UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF COLUMBIA
ASSOCIATED MORTGAGE BANKERS
INC.,
Plaintiff,
Civil Action No. 17-0075 (ESH)
v.
BEN CARSON, et al.,
Defendants.
MEMORANDUM OPINION AND ORDER
Before the Court is plaintiff’s motion for leave to file a first amended complaint. For the
reasons that follow, the Court grants the motion in part and denies the motion in part.
BACKGROUND
I. FACTUAL BACKGROUND
This suit involves a disagreement about the import of an indemnification agreement (“the
Indemnification Agreement”) between plaintiff and defendants. Plaintiff Associated Mortgage
Bankers, Inc. (“AMB” or “plaintiff”) originates mortgage loans, including mortgages that were
eligible for insurance under the Fair Housing Act (“FHA”) insurance program administered by
the Department of Housing and Urban Development (“HUD”) and its Secretary, Ben Carson1
(collectively, “defendants”). (Complaint, Jan. 12, 2017, ECF No. 1, (“Compl.”) ¶ 2.) In 2012, in
connection with a HUD audit of an individual mortgage loan (“the Loan”), AMB entered into the
1
Under Federal Rule of Civil Procedure 25(d), Ben Carson, the current Secretary of HUD, is
automatically substituted as the named defendant for Julian Castro, the former Secretary.
Indemnification Agreement with HUD.2 (Id. ¶ 9.)
Therein, AMB agreed to indemnify HUD for losses “which have been or may be incurred
related” to the Loan in the event of default “up to five years from the loan’s date of
endorsement.” (Id. Ex. A ¶ 1.) Paragraph 1(a) provides that “[i]n the event of a valid claim for
insurance on any of the mortgages covered by this Agreement, indemnification will be in
accordance with paragraph (b), (c), (d), or (e), whichever applies.” (Id. Ex. A ¶ 1(a).) Paragraph
1(a) defines HUD’s investment and explains that “[t]o the extent HUD recoups any losses . . . or
there is any discount on the property . . . HUD will deduct the amount of the recoupment or
discount from HUD’s Investment.” (Id.)
Paragraph 1(b) defines AMB’s liability in the event HUD conveys the property to the
mortgagee, AMB, and further adds that “[i]f HUD does not convey the property to the
Mortgagee, indemnification shall be calculated in accordance with paragraphs (c) or (d) as
appropriate.” (Id. Ex. A ¶ 1(b).)
Paragraph 1(c) provides in relevant part:
Where a HUD/FHA insurance claim has been paid in full and the property has
been sold by HUD to a third party, the amount of indemnification is HUD’s
Investment as defined in paragraph (a), minus the sales price of the property to be
paid in accordance with the terms of an invoice or bill the Department sends to
the Mortgagee [AMB].
(Id. Ex. A ¶ 1(c).) Paragraph 1(d) provides in relevant part: “In any other case . . . the mortgagee
shall pay HUD the amount of HUD’s Investment in accordance with the terms of an invoice or
bill the Department sends to the Mortgagee.” (Id. Ex. A ¶ 1(d).)
Finally, paragraph 2 states: “Any material breach of the terms and conditions of this
2
According to defendants, AMB agreed to indemnify HUD because a September 2012 review of
AMB’s lending practices led HUD to discover that AMB had violated the rules and regulations
for originating FHA mortgages. (Defs.’ Mot. to Dismiss, May 23, 2017, ECF No. 10, at 3.)
2
Indemnification Agreement shall constitute independent grounds for imposition of administrative
sanctions by the Mortgagee Review Board against Mortgagee pursuant to 24 CFR Part 25.” (Id.
Ex. A ¶ 2.) The Indemnification Agreement does not otherwise limit or define the remedies
either party can pursue in the event of breach. (See id.)
On September 19, 2013, HUD sold the note for the Loan for $360,531.24—instead of
selling the property/collateral for the Loan—through its Single Family Loan Sale (“SFLS”)
program. (Id. ¶¶ 10, 25.) HUD designed the SFLS program to reduce HUD’s timelines for
carrying costs of properties and to limit HUD’s losses. (Id. ¶ 11; id. Ex. C.) Loans sold in the
SFLS pool often garner a lower sales price because of the program’s structure. (Id. ¶¶ 11–12; id.
