FOR PUBLICATION
UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
JOSEPH A. PAKOOTAS, an individual
and enrolled member of the
Confederated Tribes of the
Colville Reservation and DONALD
R. MICHEL, an individual and
enrolled member of the
Confederated Tribes of the Coville
Reservation,
Plaintiffs-Appellants,
No. 08-35951
STATE OF WASHINGTON,
Petitioner-Intervenor-Appellant, D.C. No.
2:04-cv-00256-LRS
and
CONFEDERATED TRIBES OF THE
COLVILLE RESERVATION,
Plaintiff,
v.
TECK COMINCO METALS, LTD., a
Canadian corporation,
Defendant-Appellee.
7207
7208 PAKOOTAS v. TECK COMINCO METALS
JOSEPH A. PAKOOTAS, an individual
and enrolled member of the
Confederated Tribes of the
Colville Reservation; DONALD R.
MICHEL, an individual and enrolled
member of the Confederated
Tribes of the Coville Reservation; No. 10-35045
CONFEDERATED TRIBES OF THE
COLVILLE RESERVATION, D.C. No.
2:04-cv-00256-LRS
Plaintiffs-Appellees,
OPINION
STATE OF WASHINGTON,
Plaintiff-Intervenor-Appellee,
v.
TECK COMINCO METALS, LTD., a
Canadian corporation,
Defendant-Appellant.
Appeal from the United States District Court
for the Eastern District of Washington
Lonny R. Suko, Chief District Judge, Presiding
Argued and Submitted
November 6, 2009—Seattle, Washington
Filed June 1, 2011
Before: Arthur L. Alarcón, Andrew J. Kleinfeld, and
Richard R. Clifton, Circuit Judges.
Opinion by Judge Kleinfeld
PAKOOTAS v. TECK COMINCO METALS 7211
COUNSEL
Paul J. Dayton, Short Cressman & Burgess, PLLC, Seattle,
Washington, for the appellants.
Michael L. Dunning (argued), and Kristie E. Carevich
(briefed), Assistant Attorneys General, Olympia, Washington,
for intervenor-appellant State of Washington.
7212 PAKOOTAS v. TECK COMINCO METALS
C. Douglas Floyd (argued), and Kevin M. Fong (briefed), Pil-
lsbury Winthrop Shaw Pittman LLP, San Francisco, Califor-
nia, for the appellee.
OPINION
KLEINFELD, Circuit Judge:
We address citizen suit jurisdiction under the Comprehen-
sive Environmental Response, Compensation, and Liability
Act (CERCLA).
I. Facts
Teck Cominco Metals Limited (Teck Cominco), a Cana-
dian mining company, owns a smelter in Trail, British Colum-
bia. From 1905 to 1995, slag from the smelter was dumped
in the Columbia River, ten miles north of the border with Wash-
ington.1 Pollution flowed downstream into the United States.
In 1999, the Colville Tribes petitioned the Environmental
Protection Agency (EPA) to assess environmental contamina-
tion in the Columbia River and Lake Roosevelt, which border
their reservation’s lands.2 The EPA completed its investiga-
tion in 2003, determining that the Upper Columbia River site
was eligible for inclusion on CERCLA’s National Priorities
List.3 That list is colloquially called the “Superfund List”
because sites on it are top priorities for cleanup and are eligi-
ble for CERCLA-financed remedial action.4
1
See Pakootas v. Teck Cominco, 452 F.3d 1066, 1069 (9th Cir. 2006)
(hereinafter, Pakootas I).
2
Id.
3
Id.
4
See 42 U.S.C. § 9605(c); see also United States v. W.R. Grace & Co.,
429 F.3d 1224, 1228-29 (9th Cir. 2005) (“For example, remedial actions
are only eligible for Superfund financing when the site is listed on the
National Priorities List.”).
PAKOOTAS v. TECK COMINCO METALS 7213
While the EPA’s investigation was still ongoing in 2002,
Teck Cominco and its American subsidiary, Teck Cominco
American Incorporated, negotiated with the EPA, but did not
reach an agreement.5 Complications arose from, among other
reasons, Canadian government concerns about Canadian sov-
ereignty and the American assertion of jurisdiction.
