UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF COLUMBIA
WILDEARTH GUARDIANS,
DEFENDERS OF WILDLIFE, and
SIERRA CLUB,
Plaintiffs,
v.
KEN SALAZAR, Secretary, U.S.
Department of Interior, U.S. BUREAU OF Civil Action No. 10-01174 (CKK)
LAND MANAGEMENT, and U.S. FISH
AND WILDLIFE SERVICE,
Defendants,
ANTELOPE COAL LLC, NATIONAL
MINING ASSOCIATION, and STATE OF
WYOMING,
Defendant-Intervenors.
MEMORANDUM OPINION
(May 8, 2011)
Plaintiffs Wildearth Guardians, Defenders of Wildlife, and the Sierra Club (collectively,
“Plaintiffs”) commenced this civil action challenging the federal government’s decision to
authorize the leasing of certain public lands in northeastern Wyoming for coal mining operations.
Named as defendants are Ken Salazar, in his official capacity as Secretary of the United States
Department of the Interior (the “Secretary”), the United States Bureau of Land Management (the
“BLM”), and the United States Fish and Wildlife Service (collectively, the “Federal
Defendants”). Intervening as defendants are Antelope Coal LLC (“Antelope”), the State of
Wyoming, and the National Mining Association (collectively, the “Defendant-Intervenors”).1
Presently before the Court are two essentially coterminous motions—the Defendant-Intervenors’
[52] Motion for Partial Judgment on the Pleadings and the Federal Defendants’ [53] Motion for
Partial Judgment on the Pleadings. Based on the parties’ submissions, the relevant authorities,
and the record a whole, the Court shall grant both of the pending motions.2
I. STATUTORY AND REGULATORY BACKGROUND
The Mineral Leasing Act of 1920 (the “Act”), 30 U.S.C. §§ 181 et seq., provides that
“[d]eposits of coal . . . and lands containing such deposits owned by the United States . . . shall
be subject to disposition in the form and manner provided by this chapter.” 30 U.S.C. § 181.
Under the Act, the Secretary is permitted to lease public lands for coal mining operations upon
conducting a competitive bidding process:
The Secretary of the Interior is authorized to divide any lands subject
to this chapter which have been classified for coal leasing into leasing
tracts of such size as he finds appropriate and in the public interest
and which will permit the mining of all coal which can be
economically extracted in such tract and thereafter he shall, in his
discretion, upon the request of any qualified applicant or on his own
motion, from time to time, offer such lands for leasing and shall
1
This Court previously granted the Defendant-Intervenors’ motions to intervene in this
action as a matter of right, subject to certain limitations and conditions. See Wildearth
Guardians v. Salazar, 272 F.R.D. 4 (D.D.C. 2010). The Court shall refer to the Federal
Defendants and the Defendant-Intervenors collectively as “Defendants.”
2
While the Court renders its decision today on the record as a whole, its consideration
has focused on the following documents, listed in chronological order of their filing: Pls.’
Supplemented Compl. for Declaratory J. & Injunctive Relief (“Suppl. Compl.”), ECF No. [34];
Def.-Intervenors’ Mem. of P. & A. in Supp. of Mot. for Partial J. on the Pleadings, ECF No.
[52]; Fed. Defs.’ Mem. of Law in Supp. of Their Mot. for Partial J. on the Pleadings, ECF No.
[53-1]; Pls.’ Mem. in Opp’n to Mots. for Partial J. on the Pleadings (“Pls.’ Opp’n”), ECF No.
[54]; Def.-Intervenors’ Reply Mem. in Supp. of Mot. for Partial J. on the Pleadings, ECF No.
[55]; Fed. Defs.’ Reply Br. in Supp. of Their Mot. for Partial J. on the Pleadings, ECF No. [56].
2
award leases thereon on competitive bidding.
30 U.S.C. § 201(a)(1). While the Act mandates that any coal leasing authorized by the Secretary
be done by competitive bidding and prescribes certain terms and conditions for such leasing—for
example, by requiring accepted bids to meet or exceed the fair market value of the coal in
question—the Act has little to say about the competitive bidding process itself. Instead,
Congress elected to confer upon the Secretary “sweeping authority” to promulgate regulations
designed to carry out the statutory command. Indep. Petroleum Ass’n of Am. v. DeWitt, 279 F.3d
1036, 1040 (D.C. Cir. 2002). The Act provides that “[t]he Secretary of the Interior is authorized
to prescribe necessary and proper rules and regulations to do any and all things necessary to carry
out and accomplish the purposes of this chapter.” 30 U.S.C. § 189.
Pursuant to that authority, the Secretary enacted regulations describing how the BLM
would “conduct competitive leasing of rights to extract [f]ederal coal.” 43 C.F.R. § 3420.0-1.
The regulations contemplate two separate coal leasing processes—specifically, the “competitive
regional leasing” process and the “leasing-by-application” process. See generally 43 C.F.R. pt.
3420. Both processes are forms of competitive leasing, as both contemplate an open, public, and
competitive sealed-bid process and preclude the BLM from issuing a coal lease unless the highest
bid received meets or exceeds fair market value. See 43 C.F.R. §§ 3422.1, 3422.2, 3425.4.
