In the United States Court of Federal Claims
No. 19-1752
(Filed: July 16, 2021)
NOT FOR PUBLICATION
*************************************
THE CENTECH GROUP, INC., *
*
Plaintiff, *
*
Motion to Compel; Reasonable
v. *
Expenses; RCFC 37.
*
THE UNITED STATES, *
*
Defendant. *
*************************************
Kenneth A. Martin, McLean, VA, counsel for Plaintiff; James Fontana and James D’Agostino,
Tysons, VA, of counsel.
Amanda L. Tantum, U.S. Department of Justice, Civil Division, Washington, DC, and Michael J.
Farr, U.S. Air Force, of counsel, counsel for Defendant.
ORDER AND OPINION
DIETZ, Judge.
In this breach of contract case, The CENTECH Group, Inc. (“CENTECH”) filed a motion
to compel pursuant to Rule 37(a)(1) of the Rules of the Court of Federal Claims (“RCFC”)
requesting that the Court overrule the government’s relevance and proportionality objections and
order the government to produce unobjected-to documents and supplement incomplete
responses. CENTECH also requested the Court award its expenses and attorney’s fees. For the
reasons below, the Court GRANTS-IN-PART and DENIES-IN-PART the motion to compel.
The Court also DENIES the request for expenses and attorney’s fees.
I. BACKGROUND
CENTECH entered into a contract with the United States Department of the Air Force
(“USAF”) to design, acquire, and install communication infrastructure in connection with the
renovation of a building on Vandenberg Air Force Base. Am. Compl. ¶ 4, ECF No. 8. The USAF
was required under the contract to reimburse CENTECH for materials procured for the project.
Id. ¶ 5. CENTECH subcontracted a portion of the work, including the purchase of certain
materials, to Iron Bow Technologies, LLC (“Iron Bow”). Id. ¶ 8. The materials to be purchased
by Iron Bow were identified in a Bill of Materials (“BOM”), which CENTECH alleges was
approved by the USAF. Id. ¶¶10-12. Once approved, Iron Bow issued a purchase order for the
materials to its supplier, Communications Supply Corporation (“CSC”). Id. ¶ 15. However,
before CENTECH could complete delivery of the materials, the USAF cancelled the order and
stopped delivery. Id. ¶¶ 22-23. The USAF stated that the materials did not meet contract
requirements and advised CENTECH that it would not reimburse CENTECH for the cost of the
undelivered materials. Id. ¶¶ 24-25, 28. As a result, CENTECH did not pay Iron Bow, and Iron
Bow did not pay CSC. Id. ¶¶ 32-33.
CSC subsequently filed a lawsuit against Iron Bow for non-payment. Id. ¶ 33; see
Communications Supply Corp. v. Iron Bow Technologies, LLC, Civil Action No. 2:18-cv-10374-
CB (W.D. Pa.) [hereinafter CSC v. Iron Bow]. The immediate discovery dispute relates to a
sponsored claim filed by CENTECH on behalf of Iron Bow against the USAF alleging breach of
contract and seeking damages arising from cancellation of the materials order. Id. ¶ 50.
At the suggestion of the Court, the parties proposed to conduct limited discovery only—
pending resolution of CSC v. Iron Bow—to reduce the burdens on each party. Joint Status Report
at 1, August 10, 2020, ECF No. 26. The Court subsequently issued an order permitting the
parties to conduct limited written discovery on seven issues and restricting the number of
interrogatories and requests for production allowed. ECF No. 28 [hereinafter Limited Discovery
Order].
On September 1, 2020, CENTECH served its first request for production (“RFP”), which
consisted of nine document requests. Pl.’s Mot. to Compel Ex. 1 [hereinafter Pl.’s Mot.], ECF
No. 32. The government responded—thirty days later—on October 1, 2020. Def.’s Resp. to Pl.’s
Mot. to Compel App. 8-19 [hereinafter Def.’s Resp.], ECF No. 36. In its response, the
government agreed to produce documents responsive to RFP Nos. 1, 2, 3, 4, 5, 6 (partial), 8, and
9. Id. at 2. The government, however, refused to produce documents—on relevancy and
proportionality grounds—in response to portions of RFP No. 6 and all of RFP No. 7. Id.; Pl.’s
Mot. Ex. 2. RFP No. 6 requested all documents and communications concerning the
government’s review and approval of the labor for the project, and RFP No. 7 requested all
documents and communications regarding the budget and funding for the project. Pl.’s Mot. Ex.