Ex. C.) Indeed, in this instance, HUD only obtained 66% of the Loan collateral’s appraised
value. (Id. ¶ 10.)3
“In order to sell notes as part of a bulk sale,” HUD executed a Participating Service
Agreement (“PSA”) with the servicer of the loans, JPMorgan Chase Bank, N.A (“JPMorgan”),
pursuant to HUD’s statutory and regulatory authorizations. (Id. ¶ 14; id. Ex. C.) The PSA
required JPMorgan to submit an SFLS Claim Submission Report “to HUD after which HUD
would advise [Servicer] of those ‘Eligible Mortgage Loans’ which [Servicer] could include in
the pool and subsequently file a claim for insurance.” (Id. ¶ 14 (alteration in original); see also
id. Ex. C at 15–16.) The PSA defines “Eligible Mortgage Loans” as, inter alia, a mortgage loan
that “is not subject to an Indemnification Agreement, or other settlement agreement setting forth
specific obligations with respect to Mortgage Loan unless such obligations have been fully
3
The parties dispute the estimate AMB provided for the collateral’s appraised value, but at this
stage of litigation, the Court accepts AMB’s factual allegations as true, giving the property an
approximate appraisal value between $530,100 and $550,000 at the time HUD sold the note for
the Loan. (Compl. ¶¶ 21, 26.) HUD sold the note attached to the Loan in an SFLS pool to a
bidder identified as “SRMOF II 2012-1 Trust.” (Id. ¶ 10.)
3
satisfied.” (Id. Ex. C. at 9.) HUD was responsible for screening the SFLS pool for ineligible
mortgage loans subject to an indemnification agreement.4 The Loan was listed on HUD’s FHA
system as a loan subject to an indemnification agreement, meaning it was not an “Eligible
Mortgage Loan” for the bulk sale. (Id. ¶ 17; id. Ex. D.) Therefore, according to the terms of the
PSA, HUD should not have allowed the Loan to be sold as part of the bulk sale.
Almost a year after the sale, on July 28, 2014, AMB received notification that HUD
sought $160,448.62 from AMB as insurable losses due under the Indemnification Agreement.
(Id. ¶ 27.) When AMB objected to the sale, HUD replied that HUD “believe[s] that this debt is
both past due and legally enforceable” despite its “acknowledge[ment] that the indemnified loan
was erroneously included in a Single Family Loan Sale (SFLS) Program.” (Id. Ex. E.)
AMB timely requested a hearing with HUD’s Office of Hearings and Appeals, and on
December 17, 2014, the Administrative Judge (“AJ”) “issued a stay pending a final decision on
AMB’s appeal.” (Id. ¶ 30.) On December 16, 2016, the AJ issued a Decision and Order on the
issue of whether AMB’s “debt is past due and legally enforceable pursuant to 24 C.F.R. §§ 17.61
et. seq. . . . in accordance with the procedures set forth in 24 C.F.R. §§ 17.69 and 17.73.” (Id.
Ex. F at 1.) The AJ found that (1) the insurance claim was valid, (2) HUD did not breach the
Indemnification Agreement by including the Loan in the SFLS Program bulk sale, (3) HUD did
4
The PSA provides:
HUD’s identification process will be used only to identify mortgage loans
submitted as potential SFLS Claims by Participating Servicers and not to screen
mortgage loans for eligibility, with the exception of mortgage loans subject to an
Indemnification Agreement. . . . HUD will not issue an SFLS Claim Identification
Date for any mortgage loans for which Indemnification Agreements are identified
on HUD’s system of records.
(Compl. Ex. C. at 16) (emphasis added).
4
not act in contravention of its own internal guidance when it failed to abide by the terms of the
PSA, and (4) the sale of the Loan through the SFLS Program did not violate the implied
covenants of good faith and fair dealing in the Indemnification Agreement between AMB and
HUD. (Id. Ex. F at 3–9.) Accordingly, the AJ vacated the stay and authorized the collection of
the “outstanding obligation by means of administrative offset of any federal payment due.” (Id.
Ex F at 9.)
