Melchiorre, P. v. 422 Development, Inc.

Court: Superior Court of Pennsylvania
Date filed: 2017-11-14
Citations:
Copy Citations
Click to Find Citing Cases
Combined Opinion
J-A22034-17


NON-PRECEDENTIAL DECISION - SEE SUPERIOR COURT I.O.P. 65.37

    PETER D. MELCHIORRE,                            IN THE SUPERIOR COURT
                                                              OF
                                                         PENNSYLVANIA
                             Appellant

                        v.

    422 DEVELOPMENT, INC.,
    PHOENIXVILLE TOWN CENTER, LP,
    LONGVIEW DEVELOPMENT, LP, GIANT
    LANDLORD, LP, SEARS ROEBUCK & CO.,
    K MARK CORPORATION, GIANT FOOD
    STORES, INC., HARDWARE LANDLORD
    GP, LLC AND PHOENIXVILLE BOROUGH,

                             Appellees                 No. 3768 EDA 2016


               Appeal from the Order Entered November 22, 2016
                in the Court of Common Pleas of Chester County
                       Civil Division at No.: 1999-00693-IR


BEFORE: BOWES, J., LAZARUS, J., and PLATT, J.*

MEMORANDUM BY PLATT, J.:                          FILED NOVEMBER 14, 2017

        Appellant, Peter D. Melchiorre, appeals from the denial of his petition to

enforce a 1999 settlement (and later implementing orders) against Appellees,

422 Development, Inc., Phoenixville Town Center, LP, Longview Development,

LP, Giant Landlord, LP, Sears Roebuck & Co., K Mart Corporation, Giant Food



____________________________________________



*   Retired Senior Judge assigned to the Superior Court.
J-A22034-17


Stores, Inc., Hardware Landlord GP, LLC, and Phoenixville Borough.1

Appellees have ownership and various related interests in the shopping center

which adjoins Appellant’s business property.      Appellant has an easement

across the shopping center property. He asserts that a change of use of the

shopping center entitles him to a reversion to an “original” easement from

fifty years ago, which he prefers to more recent easements created in a series

of negotiated settlements. He also seeks discovery and a hearing on his claim

of damage to the easement by Appellees’ dumping of fly ash and other

contaminating substances. We affirm the order denying a reversion to the

original easement.      We remand to the trial court solely to allow Appellant

another opportunity to take depositions on his claim of dumping and

consequent damage to the easement. We decline to order a hearing on the

dumping damage claims.

       The underlying facts are not in substantial dispute.     Appellant is a

general contractor who also operates a business in Phoenixville which

prepares and sells top soil and potting soil. In 1975, he bought several parcels

of land from the Phoenixville Industrial Authority. The Authority had reserved

easement rights for the property in 1964.




____________________________________________


1The order was dated on November 21, but filed the following day, November
22, 2016. We have amended the caption accordingly. Counsel for Phoenixville
borough filed a letter joining the other Appellees’ brief.

                                           -2-
J-A22034-17


       The easement provided access over land that would later become the

shopping center in this case. These purchases preceded the shopping center

by decades. The Phoenixville Town Center Shopping Center was not proposed

until the 1990’s.

       In 1999, Appellant brought suit, claiming his right to preserve the then

existing easement, which would have prevented the building of the shopping

center. The parties eventually compromised by providing Appellant with an

alternate easement across the shopping center property which allowed access

to his business, but still allowed the shopping center to be built. The parties

could not agree on common language for a written settlement.         So then-

counsel read the oral terms of the negotiated settlement into the record. (See

N.T. Hearing, 10/28/99, at 2-15).

       Notably, the parties agreed that if “the shopping center use is

discontinued,” the easement would revert to a 50 foot width (which appears

to correspond to the “original” easement).2 (Id. at 3) (emphasis added). In

addition to providing $20,000 for the cost of paving, Appellees also agreed to

pay Appellant $10,000 in settlement for the relocation of his easement. (See

id. at 5; see also id. at 4; Appellees’ Brief, at 5).




____________________________________________


2 The parties similarly agreed that the easement would revert on other
conditions, e.g., the failure to obtain necessary permits. (See N.T. Hearing,
10/28/99, at 15).