No voluntary agreement was reached, so the EPA in
December 2003 issued a unilateral administrative order.6 The
order commands Teck Cominco and its American subsidiary
to conduct a remedial investigation and feasibility study to
assess the site conditions and to implement a cleanup.7 Teck
Cominco did not comply with the order.8 The EPA took no
action to enforce it.9
Plaintiffs Joseph A. Pakootas and Donald R. Michel sued
Teck Cominco to enforce the EPA’s unilateral administrative
order.10 They founded jurisdiction on the citizen suit provision
of CERCLA,11 seeking: (1) a declaration that Teck Cominco
was in violation of the order; (2) an injunction compelling
5
Pakootas I, 452 F.3d at 1070.
6
Pakootas I, 452 F.3d at 1070.
7
Id. at 1068.
8
Id. at 1070. In their Second Amended Complaint, Plaintiffs allege that
Teck Cominco “unequivocally indicated its intent not to comply with the
terms of the U[nilateral ]A[dministrative ]O[rder] by its letter dated Janu-
ary 12, 2004 from G. Leonard Manual to Michael F. Gearhead.”
9
Pakootas I, 452 F.3d at 1070.
10
Counsel for the parties, evidently specialists in environmental law,
refer to the unilateral administrative order as a “UAO.” We use the
English language here and elsewhere to avoid taxing the reader with
unnecessary memorization of acronyms. See Northern Cheyenne Tribe v.
Norton, 503 F.3d 836, 839 n.1 (9th Cir. 2007); Longview Fibre Co. v. Ras-
mussen, 980 F.2d 1307, 1308 n.1 (9th Cir. 1992).
11
42 U.S.C. § 9659(a)(1).
7214 PAKOOTAS v. TECK COMINCO METALS
compliance; (3) penalties for Teck Cominco’s failure to com-
ply; and (4) attorneys’ fees and costs.12
Teck Cominco moved to dismiss for lack of subject matter
and personal jurisdiction, and for failure to state a claim upon
which relief could be granted. Before the district court ruled
on the motion to dismiss, the State of Washington intervened
in the litigation and sought the same relief. The district court
denied Teck Cominco’s motion to dismiss, but certified the
order for interlocutory appeal.13 While that appeal was before
us, the Confederated Tribes of the Colville Reservation joined
as a party plaintiff. Subsequently, the State amended its com-
plaint to seek the anticipated costs of the CERCLA recovery
and assessment, as well as declaratory relief regarding the rea-
sonable costs of assessing natural resource damages, a claim
that is proceeding in district court. The Colville Tribes have
added the same demand as the State, and these claims are now
proceeding in district court.
We affirmed the district court’s denial of Teck Cominco’s
motion. We held that the suit was not an extraterritorial appli-
cation of CERCLA because even though the smelter was in
Canada, slag had moved downstream into the United States.14
Because a “site” where a hazardous substance has “come to
be located” falls within the definition of a “facility” in CER-
CLA, we held that the EPA was not acting extraterritorially
in addressing that downstream “facility.”15 The unilateral
administrative order, we held, was addressed to this “facility”
within the State of Washington.16 We did not reach the ques-
12
Pakootas I, 452 F.3d at 1070.
13
Id. at 1071.
14
Id. at 1074.
15
Id.
16
Id.
PAKOOTAS v. TECK COMINCO METALS 7215
tion of whether Congress intended CERCLA to apply extraterri-
torially.17
While that appeal was pending, but before we had decided
it, the EPA and Teck Cominco settled. The settlement went
into effect in June 2006. Teck Cominco, the Canadian com-
pany together with its American subsidiary, and the EPA,
signed what they called a “contractual agreement” (not a stip-
ulation for a consent decree or other court order) to perform
remediation. Teck Cominco consented to personal jurisdiction
in the United States District Court “solely for the limited pur-
pose of an action to enforce” designated provisions of the
contract. The EPA covenanted not to sue for penalties or
injunctive relief for noncompliance with the unilateral admin-
istrative order, “conditioned upon the satisfactory perfor-
mance” by Teck Cominco of its obligations under the
contract. And pursuant to the contract, the EPA withdrew the
unilateral administrative order. To this day, the EPA has taken
no action to collect penalties for Teck Cominco’s 892 days of
noncompliance with that order.18
Meanwhile, Teck Cominco had petitioned for certiorari
from our decision. The Supreme Court, evidently considering
the petition quite seriously, invited the Solicitor General to
17
See id.
18
Teck Cominco was out of compliance with the unilateral administra-
tive order for 892 days: from its original issuance on December 11, 2003
until it was withdrawn on June 2, 2006 by the settlement with the EPA.
