UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF COLUMBIA
THE ARK INITIATIVE
and
DONALD DUERR,
Plaintiffs,
v. Civil Action No. 12-1467 (JEB)
THOMAS L. TIDWELL, Chief of the U.S.
Forest Service,
Defendant,
and
ASPEN SKIING COMPANY,
Defendant-Intervenor.
MEMORANDUM OPINION
In the mountains of Colorado, Aspen Skiing Company has begun cutting trees to create a
new ski run on the edge of Snowmass ski resort. Plaintiffs – environmental group the Ark
Initiative and its founder Donald Duerr – believe that the parcel where the trees grow should be
designated “roadless,” which they claim would block the tree removal. To that end, Plaintiffs
sent the U.S. Forest Service an “Emergency Petition” in July, asking the agency to add the parcel
to its inventory of roadless areas and suspend the permit that allows Aspen Skiing to cut the
trees. The Forest Service denied the request, explaining its reasoning in two short letters.
Plaintiffs now complain in this Court that the Forest Service gave an inadequate
explanation for its denial. They ask the Court to enjoin Aspen Skiing from cutting trees until the
1
Forest Service justifies its decision. To accomplish such purpose, Plaintiffs moved for a
preliminary injunction. With the parties’ consent, the Court consolidated the preliminary-
injunction hearing with a hearing on the merits, making Plaintiffs’ Motion for a Preliminary
Injunction akin to a motion for summary judgment. The Forest Service and Intervenor Aspen
Skiing have simultaneously moved to dismiss the case for lack of subject-matter jurisdiction or,
in the alternative, for summary judgment. Concluding that it has jurisdiction but that the Forest
Service adequately explained its decision, the Court will deny Plaintiffs’ Motion for a
Preliminary Injunction and enter judgment for the agency.
I. Background
This case is about a parcel of land, approximately one square mile in area, on Burnt
Mountain in White River National Forest, Colorado, referred to throughout as the “Burnt
Mountain parcel.” This parcel lies entirely inside Snowmass Ski Area, operated by Aspen
Skiing. The Court will first set forth the regulatory framework surrounding “roadless”
designations and then describe the procedural history of this dispute.
A. Regulatory Framework
The Forest Service manages public lands in the National Forest System. See 36 C.F.R.
§ 200.3(b)(2) (citing statutory authority). To protect pristine parcels in those forests, the Forest
Service limits activity on land that it deems a “roadless area.” See 36 C.F.R. §§ 294.42-.44.
Those roadless areas may later gain statutory protection by congressional designation as
“wilderness areas” – defined by a contemplative Congress as “an area where the earth and its
community of life are untrammeled by man, where man himself is a visitor who does not
remain.” 16 U.S.C. § 1131(c); see 16 U.S.C. § 1133.
2
The “[r]esources or features that are often present in and characterize” roadless areas
are: “High quality or undisturbed soil, water, and air”; “Sources of public drinking water”;
“Diversity of plant and animal communities”; “Habitat for threatened, endangered, proposed,
candidate, and sensitive species, and for those species dependent on large, undisturbed areas of
land”; “Primitive, semi-primitive non-motorized and semi-primitive motorized classes of
dispersed recreation”; “Reference landscapes”; “Natural-appearing landscapes with high scenic
quality”; “Traditional cultural properties and sacred sites”; and “Other locally identified unique
characteristics.” 36 C.F.R. § 294.41 (Colorado-specific definition); see also Roadless Area
Conservation Rule, 66 Fed. Reg. 3244, 3272 (Jan. 12, 2001) (listing same characteristics).
In most national forests, the 2001 Roadless Area Conservation Rule governs the use of
roadless areas. See Wyoming v. USDA, 661 F.3d 1209 (10th Cir. 2011) (upholding Roadless
Area Conservation Rule). After promulgating that Rule, the Forest Service updated its list of
roadless areas in the White River National Forest (which it calls “inventoried roadless areas”) in
2002. See 67 Fed. Reg. 39,383, 39,384 (June 7, 2002); 1 Forest Service, Final Environmental
Impact Statement for the White River National Forest Land and Resource Management Plan
2002 Revision at 3-523 to -536 (2002), S 659-72. 1 That inventory added the Burnt Mountain
Inventoried Roadless Area, which is adjacent to the Burnt Mountain parcel in dispute here, but
omitted the parcel itself from the roadless list. See 3 Forest Service, 2002 Final Environmental
Impact Statement at C-11, S 1620. Plaintiffs never commented on the omission of the Burnt
Mountain parcel.
Because a one-size-fits-all approach does not always work, especially in vast Western
States with massive national forests, the Forest Service allowed States to petition for tailored
1
The Administrative Record in this case uses two parallel numbering schemes because of prior
litigation. Page numbers for documents in the new Burnt Mountain record begin with “B,” and page
numbers for documents in the Snowmass record used in prior litigation begin with “S.”