II. PROCEDURAL HISTORY
On January 12, 2017, AMB filed its first complaint requesting that the Court (1) set aside
the AJ’s decision as arbitrary, capricious, an abuse of discretion, and otherwise not in accordance
with the law in violation of the Administrative Procedure Act (“APA”); (2) declare HUD to be in
breach of the Indemnification Agreement; (3) enjoin HUD from issuing any administrative offset
or referring the debt to Treasury for collection; (4) certify this matter as a class action with AMB
representing a class of similarly-situated lenders; (5) issue a preliminary injunction restraining
HUD and its agents from taking action against AMB or the proposed class; and (6) award AMB
attorney’s fees and expenses, as well as granting any other proper relief. AMB pleaded two
counts in support of its requested relief: (1) violation of the APA, 5 U.S.C. § 706(2)(A), (“first
APA claim”) and (2) breach of the covenant of good faith and fair dealing (“first contract
claim”). (Id. ¶¶ 47–56.) On May 23, 2017, defendants moved to dismiss for lack of jurisdiction
and for failure to state a claim.
On September 15, 2017, plaintiff moved to amend its first complaint, seeking to plead
additional facts regarding its original claims. (Pl.’s Mot. for Leave to File a First Am. Compl.,
Sept. 15, 2017, ECF No. 22, (“FAC Mot.”); Proposed First Am. Compl., Sept. 15, 2017, ECF
No. 22-2, (“Proposed FAC”).) Plaintiff also seeks to add two new legal claims. According to
5
plaintiff, the basis for the two new legal claims became “apparent due to events subsequent to
filing of the original complaint.” (FAC Mot. at 4.)
First, plaintiff wants to add a claim that defendants violated the APA by failing to
promulgate rules governing the SFLS program and related programs by notice and comment, 5
U.S.C. §§ 553, 706 (“notice-and-comment claim”). (Proposed FAC ¶¶ 204–08.) Plaintiff bases
its notice-and-comment claim on a July 14, 2017 Report from the HUD Office of the Inspector
General (“HUD OIG”) that criticized “HUD [for] not conduct[ing] rulemaking or develop[ing]
formal procedures for its [SFLS] program. In 2006, HUD started but did not complete
rulemaking for its note sales program. . . . HUD did not finalize the comment process or prepare
the program for a final rule.” (Id. Ex. 2 at 5.) The Report recommended that HUD complete the
rulemaking process because “public officials, citizens, and industry participants were not given
the opportunity to provide comments for a more than $18 billion program. Additionally, with no
formal procedures or guidebooks, HUD lacked a consistent standard for administering its
program.” (Id. Ex. 2 at 6; see also id. Ex. 2 at 7.)
Second, plaintiff seeks to add a claim that HUD’s AJs are inferior officers not appointed
in accordance with the U.S. Constitution’s Appointment Clause, U.S. Const. Art. II § 2 cl. 2, and
thus, HUD violated the Constitution and the statute governing administrative offsets by failing to
provide review by a person within the agency legally allowed to do so (“Appointments Clause
claim”). (Proposed FAC ¶¶ 217–24.)5 Plaintiff bases its Appointments Clause claim on the June
26, 2017 en banc denial of a petition for review in Raymond J. Lucia Companies, Inc. v. SEC,
5
Although plaintiff enumerates the notice-and-comment claim as the new Count I, and the
Appointments Clause claim as the new Count III, the Court refers to them as the notice-and-
comment claim and Appointments Clause claim to avoid confusion with former Count I (the first
APA claim) and Count II (the covenant of good faith contract claim).
6
868 F.3d 1021 (D.C. Cir. 2017) (per curiam). This denial let stand a panel decision from August
9, 2016, which found that SEC administrative law judges (“ALJs”) were not officers within the
meaning of the Appointments Clause of the U.S. Constitution. Raymond J. Lucia Companies,
Inc. v. SEC, 832 F.3d 277, 289 (D.C. Cir. 2016).6
On September 20, 2017, before ruling on plaintiff’s motion for leave to file an amended
complaint, the Court issued a Memorandum Opinion on defendants’ motion to dismiss. (ECF
No. 23 (“MTD Op.”).) The Court dismissed with prejudice plaintiff’s first contract claim as
within the Tucker Act’s exclusive jurisdiction. (Id. at 7–8.) The Court also denied defendants’
motion to dismiss as to plaintiff’s first APA claim challenging the AJ’s administrative offset
decision. However, the Court noted that its review on the first APA claim going forward would
be confined to that issue: “This action will not include discovery or class certification. After the
administrative record is filed, the Court will decide whether the AJ reached her decision in an
arbitrary and capricious manner, or otherwise violated an applicable statute or regulation.” (Id.
at 13.)
