Bowes Construction, Inc. v. South Dakota Department of Transportation

Court: South Dakota Supreme Court
Date filed: 2010-12-22
Citations: 2010 S.D. 99, 793 N.W.2d 36, 2010 SD 99
Copy Citations
4 Citing Cases
Combined Opinion
#25653-a-GAS

2010 S.D. 99

                          IN THE SUPREME COURT
                                  OF THE
                         STATE OF SOUTH DAKOTA

                                     * * * *

BOWES CONSTRUCTION, INC.,                      Plaintiff and Appellant,

v.

SOUTH DAKOTA DEPARTMENT
OF TRANSPORTATION,                             Defendant and Appellee.

                                 * * * *
                   APPEAL FROM THE CIRCUIT COURT OF
                       THE SIXTH JUDICIAL CIRCUIT
                     HUGHES COUNTY, SOUTH DAKOTA

                                     * * * *

                   HONORABLE KATHLEEN F. TRANDAHL
                               Judge

                                     * * * *
THOMAS R. OLSON
JOSHUA I. WELLE of
Olson and Welle, PC
West St. Paul, Minnesota
and
STEVEN C. BEARDSLEY of
Beardsley, Jensen and VonWald, LLC
Rapid City, South Dakota                       Attorneys for plaintiff
                                               and appellant.

JEFFREY SVEEN
JULIA M. DVORAK of
Siegel, Barnett and Schutz, LLP
Aberdeen, South Dakota                         Attorneys for defendant
                                               and appellee.

                                     * * * *
                                               CONSIDERED ON BRIEFS
                                               ON NOVEMBER 15, 2010

                                               OPINION FILED 12/22/10
#25653

SEVERSON, Justice

[¶1.]         Bowes Construction, Inc., a subcontractor hired to produce aggregate

materials for three asphalt paving projects, initiated this breach of contract action

against the South Dakota Department of Transportation. Under the subcontracts,

Bowes was contractually obligated to produce aggregate materials that would pass

the Department’s sodium-sulfate-soundness test, and the Department was

contractually obligated to accept Bowes’ aggregate materials in the absence of a

valid basis to reject them. The parties’ subcontracts incorporated South Dakota’s

standard test procedure for the sodium-sulfate-soundness test. Bowes contended

that its aggregate materials failed the Department’s sodium-sulfate-soundness test

because the Department did not follow the standard test procedure. Bowes alleged

that the Department therefore rejected its aggregate materials without a valid basis

and breached the subcontracts with Bowes. After a bench trial, the trial court

entered a judgment in the Department’s favor. We affirm.

                                   BACKGROUND

[¶2.]         Bowes is a heavy highway construction company located in Brookings,

South Dakota. Approximately one-third to one-half of its business is producing

aggregate materials. Producing aggregate materials involves procuring projects,

selecting a source or “pit,” setting up a portable “crusher” at the source, producing

the aggregate, and testing the aggregate for quality. In addition to producing the

aggregate, Bowes may be responsible for developing and producing the mix design. 1



1.      A mix design is a recipe for asphalt or concrete. The composition of asphalt
        or concrete varies depending on the quality of the aggregate.

                                          -1-
#25653

Bowes has produced aggregate materials for the Department for more than thirty

years.

The Sodium-Sulfate-Soundness Test

[¶3.]          The sodium-sulfate-soundness test is used to determine whether

aggregate is suitable for use in asphalt paving projects. The use of aggregate that is

too soft will cause roads to prematurely crack, break, ravel, or fall apart. To

perform the test, one must first wash and dry the aggregate, separate the aggregate

into samples based on gradation, 2 and weigh each aggregate sample. A sodium-

sulfate solution is then prepared. When used, the solution must have a specific

gravity between 1.151 and 1.174, and the temperature must be between sixty-eight

and seventy-two degrees Fahrenheit. 3 The aggregate samples are covered in one-

half inch of the solution for sixteen to eighteen hours. During immersion, the

porous aggregate absorbs the solution. After the immersion period, the aggregate

samples are removed from the solution. The aggregate samples are placed in a

drying oven at 230 degrees Fahrenheit until they achieve constant weight.4 This

entire process is repeated five times. After the fifth cycle, the aggregate samples



2.       Only the Department’s sodium-sulfate-soundness testing of the course
         aggregate is at issue in this case. Course aggregate consists of rocks one
         quarter-inch in diameter or larger.