3
rules as an alternative to the 2001 nationwide Roadless Area Conservation Rule just discussed.
See 36 C.F.R. § 294.12 (must submit petition by November 13, 2006). Colorado petitioned for
such a tailored rule. See Letter from Gov. Bill Owens to Mike Johanns, Sec’y of Agric., et al.
(Nov. 13, 2006), B 95. Because of Colorado-specific “situations and concerns” – including
“accommodating existing permitted or allocated ski areas” – the Forest Service granted the
petition and last summer promulgated a special rule for Colorado: the Colorado Roadless Areas
Rule. See 77 Fed. Reg. 39,576, 39,577 (July 3, 2012). The final Rule emerged only after years
of work by both the State and Federal Governments and extensive public involvement, including:
Colorado legislation forming a bipartisan task force to study the issue in 2005; nine public
meetings in Colorado, six deliberative meetings open to the public, and 40,000 public comments
reviewed by the task force in 2005 and 2006; a petition by Governor Bill Owens in 2006; a
revised petition by Governor Bill Ritter in 2007; a notice of intent to prepare an environmental
impact statement by the Forest Service in 2007 that received 88,000 comments; a proposed rule
by the Forest Service in 2008 that entailed nine public meetings and received another 106,000
comments; a revised petition by Colorado in 2010 after receiving 22,000 more comments; and a
second proposed rule by the Forest Service in 2011 with nine more public meetings and 56,000
more comments. See 2 Forest Service, Rulemaking for Colorado Roadless Areas: Final
Environmental Impact Statement at 3, 8-9 (2012), B 619, 624-25.
The Colorado Roadless Rule, mirroring the Roadless Area Conservation Rule, imposed a
general ban on tree cutting in roadless areas. “Trees may not be cut, sold, or removed in
Colorado Roadless Areas, except as provided in paragraph (b) and (c) of this section.” 36 C.F.R.
§ 294.42(a). Those exceptions allow cutting, however, when “the responsible official determines
the activity is consistent with the applicable land management plan,” and “[t]ree cutting, sale, or
4
removal is incidental to the implementation of a management activity not otherwise prohibited
by this subpart.” 36 C.F.R. § 294.42(b); see also 36 C.F.R. § 294.42(c)(5).
As part of the Colorado Roadless Rule, the Forest Service again updated its list of
roadless areas this year, adding hundreds of thousands of acres to its inventory. See 77 Fed. Reg.
at 39,582-83. The Forest Service also made a change crucial to the dispute here: its inventory
excluded from roadless designation land permitted for skiing to “ensure future ski area
expansions within existing permit boundaries and forest plan allocations are not in conflict with
desired conditions provided through the final rule and address one of the State-specific concerns
identified by the State of Colorado.” Id. at 39,578; see also id. at 39,582. In other words, if a
previous roadless area lay in a permitted ski area, its roadless designation was removed. 8300
such acres were delisted, including 80 acres in the Burnt Mountain Inventoried Roadless Area
that overlapped with the Snowmass Ski Area. See 2 Forest Service, 2012 Final Environmental
Impact Statement at 254 tbl.3-52, B 870. The Burnt Mountain parcel at issue here was not
removed because it had never been designated roadless in the first place. Once more, Plaintiffs
submitted no comments.
B. Procedural History
1. Previous Litigation
In 1994, the Forest Service approved the Snowmass Ski Area Master Development Plan,
authorizing Aspen Skiing to make significant changes at Snowmass. See Record of Decision
(March 1994), S 4185; see also Ski Area Term Special Use Permit (July 13, 1995), S 5566
(special use permit for “constructing, operating, and maintaining” Snowmass Ski Area, subject to
permit terms). The Plan included building trails on Burnt Mountain and performing attendant
“glading” – that is, selective tree cutting. See Record of Decision at 5-10, S 4195-200. In 2003,
5
Aspen Skiing amended the Snowmass Master Plan, altering some of its designs for Burnt
Mountain. See Snowmass Mountain Master Plan Amendment 2003, S 5741. The Forest Service
“accepted” the amendments but cautioned that it would “review each action in detail prior to
giving any final Forest Service approval.” Letter from Jim M. Upchurch, Forest Service, to Jim
Wahlstrom, Snowmass Village (Apr. 3, 2003), S 5898-99.
The next month, Aspen Skiing formally requested permission to construct trails and
perform glading on Burnt Mountain over the summer of 2004. See Letter from Victor Gerdin,
Aspen Skiing, to Upchurch et al. at 2-3 (May 2, 2003), S 3058-59. Almost three years later, after
extensive public comment and a 121-page environmental assessment, the Forest Service
approved the request in a Decision Notice. See Decision Notice (Feb. 16, 2006), S 4685; Forest
Service, Final Environmental Assessment for the Snowmass Ski Area Master Plan Amendment
Ski Area Improvements (Feb. 16, 2006), S 4746.
