.C. 6111.04(A)(1) provides that “no person shall cause” a violation of the

statute. R.C. 6111.07(A) provides that “no person shall violate or fail to perform any

duty” under R.C. 6111.01 to R.C. 6111.08. In the definitions related to this chapter, at

R.C. 6111.01(I), the term “person” includes all those set forth in the definition found at

R.C. 1.59(C), which defines “person” as including “an individual, corporation, business

trust, estate, trust, partnership, and association.”

       {¶61} The parties stipulated that Osborne Co. is a corporation that has been

incorporated under the laws of the state of Ohio since 1956 and is currently in good

standing with the Ohio Secretary of State. Mr. Osborne was an owner and officer of

Osborne Co.

       {¶62} “A corporation is an artificial person, created by the General Assembly and

deriving its power, authority and capacity from the statutes. * * * A corporate officer or

shareholder normally will not be held liable for the debts or acts of the corporate entity.”

Mohme v. Deaton, 12th Dist. Warren No. CA2005-12-133, 2006-Ohio-7042, ¶7, citing

Worthington City School Dist. Bd. of Educ. v. Franklin Cty. Bd. of Revision, 85 Ohio

St.3d 156, 160 (1999) (citation omitted). “An exception to shareholder liability exists

where, ‘upon piercing the corporate veil,’ it appears that a corporation is simply the ‘alter




                                              21
ego’ of the individual sought to be held liable.” Id. at ¶8, quoting Inserra v. J.E.M. Bldg.

Corp., 9th Dist. Medina No. 2973-M, 2000 WL 1729480, *4 (Nov. 22, 2000).

       {¶63} “In addition, a corporate officer can be held personally liable for tortious

acts he or she has committed and, under such circumstances, a plaintiff need not pierce

the corporate veil to hold individuals liable who have personally committed such acts.”

Id. at ¶9 (citations omitted). This has become known as the “personal participation”

theory and has been applied to environmental law violations. See, e.g., State ex rel.

DeWine v. Sugar, 7th Dist. Jefferson Nos. 14 JE 0004 & 14 JE 0006, 2016-Ohio-884,

¶35 (citation omitted); State ex rel. DeWine v. Marietta Indus. Enters., Inc., 4th Dist.

Washington No. 15CA33, 2016-Ohio-7850, ¶25.

       {¶64} “A corporate officer, however, ‘may not be held liable merely by virtue of

his status as a corporate officer.’” Roberts v. RMB Ents., Inc., 197 Ohio App.3d 435,

2011-Ohio-6223, ¶35 (12th Dist.), quoting Mohme, supra, at ¶28. Rather, the evidence

presented must indicate that the officer specifically directed the particular act to be done

or that the officer participated or cooperated therein. Id., citing Young v. Featherstone

Motors, Inc., 97 Ohio App. 158, 171 (1954); see also Marietta, supra, at ¶25 (citations

omitted).

       {¶65} The parties stipulated that Mr. Franz was employed by Mr. Osborne

through Osborne Co. since 1991. It was also stipulated that Mr. Osborne directed Mr.

Franz to remove material from the stream bed and place it along the edge of the river,

on the river banks, and in the middle of the river and that Mr. Osborne personally

observed some of this work. The parties further stipulated that Mr. Osborne usually

called Mr. Franz the night before or first thing in the morning to instruct him what project




                                            22
to work on each day and what to do for each project, and that Mr. Osborne would

usually call Mr. Franz at night to see how the work for the day went. Notably, the

stipulations also include the following:

              Defendants performed the work on the East Branch Chagrin River
              pursuant to April 1983 and June 1990 Agreements with the Village
              of Kirtland Hills to maintain the river banks. * * * In exchange for
              the work performed on the East Branch Chagrin River pursuant to
              the April 19, 1983 Agreement, Defendant Jerome T. Osborne was
              allowed to farm certain property owned by the Village of Kirtland
              Hills. [Emphasis added.]

       {¶66} Thus, there is evidence that a personal benefit was conferred on Mr.

Osborne and that he acted independent of the corporation, at least to some degree.

The record does not contain any evidence that he was acting, at all times material, only

in his corporate capacity.     The State alleged Mr. Osborne personally violated the

statute. The fact that he may have been acting in his corporate capacity is a defense to

that claim—a defense that was not established in the record.

       {¶67} In light of the stipulations and evidence presented, we agree that Mr.