The competitive regional leasing process is primarily agency-driven, with the BLM
identifying public lands for prospective use and offering coal leases for sale. See Public
Participation in Coal Leasing, 64 Fed. Reg. 52,239, 52,240 (Sept. 28, 1999). The competitive
regional leasing process applies only in areas designated as “coal production regions,” which are
creatures of regulation and the boundaries of which the BLM is empowered to alter:
3
The Bureau of Land Management shall establish by publication in the
Federal Register coal production regions. A coal production region
may be changed or its boundaries altered by publication of a notice of
change in the Federal Register. Coal production regions shall be used
for establishing regional leasing levels.
43 C.F.R. § 3400.5. In the notice of proposed rulemaking, the BLM stated that the provision was
designed to “authorize[] the Bureau of Land Management to establish coal production regions for
the purpose of setting coal leasing levels and for other coal management purposes.” Proposed
Rules, 46 Fed. Reg. 61,390, 61,391-61,392 (Dec. 16, 1981). The regulations do not require the
BLM to establish specific coal production regions nor provide any express guidance as to when
and where the establishment of such regions would be appropriate.3 Nonetheless, once the BLM
has established a coal production region, the regulations specify how the BLM should go about
setting “regional leasing levels.” 43 C.F.R. § 3420.2. Specifically, when setting regional leasing
levels, the BLM must—in consultation with other federal agencies, state and local governments,
tribes, and regional coal teams—take into account such factors as national energy needs, industry
interest in coal development, and the potential economic, social, and environmental effects of
coal leasing on the region. Id. § 3420.2(c).
The leasing-by-application process, in contrast, is primarily applicant-driven, with the
applicant assuming responsibility for identifying public lands for potential use and proposing
specific tracts for leasing. See 43 C.F.R. §§ 3425.0-3425.5. The leasing-by-application process
applies in two circumstances—specifically, in “areas outside coal production regions” and in
areas within coal production regions “where an emergency need for unleased coal deposits is
3
In contrast, the regulations do specify “the process for identifying, ranking, analyzing,
selecting, and scheduling” specific lease tracts. 43 C.F.R. § 3420.3-1.
4
demonstrated.” 43 C.F.R. §§ 3425.0-2, 3425.1-5. While the leasing-by-application process is
not similarly structured around regional leasing levels, the BLM must nevertheless perform an
environmental analysis under the leasing-by-application process. See 43 C.F.R. § 3425.4.
II. FACTUAL AND PROCEDURAL BACKGROUND
A. The Certification and Decertification of the Powder River Basin as a Coal
Production Region
The Powder River Basin covers an area of approximately 24,000 square miles across
northeastern Wyoming and southeastern Montana. Suppl. Compl. ¶ 23. In 1979, the BLM
established several coal production regions; included among them was the Powder River Coal
Production Region. See Identification of Coal Production Regions Having Major Federal Coal
Interests, 44 Fed. Reg. 65,196, 65,196 (Nov. 9, 1979). As a result, any leasing within the region
was presumptively required to be conducted in accordance with the competitive regional leasing
process, which remained the state of affairs for the next decade.
The notice published in the Federal Register included the following statement concerning
the basis for the BLM’s decision to establish the various coal production regions in 1979:
In delineating the coal production regions set out in this notice, the
Department has considered the following factors: 1. Similarity in type
and situation of coal; 2. General transportation and markets; 3. Broad
economic and social-cultural similarities; 4. Administrative
efficiency; and 5. Presence of federal leases, preference right lease
applications, and other indications of industry interest in Federal coal.
Identification of Coal Production Regions Having Major Federal Coal Interests, 44 Fed. Reg. at
65,196. Furthermore, in the course of explaining why some counties were excluded from certain
coal production regions—not the Powder River Coal Production Region—the BLM “noted . . .
that if future circumstances indicate that substantial production may occur from these counties
5
subsequent boundary changes can be made to any of the coal production regions set out in this
notice to reinstate these counties into the coal region.” Id. at 65,197.
In 1989—ten years after the Powder River Coal Production Region was first established
—the BLM solicited public comments on the proposed total or partial decertification of the
Powder River Coal Production Region, citing such considerations as “limited leasing interest in
the region, soft market conditions for the foreseeable future, [] public input,” and “administrative
efficiency.” Proposed Decertification of All or a Portion of the Powder River Coal Production
Region, 54 Fed. Reg. 6,339, 6,339-6,340 (Feb. 9, 1989); see also Powder River Regional Coal
Team Activities: Public Meeting Announcement, 54 Fed. Reg. 35,941 (Aug. 30, 1989). In so
doing, the BLM observed that “if the region were partially or totally decertified, then these areas
would be opened to leasing-by-application,” but left open the possibility “for the re-
establishment of the regional activity planning process, should market conditions strengthen and
more widespread leasing again become[] necessary.” Proposed Decertification of All or a
Portion of the Powder River Coal Production Region, 54 Fed. Reg. at 6,339-6,340.