On September 28, 2017, plaintiffs filed a motion for reconsideration of the Court’s
Memorandum Opinion. On November 15, 2017, the Court issued an opinion denying plaintiff’s
motion, with the exception that it clarified that its dismissal of the contract claim for lack of
jurisdiction was without prejudice to refiling in the Court of Federal Claims. (ECF No. 32
(“Recons. Op.”) at 6–7.)
The Court is now ready to rule on plaintiff’s motion for leave to file an amended
6
Lucia created a circuit split with the 10th Circuit’s decision in Bandimere v. SEC, 844 F.3d
1168 (10th Cir. 2016), which held that SEC ALJs are inferior officers within the meaning of the
Appointments Clause. Id. at 1179. There is a petition for a writ of certiorari pending before the
Supreme Court in Lucia and Bandimere.
7
complaint. (Pl.’s Mot. to Amend Compl., Sept. 15, 2017, ECF No. 22.)
ANALYSIS
I. LEGAL STANDARD
“Rule 15(a)(2) instructs district courts to ‘freely give leave [to amend a pleading] when
justice so requires.” In re Interbank Funding Corp. Sec. Litig., 629 F.3d 213, 218 (D.C. Cir.
2010) (quoting Fed. R. Civ. P. 15(a)(2)). “Under Rule 15(a), the nonmovant”—in this case,
HUD—“generally carries the burden in persuading the court to deny leave to amend.” Dove v.
Washington Metro. Area Transit Auth., 221 F.R.D. 246, 247 (D.D.C. 2004); see also City of
Moundridge v. Exxon Mobil Corp., 250 F.R.D. 1, 6 (D.D.C. 2008).
In the absence of any apparent or declared reason—such as undue delay, bad faith
or dilatory motive on the part of the movant, repeated failure to cure deficiencies
by amendments previously allowed, undue prejudice to the opposing party by
virtue of allowance of the amendment, futility of amendment, etc.—the leave
sought should, as the rules require, be “freely given.”
Barkley v. U.S. Marshals Serv., 766 F.3d 25, 38 (D.C. Cir. 2014) (quoting Forman v. Davis, 371
U.S. 178, 182 (1962)).
Delay, prejudice, and futility can justify a denial of a request to amend. “To determine
what is ‘undue delay,’ the parties’ conduct in the litigation and the possibility of resulting
prejudice should be considered.” City of Moundridge, 250 F.R.D. at 6. “Undue prejudice is not
mere harm to the non-movant but a denial ‘of the opportunity to present facts or evidence which
[ ] would have [been] offered had the amendment[ ] been timely.’” Dove, 221 F.R.D. at 248
(alteration in original) (citing Foremost–McKesson, Inc. v. Islamic Republic of Iran, No. 82-cv-
0220, 1988 WL 122568, at *4 (D.D.C.1988) (unpublished), aff’d, 905 F.2d 438 (D.C.Cir.1990)).
As to futility, a district court may deny a motion for leave to amend “if the amended pleading
8
would not survive a motion to dismiss.” In re Interbank Funding, 629 F.3d at 218; see also
James Madison Ltd. v. Ludwig, 82 F.3d 1085, 1099 (D.C. Cir. 1996).
II. FIRST CONTRACT CLAIM
The Court will deny, as futile, plaintiff’s request for leave to amend the complaint to
include the first contract claim or add any allegations related to the first contract claim. As
explained in the Court’s two prior opinions in this case, the Court does not have jurisdiction over
this claim. (MTD Op. at 7–8; Recons. Op. at 3–6.) Plaintiff argues that filing an amended
complaint without the first contract claim would allow defendants to argue that plaintiff dropped
or waived that claim in any later suit or appeal, but as noted in the Court’s last opinion, plaintiff
remains free to file this claim in the Federal Court of Claims. (Recons. Op. at 6–7.)
Accordingly, the Court will strike Count IV of the proposed amended complaint, for it will not
reverse its prior rulings as to this count.