This length of time could be very costly for Teck Cominco, as the statu-
tory fines for violating an order on a daily basis quickly add up. See 42
U.S.C. § 9606(b)(1) (“(1) Any person who, without sufficient cause, will-
fully violates, or fails or refuses to comply with, any order of the President
under subsection (a) may, in an action brought in the appropriate United
States district court to enforce such order, be fined not more than $25,000
for each day in which such violation occurs or such failure to comply con-
tinues.”); see also 73 Fed. Reg. 75,340, 75,340-46 (Dec. 11, 2008) (setting
the current maximum monetary penalty amount for noncompliance at
$37,500 per day).
7216 PAKOOTAS v. TECK COMINCO METALS
express the views of the United States. The Solicitor General,
urging denial of certiorari, filed an amicus brief arguing both
that the case was moot because of the settlement agreement,
and that citizen suits for penalties could be brought only for
ongoing, not past, violations. The Court denied certiorari, so
these arguments were not ruled upon.19
Plaintiffs then amended their complaint, no longer seeking
declaratory and injunctive relief, but maintaining their claims
for civil penalties for Teck Cominco’s 892 days of noncom-
pliance with the unilateral administrative order, and for costs
and attorneys’ fees. Teck Cominco once again moved to dis-
miss. The district court dismissed the claims under Rule
12(b)(1) for lack of jurisdiction. The district court granted a
stipulated Rule 54(b) certification of its dismissal order,
because Pakootas and Michel had no claims except for penal-
ties for the 892 days of past noncompliance, and resolution of
the remaining claims of the Colville Tribes and the State of
Washington for response costs or damages from the cleanup
might not be resolved for several years.
Plaintiffs appeal.
II. Analysis
We review a district court’s Rule 12(b)(1) dismissal de novo.20
The district court held that the Pakootas-Michel claim for
penalties for the 892 days of noncompliance was a challenge
barred by 42 U.S.C. § 9613(h), and that it did not fall within
§ 9613(h)(2)’s exception. We generally agree with the district
court’s careful analysis and affirm. Appellants argue that the
district court erred in both respects, and also that these statu-
tory limitations go only to whether a claim upon which relief
could be granted was stated, and not jurisdiction.
19
Teck Cominco Metals, Ltd. v. Pakootas, 552 U.S. 1095 (2008).
20
Rhoades v. Avon Products, Inc., 504 F.3d 1151, 1156 (9th Cir. 2007)
(“We review de novo dismissals under Rules 12(b)(1) and 12(b)(6).”).
PAKOOTAS v. TECK COMINCO METALS 7217
A. Is 42 U.S.C. § 9613(h) jurisdictional?
[1] Plaintiffs argue that 42 U.S.C. § 9613(h) is a timing
regulation, not a limitation on jurisdiction. We disagree. Here
is the relevant statutory language:
(h) Timing of review
No Federal court shall have jurisdiction under Fed-
eral law other than under section 1332 of Title 28
(relating to diversity of citizenship jurisdiction) or
under State law which is applicable or relevant and
appropriate under section 9621 of this title (relating
to cleanup standards) to review any challenges to
removal or remedial action selected under section
9604 of this title, or to review any order issued under
section 9606(a) of this title, in any action except one
of the following:
(1) An action under section 9607 of this title to
recover response costs or damages or for contribu-
tion.
(2) An action to enforce an order issued under sec-
tion 9606(a) of this title or to recover a penalty for
violation of such order.
(3) An action for reimbursement under section
9606(b)(2) of this title.
(4) An action under section 9659 of this title (relat-
ing to citizens suits) alleging that the removal or
remedial action taken under section 9604 of this title
or secured under section 9606 of this title was in vio-
lation of any requirement of this chapter. Such an
action may not be brought with regard to a removal
where a remedial action is to be undertaken at the
site.
7218 PAKOOTAS v. TECK COMINCO METALS
(5) An action under section 9606 of this title in
which the United States has moved to compel a
remedial action.21
Plaintiffs argue that both the title of the subsection, “Tim-
ing of review,” and a Seventh Circuit decision, Frey v. EPA,22
establish that the statute merely regulates timing, and is not a
true jurisdictional statute.