On January 9, 1990, the BLM decertified the Powder River Coal Production Region as a
coal production region, which had the effect of replacing the competitive regional leasing process
with the leasing-by-application process in that area. See Decertification of the Powder River
Coal Production Region, 55 Fed. Reg. 784 (Jan. 9, 1990). According to the notice published in
the Federal Register, the BLM received sixteen written responses supporting total or partial
decertification, and no letters of opposition. Id. at 784. During a public meeting, three parties
proposed retaining the Powder River Coal Production Region in its existing form, including the
Powder River Basin Resource Council. Id. Ultimately, the BLM adopted the recommendation
6
of the regional coal team that the Powder River Coal Production Region be completely
decertified subject to certain conditions. Id. Accordingly, beginning in early 1990, “[f]ederal
coal lease applications [could] . . . be filed in accordance with 43 C.F.R. § 3425”—that is, the
leasing-by-application process. Id. at 785.
Since decertification, coal production in the Powder River Basin has increased nearly
242%, from 184 million tons in 1990 to 444.9 million tons in 2006. Suppl. Compl. ¶ 33. Since
2000, production has increased nearly 40%. Id. ¶ 1. In 2008, 42% of all coal produced in the
United States came from the Powder River Basin. Id. The ten highest producing coal mines in
the United States are all located in the Powder River Basin. Id. Throughout this period of
increasing production in the Powder River Basin, coal leasing has been conducted according to
the leasing-by-application process.
B. The BLM’s Decision to Authorize the Leasing of the West Antelope II Tracts
On April 6, 2005, Antelope filed an application with the BLM pursuant to the leasing-by-
application process, requesting that certain public lands adjacent to Antelope’s pre-existing coal
mining operations in Campbell and Converse Counties, Wyoming—approximately 4,746 acres
of land within the Powder River Basin containing approximately 429.7 million tons of in-place
federal coal—be offered up for competitive lease sale to interested parties. Suppl. Compl. ¶¶ 34-
35, 37; see also Notice of Intent (NOI) to Prepare an Environmental Impact Statement (EIS), 71
Fed. Reg. 61,064, 61,065 (Oct. 17, 2006). Ultimately, on March 25, 2010, the BLM decided to
divide the land into two separate tracts—designated as the “West Antelope II” tracts—and to
offer each tract for lease at separate, competitive sealed-bid sales, reasoning that the
northernmost tracts would be of greater interest to companies other than Antelope. Suppl.
7
Compl. ¶¶ 37, 63-64; see also Notice of Availability of the Record of Decision, 74 Fed. Reg.
16,502 (Apr. 1, 2010). In the event the highest bid received at each sale met or exceeded the fair
market value for the leases and all other leasing requirements were met, the leases would be
issued to the successful qualified bidder or bidders. In the course of reaching this decision, the
BLM prepared an Environmental Impact Statement, a subject of considerable dispute among the
parties. Suppl. Compl. ¶ 63; see also Notice of Availability of Final Environmental Impact
Statement, 74 Fed. Reg. 4,228 (Jan. 23, 2009).
III. LEGAL STANDARD
Under the Federal Rules of Civil Procedure, a party may move for judgment on the
pleadings “[a]fter the pleadings are closed—but early enough not to delay trial.” Fed. R. Civ. P.
12(c). The appropriate standard for reviewing a motion for judgment on the pleadings is
“virtually identical” to that applied to a motion to dismiss for failure to state a claim under Rule
12(b)(6). Baumann v. District of Columbia, 744 F. Supp. 2d 216, 221 (D.D.C. 2010). Because a
Rule 12(c) motion “would summarily extinguish litigation at the threshold and foreclose the
opportunity for discovery and factual presentation,” the district court must approach such
motions “with the greatest of care” and deny it “if there are allegations in the complaint which, if
proved, would provide a basis for recovery.” Haynesworth v. Miller, 820 F.2d 1245, 1254 (D.C.
Cir. 1987), abrogated on other grounds by Hartman v. Moore, 547 U.S. 520 (2006). The district
court is limited to considering facts alleged in the complaint, any documents attached to or
incorporated in the complaint, matters of which the court may take judicial notice, and matters of
public record. Baumann, 744 F. Supp. 2d at 222.
A complaint must contain “a short and plain statement of the claim showing that the
8
pleader is entitled to relief,” Fed. R. Civ. P. (8)(a), “in order to ‘give the defendant fair notice of
what the . . . claim is and the grounds upon which it rests.’” Bell Atl. Corp. v. Twombly, 550
U.S. 544, 555 (2007) (quoting Conley v. Gibson, 355 U.S. 41, 47 (1957)). When presented with
a motion to dismiss on the ground that the complaint “fail[s] to state a claim upon which relief
can be granted,” Fed. R. Civ. P. 12(b)(6), the district court must accept as true the well-pleaded
factual allegations contained in the complaint, Atherton v. D.C. Office of Mayor, 567 F.3d 672,
681 (D.C. Cir. 2009), cert. denied, __ U.S. __, 130 S. Ct. 2064 (2010). Although “detailed
factual allegations” are not necessary to withstand a motion to dismiss for failure to state a claim,
to provide the “grounds” of “entitle[ment] to relief,” a plaintiff must furnish “more than labels
and conclusions” or “a formulaic recitation of the elements of a cause of action.” Twombly, 550
U.S. at 555. “Nor does a complaint suffice if it tenders ‘naked assertion[s]’ devoid of ‘further
factual enhancement.’” Ashcroft v. Iqbal, __ U.S. __, 129 S. Ct. 1937, 1949 (2009) (quoting
Twombly, 550 U.S. at 557). Rather, a complaint must contain sufficient factual allegations that,
if accepted as true, “state a claim to relief that is plausible on its face.” Twombly, 550 U.S. at
570. “A claim has facial plausibility when the plaintiff pleads factual content that allows the
court to draw the reasonable inference that the defendant is liable for the misconduct alleged.”