1 at 5; Def.’s Resp. App. 5. The government argued that RFP No. 6 was “non-proportional to the
extent that it requests documents or communications related to labor performed - following
CENTECH’s replacement of Iron Bow” and “not relevant to CENTECH’s claim that the Air
Force breached its contractual obligations[;]” and that RFP No. 7 was “of questionable relevance
and not proportional to the issue of whether the [g]overnment breached its contractual
obligations.” Def.’s Resp. at 5-10, 12-13.
CENTECH did not request a specific date for production of documents in its RFP; and, in
its response, the government similarly did not provide a date on which it would produce the
documents. Because the government’s October 1st response did not include the requested
documents, CENTECH emailed the government on October 2, 2020, inquiring “when [the
government] w[ould] be making the documents production.” Pl.’s Mot. at 3. The government did
not respond. Id. CENTECH and Iron Bow made additional unsuccessful attempts—on October 5,
8, 13, and 15—to contact the government via telephone and email to discuss a production
2
schedule. Id. With no response, CENTECH sent its first deficiency letter to the government on
October 15, 2020. Pl.’s Mot. at 3; Pl.’s Mot. Ex. 3.
That same day, the government sent an email to CENTECH advising that a protective
order was needed before the government would produce certain documents. Pl.’s Mot. at 4.
CENTECH states that this “was the first time . . . that counsel for [the government] raised the
need for a protective order.” Id. On October 26, 2020—prior to filing the protective order—the
government produced twenty-six documents in connection with RFP No. 3, which CENTECH
argues was “clearly” inadequate in size and scope. Id. During a subsequent phone call between
CENTECH and the government, the government confirmed it had additional documents to
produce—including documents relating to RFP No. 3—but the government reasserted that such
documents would be produced only after a protective order was entered by the Court. Id. at 5.
The government filed its Joint Motion for Protective Order on October 30, 2020, and the Court
adopted the protective order shortly thereafter. See Joint Mot. for Protective Order, ECF No. 30;
Protective Order, ECF No. 31.
Because the government stated that it expected to “produce documents within three or
four days of the protective order being entered,” CENTECH emailed the government on
November 5, 2020 stating that CENTECH expected the remainder of the production that day.
Pl.’s Mot. at 5. When the government did not respond, CENTECH sent its second deficiency
letter on November 10, 2020. Id.; Pl.’s Mot. Ex. 4. This letter also challenged the government’s
objections raised regarding RFP Nos. 6 and 7. Pl.’s Mot. Ex. 4.
On November 17, 2020, the government responded to CENTECH’s second deficiency
letter with its own letter. Pl.’s Mot. Ex. 5; Def.’s Resp. App. 25-29. In its letter, the government
noted “the discovery period in this matter currently has no deadline,” as the “Court’s order
makes clear that discovery will not close on any particular date[.]” Pl.’s Mot. Ex. 5 at 1; Def.’s
Resp. App. 25. The government further stated that since “CENTECH’s first set of requests for
production did not specify a time for inspection of responsive documents . . . there was no
deadline for production of documents.” Pl.’s Mot. Ex. 5 at 2; Def.’s Resp. App. 26. The
government, inter alia, renewed its objection to RFP Nos. 6 and 7 and further explained that “the
agency requires time to search for responsive documents” and the “Department of Justice also
requires time for review of such documents[,]” so the process for production “ha[d] required
more time than . . . anticipated[.]” Pl.’s Mot. Ex. 5 at 1-2; Def.’s Resp. App. 25-26.
CENTECH “made several additional attempts to resolve the outstanding disputes with
counsel for Defendant[,]” including asking for “a date certain by which all responsive documents
would be produced.” Pl.’s Mot. at 6. The government would not agree to such a date. Id. The
government subsequently produced 138 documents on December 5, 2020; however, the
government still did not confirm that its production was complete or provide a date certain for
full production. Id. Unsatisfied with the government’s response, CENTECH filed its motion to
compel on December 8, 2020. Id.
In its motion, CENTECH requests that the Court overrule the government’s objections to
RFP Nos. 6 and 7 and order the government to produce unobjected-to documents by a date
3
certain and supplement incomplete production. Pl.’s Mot. at 1. CENTECH argues that the
government “has resorted to a ‘drip drip’ approach in providing piecemeal and incomplete
production of documents” and further asserts that the Court should not tolerate the government’s
“flouting the Rules and failure to provide complete discovery of all unobjected to document
requests on a timely basis.” Id. at 7.