3.       Specific gravity, or relative density, is the ratio of the density of a substance
         to the density of a standard reference substance. Specific gravity (physics),
         Britannica Online Encyclopedia, www.britannica.com/EBchecked/topic/
         558700/specific-gravity, (last visited December 16, 2010). In other words,
         specific gravity is a measure of the strength of the solution.

4.       Constant weight is achieved when the aggregate sample loses less than 0.1%
         of its weight in four hours of drying.

                                             -2-
#25653

are washed and weighed. A percent loss is calculated for each aggregate sample.

South Dakota tolerates a fifteen-percent loss rounded to the nearest whole number.

By contrast, some states have sodium-sulfate-soundness-loss limits as low as five

percent. Because the absorbed solution crystallizes during the drying cycle and

expands during the subsequent soaking cycle, the sodium-sulfate-soundness test

measures the durability of the aggregate to freeze and thaw cycles.

[¶4.]         Several states utilize the sodium-sulfate-soundness test, but the

testing methods vary by state. The American Society for Testing and Materials

(ASTM) has published a standard test method for the sodium-sulfate-soundness test

known as ASTM C88. SD 220, a modified version of ASTM C88, is the standard

test method used by the Department. The most significant difference between

ASTM C88 and SD 220 is the containers used during the tests. ASTM C88 requires

the use of “baskets made of suitable wire mesh or sieves with suitable openings.”

SD 220, by contrast, requires the use of “pans.”5 The different containers result in

other variations between ASTM C88 and SD 220. According to SD 220, after the

soaking cycle, the sodium-sulfate solution is poured off the aggregate sample, and

the aggregate sample is placed in the drying oven. Because ASTM C88 requires the

use of sieves, it is not necessary to pour off the solution. The sieve containing the

aggregate sample is removed from the solution and allowed to drain before it is

placed in the drying oven.




5.      Although the Department uses metal pans to conduct its sodium-sulfate-
        soundness tests, several materials-testing laboratories in South Dakota use
        glass bowls.

                                          -3-
#25653

[¶5.]        The Department has performed the sodium-sulfate-soundness test for

decades. Howard Schill was primarily responsible for performing the sodium-

sulfate-soundness test for the Department from 1966 to 1999. He testified that

when the sodium-sulfate solution is poured off the aggregate sample after the

soaking cycle, sodium-sulfate crystals remain in the pan. These crystals liquefy

when the aggregate sample is placed in the drying oven. Because SD 220 requires

the use of pans rather than sieves, this additional liquid does not drain away from

the aggregate sample as it would under ASTM C88. Thus, when Schill began

working for the Department in 1966, he was taught to place the aggregate sample

in the drying oven, allow it to warm, remove it from the drying oven, and pour off

any remaining solution. Schill refers to this additional step as the “double pour” or

“redrain.”

[¶6.]        Schill testified that he performed the sodium-sulfate-soundness test

with the double pour during his entire tenure with the Department. In 1996, Schill

helped the Department develop SD 220. At trial, Schill acknowledged that SD 220

does not require that the sodium-sulfate-soundness test be performed with the

double pour. Yet he testified that he intended SD 220’s requirement that “the

sodium-sulfate solution from the pan . . . be poured off” to include the double pour.

In 1999, in order to train his replacement to perform the sodium-sulfate-soundness

test, Schill prepared a procedure sheet, which was posted on the wall of the

Department’s materials-testing laboratory. Although the procedure sheet explained

the several steps necessary to conduct the sodium-sulfate-soundness test, the sheet

did not include the double pour.