                                           -3-
J-A22034-17


       The roadway for the relocated easement was not to exceed twenty-

seven feet in width.       (See N.T. Hearing, 10/28/99, at 4).     The trial court

retained jurisdiction to enforce the terms of the settlement. (See id. at 6).

       Over the years, there were additional ongoing disputes over the width

of the easement, the proper angle of the easement, (so trucks could negotiate

turns), whether the enlargement of an existing store encroached on the

easement (the court decided it did not), etc.

       The trial court’s 2009 order also provided that if the parties did not agree

on the terms of the easement documentation, the court would “determine the

content of the said documentation after consultation with the parties.” (Order

6/30/09, at 3 n.2).3

       In 2011 (after legal notice was published in 2009) an Eckerd drug store

in the shopping center was demolished. In 2012, the drug store was replaced

by a gasoline service station operated by Giant Foods, an anchor tenant of the

shopping center.

       Of special note for the consideration of this appeal, in the settlement

order of 2012, (as in the 1999 settlement), prior easements were extinguished

subject to a right of reversion if Appellees’ “property ceases to be used as

a shopping center or the easement as set forth herein is not available for




____________________________________________


3 There is no dispute that the parties could not agree on common language
for a written settlement agreement. (See id.).

                                           -4-
J-A22034-17


the use of [Appellant] . . . for any reason other than the voluntary act of

[Appellant] . . . .” (Order, 3/15/12, at 3) (emphasis added).

       In June of 2016, Appellant filed a petition to enforce the orders of 2009

and 2012.      (See Petition to Enforce the Orders of the Honorable Robert

Shenkin dated June 30, 2009, and March 13, 2012, Requiring the Reversion

to Peter D. Melchiorre of his Original Easement Rights Due to the Change of

Use of the Shopping Center,” 6/30/16) (unnecessary capitalization omitted).

       Citing Commonwealth Court zoning cases, not binding on this Court,

Appellant argued in the petition (as in this appeal) that the construction of a

service station changed the use of the shopping center to the effect that it “is

not encompassed within the standard customer use of the term shopping

center.” (Id. at unnumbered page 4, Paragraph 8; see also id. at

unnumbered pages 3-4).

       The trial court denied the petition, reasoning that “shopping center”

should be construed in its “ordinary definition,” such that the shopping center

was still a shopping center even after a gas station was built on it, and no

change in use entitling Appellant to a reversion of easement had occurred.

(Order, 11/22/16, at 1 n.1; see also Trial Court Opinion, 1/12/17, at 2).

Appellant timely appealed.4


____________________________________________


4Appellant timely filed a court-ordered statement of errors, on December 21,
2016. The trial court filed its opinion on January 12, 2017. See Pa.R.A.P.
1925.


                                           -5-
J-A22034-17


      On appeal, Appellant presents multiple claims which raise at least seven

issues, arguably eight, nominally framed as three “questions involved.” See

Pa.R.A.P. 2116.

             1. Did the [trial court] err in dismissing the Petition to
      Enforce the Settlement and Orders of the Court that the easement
      of [Appellant] would revert back to its original location once the
      shopping center changed its use to allow a gas station? Did [the
      trial court] err in finding the use of the shopping center was not
      changed by the addition of the gas station? Did [the trial court]
      ignore the language of [its] orders and settlement that the original
      easement reverts back to [Appellant] if the property ceased to be
      used solely as a shopping center? Did [the trial court] ignore the
      agreement and prior orders were conditional upon the property
      being used only as a shopping center, and the agreements were
      broken with the additional use of the gas station?

            2. Did [the trial court] err in ignoring the second issue raised
      in the Petition to Enforce and err in not holding a hearing when
      [Appellant] alleged the Appellees improperly filled the adjoining
      flood plan [sic] and wetlands with fly ash and illegal waste, causing
      severe flooding, which made [Appellant’s] easement unusable?
      Did [the trial court] ignore the language in the settlement
      agreement and orders that if the Appellees rendered the easement
      unusable, [Appellant] would have the right to the easement that
      existed prior to October 28, 1999?