After this matter was transferred to the undersigned Judge, the Court held a telephonic
status conference to discuss the status of discovery, see Status Conference Order, Jan. 29, 2021,
ECF No. 40, followed by a discovery hearing to discuss CENTECH’s motion to compel and
outstanding discovery matters. Disc. Hr’g Tr. [hereinafter Hr’g Tr.], May 11, 2021, ECF No. 51.
At the hearing, the Court stated that the government’s objections to RFP Nos. 6 and 7 were
reasonable. Hr’g Tr. 45:3-10; see Hr’g Tr. 59:10-13. The Court also expressed that RFP Nos. 6
and 7, as currently written, were broad and not appropriately tailored to identify the information
that CENTECH needs to develop its case. Hr’g Tr. 45-46. The Court acknowledged that the
government’s actions after Iron Bow was replaced “may or may not be admissible” and “may or
may not be useful as it relates to proving a breach of contract[.]” Hr’g Tr. 50:19-20; see Hr’g Tr.
54:22-24. Nevertheless, the Court found that this information could help CENTECH develop its
case or lead to other discoverable information. See Hr’g Tr. 50:20-22. For this reason, the Court
instructed: “[T]his information, when appropriately scoped, is relevant and discoverable, while
not necessarily admissible in a breach of contract case, and that it just requires the parties to
work together to fine tune those two requests in a way that satisfies [CENTECH’s] needs[.]” 1
Hr’g Tr. 59:1-22.
The Court concluded the hearing by explaining that this discovery dispute seems to be
more of an issue with the government’s lack of communication, not failure to comply with the
discovery rules. Hr’g Tr. 61:5-8. The Court directed the parties to put together a discovery
schedule that expands limited discovery under the Limited Discovery Order to full discovery and
also covers document production in response to RFP Nos. 6 and 7 as “appropriately scoped so
that it does not overly burden the government.” Hr’g Tr. 61:8-14. Once in receipt of the proposed
schedule and agreed approach on RFP Nos. 6 and 7, the Court instructed that it would determine
how to deal with the outstanding motion to compel, including the request for expenses. Hr’g Tr.
61-62, 66:16-19.
On June 4, 2021, the parties filed a joint status report. See Joint Status Report, ECF No.
54. The status report stated that the parties had “agreed upon . . . [an] approach for production of
documents related to RFP Nos. 6 and 7 – taking into account the Court’s conclusions related to
[the government’s] objections as articulated during the [discovery hearing].” Id. at 2. With
respect to the unobjected-to documents, the status report established that the government
“believes it can produce all responsive documents by August 17, 2021.” Id. at 3. The parties
1
Relevant information “has been construed broadly to encompass any matter that bears on, or that reasonably could
lead to other matter that could bear on, any issue that is or may be in the case.” Oppenheimer Fund, Inc. v. Sanders,
437 U.S. 340, 351 (1978); see generally Herrmann v. United States, 127 Fed. Cl. 22, 33 (2016) (“As a general rule,
parties may obtain discovery regarding any nonprivileged matter that is relevant to any party’s claim or defense . . .
Relevant information need not be admissible at trial if the discovery appears reasonably calculated to lead to the
discovery of admissible evidence.”).
4
proposed a full discovery schedule with dates, which was adopted by the Court, see Scheduling
Order, June 14, 2021, ECF No. 55. While expressing appreciation for the government’s
cooperation to resolve the discovery issues, CENTECH stated that “recent efforts do not erase
[the government’s] prior actions” and renewed its request for reimbursement of expenses and
attorney’s fees. Id. at 4.
II. LEGAL STANDARD
RCFC 37 provides that “a party may move for an order compelling disclosure or
discovery.” RCFC 37(a)(1). This Rule is “designed to encourage or secure compliance with the
discovery rules, not to reward a party prevailing on a motion to compel.” Council for Tribal
Employment Rights v. United States, 110 Fed. Cl. 244, 248 (2013). In acting on a motion to
compel, the court exercises broad discretion, guided by the court’s rules. New Orleans Reg’l
Physician Hosp. Org., Inc. v. United States, 122 Fed. Cl. 807, 820 (2015); see Schism v. United
States, 316 F.3d 1259, 1300 (Fed. Cir. 2002) (en banc).