Iqbal, 129 S. Ct. at 1949. The plaintiff must provide more than just “a sheer possibility that a
defendant has acted unlawfully.” Id. at 1950. When a complaint’s well-pleaded facts do not
enable a court, “draw[ing] on its judicial experience and common sense,” “to infer more than the
mere possibility of misconduct,” the complaint has not shown that the pleader is entitled to relief.
Id.
9
IV. DISCUSSION
Plaintiffs assert a total of four claims in this action, each of which is a challenge—in one
way or another—to the BLM’s March 25, 2010 decision to authorize the leasing of the West
Antelope II tracts for prospective coal mining operations. Only one of those four claims is the
subject of the instant motions—the first. Due in large part to Plaintiffs’ opaque reasoning, the
contours of that claim are not readily susceptible to precise definition, and the parties have
unsurprisingly offered conflicting characterizations of the claim. As explained in greater detail
below, the Court credits Defendants’ characterization of the claim, which leads ineluctably to the
conclusion that the claim is time-barred. However, even crediting Plaintiffs’ characterization of
their claim, Plaintiffs fail to state a plausible claim for relief.
A. Plaintiffs’ First Claim for Relief is an Untimely Collateral Attack on the BLM’s
January 1990 Decision to Decertify the Powder River Coal Production Region
The dispute presents at the outset a question of framing—specifically, whether Plaintiffs’
first claim for relief should be construed as a collateral attack on the BLM’s decision to decertify
the Powder River Basin as a coal production region in January 1990—more than twenty years
before the BLM decided to authorize the leasing of the West Antelope II tracts—or whether it
should instead be seen as a challenge to the BLM’s ongoing failure to “recertify” the Powder
River Basin as a coal production region prior to approving the leasing of the West Antelope II
tracts based upon the alleged increase in coal production within the Powder River Basin in the
intervening two decades. The question is an important one; if Plaintiffs’ claim is properly
construed as a challenge to the BLM’s 1990 decertification decision, it would plainly be time-
barred. The Court therefore begins with a more fulsome discussion of the nature of the claim.
What is clear is that the claim rests to some extent on the provisions of the Administrative
10
Procedure Act (the “APA”), with Plaintiffs claiming that the BLM’s decision to authorize the
leasing of the West Antelope II tracts was “arbitrary and capricious and otherwise not in
accordance with law,” Suppl. Compl. ¶ 105, which the Court takes as a reference to the APA
provision permitting a reviewing court to “set aside agency action, findings, and conclusions
found to be . . . arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with
law.” 5 U.S.C. § 706(2)(A). Unfortunately, the picture begins to cloud as one proceeds from this
starting point. Plaintiffs allege that the BLM’s March 25, 2010 leasing decision was in error
because the BLM approved the leasing of the West Antelope II tracts without first “recertifying”
the entirety of the Powder River Basin as a coal production region. See Suppl. Compl. ¶¶ 98-
105. While Plaintiffs concede, as they must, that the Powder River Basin was decertified as a
coal production region over two decades before the BLM authorized the leasing of the West
Antelope II tracts, and that the region was not certified as a coal production region at the time the
BLM rendered its final leasing decision, Plaintiffs steadfastly maintain that they are not in fact
challenging the BLM’s decertification decision. Pls.’ Opp’n at 10. Instead, Plaintiffs frame their
claim as a challenge to the “[c]ontinuing decertification of the Powder River Basin,” contending
that “[g]iven the [current] levels of coal production in the Powder River Basin, and anticipated
production levels for the West Antelope II leases, decertification is no longer appropriate.”
Suppl. Compl. ¶¶ 102, 105. Plaintiffs contend that the Powder River Basin should have been
“recertified” as a coal production region prior to the authorization of the leasing of the West
Antelope II tracts, which by extension would have required the BLM to evaluate the propriety of
any leasing under the “competitive regional leasing” process that applies within coal production
regions, as opposed to the “leasing-by-application process” that applies outside coal production
11
regions. From this premise, Plaintiffs argue that the BLM “improperly authorized” the leasing of
the West Antelope II tracts under the leasing-by-application process. Id. ¶ 104.