                                         -4-
#25653

[¶7.]        The Department no longer performs the sodium-sulfate-soundness test

with the double pour. For a short period of time after Schill left the Department in

1999, Everett Lawver performed the sodium-sulfate-soundness test. Lawver

testified that he performed the sodium-sulfate-soundness test without the double

pour. The Department subsequently hired Reed Sommers to perform the sodium-

sulfate-soundness test. Schill trained Sommers to perform the sodium-sulfate-

soundness test with the double pour. But Sommers passed away in 2001, and Brian

Hipple replaced him. There is no evidence whether Hipple performed the sodium-

sulfate-soundness test with the double pour. In December 2001, Perry Griffith, who

had no previous experience performing the sodium-sulfate-soundness test, replaced

Hipple. Hipple, not Schill, trained Griffith. Griffith, who was primarily responsible

for performing the sodium-sulfate-soundness test for the Department at all times

relevant to this lawsuit, has consistently performed the test without the double

pour since 2001.

The Highway 37 Project

[¶8.]        The Department let bids on an asphalt paving project on Highway 37

in Bon Homme County, South Dakota, in May 2004. Brauer Construction from

Sioux City, Iowa, the successful general contractor on the project, selected Bowes to

produce the aggregate and mix design for the project. The parties’ subcontract

incorporated SD 220 and the South Dakota Quality Control/Quality Assurance

(QC/QA) program. South Dakota implemented the QC/QA program in the 1990s to

build better roads by providing contractors more control and responsibility in the

production of aggregate materials. Under the QC/QA program, a contractor must


                                        -5-
#25653

submit a mix design to the Department that will pass the sodium-sulfate-soundness

test as set forth in SD 220. Thus, under the parties’ subcontract, Bowes was

contractually obligated to produce aggregate materials that would pass the

Department’s sodium-sulfate-soundness test as set forth in SD 220, and the

Department was contractually obligated to accept Bowes’ aggregate materials in the

absence of a valid basis to reject them.

[¶9.]        Bowes chose the Beeson Pit in Bon Homme County to produce the

aggregate materials for the Highway 37 project. While investigating sources for the

project, Bowes spoke with another company that had done an asphalt project at the

Beeson Pit, but did not contact the Department to inquire about the quality of the

aggregate in that pit. Bowes also ran several preliminary laboratory tests on

aggregate taken from the Beeson Pit, but did not run a sodium-sulfate-soundness

test. Before the Highway 37 project, Bowes had not used the Beeson Pit to produce

aggregate materials.

[¶10.]       In September 2004, Brauer obtained a sample of the mix design Bowes

was producing for the Highway 37 project and submitted it to the Department for

testing. The mix design failed the Department’s sodium-sulfate-soundness test. On

January 20, 2005, Bowes submitted a second sample of the mix design to the

Department. On February 1, 2005, the Department notified Bowes that it would

not test the mix design a second time. In a letter dated February 8, 2005, Bowes

argued that the first sample was not representative of the mix design it was

producing. The Department therefore agreed to perform a second sodium-sulfate-




                                           -6-
#25653

soundness test. The representative second sample of the mix design failed the

Department’s sodium-sulfate-soundness test with a 15.6 percent loss.

[¶11.]         Because Bowes had never before failed a sodium-sulfate-soundness

test, it submitted representative samples of the mix design it was producing for the

Highway 37 project to independent materials-testing laboratories. In December

2004, before the Department agreed to test the mix design a second time, Bowes

sent a sample of the mix design to Maxim Technology. Although Maxim is aware

that SD 220 does not provide for it and that the Department performs the sodium-

sulfate-soundness test without it, Maxim performs the sodium-sulfate-soundness

test with the double pour. The mix design passed Maxim’s sodium-sulfate-

soundness test with a 13.4 percent loss. Bowes also sent a sample of the mix design

to GeoTek Engineering & Testing Services in February 2005. GeoTek ran the

sodium-sulfate-soundness test twice. Because the test results are rounded to the

nearest whole number, the mix design passed both tests with 14.7 percent and 15.3

percent losses. Ultimately, the Department allowed Bowes to proceed on the

Highway 37 project with a mix design containing five-percent Spencer quarry rock. 6