[2] Subsequent to the Seventh Circuit’s decision, the
Supreme Court clarified how to determine whether a statute
limits jurisdiction or simply affects whether a claim for relief
can be stated.23 Arbaugh v. Y & H Corp. concedes that the
Supreme “Court and others have been less than meticulous”
about when statutes should be deemed “jurisdictional.”24
Rejecting what it called “drive-by jurisdictional rulings,”25 the
Court adopted a “readily administrable bright[-]line” test.26 “If
the Legislature clearly states that a threshold limitation on a
statute’s scope shall count as jurisdictional, then courts and
litigants will be duly instructed and will not be left to wrestle
with the issue.”27 If not, then the restriction is nonjurisdictional.28
21
42 U.S.C. § 9613(h) (emphases added).
22
270 F.3d 1129 (7th Cir. 2001).
23
We recently acknowledged that a jurisdictional limitation, such as
“[s]tanding, or the lack of it, may be intertwined with whether the com-
plaint states a claim upon which relief can be granted, but it is not the
same thing.” Catholic League for Religious and Civil Rights v. City and
County of San Francisco, No. 06-17328, ___ F.3d ___, 2010 WL
4138432, at *2 (9th Cir. Oct. 22, 2010) (en banc).
24
546 U.S. 500, 511 (2006).
25
Id. at 512.
26
Id. at 516.
27
Id. at 515-16; see also Henderson v. Shinseki, No. 09-1036, slip op.
at 6 (S. Ct. Mar. 1, 2011) (“Under Arbaugh, we look to see if there is any
‘clear’ indication that Congress wanted the rule to be ‘jurisdictional.’ This
approach is suited to capture Congress’ likely intent and also provides
helpful guidance for courts and litigants, who will be ‘duly instructed’
PAKOOTAS v. TECK COMINCO METALS 7219
The Court reemphasized this bright-line test last year in Reed
Elsevier, Inc. v. Muchnik, focusing on whether the word “ju-
risdiction” was used in a sentence controlling the claim at issue.29
And even more recently in Henderson v. Shinseki, the Court
held that the 120-day deadline for filing appeals in Veterans
Court was nonjurisdictional because the provision at issue did
not speak in jurisdictional terms.30
[3] Here, the statute says “[n]o Federal court shall have
jurisdiction . . . .”31 That language expressly addresses juris-
diction, satisfying the bright-line test of Arbaugh.32 Because
the words are “[n]o Federal court shall have jurisdiction,” the
statute means that no federal court shall have jurisdiction. The
statute limits the timing of judicial review33 by means of the
“jurisdiction-stripping provision contained in 42 U.S.C.
§ 9613(h).”34 Were we to wiggle around the words “[n]o Fed-
eral court shall have jurisdiction” because of the timing lan-
guage, we would be doing just the sort of “wrestl[ing]”
Arbaugh rejects in favor of a bright-line test.35 As we held in
regarding a rule’s nature.” (citing Arbaugh, 546 U.S. at 514-16, and
n.11)).
28
See id.; Arbaugh, 546 U.S. at 515-16; Bodine v. Graco, Inc., 533 F.3d
1145, 1148 (9th Cir. 2008) (“Because [49 U.S.C. ]§ 32710(a) ‘does not
speak in jurisdictional terms or refer in any way to the jurisdiction of the
district courts,’ it was improper to dismiss this case on jurisdictional
grounds.” (quoting Arbaugh, 546 U.S. at 515)).
29
130 S. Ct. 1237, 1244-45 (2010) (discussing Arbaugh and choosing to
“apply this same approach to [17 U.S.C.] § 411(a)”).
30
Henderson v. Shinseki, No. 09-1036, slip op. at 8-9 (S. Ct. Mar. 1,
2011).
31
42 U.S.C. § 9613(h).
32
Arbaugh, 546 U.S. at 516.
33
City of Rialto v. West Coast Loading Corp., 581 F.3d 865, 869-71 (9th
Cir. 2009).
34
Id. at 869.
35
Arbaugh, 546 U.S. at 516.
7220 PAKOOTAS v. TECK COMINCO METALS
McClellan Ecological Seepage Situation v. Perry, the statute
“amounts to a ‘blunt withdrawal of federal jurisdiction.’ ”36
B. Does the jurisdictional bar apply?
(1) Is the Pakootas-Michel suit for penalties a
“challenge”?
[4] The jurisdictional bar applies to “challenges to removal
or remedial action . . . .”37 The statute “ ‘withholds federal
jurisdiction to review . . . claims, including those made in citi-
zen suits and under non-CERCLA statutes, that are found to
constitute ‘challenges’ to ongoing CERCLA cleanup actions.”38
Appellants argue that they make no challenge to the ongoing
remedial action pursuant to the contract, because all they seek
are penalties for the 892 days of past noncompliance with the
withdrawn unilateral administrative order.