Defendants persuasively rejoin that Plaintiffs’ first claim for relief is—at its core—a
thinly veiled challenge to the BLM’s 1990 decertification decision, because it was that decision
that prescribed the specific leasing process that the BLM would apply to administer its federal
coal leasing program in the Powder River Basin from that point forward. Significantly, this
conclusion necessarily flows from the limitations imposed on the scope of judicial review of
agency action. Under the APA, the reviewing court is generally confined to evaluating “final
agency action,” 5 U.S.C. § 704, which may include “the whole or part of an agency rule, order,
license, sanction, relief, or the equivalent or denial thereof, or failure to act,” id. § 551(13). As
the United States Supreme Court has observed, all of these enumerated categories implicate
“circumscribed, discrete agency actions,” a limitation designed in large part “to protect agencies
from undue interference with their lawful discretion, and to avoid judicial entanglement in
abstract policy disagreements.” Norton v. S. Utah Wilderness Alliance, 542 U.S. 55, 62 & 66
(2004). But Plaintiffs’ first claim for relief is less a challenge to a discrete action taken by the
BLM than a challenge to the BLM’s broader policy decision to phase out coal production
regions—and, in particular, the Powder River Coal Production Region—and to conduct its
federal coal leasing program pursuant to the leasing-by-application process going forward.
Critically, that policy decision was announced in January 1990, when the BLM decertified the
Powder River Coal Production Region and thereby displaced the competitive regional leasing
process with the leasing-by-application process in that area. See Decertification of the Powder
River Coal Production Region, 55 Fed. Reg. 784 (Jan. 9, 1990). It was that decision—and none
12
other—that defined the process by which federal coal leasing was to occur in the Powder River
Basin from that point onward absent further agency action.4 Because any cause of action
pertaining to that agency action began to accrue on the date the action was taken—January 9,
1990—Plaintiffs’ challenge is untimely because “every civil action commenced against the
United States shall be barred unless the complaint is filed within six years after the right of action
first accrues.” 28 U.S.C. § 2401(a).
While not dispositive, the Court is mindful that this six-year limitations period must be
“strictly construed” in favor of the United States. Spannaus v. U.S. Dep’t of Justice, 824 F.2d 52,
55 (D.C. Cir. 1987). In this case, were Plaintiffs’ proffered theory to prevail, it might very well
have the effect of vitiating the essential function of the limitations period—to provide repose
when parties elect not to act upon their legal rights in a timely manner. In particular, Plaintiffs’
theory would require federal agencies to constantly reevaluate and defend their past policy
decisions in perpetuity, even in the absence of a mandatory statutory or regulatory duty to do so,
whenever they take some action that somehow pertains to or relies upon those past decisions.
Simply put, this “theory cannot hold water because . . . it would thwart statutes of limitations by
allowing for instant revival of challenges to decades-old agency actions, and because it would
open the door for the kind of programmatic challenges courts cannot hear, simply by treating an
4
Viewed from a slightly different perspective, the BLM’s 1990 decertification decision
“mark[ed] the consummation of [the BLM’s] decisionmaking process” and constitutes the
agency decision from which “rights and obligations [were] to be determined.” Bennett v. Spear,
520 U.S. 154, 177-78 (1997). Despite Plaintiffs’ consistent attempts to draw the attention
elsewhere, “[w]hen an agency has employed a formal procedure . . . to announce a major policy
decision not to regulate certain conduct, courts can use this procedure as ‘a focal point for
judicial review.’” Alliance for Bio-Integrity v. Shalala, 116 F. Supp. 2d 166, 171 (D.D.C. 2000)
(quoting Nat’l Treasury Employees Union v. Horner, 854 F.2d 490, 496 (D.C. Cir. 1988)).
13
agency’s ‘adoption’ of an existing program as discrete agency action.” Friends of The Earth,
Bluewater Network Div. v. U.S. Dep’t of Interior, 478 F. Supp. 2d 11, 26 (D.D.C. 2007).
Notably, such a conclusion hardly leaves Plaintiffs without a remedy. To the extent they
believed that the “continued decertification” of the Powder River Basin was no longer
appropriate, Plaintiffs were free to petition the BLM to “recertify” the Powder River Basin as a
coal production region at any point in the past two decades. In fact, Plaintiffs eventually did
precisely that, and their petition for “recertification” is now the subject of a separate civil action
pending before this Court. See Compl., Wildearth Guardians v. Salazar, No. 11 Civ. 670 (CKK)
(D.D.C. Apr. 4, 2011), ECF No. [1].
In sum, the Court construes Plaintiffs’ first claim for relief as a challenge to the BLM’s
decertification decision, and construed as such, the claim is untimely and must be dismissed.
B. Plaintiffs Fail to State a Plausible Claim for Relief Based on the BLM’s
Alleged Failure to “Recertify” the Powder River Basin
Even crediting Plaintiffs’ characterization of their first claim for relief as a putative
challenge to the BLM’s ongoing failure to “recertify” the Powder River Basin at some
unspecified point in time prior to authorizing the leasing of the West Antelope II tracts, the same
result would obtain. For at least two reasons, Plaintiffs simply fail to state a plausible claim for
relief. First, the essential premise to such a claim—that the BLM was somehow required to
recertify the Powder River Basin—is without legal support. Second, even assuming, arguendo,
that the BLM was subject to an abstract obligation to establish some coal production regions at
some point in time, the question of when and where to establish coal production regions is a
matter that has been committed to the BLM’s discretion by law and lies beyond the ambit of
judicial review. Both grounds for dismissal turn on the conclusion that the relevant statutory and
14
regulatory framework neither requires the BLM to establish specific coal production regions nor
provides a meaningful standard to adjudge the BLM’s exercise of its discretion in this field.