The Highway 50 Project

[¶12.]         The Department let bids on an asphalt paving project on Highway 50

in Bon Homme County in January 2005. Like the Highway 37 project, the

Department awarded Brauer the general contract, and Brauer selected Bowes to



6.       Spencer quarry rock is very durable to freeze and thaw cycles. It is often
         added to mix designs to compensate for lower-quality aggregate with higher
         sodium-sulfate-soundness losses.


                                         -7-
#25653

produce the aggregate and mix design for the project. Again, the parties’

subcontract incorporated SD 220 and the QC/QA program.

[¶13.]         Bowes chose the Beeson Pit to produce the aggregate materials for the

Highway 50 project. Bowes planned to use the mix design it was already producing

for the Highway 37 project on the Highway 50 project. But after Bowes was

awarded the Highway 50 subcontract, it learned that the mix design it was

producing for the Highway 37 project failed the Department’s sodium-sulfate-

soundness test. 7 Highway 50, unlike Highway 37, is a medium-volume-traffic

roadway, thus requiring stricter testing standards. Therefore, if the mix design

Bowes was producing for the Highway 37 project had been submitted to the

Department for the Highway 50 project, it almost certainly would have failed.

Accordingly, Brauer submitted a mix design that contained five-percent Spencer

quarry rock to the Department. In May 2005, that mix design passed the

Department’s sodium-sulfate-soundness test. The Department allowed Bowes to

proceed on the Highway 50 project using the mix design containing five-percent

Spencer quarry rock. Bowes did not fail a sodium-sulfate-soundness test performed

on a mix design it was producing for the Highway 50 project.

The Highway 47 Project

[¶14.]         The Department let bids on an asphalt paving project on Highway 47

in Lyman County in March 2005. The Department awarded Commercial Asphalt



7.       Bowes did not learn that the representative sample of the mix design it was
         producing for the Highway 37 project failed the Department’s sodium-sulfate-
         soundness test until February 2005.


                                          -8-
#25653

the general contract, and Commercial Asphalt selected Bowes to produce the

aggregate materials for the project. Unlike the Highway 37 and 50 projects, Bowes

was responsible for not only producing the aggregate and mix design, but also

developing the mix design and submitting it to the Department for testing. Again,

the parties’ subcontract incorporated SD 220 and the QC/QA program.

[¶15.]       Bowes chose the Lafferty Pit in Lyman County to produce the

aggregate materials for the Highway 47 project. The central part of South Dakota

has lower-quality aggregate with higher sodium-sulfate-soundness losses, and

Bowes had never before used the Lafferty Pit to produce aggregate materials.

Bowes was therefore concerned about the quality of the aggregate in the Lafferty

Pit and contacted the Department for information. The Department provided

information showing passing sodium-sulfate-soundness-test results for aggregate

samples taken from the Lafferty Pit, but Bowes ultimately took its aggregate from a

different part of the pit. Further, Bowes ran several preliminary laboratory tests on

aggregate taken from the Lafferty Pit, but did not run a sodium-sulfate-soundness

test. Bowes did not contact other contractors about the quality of the aggregate in

the Lafferty Pit.

[¶16.]       Bowes contracted with Maxim to develop the mix design for the

Highway 47 project. After developing the mix design, Maxim performed a sodium-

sulfate-soundness test on it in July 2005. The mix design passed Maxim’s sodium-

sulfate-soundness test with a 14.9 percent loss. On July 15, 2005, Maxim submitted

the mix design it developed to the Department. Maxim did not, however, send

tensile strength ratio (TSR) data, which is required to properly complete and test a


                                        -9-
#25653

mix design. Nonetheless, the Department began its sodium-sulfate-soundness test

on the mix design on July 18, 2005. When the Department contacted Maxim to

inquire about the missing TSR data on July 19, 2005, the Department learned that

Maxim had already run a sodium-sulfate-soundness test on the mix design. On

July 21, 2005, Maxim sent the Department the TSR data and the results of its

sodium-sulfate-soundness test. Although Maxim’s mix design had passed the

sodium-sulfate-soundness test it conducted, Maxim submitted a second mix design

containing five-percent Spencer quarry rock to the Department that day.