[5] Congress made a choice to “protect[ ] the execution of
a CERCLA plan during its pendency from lawsuits that might
interfere with the expeditious cleanup effort.”39 As we held in
McClellan, where the EPA works out a plan, and a citizen suit
“seeks to improve on the CERCLA cleanup” because it
“wants more,” that constitutes interference.40 Such a claim
“would second-guess the parties’ determination and thus
interfere with the remedial actions selected . . . .”41
True, plaintiffs seek only past penalties, not any additional
requirements for the ongoing cleanup. But that demand is still
a challenge.
36
47 F.3d 325, 328 (9th Cir. 1995).
37
42 U.S.C. § 9613(h).
38
McClellan, 47 F.3d at 329.
39
Id.
40
Id. at 330.
41
Id.
PAKOOTAS v. TECK COMINCO METALS 7221
First, Teck Cominco and the EPA made a deal to accom-
plish the cleanup. Part of their contract is that the penalties are
neither sought nor waived. They are the EPA’s hammer, held
over Teck Cominco’s head. The penalties are not Pakootas
and Michel’s hammer to wield. The penalties are the EPA’s
hammer.
[6] Under the agreement, the United States covenanted not
to sue for the penalties for the 892 days, “conditioned upon
the satisfactory performance” by Teck Cominco of its cleanup
obligations.42 That conditional covenant not to sue means that
if Teck Cominco does not perform its obligations, the EPA
can bring down its hammer, by seeking penalties of up to
$27,500 a day for 892 days,43 more than $24 million. The pen-
alties Pakootas and Michel want to enforce are the hammer
EPA retained to compel performance of the agreement. If
42
The relevant paragraph of the agreement is as follows:
[T]he United States covenants not to sue or to take administrative
action against T[eck ]C[ominco] and T[eck ]C[ominco ]A[meri-
can ]I[ncorporated] pursuant to Sections 106 and 107(a) of CER-
CLA, 42 U.S.C. §§ 9606 and 9607(a) . . . for (i) civil penalties or
injunctive relief for non-compliance with the Unilateral Adminis-
trative Order issued by EPA to T[eck ]C[ominco] on December
11, 2003, or (ii) for performance of the R[eme-
dial ]I[nvestigation]/F[easibility ] S[tudy] costs paid by
T[eck ]C[ominco ]A[merican ]I[ncorporated]. This covenant not
to sue shall take effect upon the Effective Date of this Settlement
Agreement, and is conditioned upon the satisfactory performance
by T[eck ]C[ominco ]A[merican ]I[ncorporated] and T[eck ]C[o-
minco] of their obligations under this Agreement.
United States Environmental Protection Agency, Agreement for Remedial
Investigation and Feasibility Study, at 22 (June 2, 2006), available at
http://yosemite.epa.gov/R10/CLEANUP.NSF/7780249be8f251538825650
f0070bd8b/f0e551fb8a69dcd288256fac00064739/$FILE/TeckCominco_
SettlementAgreement.pdf.
43
See 42 U.S.C. § 9606(b)(1); see also 73 Fed. Reg. 75,340, 75,340-46
(Dec. 11, 2008) (listing the maximum penalties rate for noncompliance
from January 31, 1997 through March 15, 2004 at $27,500 per day, and
from March 16, 2004 through January 12, 2009 at $32,500).
7222 PAKOOTAS v. TECK COMINCO METALS
Pakootas and Michel were to enforce the penalties, the EPA
would be left bare-handed, without this weapon. And if Teck
Cominco paid the parties adjudicated before the cleanup was
done, it might find it economically advantageous to walk
away from further cleanup efforts, an “efficient breach.”44
Also, were the EPA to seek to enforce the agreement at that
point, all the risks to its position raised by extraterritoriality
concerns and other litigation hazards would rise again.45 Like
all litigation, a lawsuit against Teck Cominco could go sour
for the EPA. No doubt that risk played into its decision to set-
tle the matter by contract.
[7] In addition, penalties exacted before a cleanup is com-
pleted may interfere with the ability to perform a cleanup.
While Teck Cominco may, for all we know, have the ability
to pay $24 million in penalties and possibly a great deal of
additional money to Pakootas and Michel for attorneys’ fees,
and still have plenty of money left for a cleanup, that cannot
be assumed for this or for all cases. Many polluters do not
have unlimited financial resources. Sometimes the orange is
squeezed dry. And if it is, whatever juice going to the govern-
ment in penalties and to the lawyers in fees cannot go from
the polluter to the contractors who perform the cleanup work.