            3. Did [the trial court] err in not allowing a hearing on these
      issues and instead deciding the case on the legal papers and/or
      should this Court remand this case for depositions since
      [Appellant’s counsel] never received the [trial court’s] Order
      allowing depositions so testimony could have been presented on
      the issue of the destruction of the easement by the Appellees?

(Appellant’s Brief, at 4-5).

      Preliminarily, we observe that many of these issues overlap. Some are

purely redundant. We note that counsel for Appellant raised twenty issues in




                                      -6-
J-A22034-17


the Statement of Errors. The trial court responded to Appellant’s twenty issue

statement of errors by grouping the claims into three broad categories.

       In this appeal, on independent review we find that, shorn of

duplications, repetitions and redundancies, Appellant raises three identifiable,

discrete issues for our review on appeal: 1) the purported right of reversion

to the “original” easement based on change of use from a shopping center; 2)

the opportunity to take depositions on his claim of damage to the easement

(coupled with a denial of receipt of the order granting the original extension);

and 3) the right to a hearing on his claim of damage to the easement. We will

address Appellant’s developed issues.5           We decline to address Appellant’s

undeveloped, overlapping issues. See Pa.R.A.P. 2119(a).

       We first address Appellant’s principal issue, the claim of reversion to a

different easement by change of use.

       Our scope and standard of review for the trial court’s interpretation of

an easement is well-established.

             When reviewing the decision of the trial court in a
       declaratory judgment action, our scope of review is narrow.
       Consequently, we are limited to determining whether the trial
       court’s findings are supported by substantial evidence, whether
____________________________________________


5 We note that by conflating multiple issues, and then addressing all issues
generally under only three headings, Appellant’s brief fails to comply with
Pa.R.A.P. 2119 (“The argument shall be divided into as many parts as there
are questions to be argued; and shall have at the head of each part−in
distinctive type or in type distinctively displayed−the particular point treated
therein, followed by such discussion and citation of authorities as are deemed
pertinent.”). Pa.R.A.P. 2119(a).


                                           -7-
J-A22034-17


     an error of law was committed or whether the trial court abused
     its discretion[.]

            The test is not whether we would have reached the same
     result on the evidence presented, but whether the trial court’s
     conclusion can reasonably be drawn from the evidence. Where
     the trial court’s factual determinations are adequately supported
     by the evidence we may not substitute our judgment for that of
     the trial court.

           Moreover, the findings of the trial judge in a non-jury case
     must be given the same weight and effect on appeal as a verdict
     of a jury and will not be disturbed on appeal absent error of law
     or abuse of discretion. When this court reviews the findings
     of the trial judge, the evidence is viewed in the light most
     favorable to the victorious party below and all evidence and
     proper inferences favorable to that party must be taken as
     true and all unfavorable inferences rejected.

PARC Holdings, Inc. v. Killian, 785 A.2d 106, 110 (Pa. Super. 2001), appeal

denied, 796 A.2d 984 (Pa. 2002) (citations omitted) (emphasis added).

     Our standard of review for settlement agreements is also well-settled.

            The enforceability of settlement agreements is determined
     according to principles of contract law.          Because contract
     interpretation is a question of law, this Court is not bound by the
     trial court’s interpretation. Our standard of review over questions
     of law is de novo and to the extent necessary, the scope of our
     review is plenary as [the appellate] court may review the entire
     record in making its decision. With respect to factual conclusions,
     we may reverse the trial court only if its findings of fact are
     predicated on an error of law or are unsupported by competent
     evidence in the record.

            The law of this Commonwealth establishes that an
     agreement to settle legal disputes between parties is favored.
     There is a strong judicial policy in favor of voluntarily settling
     lawsuits because it reduces the burden on the courts and
     expedites the transfer of money into the hands of a complainant.
     If courts were called on to reevaluate settlement agreements, the
     judicial policies favoring settlements would be deemed useless.


                                    -8-
J-A22034-17


      Settlement agreements are enforced according to principles of
      contract law.