1. The Relevant Statutory and Regulatory Framework Does Not Require
the BLM to Establish Coal Production Regions
In their first claim for relief, Plaintiffs purport to challenge the BLM’s March 25, 2010
decision to authorize the leasing of the West Antelope II tracts through the leasing-by-application
process. There are three important matters that are undisputed about the circumstances
surrounding the BLM’s leasing decision. First, it is undisputed that the BLM authorized the
leasing of the West Antelope II tracts pursuant to the “leasing-by-application” process. Second,
it is undisputed that the West Antelope II tracts were not within a “coal production region,” as
that term is used in 43 C.F.R. § 3400.5, at the time the BLM rendered its decision.5 Third, it is
undisputed that the BLM’s coal leasing regulations provide that the “competitive regional
leasing” process applies within coal production regions—and only within coal production
regions—while the “leasing-by-application” process applies outside coal production regions. See
generally 43 C.F.R. pt. 3420.
All this leads to an important conclusion—one that is not contested by the parties but
nevertheless warrants mentioning here. Because the competitive regional leasing process only
applies in coal production regions and because the West Antelope II tracts were indisputably not
within a coal production region at the time the BLM rendered its decision, Plaintiffs’ first claim
for relief necessarily hinges on the premise that the BLM was somehow required to recertify the
5
Indeed, the Powder River Coal Production Region, which would have encompassed the
West Antelope II tracts had it survived, had not been certified as a coal production region for
over twenty years. See Decertification of the Powder River Coal Production Region, 55 Fed.
Reg. 784 (Jan. 9, 1990).
15
Powder River Basin as a coal production region before it authorized the leasing of the West
Antelope II tracts. Indeed, had the BLM hypothetically sought to lease the West Antelope II
tracts pursuant to the competitive regional leasing process without first recertifying the area as a
coal production region, its decision would clearly have run counter to its own coal leasing
regulations, as the competitive regional leasing process is by definition confined to coal
production regions. See generally 43 C.F.R. pt. 3420. And so, in order to state a plausible claim
for relief, Plaintiffs must show that the BLM was required to recertify the Powder River Basin as
a coal production region before it authorized the leasing of the West Antelope II tracts.
The logical next question is what could be the source of the alleged obligation. Despite
having ample opportunity to do so, Plaintiffs have failed to answer that question. Simply put, no
such obligation emanates from the Mineral Leasing Act of 1920, the BLM’s coal leasing
regulations, or the BLM’s formal or informal policy statements and pronouncements. The Court
shall address each of these potential sources in turn.
i. The Mineral Leasing Act of 1920
While Plaintiffs wisely disclaim any reliance upon the terms of the Mineral Leasing Act
of 1920 to support their claim, the Act is not, as they inexplicably suggest, completely
“inapposite” to the viability of their claim. Pls.’ Opp’n at 6. The Court takes note of the fact that
the Act makes no mention of coal production regions, the competitive regional leasing process,
or the leasing-by-application process. Instead, Congress simply conferred upon the Secretary the
broad authority “to divide any lands . . . which have been classified for coal leasing into leasing
tracts of such size as he finds appropriate and in the public interest,” and vested him with the
“discretion, upon the request of any qualified applicant or on his own motion, from time to time,
16
[to] offer such lands for leasing and [to] award leases thereon on competitive bidding.”6 30
U.S.C. § 201(a)(1). Rather than defining the precise contours of the competitive leasing process,
Congress elected to confer upon the Secretary “sweeping authority” to promulgate regulations in
this area, Indep. Petroleum Ass’n of Am., 279 F.3d at 1040, expressly authorizing him to
“prescribe [any and all] necessary and proper rules and regulations” to discharge his discretion,
30 U.S.C. § 189. In other words, the Act simply has nothing to say about certifying, decertifying,
or recertifying coal production regions. While this congressional silence is not the end of the
matter, it is nonetheless relevant in asking whether the BLM was under an obligation to recertify
the Powder River Basin as a coal production region before it authorized the leasing of the West
Antelope II tracts. The statute itself imposed no such obligation on the BLM.
ii. The BLM’s Coal Leasing Regulations
Recognizing that no mandatory obligation can be found in the Act itself, Plaintiffs
purport to rely on the BLM’s coal leasing regulations, suggesting that the BLM has somehow
“failed to comply with its own leasing regulations” by failing to recertify the Powder River Basin
prior to authorizing the leasing of the West Antelope II tracts. Pls.’ Opp’n at 6. The argument is
without merit. While agencies may certainly be bound by the terms of their own regulations, the
two provisions relied upon by Plaintiffs—43 C.F.R. §§ 3400.5, 3420.0-2—simply do not impose
upon the BLM any obligation to certify, decertify, or recertify coal production regions nor
provide any guidance as to whether, when, and where coal production regions should be
established. The first cited provision merely authorizes the BLM to alter or change the
6
As described above, both the competitive regional leasing process and the leasing-by-
application process are forms of competitive leasing. See supra Part I.