III. NOTICE-AND-COMMENT CLAIM
Plaintiff wishes to add allegations related to HUD’s rulemaking requirements under the
APA. (Proposed FAC ¶¶ 17–47, 182–85, 191–94, 204–08.) Plaintiff’s notice-and-comment
claim can be roughly distilled as follows: (1) HUD had no regulation or unified policy publically
promulgated on how to implement the SFLS program and related programs, (2) HUD was
required to go through notice-and-comment procedures to promulgate policies for these
programs, and (3) HUD’s failure to do so resulted in the erroneous sale of the note at issue in this
case. (See, e.g., Proposed FAC ¶ 194 (“If HUD had adopted a valid regulation and had a clear,
unified set of policies, procedures, and rules with respect to implementation of the SFLS
program, HUD and HUD OIG would likely have been aware earlier that loans subject to
indemnification agreements were not supposed to be part of the SFLS program.”).
9
Defendants oppose this amendment arguing that allowing plaintiff to add such a claim is
unwarranted because (1) any amendment would be futile on waiver and exhaustion grounds due
to plaintiff’s failure to bring this claim before the agency, see, e.g., Hettinga v. United States,
560 F.3d 498, 502 (D.C. Cir. 2009), and (2) plaintiff unduly delayed raising this claim.
Defendants suggest that plaintiff should have raised its notice-and-comment concerns in
June 2006 during a proposed rulemaking that HUD later withdrew in March 2007.
(See Proposed FAC ¶¶ 33–45.) The Court cannot follow the logic of defendants’ argument.
While the rulemaking was ongoing, plaintiff had no reason to comment that HUD should be
promulgating policies by notice and comment, and plaintiff had no agency rulemaking process in
which to file a comment after HUD withdrew the notice of proposed rulemaking.
Defendants also argue that plaintiff should have raised its notice-and-comment claim
before the AJ, and its failure to do so constitutes waiver of that claim. However, waiver only
applies if plaintiff could have presented its notice-and-comment claim before the AJ in the first
instance. See CSX Transp., Inc. v. Surface Transp. Bd., 584 F.3d 1076, 1079 (D.C. Cir. 2009).
Defendants do not cite any regulations or policies showing that a HUD AJ can consider such a
claim, and HUD regulations on the AJ’s review limit that review to questions concerning
whether “there is a debt that is past due and whether it is legally enforceable.” 24 C.F.R.
§ 17.69(c); see also id. § 17.73; cf. Hous. Study Grp. v. Kemp, 739 F. Supp. 633, 638 (D.D.C.
1990) (requiring plaintiffs to exhaust administrative remedies before HUD where “HUD’s
regulations provide[d] plaintiffs with an administrative remedy”).
The doctrines of exhaustion and waiver in the administrative context involve complex
inquiries concerning whether a statute, regulation, or other promulgated agency policy requires
exhaustion of remedies, and whether failure to exhaust precludes court review. See Hettinga,
10
560 F.3d at 502–03; see also Blackmon-Malloy v. U.S. Capitol Police Bd., 575 F.3d 699, 704
(D.C. Cir. 2009). Defendants have not specifically identified any statute or regulation requiring
plaintiff to exhaust a notice-and-comment claim before the HUD AJ, and instead, they have only
cited precedent regarding general principles of waiver and exhaustion. Without more, the Court
cannot conclude that granting plaintiff leave to amend its complaint to include a notice-and-
comment claim would be futile on the grounds of exhaustion or waiver. See Darby v. Cisneros,
509 U.S. 137, 146 (1993) (noting that the APA “has limited the availability of the doctrine of
exhaustion of administrative remedies to that which the statute or rule clearly mandates.”); see
also CSX Transp., 584 F.3d at 1079; DSE, Inc. v. United States, 169 F.3d 21, 27 (D.C. Cir.
1999).
Defendants’ undue-delay argument seems to be intertwined with its exhaustion argument,
but to the extent that it is not, defendants fail to clearly articulate a standalone undue-delay
argument that justifies the denial of leave to amend. “Courts that have found an undue delay in
filing have generally confronted cases in which the movants failed to promptly allege a claim for
which they already possessed evidence.” United States ex rel. Westrick v. Second Chance Body
Armor, Inc., 301 F.R.D. 5, 9 (D.D.C. 2013). Plaintiff alleges that its notice-and-comment claim
arises from the HUD OIG Report issued on July 14, 2017. (FAC Mot. at 5; Proposed FAC Ex. 2
& ¶¶ 56–59, 192–94.) Plaintiff filed its motion for leave to amend exactly two months and one
day later, before the Court had ruled on any dispositive motions, and most significantly,
defendants fail to explain how such a short delay prejudices them. See United States ex rel.