Plaintiffs first appealed the Decision Notice within the Forest Service. See Notice of
Appeal (Apr. 10, 2006), S 4868. One of their many complaints was that the Decision Notice had
ignored areas that had roadless characteristics but not the official “roadless area” designation –
including the Burnt Mountain parcel. These were not throwaway comments hidden in footnotes.
The appeal spent two pages arguing that “it was arbitrary, capricious and an abuse of discretion
for the Forest Service to exclude the roadless lands – located along the east side of the Snowmass
Ski Area – from the inventoried Burnt Mountain Roadless Area.” Id. at 115-17, S 4982-84. And
it spent another 11 pages objecting to the Decision Notice’s failure to disclose that the Burnt
Mountain parcel was roadless and evaluate how the construction and glading would affect the
parcel. See id. at 56-67, S 4923-34. The Forest Service affirmed its decision with respect to the
Burnt Mountain parcel, saying that altering the roadless inventory was outside the scope of the
6
proceedings. See Letter from Greg Griffith, Forest Service, to Ark Initiative et al. (May 22,
2006), S 5121 (adopting and incorporating recommendation of Peter L. Clark, Forest Service,
Recommendation Memorandum for Snowmass Master Plan Amendment and Ski Area
Improvement EA at 20-22, 29-30 (May 19, 2006), S 5085-87, 5094-95).
Having exhausted their administrative appeals, Plaintiffs then challenged the Forest
Service’s Decision Notice in federal court. The objections relating to the Burnt Mountain parcel,
however, were not among the issues they raised in the suit. The U.S. District Court for the
District of Colorado upheld the Decision Notice. See Ark Initiative v. Forest Serv., No. 06-cv-
2418, 2010 WL 3323661 (D. Colo. Aug. 18, 2010). The Tenth Circuit affirmed. See Ark
Initiative v. Forest Serv., 660 F.3d 1256 (10th Cir. 2011).
2. Current Dispute
In the summer of 2012, it finally looked like Aspen Skiing would be able to proceed with
the long-delayed construction and glading. But then on July 16, 2012, Plaintiffs submitted an
“Emergency Petition” to the Forest Service, alerting the agency to “an erroneous roadless
determination with respect to Burnt Mountain” because the Burnt Mountain parcel “does in fact
satisfy the Service’s own roadlessness criteria.” See Emergency Petition Concerning Roadless
Eligibi[l]ity of Burnt Mountain in the White River National Forest at 1-2 (July 16, 2012), B 26-
27. Plaintiffs asked the Forest Service to “revisit its roadless determination for Burnt Mountain”
and, in the meantime, “immediately suspend, pursuant to USFS regulations, the special use
authorization for [Aspen Skiing’s] project.” Id. at 2, B 27. To correct this “mistake,” Plaintiffs
proposed that the Forest Service make an “administrative correction” to the Burnt Mountain
Colorado Roadless Area boundary under 36 C.F.R. § 294.47(b) based on a “clerical error[]” –
here, overlooking the parcel’s roadless characteristics during previous inventories – or on
7
“improved field data due to updated imagery, global positioning system data, or other collected
field data” – apparently Google Earth’s upgraded resolution. See Emergency Petition at 9, B 34;
First Decl. of Donald J. Duerr, ¶ 13, B 45-46. Alternatively, the Forest Service could “modify”
the boundary under 36 C.F.R. § 294.47(a) based on “changed circumstances” – specifically,
Duerr’s observations during a recent hike. See Emergency Petition at 9 n.2, B 34; Duerr Decl. 1,
¶¶ 10-12, B 43-45.
The Forest Service rejected the request in two letters, each shorter than one page. First, a
Forest Service Supervisor explained that the 2006 Decision Notice and subsequent litigation had
already decided the issue: “[A]s I believe you are aware, tree cutting and other activities that
occur outside of the old Burnt Mountain IRA can be implemented based on the May 22, 2006
Appeal Deciding Officer’s letter and subsequent November 8, 2011 U.S. Tenth Circuit Court of
Appeals’ ruling.” Letter from Scott G. Fitzwilliams, Forest Supervisor, Forest Service, to
William S. Eubanks II, Counsel, Ark Initiative (Aug. 17, 2012), B 56. Second, the Chief of the
Forest Service said that the new Colorado Roadless Rule independently barred the petition: “The
roadless area inventory for the Colorado Roadless Rule excluded lands within ski area permitted
boundaries. . . . The expansion activities proposed by the Aspen Ski Company are within their
Master Development Plan in the permitted boundary and outside of the Burnt Mountain CRA.”