Osborne’s personal participation in the violations has been established by a

preponderance of the evidence. The trial court did not err in finding Mr. Osborne’s

Estate jointly and severally liable along with Osborne Co.

       {¶68} Appellants’ fourth assignment of error is without merit.

       {¶69} The judgment of the Lake County Court of Common Pleas is affirmed with

regard to holding appellants jointly and severally liable. The judgment is reversed with

regard to the finding of liability for activity outside the scope of R.C. 6111.04(A). This

matter is remanded for the trial court to make a finding specifically related to the




                                           23
violations alleged in the complaint and thereafter limit any civil penalty and injunctive

relief to the consequences of that conduct.



DIANE V. GRENDELL, J., concurs with a Concurring Opinion,

COLLEEN MARY O’TOOLE, J., dissents with a Dissenting Opinion.


                                ____________________


DIANE V. GRENDELL, J., concurs with a Concurring Opinion.

       {¶70} I concur in the decision to reverse the trial court’s judgment and remand

this matter for a proper determination of damages based on the alleged violations of

R.C. 6111.04(A) contained in the complaint, i.e., the “discharge of materials into the

East Branch Chagrin River.” Supra at ¶ 57. It is evident from the trial court’s judgment

that its determination of the appellants’ liability relied heavily on the dredging of the

stream channel and the failure to obtain permits rather than the discharge of materials.

See, e.g., “Anderson testified that the dredging activities significantly degraded fish and

macro invertebrate habitat”; “[t]he dredging throughout the river resulted in a loss of

riffles, pools and bank vegetation”; and “significant adverse changes in the morphology

and habitat of the river were caused by the dredging.” July 29, 2016 Opinion and

Judgment Entry, at 12, 16, and 18.

       {¶71} I would also point out the trial court, in its consideration of damages, noted

that the appellants “chose not to settle at the administrative level” and, “unlike the

Village of Kirtland Hills, * * * did not agree to measures to remediate the river,” and also

“obtained an economic benefit from being able to farm the extensive lands owned by




                                              24
the Village of Kirtland Hills.” Opinion and Judgment Entry, at 19. The import of these

findings is compromised by the fact that the appellants were willing to adopt measures

to remediate the river if the State would have been willing to waive the right to seek civil

penalties as it had done for the Village of Kirtland Hills. The State’s failure to make this

concession has not been satisfactorily explained, particularly given that all the

appellants’ dredging activity was done at the behest of the Village. With respect to the

economic benefit derived by the appellants, this literally consisted of grass for

consumption by appellants’ horses. There is little in the record to support a finding of

bad faith or self-interest on the part of the appellants.

       {¶72} Accordingly, I concur in the judgment and opinion of this court.


                                       ____________________


COLLEEN MARY O’TOOLE, J., dissents with a Dissenting Opinion.

       {¶73} I respectfully dissent.

       {¶74} I would uphold the lower court’s ruling in toto as the majority disregards

the overriding concept of notice pleading. Ohio law does not ordinarily require a plaintiff

to plead operative facts with particularity. Civ.R. 8(A) requires only a short and plain

statement of the claim that gives the defendant fair notice of the plaintiff's claim and the

grounds upon which it is based. A plaintiff is not required to outline the legal theory

case at the pleading stage and is required only to give reasonable notice of the claim. It

is not required that a complaint contain more than ‘“brief and sketchy allegations of fact

to survive a motion to dismiss under the notice pleading rule.”’         (Internal citations

omitted.) Ogle v. Ohio Power Co., 180 Ohio App.3d 44, ¶5 (4th Dist.). Additionally




                                              25
courts must be mindful of the admonition that cases should be decided on their merits,

where possible, rather than procedural grounds.         Sericola v. Johnson, 11th Dist.

Trumbull No. 2015-T-0091, 2016-Ohio-1164, ¶19, citing State ex rel. Lindenschmidt v.

Bd. of Commrs. of Butler Cty., 72 Ohio St.3d 464, 466 (1995).

        {¶75} Secondly, in the event that the defendants did not understand or could not

discern which laws or specific sections of the statute they violated, their remedy in a

notice pleading framework would be to file a motion for a more definite statement under

Civ.R. 12(E). The defendants in this matter are familiar with commercial contracts and

dealing with builders and should have known to inquire as to what permits were needed

regarding property that they did not own or control. As such I would affirm the trial court

in total.

        {¶76} I respectfully dissent.