44
See, e.g., Charles Goetz & Robert Scott, Liquidated Damages, Penal-
ties, and the Just Compensation Principle, 77 Colum. L. Rev. 554, 578
(1977); cf. Oliver Wendell Holmes Jr., The Path of the Law, 10 Harv. L.
Rev. 457, 459 (1897) (“If you want to know the law and nothing else, you
must look at it as a bad man, who cares only for the material consequences
which such knowledge enables him to predict, not as a good one, who
finds his reasons for conduct, whether inside the law or outside of it, in
the vaguer sanctions of conscience.”).
45
See, e.g., Morrison v. Nat’l Australia Bank Ltd., 130 S. Ct. 2869, 2878
(2010) (“When a statute gives no clear indication of an extraterritorial
application, it has none.”). The Supreme Court’s recent decision in Morri-
son shows the Court’s interest in the extraterritorial application of statutes,
and this is confirmed by the Court having invited for the views of the
Solicitor General on the extraterritoriality issue with the previous petition
for certiorari in this case in 2007.
PAKOOTAS v. TECK COMINCO METALS 7223
A suit for past penalties always has the potential to interfere
with ongoing cleanup efforts, because of its potential effect on
the responsible party’s financial ability to perform the
cleanup. The $24 million in potential penalties that the con-
tract holds over Teck Cominco’s head not only works as a
hammer, but also as a means by which Teck Cominco can
perform the cleanup or pay the money to the government.
Some polluters, facing a suit for past penalties while cleanup
is ongoing, may simply go bankrupt and leave,46 or use the
threat of bankruptcy as their own hammer to hold over the
EPA’s head.
Appellants argue that our decision in ARCO Environmental
Remediation, LLC. v. Montana Department of Health & Envi-
ronmental Quality limits “challenges” to claims that would
dictate specific remedial actions or reporting requirements or
otherwise alter the cleanup plan.47 It does not. In that case,
ARCO, a potentially responsible party, sued a State of Mon-
tana agency to get access to documents pertaining to an agree-
ment between the State of Montana and the EPA relating to
a cleanup.48 It was not a citizen suit for penalties, nor did it
affect in any way the ongoing cleanup.49 We held that the law-
suit to obtain access to documents “involves only the public’s
right of access to information about the cleanup,” so it was
not a “challenge.”50 Appellants would have us parse the word
“incidental” in the decision, and infer a negative pregnant
from the distinction ARCO drew between the suit for docu-
ments and several cases where we had held that citizen suits
46
See Ingrid Martin, Spark Seeks to Ignite New Markets: Fairbanks
Battery-Maker Earl Romans Takes his Expertise to Russia, Alaska Bus.
Monthly at 56 (June 1992) (describing how a cold-weather battery manu-
facturer, faced with a $3.2 million Superfund liability, closed his business,
went bankrupt, and left for Russia to manufacture batteries there instead).
47
213 F.3d 1108 (9th Cir. 2000).
48
Id. at 1111.
49
See id. at 1115.
50
Id.
7224 PAKOOTAS v. TECK COMINCO METALS
were “challenges.” But our decision in ARCO does not hold,
as appellants argue, that no suit is a “challenge” unless it
seeks to dictate specific remedial actions, to postpone the
cleanup, to impose additional reporting requirements, or to
terminate or alter a cleanup.51 These were the “challenges”
that ARCO distinguished. The holding of ARCO is that a suit
for documents is not a challenge to an ongoing cleanup, not
that challenges are limited to the four cases ARCO distinguish-
es.52
Finally, if suits for penalties are not “challenges,” Congress
would not have had to make an exception for EPA suits to
recover penalties. The EPA could seek penalties without sub-
section (h)(2), if penalties were not “challenges.” Subsection
(h)(2) would thus be surplusage if a suit for past penalties
were not a “challenge[ ].”
[8] A citizen suit for penalties is indeed a “challenge[ ] to
removal or remedial action selected by EPA . . . .”53
(2) Does the penalty exception apply?
Plaintiffs argue alternatively that even if a citizen suit for
penalties while remediation is ongoing is a challenge, the
jurisdiction-stripping statute has an exception for such suits.
They rely on subsection (h)(2),54 quoted in context above.
Subsection (h)(2) does not apply to citizens suits. Plaintiffs
51
Id.
52
Id. at 1115-16.
53
42 U.S.C. § 9613(h).
54
The operative words of subsection (h)(2) are as follows: “No Federal
court shall have jurisdiction . . . to review any challenges to removal or
remedial action . . . in any action except one of the following: . . . . (2)
An action to enforce an order issued under section 9606(a) of this title or
to recover a penalty for violation of such order.” 42 U.S.C. § 9613(h)(2)
(emphasis added).