Letter from Thomas L. Tidwell, Chief, Forest Service, to Eubanks (Sept. 7, 2012), B 57.
Plaintiffs then filed suit in this Court, complaining that the explanation in the letters was
inadequate and asking for declaratory and injunctive relief. They next moved for a preliminary
injunction on September 11 to halt the tree removal until the Court could evaluate the Forest
Service’s response. Unfortunately for Plaintiffs, that was not quick enough: On August 28, the
Forest Service gave Aspen Skiing a “formal Notice to Proceed.” Letter from Fitzwilliams to
8
Steve Sewell, Aspen Skiing (Aug. 28, 2012), B 21. Over the next ten days, Aspen Skiing cut the
vast majority of trees it planned to cut. See Aspen Skiing Mot., Exh. 18 (Decl. of David Perry),
¶¶ 4-6. Now all that remains is cutting “approximately 20 to 25 trees of 6-inch diameter or
greater in two locations” and removing “brush, limbs, branches, and other potential hazards.”
Id., ¶ 6.
The parties agreed in a conference call to Chambers that the preliminary injunction and
merits determinations would be combined. As a result, the Forest Service now moves to dismiss
for want of subject-matter jurisdiction, claiming that Plaintiffs lack standing, or in the alternative
moves for summary judgment. Aspen Skiing also moves to dismiss for want of subject-matter
jurisdiction, claiming that sovereign immunity bars the suit, or in the alternative asks the Court to
limit Plaintiffs’ injunction.
As Mother Nature waits for no court and Aspen Skiing must cut the trees before the
seasons change, the parties agreed to expedited briefing. The Court held a hearing on all pending
motions on October 4, 2012. This Opinion follows the next day.
II. Legal Standard
Plaintiffs moved for a preliminary injunction but agreed to consolidate their request with
a decision on the merits. See Fed. R. Civ. P. 65(a)(2) (“Before or after beginning the hearing on
a motion for a preliminary injunction, the court may advance the trial on the merits and
consolidate it with the hearing.”). The Court will therefore treat Plaintiffs’ Motion for a
Preliminary Injunction like a motion for summary judgment. See Teva Pharm. USA, Inc. v.
FDA, 441 F.3d 1, 3 (D.C. Cir. 2006); Ass’n of Flight Attendants, AFL-CIO v. USAir, Inc., 24
F.3d 1432, 1436 (D.C. Cir. 1994). The Forest Service’s Motion seeks dismissal and, in the
alternative, summary judgment. Aspen Skiing’s Motion seeks dismissal and, in the alternative,
9
for the Court to strike part of Plaintiffs’ request for relief. The three Motions thus entail two
distinct standards of review.
A. Motion to Dismiss
In evaluating Defendants’ Motions to Dismiss, the Court must “treat the [C]omplaint’s
factual allegations as true . . . and must grant [P]laintiff[s] ‘the benefit of all inferences that can
be derived from the facts alleged.’” Sparrow v. United Air Lines, Inc., 216 F.3d 1111, 1113
(D.C. Cir. 2000) (quoting Schuler v. United States, 617 F.2d 605, 608 (D.C. Cir. 1979)) (internal
citation omitted); see also Ashcroft v. Iqbal, 556 U.S. 662, 678 (2009). The Court need not
accept as true, however, “a legal conclusion couched as a factual allegation,” nor an inference
unsupported by the facts set forth in the Complaint. Trudeau v. FTC, 456 F.3d 178, 193 (D.C.
Cir. 2006) (quoting Papasan v. Allain, 478 U.S. 265, 286 (1986)) (internal quotation marks
omitted).
To survive a motion to dismiss under Rule 12(b)(1), Plaintiffs bear the burden of proving
that the Court has subject-matter jurisdiction to hear their claims. See Lujan v. Defenders of
Wildlife, 504 U.S. 555, 561 (1992); U.S. Ecology, Inc. v. Dep’t of Interior, 231 F.3d 20, 24
(D.C. Cir. 2000). A court has an “independent obligation to determine whether subject-matter
jurisdiction exists, even in the absence of a challenge from any party.” Arbaugh v. Y & H Corp.,
546 U.S. 500, 514 (2006). “For this reason ‘the [p]laintiff’s factual allegations in the complaint
. . . will bear closer scrutiny in resolving a 12(b)(1) motion’ than in resolving a 12(b)(6) motion
for failure to state a claim.” Grand Lodge of the Fraternal Order of Police v. Ashcroft, 185 F.