Pursuant to RCFC 37(a)(5), a prevailing party in a motion to compel may be entitled to
reasonable expenses. RCFC 37(a)(5)(C), the applicable provision here, provides the Court with
considerable discretion to apportion fees when a motion to compel is granted in part and denied
in part. In such a scenario, this Rule provides that the Court “may, after giving an opportunity to
be heard, apportion the reasonable expenses for the motion.” RCFC 37(a)(5)(C) (emphasis
added). The Court has broad discretion to determine which party, if any, should bear the
reasonable expenses of preparing the underlying motion. Confidential Informant 59-05071 v.
United States, 121 Fed. Cl. 36, 49 (2015) (holding that an award of expenses under RCFC
37(a)(5)(C) is “discretionary”); see Wilson v. Greater Las Vegas Assoc. of Realtors, Wilson v.
Greater Las Vegas Ass'n of Realtors, No. 214CV00362APGNJK, 2016 WL 4087272, at *1 (D.
Nev. July 28, 2016); 2 see also New Orleans Reg’l Physician Hosp. Org., 122 Fed. Cl. at 820.
The Court may decline to apportion expenses under the Rule if it determines that such an award
would not advance the ultimate resolution of the case. Fairholme Funds, Inc. v. United States,
132 Fed. Cl. 391, 393 (2017) (emphasis added); see also Jicarilla Apache Nation v. United
States, 88 Fed. Cl. 1, 21 (2009) (declining to apportion expenses when neither party fully
prevailed).
III. DISCUSSION
CENTECH requests that the Court require the government to pay its reasonable expenses
and attorney’s fees incurred in bringing its motion to compel. Pl.’s Mot. at 12. The government
argues against such an award and argues further that, if the Court grants-in-part and denies-in-
part the motion to compel, the Court should not apportion expenses. Def.’s Resp. at 20. For the
2
RCFC’s discovery rules mirror the discovery rules set forth in the Federal Rules of Civil Procedure (“FRCP”). See
RCFC 37 App. A (“RCFC 37 parallels the structure and content of [FRCP] 37”). The Court, therefore, refers to
cases that have interpreted FRCP 37. Allogonac Mfg. Co. v. United States, 458 F.2d 1372 (Ct. Cl. 1972); accord
Eden Isle Marina, Inc. v. United States, 89 Fed. Cl. 480, 492 (2009).
5
reasons below, the Court grants-in-part and denies-in-part the motion to compel and declines to
award or apportion expenses. 3
A. Request to overrule the government’s relevance and proportionality objections
CENTECH requests that the Court overrule the government’s relevance and
proportionality objections to RFP Nos. 6 and 7. Pl.’s Mot. at 1, 8-12. As detailed above, the
Court rejected the government’s relevance objections to RFP Nos. 6 and 7 during the May 11,
2021 discovery hearing. See Hr’g Tr. 45:14-24. As to proportionality, the Court instructed the
parties to appropriately tailor the scope of RFP Nos. 6 and 7 because the RFPs were overly
broad. See Status Report Order, May 12, 2021, ECF No. 49. The parties subsequently conferred
and reached agreement on the appropriate scope of RFP Nos. 6 and 7. See Joint Status Report at
1-2, June 4, 2021. Accordingly, the Court affirms its rejection of the government’s relevance
objections and grants this part of CENTECH’s motion to compel and denies the part of
CENTECH’s motion to compel that requests that the Court overrule the government’s
proportionality objections.
B. Request to order the government to produce unobjected-to documents and
supplement incomplete responses
CENTECH also requests that the Court order the government to produce unobjected-to
documents by a date certain and supplement incomplete responses. Pl.’s Mot. at 1, 14.
CENTECH’s dissatisfaction with the government’s timeliness of production appears to stem
from its expectation that the “document production deadline” was thirty days after it served its
first RFP. See Pl.’s Mot. at 1 n.1; Pl.’s Reply at 2, ECF No. 39. As the Court mentioned during
the discovery hearing, Hr’g Tr. 60:8-25, and as the plain language of RCFC 34 states, the
government has thirty days to respond to CENTECH’s request—not thirty days to produce all
responsive documents. See RCFC 34(b)(2)(A) (“The party to whom the request is directed must
respond in writing within 30 days after being served . . . .”); RCFC 34(b)(2)(B) (“The production
must then be completed no later than the time for inspection specified in the request or another
reasonable time specified in the response.”).