                                  *    *    *

           Where a settlement agreement contains all of the requisites
      for a valid contract, a court must enforce the terms of the
      agreement. This is true even if the terms of the agreement are
      not yet formalized in writing.        Pursuant to well-settled
      Pennsylvania law, oral agreements to settle are enforceable
      without a writing.

Step Plan Servs., Inc. v. Koresko, 12 A.3d 401, 408–09 (Pa. Super. 2010)

(internal citations and quotation marks omitted).

      Generally, courts must give plain meaning to a clear and
      unambiguous contract provision unless to do so would be contrary
      to a clearly expressed public policy.

             Where the language of the contract is clear and
      unambiguous, a court is required to give effect to that language.
      Contractual language is ambiguous “if it is reasonably susceptible
      of different constructions and capable of being understood in more
      than one sense.” Hutchison v. Sunbeam Coal Co., 513 Pa. 192,
      201, 519 A.2d 385, 390 (1986). “This is not a question to be
      resolved in a vacuum. Rather, contractual terms are ambiguous
      if they are subject to more than one reasonable interpretation
      when applied to a particular set of facts.” Madison Constr. Co.
      v. Harleysville Mut. Ins. Co., 557 Pa. 595, 606, 735 A.2d 100,
      106 (1999).

Allstate Fire & Cas. Ins. Co. v. Hymes, 29 A.3d 1169, 1172 (Pa. Super.

2011), appeal denied, 46 A.3d 715 (Pa. 2012) (some citations omitted).

      Here, Appellant maintains that the shopping center is no longer “used

solely as a shopping center” by virtue of the establishment of a gasoline

service station. (Appellant’s Brief, at 26). In support of this claim Appellant

principally cites two Commonwealth Court zoning cases, Campbell v. Zoning


                                      -9-
J-A22034-17


Hearing Bd. of Plymouth Twp., 310 A.2d 444 (Pa. Cmwlth. 1973); and Atl.

Ref. & Mktg. Corp. v. Bd. of Comm'rs of York Twp., 608 A.2d 592 (Pa.

Cmwlth. 1992). (See Appellant’s Brief, at 27, 30). Appellant’s reliance is

misplaced.

       In the first place, as already noted, we are not bound by decisions of

the Commonwealth Court. See Stackhouse v. Stackhouse, 862 A.2d 102,

105 (Pa. Super. 2004); Bell v. Ferraro, 849 A.2d 1233, 1234 n.2 (Pa. Super.

2004).

       Moreover, neither case would apply. Both of these cases are zoning

cases, not easement cases.6             Zoning is not at issue in this appeal.

Furthermore, neither case addresses the legal consequence of a compromise

easement, or what conditions under a settlement require the reversion to a

prior easement.       Specifically, neither case mentions, let alone holds, the

proposition that Appellant asserts, viz., that the addition of a gasoline service

station to a shopping center changes the identity of what used to be a

shopping center, to something other than a shopping center, for purposes of

triggering the substitution of an easement.

____________________________________________


6  Campbell affirmed the denial of a zoning variance for use as a service
station where the oil company applicant leased (conditionally) with knowledge
of the zoning restriction and failed in its burden to establish unnecessary
hardship. See Campbell, supra at 447. Atlantic Refining concluded that
a gasoline station convenience store was properly zoned “C-S”
(commercial/shopping district), even though other area service stations were
zoned “C-H” (commercial/highway). See Atlantic Refining, supra at 595.



                                          - 10 -
J-A22034-17


      Appellant attempts to blunt the illogic of this argument, counter-intuitive

at best, by adding the qualifier “solely.” (“[Appellant’s understanding of the

agreement is that the easement is contingent on the property being used

solely as a shopping center.”). (Appellant’s Brief, at 26) (emphasis added).

It does not help his case.

      First, on independent review, none of the constituent settlement

documents includes the qualifier “solely,” or an equivalent, such as

“exclusively” or “only,” and Appellant points us to none. (See Appellees’ Brief,

at 11, 14).

      What the documents do say is that if the shopping center ceases to be

used as a shopping center, then the easement reverts to the “original”

reserved easement.