Supp. 2d 9, 13-14 (D.D.C. 2001) (quoting 5A Charles A. Wright & Arthur R. Miller, Federal
Practice and Procedure § 1350 (2d ed. 1987) (alteration in original)). Additionally, unlike with a
motion to dismiss under Rule 12(b)(6), the Court “may consider materials outside the pleadings
10
in deciding whether to grant a motion to dismiss for lack of jurisdiction.” Jerome Stevens
Pharm. v. FDA, 402 F.3d 1249, 1253 (D.C. Cir. 2005); see also Venetian Casino Resort, LLC v.
EEOC, 409 F.3d 359, 366 (D.C. Cir. 2005) (“given the present posture of this case – a dismissal
under Rule 12(b)(1) on ripeness grounds – the court may consider materials outside the
pleadings”); Herbert v. Nat’l Acad. of Sciences, 974 F.2d 192, 197 (D.C. Cir. 1992).
B. Motion for Summary Judgment
Summary judgment may be granted if “the movant shows that there is no genuine dispute
as to any material fact and the movant is entitled to judgment as a matter of law.” Fed. R. Civ. P.
56(a); see also Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 247-48 (1986); Holcomb v.
Powell, 433 F.3d 889, 895 (D.C. Cir. 2006). A fact is “material” if it is capable of affecting the
substantive outcome of the litigation. See Liberty Lobby, 477 U.S. at 248; Holcomb, 433 F.3d at
895. A dispute is “genuine” if the evidence is such that a reasonable jury could return a verdict
for the nonmoving party. See Scott v. Harris, 550 U.S. 372, 380 (2007); Liberty Lobby, 477
U.S. at 248; Holcomb, 433 F.3d at 895.
Although styled Motions for Summary Judgment, the pleadings in this case more
accurately seek the Court’s review of an administrative decision. The standard set forth in Rule
56(c), therefore, does not apply because of the limited role of a court in reviewing the
administrative record. See Sierra Club v. Mainella, 459 F. Supp. 2d 76, 89-90 (D.D.C. 2006)
(citing Nat’l Wilderness Inst. v. Army Corps of Eng’rs, 2005 WL 691775, at *7 (D.D.C. 2005);
Fund for Animals v. Babbitt, 903 F. Supp. 96, 105 (D.D.C. 1995), amended on other grounds,
967 F. Supp. 6 (D.D.C. 1997)). “[T]he function of the district court is to determine whether or
not as a matter of law the evidence in the administrative record permitted the agency to make the
decision it did.” Id. at 90 (citation omitted). “Summary judgment thus serves as the mechanism
11
for deciding, as a matter of law, whether the agency action is supported by the administrative
record and otherwise consistent with the APA standard of review.” Id. (citing Richards v. INS,
554 F.2d 1173, 1177 & n.28 (D.C. Cir. 1977), cited in Bloch v. Powell, 227 F. Supp. 2d 25, 31
(D.D.C. 2002), aff’d, 348 F.3d 1060 (D.C. Cir. 2003)).
The Administrative Procedure Act “sets forth the full extent of judicial authority to
review executive agency action for procedural correctness.” FCC v. Fox Television Stations,
Inc., 556 U.S. 502, 513 (2009). It requires courts to “hold unlawful and set aside agency action,
findings, and conclusions” that are “arbitrary, capricious, an abuse of discretion, or otherwise not
in accordance with law.” 5 U.S.C. § 706. This is a “narrow” standard of review as courts defer
to the agency’s expertise. Motor Vehicle Mfrs. Ass’n of the U.S. v. State Farm Mut. Auto. Ins.
Co., 463 U.S. 29, 43 (1983). An agency is required to “examine the relevant data and articulate a
satisfactory explanation for its action including a rational connection between the facts found and
the choice made.” Id. (internal quotation marks omitted). The reviewing court “is not to
substitute its judgment for that of the agency,” id., and thus “may not supply a reasoned basis for
the agency’s action that the agency itself has not given.” Bowman Transp., Inc. v. Ark.-Best
Freight Sys., Inc., 419 U.S. 281, 285-86 (1974). Nevertheless, a decision that is not fully
explained may be upheld “if the agency’s path may reasonably be discerned.” Id. at 286.
III. Analysis
On the merits, Plaintiffs contend that the Forest Service denied their Emergency Petition
without a sufficient explanation. Before addressing this question, the Court must first resolve
some preliminary issues – including ensuring that it has jurisdiction to hear the case.
12
A. Standing
Article III of the Constitution limits the power of the federal judiciary to the resolution of
“Cases” and “Controversies.” U.S. Const. art. III, § 2; see also Allen v. Wright, 468 U.S. 737,
750 (1984) (discussing the case-or-controversy requirement). “This limitation is no mere
formality: it ‘defines with respect to the Judicial Branch the idea of separation of powers on
which the Federal Government is founded.’” Dominguez v. UAL Corp., 666 F.3d 1359, 1361
(D.C. Cir. 2012) (quoting Allen, 468 U.S. at 750). Because “standing is an essential and
unchanging part of the case-or-controversy requirement of Article III,” Lujan, 504 U.S. at 560,
finding that a plaintiff has standing is a necessary “predicate to any exercise of [the Court’s]
jurisdiction.” Fla. Audubon Soc’y v. Bentsen, 94 F.3d 658, 663 (D.C. Cir. 1996) (en banc).