The government responded in writing to CENTECH’s first RFP within thirty days and
agreed to produce documents without objection in response to the majority of CENTECH’s
requests. See Def.’s Resp. App. 14-18. Thereafter, the government produced documents on
October 26 and December 5, 2020. Pl.’s Mot. at 4, 6. While CENTECH may fairly criticize the
government’s pace and manner of production, CENTECH cannot refute that the government
never refused to produce the unobjected-to documents and commenced document production
before the motion to compel was filed. See Pl.’s Mot. at 6; Pl.’s Reply at 2 (acknowledging that
the government had produced documents before the motion to compel was filed); Def.’s Resp. at
15 (prior to CENTECH’s filing of its motion to compel, the government had produced 1,568
3
The procedural requirement for an award of expenses has been met in this case as CENTECH certified that it made
a good faith attempt to obtain the discovery prior to filing its motion to compel as required by RCFC 37(a)(1). See
Pl.’s Mot. at 6.
6
pages of responsive documents). The government’s production continued throughout the
discovery dispute. See Def.’s Resp. at 19-20.
At the time of CENTECH filing the motion to compel, the parties were engaged in
limited discovery pending resolution of CSC v. Iron Bow. The parties had not established—and
the Court had not ordered—a discovery schedule. Such limited discovery was intended to reduce
the burdens on both parties recognizing that the outcome of CSC v. Iron Bow could eliminate the
need for discovery. Under these circumstances, the Court does not find it necessary to compel
the government to complete production by a certain date, so this part of CENTECH’s motion to
compel is denied. Furthermore, as explained above, this issue has been mooted by the parties’
proposed discovery schedule, which has been adopted by the Court.
CENTECH also raises concerns regarding the government’s alleged incomplete
production stating it “has knowledge of hundreds of responsive documents sent to and from the
Defendant that are nevertheless not included within the Defendant’s production[.]” See Pl.’s
Mot. at 12. The government responds stating it is unaware of such documents, and CENTECH
does not provide details for the alleged missing documents it “has knowledge of.” Def.’s Resp. at
16 n.12. The government explains that it “has diligently attempted to search for, collect, process,
and produce responsive documents, including requesting searches by agency employees[,]” and
“CENTECH has provided no evidence that documents have been withheld.” Def.’s Resp. at 15-
16, 17. To the contrary, the government states that it had produced all responsive documents as
provided by the agency, see Def.’s Resp. at 15, 19. At CENTECH’s request, the government also
agreed to expand the search criteria to locate additional responsive documents. See Joint Status
Report at 5, June 4, 2021; Hr’g Tr. 13:4-6; see also Hr’g Tr. 23:19-21. Despite CENTECH’s
allegation that the government’s production was deficient, the record does not demonstrate that
the government failed to utilize reasonable discovery procedures, applied search criteria to avoid
discovering responsive documents, or otherwise withheld responsive documents. Accordingly,
the Court does not find it necessary to order the government to supplement incomplete
responses, and this part of CENTECH’s motion to compel is denied.
C. Request for payment of expenses and attorney’s fees
Because the Court grants-in-part and denies-in-part CENTECH’s motion to compel, the
Court must decide whether to apportion expenses. The Court has broad discretion in making this
decision. While CENTECH rightfully rebukes the government’s lack of responsiveness to
CENTECH’s communications, the Court finds that an award of expenses in this discovery
dispute would be counterproductive to resolution of the case. The parties had agreed to limited
discovery only and had not established a discovery schedule. This approach should not have
been treated by the government as an invitation to ignore CENTECH’s communications, but the
government’s lack of responsiveness does not, by itself, warrant an award of fees. The facts
remain that the government did respond to CENTECH’s requests for production by agreeing to
produce documents in response to most of CENTECH’s requests and produced such responsive
documents. Additionally, the government’s relevance and proportionality objections to RFP Nos.
6 and 7 were reasonable, and the government was justified in withholding such documents until
the Court’s decision.
7
IV. CONCLUSION
For the reasons stated above, CENTECH’s motion to compel is GRANTED-IN-PART
and DENIED-IN-PART. CENTECH’s request for attorney’s fees and expenses is DENIED.
IT IS SO ORDERED.
s/ Thompson M. Dietz
THOMPSON M. DIETZ, Judge
8