      However, Appellant himself concedes that the property is still a shopping

center. (See Appellant’s Brief, at 27 (“obviously there are still shopping

center buildings but there is also a gas station, which has a different use.”);

see also id. at 33 (“the use of the shopping center has changed even though

aspects of it are still being used as a shopping center.”) (emphases

added)). Appellant’s first argument has numerous weaknesses and defects.

But its fatal flaw is the failure to establish that the change of use of one retail

establishment is a change of use of the entire shopping center.

      The plain meaning of the exception is that if the entire shopping center

ceases operation, Appellant would get his original easement back.         Nothing


                                      - 11 -
J-A22034-17


in the language of the orders justifies the idiosyncratic interpretation that any

change in the operation of any individual tenant creates a change of use for

the entire shopping center.

      The trial court decided that under the “ordinary definition,” the shopping

center was still a shopping center. (Order, 11/22/16, at 1 n.1). “With respect

to factual conclusions, we may reverse the trial court only if its findings of fact

are predicated on an error of law or are unsupported by competent evidence

in the record.”   Step Plan Servs., Inc., supra at 408 (citation omitted).

Here, the trial court properly gave “shopping center” its plain meaning. We

accept the trial court’s finding of fact, and we decline to disturb the court’s

correct conclusion.

      Additionally, the incidental fact that operation of a service station may

incur different or additional zoning restrictions does not change the character

of the entire shopping center any more than the establishment of any other

specially-regulated enterprise (e.g., a pharmacy, or a walk-in medical office)

would.

      We would add, in the exercise of our plenary review, that the real issue

is not whether there was an incidental change of use. (See Appellant’s Brief,

at 22). The controlling question is whether there was a cessation of use as

a shopping center. (See Order, 3/15/12, at 3). Even Appellant concedes

there was not.




                                      - 12 -
J-A22034-17


       The plain meaning of “shopping center” controls.              No triggering

cessation of use as a shopping center occurred.7 No reversion to an original

easement is justified or warranted. Viewing the evidence in the light most

favorable to Appellees as verdict winners, as we must under our standard of

review, we conclude the findings of the trial judge are more than amply

supported by the record. See PARC Holdings, supra at 110. Appellant’s

first claim lacks merit.

       We address Appellant’s remaining two claims together because they

overlap and argue the same issues.             Both claim the right to a hearing on

Appellant’s dumping claims. (See Appellant’s Brief, passim). We disagree.

       Preliminarily, we address Appellant’s claim for additional discovery time.

On August 31, 2016, counsel for Appellant requested an additional thirty days

to take depositions, citing other trial obligations and vacation schedules. (See

Appellant’s Brief, at 15, 44; see also Motion of the Plaintiff, Peter D.

Melchiorre, to Extend the Time for Depositions, 8/31/16).

       On September 20, 2016, the trial court granted a thirty-day extension,

until October 21, 2016. However, counsel for Appellant denies receipt of the

trial court’s grant. (See Appellant’s Brief, at 45). Counsel provides copies of

correspondence to third parties consistent with his claim that he was unaware



____________________________________________


7 Moreover, Appellant virtually concedes that the construction and operation
of the gas station did not interfere with the use and enjoyment of his
easement. (See Appellant’s Brief, at 34).

                                          - 13 -
J-A22034-17


an extension had been granted. He further explains that he was not aware of

the grant of the extension until he read the Rule 1925(a) trial court opinion.

(See id.). As an alternative to his request for a hearing, Appellant requests

remand for depositions. (See id. at 47).

      Appellees argue that Appellant (or his counsel) failed to avail themselves

of prior opportunities to take depositions.    They recite perceived technical

deficiencies in the proffered reports, and note that counsel failed to provide a

sworn statement of non-receipt. (See Appellees’ Brief, at 21-25).

      We remain mindful that this is an error-correcting Court, not a fact-

finding court.   Appellate courts are not charged, nor particularly well-

equipped, to make fact-specific determinations on a cold record.