Westrick, 301 F.R.D. 5, 9 (D.D.C. 2013); see also Ellis v. Georgetown Univ. Hosp., 631 F. Supp.
2d 71, 79 (D.D.C. 2009).
11
IV. APPOINTMENTS CLAUSE CLAIM
Plaintiff also seek to add allegations related to the constitutionality of HUD’s AJs under
the Appointments Clause. U.S. Const. Art. II § 2 cl. 2 (Proposed FAC ¶¶ 159–66, 217–224.)
Defendants argue that plaintiff should have exhausted this claim before the AJ, but this argument
fails for the reasons outlined above in Part III—defendants have not cited any statute, regulation,
or policy requiring plaintiff to exhaust such a claim before the AJ. See Darby, 509 U.S. at 146;
CSX Transp., Inc., 584 F.3d at 1079. Moreover, the Court is even more hesitant to conclude as a
matter of law that plaintiff must exhaust a constitutional claim before an AJ that challenges that
AJ’s very authority. See, e.g., Freytag v. C.I.R., 501 U.S. 868, 878–79 (1991).7
Defendants’ arguments about undue delay also fail for reasons similar to those outlined in
Part III. The Court recognizes that plaintiff could have raised the Appointments Clause claim in
its first complaint since the panel decision in Lucia, which plaintiff relies on as persuasive
authority, was issued over five months before plaintiffs filed their first complaint on January 12,
2017. However, defendants do not explain what prejudice would result from allowing an
amendment to add this claim, for “an amendment is not automatically deemed prejudicial [just
because] it causes the non-movant to expend additional resources.” United States ex rel.
Westrick, 301 F.R.D. at 9; see also Nwachukwu v. Karl, 222 F.R.D. 208, 211 (D.D.C. 2004) (“In
the District of Columbia, a court cannot deny leave to amend solely on the time elapsed between
the filing of the pleading and the request for leave to amend.”). This case is still in its early
stages, and the Appointment Clause claim presents an essentially legal issue. If plaintiff’s claim
7
Defendants cite cases purporting to establish that a constitutional challenge under the
Appointments Clause is non-jurisdictional and can be waived or forfeited, but plaintiff
satisfactorily distinguishes these cases so as to avoid a finding that an amendment to add such a
claim would clearly be futile. (See Pl.’s Reply in Supp. of Mot. for Leave to File a First Am.
Compl., Oct. 6, 2017, ECF No. 27, at 6–9.)
12
has merit, the Court should have the opportunity to consider it before assessing the lawfulness of
the AJ’s decision under the APA. 5 U.S.C. § 706(2)(A); see also Landry v. FDIC, 204 F.3d
1125, 1131 (D.C. Cir. 2000) (“Freytag itself indicates that judicial review of
an Appointments Clause claim will proceed even where any possible injury is radically
attenuated.”).
CONCLUSION
The Court will grant plaintiff leave to amend its complaint to add factual allegations
related to the first APA claim, the notice-and-comment claim, and the Appointments Clause
claim. However, nothing in this opinion should be read as prejudging the merits of plaintiff’s
notice-and-comment claim or Appointments Clause claim for purposes of a motion to dismiss.
Plaintiff’s motion for leave to amend, ECF No. 22, is DENIED IN PART to the extent that
plaintiff may not include its first contract claim, which this Court has already dismissed without
prejudice to refiling in the Court of Federal Claims, and thus, Count IV of the proposed amended
complaint is stricken. Plaintiff’s motion for leave to amend, ECF No. 22, is GRANTED IN
PART to the extent that plaintiff’s amended complaint (minus Count IV) will be treated as filed
this date. Defendants shall file their responsive pleading consistent with Federal Rule of Civil
Procedure 15 and D.C. Local Civil Rule 7(n), on or before December 15, 2017.
/s/ Ellen Segal Huvelle
ELLEN SEGAL HUVELLE
United States District Judge
Date: December 1, 2017
13