17
boundaries of coal production regions by publication of a notice in the Federal Register.7 43
C.F.R. § 3400.5. The second cited provision merely sets forth the overarching objectives of the
coal leasing regulations.8 Id. § 3420.0-2. Neither provision can be read as cabining the BLM’s
discretion to certify, decertify, or recertify coal production regions as it sees fit in an exercise of
7
The provision provides, in full, as follows:
The Bureau of Land Management shall establish by publication in the
Federal Register coal production regions. A coal production region
may be changed or its boundaries altered by publication of a notice of
change in the Federal Register. Coal production regions shall be used
for establishing regional leasing levels under § 3420.2 of this title.
Coal production regions shall be used to establish areas in which
leasing shall be conducted under § 3420.3 of this title and for other
purposes of the coal management program.
43 C.F.R. § 3400.5. The BLM does not interpret this provision as cabining its discretion to
establish coal production regions as it sees fit but rather sees it as prescribing the requisite
procedure to be followed when it elects to exercise that discretion—namely, publication in the
Federal Register. Because the BLM is the agency charged with administering the regulations, its
interpretation is entitled to deference. See Thomas Jefferson Univ. v. Shalala, 512 U.S. 504, 512
(1994) (agency’s interpretation of its own regulation must be given controlling weight unless
plainly erroneous or inconsistent with the regulation). The BLM’s proffered interpretation is
reasonable; indeed, the Court would adopt the same interpretation were it presented with the
question de novo.
8
The provision provides, in full, as follows:
The objectives of these regulations are to establish policies and
procedures for considering development of coal deposits through a
leasing system involving land use planning and environmental
assessment or environmental impact statement processes; to promote
the timely and orderly development of publicly owned coal resources;
to ensure that coal deposits are leased at their fair market value; and
to ensure that coal deposits are developed in consultation, cooperation
and coordination with the public, state and local governments, Indian
tribes and involved Federal agencies.
43 C.F.R. § 3420.0-2.
18
its discretion, nor as providing any guidance as to whether, when, and where coal production
regions should be established.
In an attempt to evade this conclusion, Plaintiffs speculate that the BLM simply “must
have” intended to have a competitive regional leasing program on an ongoing basis or else the
regulations governing that process would be “entirely superfluous.” Pls.’ Opp’n at 7. There are
several reasons why this argument is unavailing, but the Court will only mention two. First, the
BLM indisputably did maintain a competitive regional leasing program for over a decade,
meaning that the regulations plainly were not “superfluous” at that time. What Plaintiffs appear
to be suggesting is that the BLM was somehow obligated to rescind the regulations once they
were no longer in active use, but they cite no legal support for the proposition and the Court is
aware of none. Second, and in a similar vein, the BLM has never foreclosed the possibility that it
might create new coal production regions sometime in the future. Should it elect to do so, the
regulations would clearly serve a renewed purpose at that time, and not be, as Plaintiffs suggest,
“superfluous.” In the final analysis, Plaintiffs’ arguments fall woefully short of transforming the
BLM’s coal leasing regulations into a mandatory obligation to create coal production regions.
iii. The BLM’s Statements and Pronouncements
With these avenues foreclosed, Plaintiffs next turn to a handful of statements and
pronouncements made by the BLM over the years with the basic aim of suggesting that the BLM
is required to establish coal production regions wherever significant coal production may be
expected to occur. Pls.’ Opp’n at 8. True, “[i]t is well settled that an agency, even one that
enjoys broad discretion, must adhere to voluntarily adopted, binding policies that limit its
discretion.” Padula v. Webster, 822 F.2d 97, 100 (D.C. Cir. 1987). However, the question that
19
remains is whether the statements relied upon by Plaintiffs “create binding norms by imposing
rights or obligations on the respective parties.” Steenholdt v. Fed. Aviation Admin., 314 F.3d
633, 638 (D.C. Cir. 2003) (emphasis in original). Generally speaking, “an agency
pronouncement is transformed into a binding norm if the statement’s language, context, and
available extrinsic evidence indicate the agency so intended.” Empresa Cubana Exportadora de
Alimentos y Productos Varios v. United States, 516 F. Supp. 2d 43, 58 (D.D.C. 2007) (internal
quotation marks omitted). Where, as here, the pronouncements impose no significant restraints
on the agency’s discretion, they cannot be regarded as binding norms. Padula, 822 F.2d at 100.
Plaintiffs first rely upon a particular phrase used by the BLM in the notice of final
rulemaking that it published in the Federal Register when first enacting its coal leasing
regulations in 1979—namely, the “normal leasing process.” See Final Rulemaking, 44 Fed. Reg.
42,584, 42,594 (July 19, 1979). Specifically, Plaintiffs suggest that the “agency repeatedly
referred to the Competitive [Regional] Leasing Program as ‘the normal leasing process’ for
federal coal.” Pls.’ Opp’n at 7. As a threshold matter, Plaintiffs’ argument fails at the outset
because it rests on a strained and untenable reading of the BLM’s notice of final rulemaking. In
proffering their interpretation, Plaintiffs elide the fact that the leasing-by-application process
applies not just in “areas outside coal production regions,” but also within coal production
regions “where an emergency need for unleased coal deposits is demonstrated.” 43 C.F.R. §§
3425.0-2, 3425.1-5. Here, the language in the notice of final rulemaking that is relied upon by
Plaintiffs at most suggests that the BLM intended the competitive regional leasing process to be
the default leasing process within coal production regions. That is, the cited language speaks to a
concern that the “emergency need” exception to the competitive regional leasing process be
20
appropriately circumscribed. It does not suggest that the leasing-by-application process was to be
the exception to the rule. Regardless, even crediting Plaintiffs’ interpretation, mere passing
references to a certain process as “normal” in a notice of rulemaking hardly creates the sort of
“binding norm” that could support their first claim for relief. There simply is no indication—
none—that the BLM intended to cabin its discretion to certify, decertify, and recertify coal
production regions or to prioritize the competitive regional application process over the leasing-
for-application process.