“Every plaintiff in federal court,” consequently, “bears the burden of establishing the
three elements that make up the ‘irreducible constitutional minimum’ of Article III standing:
injury-in-fact, causation, and redressability.” Dominguez, 666 F.3d at 1362 (quoting Lujan, 504
U.S. at 560-61). Standing for a procedural injury is “special,” however, because a “person who
has been accorded a procedural right to protect his concrete interests can assert that right without
meeting all the normal standards for redressability and immediacy.” Lujan, 504 U.S. at 572 n.7.
“A plaintiff who alleges a deprivation of a procedural protection to which he is entitled never has
to prove that if he had received the procedure the substantive result would have been altered. All
that is necessary is to show that the procedural step was connected to the substantive result.”
Sugar Cane Growers Co-op. of Fla. v. Veneman, 289 F.3d 89, 94-95 (D.C. Cir. 2002). When
seeking review of an administrative action, the petitioning party “must support each element of
its claim to standing by affidavit or other evidence.” Sierra Club v. EPA, 292 F.3d 895, 899
(D.C. Cir. 2002) (internal quotation marks omitted).
13
In “considering whether a plaintiff has Article III standing, a federal court must assume
arguendo the merits of his or her legal claim.” Parker v. District of Columbia, 478 F.3d 370, 377
(D.C. Cir. 2007), aff’d on other grounds sub nom. District of Columbia v. Heller, 554 U.S. 570
(2008). That assumption ensures that a court does not resolve the merits while analyzing
standing. See City of Waukesha v. EPA, 320 F.3d 228, 235 (D.C. Cir. 2003). The Court here
must therefore assume arguendo that Plaintiffs’ ultimate legal claim has merit – that is, that the
Forest Service really should designate the Burnt Mountain parcel a roadless area.
Plaintiff Duerr easily satisfies standing’s injury-in-fact requirement. He declares that he
regularly hikes on the Burnt Mountain parcel and that removal of the trees will strip the land of
its pristine nature and drive away animals he likes to observe, diminishing his enjoyment of the
land. See Pls.’ Mot., Exh. 7 (Second Decl. of Donald Duerr), ¶¶ 3-4, 13-16. Such an injury is
clearly adequate. See Friends of the Earth, Inc. v. Laidlaw Envtl. Servs., Inc., 528 U.S. 167, 183
(2000); Lujan, 504 U.S. at 562-63; Sierra Club v. Morton, 405 U.S. 727, 735 (1972).
Causation and redressability present far closer questions. Because the trees’ survival at
this point turns on the roadless designation, the Court concludes that Duerr satisfies those
requirements as well. Here is the full chain of causation, link by link: If Plaintiffs prevail on
their ultimate legal claim here, then the Burnt Mountain parcel will be designated roadless. If the
parcel is designated roadless, Plaintiffs gain a procedural right to have a responsible official
decide whether the cutting can proceed. And that decision by the official on whether cutting can
proceed controls whether Aspen Skiing will cut down the trees and thus whether Duerr will
suffer his injury from diminished enjoyment of the land.
According to the Government, the roadless designation is beside the point here for two
reasons. First, the Government claims that the trees will be cut down anyway. Even in roadless
14
areas, trees may be cut if a responsible official determines both that “the activity is consistent
with the applicable land management plan” and that “[t]ree cutting, sale, or removal is incidental
to the implementation of a management activity not otherwise prohibited by this subpart.” 36
C.F.R. § 294.42(b); see also 36 C.F.R. § 294.42(c) (same); Proposed Colorado Roadless Rule, 76
Fed. Reg. 21,272, 21,276 (Apr. 15, 2011) (official makes both determinations). Because the
trees here are in ski areas and are being felled to create approved ski runs, the Government
claims that both prongs of the exception are met. The problem with that reasoning, however, is
that the regulations require a “responsible official” to determine that the exception is met; it is
not enough for the Government to assert in litigation that these trees fit the exception. To put it
simply: Without the roadless designation, Aspen Skiing can immediately cut the trees. With the
designation, the trees stay standing unless and until a responsible official makes the appropriate
findings.