      Therefore, here, rather than try to sort out the conflicting factual claims

made by both parties, we conclude the best way to expedite disposition of this

appeal will be to remand to the trial court with direction to reinstate its

previous grant of a thirty-day extension for Appellant to take the depositions

as previously requested. See Pennsylvania Rule of Appellate Procedure 105:

            (a) Liberal construction and modification of rules.
      These rules shall be liberally construed to secure the just, speedy
      and inexpensive determination of every matter to which they are
      applicable. In the interest of expediting decision, or for other good
      cause shown, an appellate court may, except as otherwise
      provided in Subdivision (b) of this rule, disregard the
      requirements or provisions of any of these rules in a particular
      case on application of a party or on its own motion and may order
      proceedings in accordance with its direction.




                                     - 14 -
J-A22034-17


             (b) Enlargement of time. An appellate court for good
      cause shown may upon application enlarge the time prescribed by
      these rules or by its order for doing any act, or may permit an act
      to be done after the expiration of such time, but the court may
      not enlarge the time for filing a notice of appeal, a petition for
      allowance of appeal, a petition for permission to appeal, or a
      petition for review.

Pa.R.A.P. 105 (a)-(b).

      We emphasize that the remand we mandate today is for the sole

purpose of permitting the extension of the discovery period as previously

granted. The thirty-day period shall not be further extended. Nor may any

other issues be considered.

      Next, we consider Appellant’s multiple demands for a hearing. (See

Appellant’s Brief, at 40, 41, 43, 46, 47). He claims he is entitled to a hearing

based on disputed issues of fact. We disagree.

      Appellant incorrectly (and inconsistently) states, without citation to

support, that “[n]o hearing is allowed” on a petition pursuant to Pa.R.C.P.

206.7. (Appellant’s Brief, at 14).

      We read the rule to leave the decision on whether to hold a hearing or

not to the discretion of the trial court. See Pa.R.C.P. 206.7(c), which provides

in pertinent part: “If an answer is filed raising disputed issues of material fact,

the petitioner may take depositions on those issues, or such other discovery

as the court allows, within the time set forth in the order of the court.”

(emphasis added).




                                      - 15 -
J-A22034-17


      “An abuse of discretion occurs if there was an error of law or the

judgment was manifestly unreasonable or the result of partiality, prejudice,

bias or ill will.” Silver v. Thompson, 26 A.3d 514, 516 (Pa. Super. 2011)

(citation omitted). We conclude Appellant has failed to establish any abuse of

discretion.

      Appellant insists the trial court’s failure to allow a hearing was “more

than an abuse of discretion[.]” (Appellant’s Brief, at 41). However, aside from

generic, conclusory claims of violation of the preceding easement settlement

agreements, Appellant fails to identify with any meaningful degree of

specificity what disputed facts would have required a hearing.

      We note that, “[i]t is not the duty of the Superior Court to scour the

record and act as the appellant’s counsel[;]” therefore we decline to speculate

what factual issues Appellant conceives to be disputed.           Hayward v.

Hayward, 868 A.2d 554, 558 (Pa. Super. 2005) (citation omitted).

Accordingly, this argument is waived. See Pa.R.A.P. 2119(c).

      Moreover, Appellant’s claim to a hearing would not merit relief.

      Even if we were to assume for the sake of argument that Appellant

identified genuine disputes of material fact, he fails to establish abuse of

discretion by the trial court for not holding a hearing based on partiality,

prejudice, bias, or ill-will. The trial court plainly possessed the discretion to

determine whether a hearing on factual disputes was necessary to decide the

issues.


                                     - 16 -
J-A22034-17


       Accordingly, we vacate the verdict of the trial court, but only in part.

We affirm the order denying reversion to the original easement. We remand

to the trial court for the sole purpose of permitting Appellant to take

depositions during a thirty-day period beginning with the filing date of this

memorandum. The trial court may, if it chooses, review its decision in the

light of Appellant’s depositions.8 We decline to order a hearing.

       Order affirmed in part and vacated in part.    Case remanded.     Panel

jurisdiction relinquished.

Judgment Entered.




Joseph D. Seletyn, Esq.
Prothonotary



Date: 11/14/2017




____________________________________________


8If, after reviewing the depositions, the trial court decides that a hearing is
necessary or appropriate, the court in the exercise of its discretion may, but
need not, order a hearing.


                                          - 17 -