PAKOOTAS v. TECK COMINCO METALS 7225
argue for a “plain language” reading, and we agree that such
a reading is appropriate. But it does not suffice to only read
the word “penalty.” We must read all of the statutory lan-
guage, including the word “recover.”55 That word means, in
this context, to get money. Ordinarily, “recover” “refers to the
getting back of something lost,” or “[t]o receive a favorable
judgment in a lawsuit.”56 If Pakootas and Michel were the par-
ties entitled to “recover” the penalties for the 892 days of non-
compliance, then the exception would apply to them. But they
are not.
[9] The penalty provision speaks to penalties for violation
of orders issued under 42 U.S.C. § 9606(a). Such penalties are
denoted in § 9606(b) as “Fines.”57 The fines are paid to the
EPA as an enforcement or cost recovery action for the Super-
fund.58 They are not disbursed to persons claiming to be
injured by the pollution. The statutory scheme provides that
a person who without sufficient cause fails to comply with an
order such as the one at issue in this case “may . . . be fined
. . . for each day.”59 In appropriate circumstances, reimburse-
ment of the fine or a portion thereof “from the [Super]Fund”
may be sought.60 The penalty money is Superfund money,
payable to the government, not payable to citizens who bring
lawsuits.
[10] Thus what Pakootas and Michel seek is not a penalty
payable to themselves, but enforcement of a penalty payable
55
Id.
56
See American Heritage Dictionary 1035 (2d Coll. ed. 1985).
57
42 U.S.C. § 9606(b).
58
See 42 U.S.C. § 9613(h); see also General Electric Co. v. Jackson,
610 F.3d 110, 115 (D.C. Cir. 2010) (“Central to this case, these two
options — comply and seek reimbursement, or refuse to comply and wait
for EPA to bring an enforcement or cost recovery action — are exclu-
sive.”).
59
l42 U.S.C. § 9606(b)(1).
60
42 U.S.C. § 9606(b)(2).
7226 PAKOOTAS v. TECK COMINCO METALS
to the Superfund. Such a lawsuit is not one to “recover”
money. It is one to compel the payment of money to the
Superfund. If we had jurisdiction, there would be a serious
question as to whether Pakootas and Michel could state a
claim for the EPA to recover money it has chosen not to
recover at this time, but we cannot even consider that question
unless the exception applies, since without the exception, we
lack jurisdiction.
[11] Citizen suits for specified relief, including penalties,
are provided for in 42 U.S.C. § 9659. That provision subjects
citizen suits to the § 9613(h) exceptions: “Except as provided
. . . in section 9613(h) of this chapter relating to timing.”61
Section 9613(h)(2) provides an exception to the jurisdictional
bar for actions “to enforce an order issued under section
[9606(a)] of this title or to recover a penalty for violation of
such order.”62 Thus, this exception to jurisdiction stripping
allows the government to enforce its orders and recover pen-
alties for violation of them even when a cleanup is ongoing.
And only the government has that prerogative.
This statutory scheme becomes much easier to interpret if
we consider the sections together, to figure out what rational
purpose Congress might have had.63 And that purpose, as we
61
42 U.S.C. § 9659.
62
42 U.S.C. § 9613(h)(2).
63
See Henry M. Hart, Jr. & Albert M. Sacks, The Legal Process 1378
(William N. Eskridge, Jr. & Philip P. Frickey eds., 1994) (1958); 2 Henry
M. Hart Jr. & Albert M. Sacks, The Legal Process 1414-15 (tent. ed.
1958) (“In determining the more immediate purpose which ought to be
attributed to a statute, and to any subordinate provision of it which may
be involved, a court should try to put itself in imagination in the position
of the legislature which enacted the measure . . . . It should assume, unless
the contrary unmistakably appears, that the legislature was made up of rea-
sonable persons pursuing reasonable purposes reasonably . . . . The court
should then proceed to [ask] . . . Why would reasonable men, confronted
with the law as it was, have enacted this new law to replace it? . . . . The
most reliable guides to an answer will be found in the instances of unques-
PAKOOTAS v. TECK COMINCO METALS 7227
have said, is to prevent lawsuits that would interfere with the
cleanup process.64 It makes sense that if the polluter is not per-
forming its cleanup duties, then the EPA can swing its ham-
mer without waiting for years until the cleanup is done. It
does not make sense to read the statute as though it allowed
a citizen suit to take away this compliance device before the
cleanup is complete. And that pragmatic arrangement is the
one the words of the statute adopt.