[¶17.]       On July 22, 2005, the Department began a sodium-sulfate-soundness

test on Maxim’s second mix design. The Department completed its sodium-sulfate-

soundness test on the first mix design on July 28, 2005. That test showed a failing

twenty-one-percent loss. Given the significant sodium-sulfate-soundness loss,

Commercial Asphalt knew that a drastic change to the mix design was necessary.

Before the Department completed the sodium-sulfate-soundness test on the second

mix design, Commercial Asphalt asked the Department to perform a sodium-

sulfate-soundness test on a mix design containing seventeen-percent Spencer

quarry rock. The Department completed its sodium-sulfate-soundness test on the

second mix design on August 2, 2005. With a twenty-percent loss, the second mix

design also failed the Department’s sodium-sulfate-soundness test. Only the mix

design containing seventeen-percent Spencer quarry rock passed the Department’s

sodium-sulfate-soundness test. The Department allowed Bowes to proceed on the

Highway 47 project using the third mix design.




                                       - 10 -
#25653

Procedural History

[¶18.]         Bowes initiated this breach of contract against the Department in May

2006. 8 Bowes alleged that its aggregate materials failed the Department’s sodium-

sulfate-soundness test because the Department did not follow SD 220. Bowes

contended that the Department incorrectly performed its sodium-sulfate-soundness

test in three respects: (1) the double pour was not done; (2) the temperature of the

sodium-sulfate solution was too warm; 9 and, (3) the specific gravity of the solution

was too high. See supra ¶ 3. Bowes alleged that the Department therefore rejected

its aggregate materials without a valid basis and breached the subcontracts with

Bowes. After a bench trial, the trial court entered extensive findings of fact and

conclusions of law. The trial court concluded that the Department followed SD 220

and did not breach the subcontracts with Bowes. The trial court thus entered a

judgment in the Department’s favor. Bowes appeals.

                             ANALYSIS AND DECISION

[¶19.]         Whether the trial court erred by concluding that the
               Department did not breach the subcontracts with Bowes.




8.       Bowes, an approved subcontractor for the asphalt paving projects at issue,
         may directly sue the Department for breach of contract under SDCL 31-2-34.
         See Fisher Sand & Gravel Co. v. S.D. Dep’t of Transp., 1997 S.D. 8, ¶¶ 9-10,
         558 N.W.2d 864, 867; Sweetman Constr. Co. v. S.D. Dep’t of Transp., 293
         N.W.2d 457, 461 (S.D. 1980).

9.       Although the Department presented evidence that the temperature of its
         materials-testing laboratory was within the allowable limits, it presented no
         evidence that it monitored the temperature of the sodium-sulfate solution.
         Nonetheless, testimony at trial established that if the solution exceeds
         seventy-two degrees Fahrenheit, the results of the sodium-sulfate-soundness
         test will favor the contractor.

                                          - 11 -
#25653

[¶20.]       Bowes argues that the trial court erred by concluding that the

Department did not breach the subcontracts with Bowes. Although Bowes argued

at trial that the Department incorrectly performed the sodium-sulfate-soundness

test in three respects, the primary issue in this appeal is the double pour. Bowes

concedes that SD 220, which is incorporated into the parties’ subcontracts, does not

require that the sodium-sulfate-soundness test be performed with the double pour.

But Bowes claims that SD 220 is ambiguous and should be supplemented or

explained by oral testimony of the South Dakota materials-testing industry’s usage

of trade to perform the sodium-sulfate-soundness test with the double pour. Bowes

therefore alleges that the Department breached the subcontracts by rejecting its

aggregate materials on the basis of a sodium-sulfate-soundness test performed

without the double pour. The Department, on the other hand, contends that SD 220

is not ambiguous.