Second, since the Forest Service always has to approve tree removal in national forests,
even without a roadless designation, the Government asserted at the hearing that the designation
itself adds no procedural right. (The Government did not specify precisely what standard would
apply outside of a roadless area in a national forest.) “Roadless area,” nevertheless, is a
heightened designation, presumably meaning that cutting trees in a national forest is easier than
cutting trees in a roadless area. Nothing before the Court suggests that the inquiries for roadless
and non-roadless areas are identical or that the procedural right is hollow.
While the chain here is long, each link seems to hold; thus, causation and redressability
are satisfied. Since Duerr himself has standing, the Court need not address standing for the Ark
Initiative. See Hall v. Sebelius, 667 F.3d 1293, 1295 (D.C. Cir. 2012).
15
B. Other Preliminary Issues
Defendants also assert defenses of timeliness and res judicata. Aspen Skiing, for
example, claims that a statute of limitations bars Plaintiffs’ suit. According to Intervenor,
Plaintiffs are actually attempting to challenge the Forest Service’s 2006 Decision Notice, and 28
U.S.C. § 2401(a) bars “every civil action commenced against the United States . . . unless the
complaint is filed within six years after the right of action first accrues.” That six-year statute of
limitations is a “condition attached to the government’s waiver of sovereign immunity” and is
thus “jurisdictional.” P & V Enters. v. Army Corps of Eng’rs, 516 F.3d 1021, 1026 (D.C. Cir.
2008) (citation omitted).
The Government, conversely, claims that res judicata requires dismissal. “Under the
doctrine of claim preclusion, a final judgment forecloses successive litigation of the very same
claim, whether or not relitigation of the claim raises the same issues as the earlier suit.” Taylor
v. Sturgell, 553 U.S. 880, 892 (2008) (internal quotation marks omitted). Claim preclusion aims
to weed out “matters that both might and should have been advanced in the first litigation” in
order “to force the parties to raise these matters in their first suit.” 18 Charles Alan Wright et al.,
Federal Practice & Procedure § 4406 (2d ed. 2002) (emphasis omitted). The Government, like
Aspen Skiing, asserts that Plaintiffs are really challenging the 2006 Decision Notice. Because
they objected in their administrative appeal to the omission of the Burnt Mountain parcel from
the roadless inventory, Plaintiffs could have and should have raised that objection in their
subsequent lawsuit challenging the 2006 Decision Notice. Even if the objection is different, the
Government asserts, claim preclusion still bars relitigating the validity of the 2006 Decision
Notice.
16
Both defenses are tempting. The “clerical error” and “changed circumstances” alleged
here, see 36 C.F.R. §§ 294.47(a)-(b), are flimsy – observations on a recent hike, improved
resolution on Google Maps, etc. In substance, Plaintiffs really do appear to be challenging the
Forest Service’s 2006 decision. Formally, however, Plaintiffs’ challenge is to the Forest
Service’s rejection of their 2012 Petition. As the Government concedes, § 2401(a) and claim
preclusion would offer no defense if there were a genuine change in circumstances – e.g., the
sole road on a tract falling into disuse. The deficiency of the changed circumstances alleged here
could justify affirming the Forest Service on the merits. It does not, however, stop Plaintiffs
from entering the courtroom door. Sovereign immunity and res judicata thus impose no barriers
here.
C. Merits
Through the familiar arbitrary-and-capricious standard of 5 U.S.C. § 706(2), the
Administrative Procedure Act requires an agency to “articulate a satisfactory explanation for its
action.” State Farm, 463 U.S. at 43 (internal quotation marks omitted). In the context of a
“denial in whole or in part of a written application, petition, or other request of an interested
person made in connection with any agency proceeding,” the APA requires the agency to give
“[p]rompt notice” of the decision. 5 U.S.C. § 555(e). “Except in affirming a prior denial or
when the denial is self-explanatory, the notice shall be accompanied by a brief statement of the
grounds for denial.” Id. (emphasis added).
The D.C. Circuit has described the “brief statement” requirement of § 555(e) as
“minimal,” Butte County v. Hogen, 613 F.3d 190, 194 (D.C. Cir. 2010), saying that it “probably
does not add to, and may even diminish, the burden put on an agency by the APA’s provision for
judicial review.” Roelofs v. Secretary of Air Force, 628 F.2d 594, 601 (D.C. Cir. 1980). At its
17
core, this requirement simply forces the agency to explain “why it chose to do what it did.”
Tourus Records, Inc. v. DEA, 259 F.3d 731, 737 (D.C. Cir. 2001) (citation omitted). The agency
explanations that the D.C. Circuit has branded too brief seem to be limited to single, conclusory
sentences. See Butte County, 613 F.3d at 195 (“Yet the entirety of Interior’s response to Butte
County was this: ‘We are not inclined to revisit this decision now because the Office of the
Solicitor reviewed this matter in 2003, and concurred in the NIGC’s determination of March 14,
2003.’”) (alteration omitted); Tourus Records, 259 F.3d at 737 (“The letter says nothing other
than that the ‘Affidavit of Indigency you submitted in lieu of a cost bond is not adequately
supported.’ That is not a statement of reasoning, but of conclusion.”) (citation omitted); see also
Roelofs, 628 F.2d at 596 (agency “prepared no statement of findings and offered no explanation
for its decision”).