The separate citizen suit exception that Congress provided
to the jurisdiction-stripping statute bolsters this reading. Citi-
zen suits are allowed under subsection (h)(4) for claims that
the remediation itself violates the statute.65 We note that even
in this circumstance, Congress wrote an exception to this citi-
zen suit exception (so that jurisdiction remains absent),
“where a remedial action is to be undertaken at the site.”66
This careful structuring by Congress would be gutted if a citi-
zen suit could escape the limitations and the exception to the
exception in subsection (h)(4). Yet that is just what plaintiffs
urge, dancing around subsection (h)(4)’s citizen suit provision
and trying to use the different exception in subsection (h)(2).
tioned application of the statute. Even in the case of a new statute there
almost invariably are such instances, in which, because of the perfect fit
of words and context, the meaning seems unmistakable . . . . What is cru-
cial here is the realization that law is being made, and that law is not sup-
posed to be irrational.”).
64
See, e.g., McClellan Ecological Seepage Situation v. Perry, 47 F.3d
325, 330 (9th Cir. 1995).
65
The operative words of subsection (h)(4) are as follows: “No Federal
court shall have jurisdiction . . . to review any challenges to removal or
remedial action . . . in any action except one of the following: . . . . (4)
An action under [42 U.S.C. § 9659] (relating to citizens suits) alleging that
the removal or remedial action taken under [42 U.S.C. § 9604] or secured
under [42 U.S.C. § 9606] was in violation of any requirement of this Act.
Such an action may not be brought with regard to a removal where a reme-
dial action is to be undertaken at the site.” 42 U.S.C. § 9613(h)(4).
66
Id.
7228 PAKOOTAS v. TECK COMINCO METALS
Subsection (h)(4) is the exception for citizen suits. It makes
sense in this statute to apply “the expressio unius, or inclusio
unius, principle.”67 Subsection (h)(2) is thus for the govern-
ment, so that it can wield its own hammer during the cleanup
if it deems that prudent, subsection (h)(4) is for citizen suits.
The provisions for a citizen suit in subsection (h)(4) imply
that citizen suits are not allowed under subsection (h)(2).
[12] We have found no circuit court authority to aid us in
this interpretation. Plaintiffs urge us to follow a district court
case from Puerto Rico,68 defendants a (more thoroughly rea-
soned) district court case from our own circuit.69 We agree
with the conclusion reached in Fairchild Semiconductor
Corp. v. EPA that the (h)(2) exception applies only to “[a]n
action to enforce an order issued under section 9606(a) of this
title or to recover a penalty for violation of such order[,]” and
that only the government may issue orders or recover penal-
ties for violations of those orders under § 9606(a),70 so sub-
section (h)(2) does not apply to citizens suits. Both sides cite
snippets of language from our decisions in our earlier decision
in this case,71 McClellan Ecological Seepage Situation v.
Perry,72 and City of Rialto v. West Coast Loading Corp.,73 but
in none of those cases were we faced with deciding whether
citizen suits for penalties fall within the subsection (h)(2)
exception. Now we are. We conclude that they do not.
67
Longview Fibre Co. v. Rasmussen, 980 F.2d 1307, 1312-13 (9th Cir.
1992) (noting that “ ‘when a statute limits a thing to be done in a particular
mode, it includes a negative of any other mode’ ” (quoting Raleigh & Gas-
ton Ry. Co. v. Reid, 80 U.S. 269, 270 (1871))).
68
M.R. (Vega Alta), Inc. v. Caribe General Elec. Products, Inc., 31 F.
Supp.2d 226, 233 (D. Puerto Rico 1998).
69
Fairchild Semiconductor Corp. v. EPA, 769 F. Supp. 1553 (N.D. Cal.
1991), aff’d, 984 F.2d 283 (9th Cir. 1993).
70
Id. at 1560-61.
71
Pakootas I, 452 F.3d 1066 (9th Cir. 2006).
72
47 F.3d 325 (9th Cir. 1995).
73
581 F.3d 865 (9th Cir. 2009).
PAKOOTAS v. TECK COMINCO METALS 7229
III. Conclusion
[13] As the district court correctly concluded, it lacked
jurisdiction to adjudicate the Pakootas and Michel claims for
penalties for the 892 days of noncompliance with the unilat-
eral administrative order, and properly dismissed their claims.
AFFIRMED.