[¶21.]       The trial court found that Bowes failed to establish it suffered damages

caused by the breach it alleges. The elements of a breach of contract are (1) an

enforceable promise; (2) a breach of the promise; and, (3) resulting damages.

Guthmiller v. Deloitte & Touche, L.L.P., 2005 S.D. 77, ¶ 14, 699 N.W.2d 493, 498

(citing McKie v. Huntley, 2000 S.D. 160, ¶ 17, 620 N.W.2d 599, 603; Krzycki v.

Genoa Nat’l Bank, 242 Neb. 819, 496 N.W.2d 916, 923 (1993)). If the trial court

properly found that Bowes failed to establish it suffered damages caused by the

breach it alleges, we need not decide whether SD 220 is ambiguous thus allowing

oral testimony to explain or supplement its written terms. We therefore address

the causation of damages issue first.


                                        - 12 -
#25653

[¶22.]        Bowes presented testimony at trial on its hypothesis that its

aggregate materials failed the Department’s sodium-sulfate-soundness test because

the Department performed the test without the double pour. Bowes argued that

excess sodium-sulfate solution remains in the pan during the drying cycle if the

double pour is not performed. And although the water in the solution evaporates

during the drying cycle, sodium-sulfate crystals remain in the pan. These

remaining crystals raise the specific gravity of the solution in the next soaking

cycle. The solution is thus stronger in the subsequent soaking cycle. The stronger

solution causes more crystallization on the aggregate and more sodium-sulfate-

soundness loss. Accordingly, Bowes maintains that if the double pour is not

performed, the results of the sodium-sulfate-soundness test will be artificially high.

Bowes asserts that the fact that its mix designs passed the sodium-sulfate-

soundness tests performed with the double pour by independent materials-testing

laboratories supports its hypothesis.

[¶23.]       The Department, by contrast, presented evidence at trial that

performing the sodium-sulfate-soundness test without the double pour does not

materially affect the test results. Upon having its sodium-sulfate-soundness test

results questioned, the Department ran several sodium-sulfate-soundness tests on

the mix design Bowes produced for the Highway 47 project. The Department first

ran a series of tests to determine if the specific gravity of the sodium-sulfate

solution increased after each soaking cycle. The tests showed that the specific

gravity was within tolerance. The Department also ran two tests with sieves, three

tests with the double pour, and one test without the double pour. The results of all


                                         - 13 -
#25653

six tests were within close parameters. In fact, the sodium-sulfate-soundness test

run without the double pour had the lowest loss percentage. Finally, the

Department sent samples of the mix design Bowes produced for the Highway 47

project to materials-testing laboratories in Wisconsin and Wyoming. The sodium-

sulfate-soundness tests performed by those laboratories had higher sodium-sulfate-

soundness losses than the Department’s tests.

[¶24.]       The trial court carefully considered and weighed all the evidence and

testimony presented on the causation of damages issue. Ultimately, the trial court

found that Bowes failed to establish that its aggregate materials failed the

Department’s sodium-sulfate-soundness test because the Department performed the

test without the double pour. The trial court was in the best position to weigh the

conflicting evidence, and we will not disturb the trial court’s factual findings unless

they are clearly erroneous. See Geraets v. Halter, 1999 S.D. 11, ¶¶ 12, 18, 588

N.W.2d 231, 233-34 (citations omitted). The record contains sufficient evidence to

support the trial court’s findings and conclusion that Bowes failed to establish it

suffered damages caused by the breach it alleges. We therefore need not further

address whether the Department breached the subcontracts with Bowes or

breached a duty of good faith and fair dealing. With no proof of causation of

damages, Bowes cannot prevail under any of the theories of recovery it has

presented.

[¶25.]       Affirmed.

[¶26.]       GILBERTSON, Chief Justice, and KONENKAMP, ZINTER and

MEIERHENRY, Justices, concur.


                                         - 14 -