Here, the Forest Service gave two explanations in two separate letters. (Plaintiffs have
made no objection to the split responses.) The first letter told Plaintiffs that, “as I believe you are
aware, tree cutting and other activities that occur outside of the old Burnt Mountain IRA can be
implemented based on the May 22, 2006 Appeal Deciding Officer’s letter and subsequent
November 8, 2011 U.S. Tenth Circuit Court of Appeals’ ruling.” Letter from Fitzwilliams to
Eubanks, B 56. That letter seems to reiterate the Forest Service’s 2006 denial of Plaintiffs’
request to designate the Burnt Mountain parcel roadless. Under that understanding, the Forest
Service would be “affirming a prior denial” under § 555(e) and thus would have no obligation to
provide a further explanation. The Court, however, need not resolve the adequacy of the first
letter because the second suffices.
In the second letter, the Chief of the Forest Service relied on the Colorado Roadless
Rule’s bar of roadless areas within permitted ski areas: “The roadless area inventory for the
18
Colorado Roadless Rule excluded lands within ski area permitted boundaries. This change was
applied to the Burnt Mountain roadless area. . . . The expansion activities proposed by the Aspen
Ski Company are within their Master Development Plan in the permitted boundary and outside
of the Burnt Mountain CRA.” Letter from Tidwell to Eubanks, B 57. In other words, it does not
matter whether the Burnt Mountain parcel has the characteristics of a roadless area; the parcel is
inside Snowmass Ski Area, so the Colorado Roadless Rule precludes designating it roadless.
Effectively, the Forest Service is saying that any error in earlier inventories is harmless because
the Burnt Mountain parcel cannot qualify as roadless now anyway.
Plaintiffs claim that the Chief misread the Colorado Roadless Rule. Specifically, they
assert that the Rule carved out only areas that already fell within the agency’s roadless inventory
when the Rule went into effect, and this parcel was not in the inventory on that date. See Pls.’
Reply at 3-4 (citation and emphasis omitted). They point to the Forest Service’s calculation of
the acres excluded by the Colorado Roadless Rule, which made no mention of areas (such as the
Burnt Mountain parcel) with roadless characteristics that have not been inventoried. See 77 Fed.
Reg. at 39,578 (“The final rule inventory excludes approximately 8,300 acres of permitted ski
area boundaries or ski area management allocations from CRAs, which include roadless acres
with degraded roadless area characteristics due to the proximity to a major recreational
development and is less than 0.2% of the CRAs.”).
But the question for the Court is whether the Chief’s explanation based on the Colorado
Roadless Rule was arbitrary and capricious. See also Auer v. Robbins, 519 U.S. 452, 461 (1997)
(agency’s interpretation of its own regulation is “controlling unless plainly erroneous or
inconsistent with the regulation”) (internal quotation marks omitted). One permissible reading of
the Colorado Roadless Rule – maybe even the best reading – is that the Rule precludes future
19
designation of roadless areas within ski permits. Certainly the Colorado-specific concern about
“accommodating existing permitted or allocated ski areas” applies with equal force to all land
within a ski area. 77 Fed. Reg. at 39,577. The Rule, furthermore, would create a bizarre regime
if it excluded established roadless areas that fell within ski areas yet allowed other areas with
roadless characteristics within ski areas to be added to the roadless inventory. In sum, it was not
arbitrary and capricious for the Chief to read the Colorado Roadless Rule as laying out a
forward-looking “rule” prohibiting roadless designations in ski areas, and therefore disqualifying
the Burnt Mountain parcel from roadless designation.
The Colorado Roadless Rule was not off-the-cuff rulemaking. As the Forest Service
explained in its letter, the Rule “is the result of extensive public involvement. More than
310,000 public comments, over a 6-year period, were reviewed and considered in the
development of the final rule.” Letter from Tidwell to Eubanks, B 57. Plaintiffs chose not to
comment on the Rule and thus cannot challenge it now. If Plaintiffs wanted roadless
designations in ski areas, they should have participated in the rulemaking.
IV. Conclusion
For the aforementioned reasons, the Court will deny Plaintiffs’ Motion for a Preliminary
Injunction and grant the Forest Service’s Motion for Summary Judgment. A separate Order
consistent with this Opinion will be issued this day.
/s/ James E. Boasberg
JAMES E. BOASBERG
United States District Judge
Date: October 5, 2012
20