The same holds true for the BLM’s statement—made in the context of delineating the
boundaries of coal production regions in 1979—that it included counties within the designated
regions within which “substantial [coal] production may occur.” Identification of Coal
Production Regions Having Major Federal Coal Interests, 44 Fed. Reg. at 65,197. Rather than
cabining the scope of the BLM’s discretion to certify, decertify, or recertify coal production
regions, the statement actually reinforces that discretion. In the cited language, the BLM was
explaining that “subsequent boundary changes can be made to any of the coal production regions
set out in this notice.” Id. That the BLM identified as one of the factors in its decision the level
of coal production in the areas at issue is hardly remarkable—it would be a strange thing indeed
if the BLM decided to create a coal production region in an area without meaningful levels of
coal production. But in making the statement, the BLM did not impose upon itself a “binding
norm” to certify, decertify, or recertify coal production regions or to limit the factors it could
consider in exercising its discretion.
Nor did the BLM cabin the scope of its broad discretion when it fleshed out the reasons
behind its decision to create certain coal production regions. The notice published in the Federal
21
Register included the following statement concerning the basis for the BLM’s decision to
establish the various coal production regions:
In delineating the coal production regions set out in this notice, the
Department has considered the following factors: 1. Similarity in type
and situation of coal; 2. General transportation and markets; 3. Broad
economic and social-cultural similarities; 4. Administrative
efficiency; and 5. Presence of federal leases, preference right lease
applications, and other indications of industry interest in Federal coal.
Identification of Coal Production Regions Having Major Federal Coal Interests, 44 Fed. Reg. at
65,196. But this is merely the explanation for the agency’s reasoned decision. It too does not
evince any intention on the BLM’s part to create a “binding norm” governing future agency
decisionmaking. The agency did not purport to limit the factors that it might consider when
certifying, decertifying, or recertifying coal production regions in the future, nor can it be read as
requiring the BLM to create coal production regions in specific areas. What Plaintiffs would
essentially have this Court conclude is that whenever an agency attempts to articulate the
reasoning behind a decision entrusted to its discretion by law, it cabins its discretion to depart
from that reasoning down the road and freezes its decisionmaking in time. But this is not the
law—the language and context of the agency’s pronouncement must evince an intent to be bound
thereby. No such intent exists here.
In the final analysis, Plaintiffs have failed to point this Court to any legal authority that
could conceivably serve as a basis for concluding that the BLM was required to recertify the
Powder River Basin before authorizing the leasing of the West Antelope II tracts. See Alliance to
Save Mattaponi v. U.S. Army Corps of Eng’rs, 515 F. Supp. 2d 1, 5 (D.D.C. 2007) (dismissal
appropriate where plaintiff “identified no nondiscretionary duty that [the agency] has failed to
perform.”). Congress expressly conferred upon the Secretary the discretion to offer public lands
22
for coal leasing, and left it to the agency to articulate the process and procedure that it considered
necessary and proper to carry out the statutory command to lease such lands upon competitive
bidding. See 30 U.S.C. §§ 189, 201(a)(1). In enacting the contemplated regulations pursuant to
the authority conferred upon it by Congress, the BLM created two competitive leasing
processes—one applying within coal production regions and a second applying largely outside
coal production regions. See generally 43 C.F.R. pt. 3420. Those regulations articulated the
procedure to be used when creating coal production regions—notice in the Federal Register—but
neither required the creation of coal production regions nor specified when and where the
creation of coal production regions might be appropriate. See 43 C.F.R. § 3400.5. When it first
certified various coal production regions, the BLM made a variety of statements explaining the
basis for its decision, none of which can be construed as cabining its discretion to decide
whether, when, and where to create coal production regions. Without a mandatory obligation to
create coal production regions at all, let alone coal production regions in specific areas or under
certain circumstances, Plaintiffs’ first claim for relief—which hinges on the premise that the
BLM was somehow required to recertify the Powder River Basin as a coal production region
before it authorized the leasing of the West Antelope II tracts—fails to state a plausible claim for
relief and must be dismissed.
2. The Relevant Statutory and Regulatory Framework Does Not Provide
a Judicially Manageable Standard
Even assuming, arguendo, that the BLM was subject to an abstract obligation to establish
some coal production regions at some point in time, the question of when and where to establish
coal production regions is a matter that has been committed to the BLM’s discretion by law and
lies beyond the ambit of judicial review. It is axiomatic that judicial review cannot extend to
23
“agency action [that] is committed to agency discretion by law.” 5 U.S.C. § 701(a)(2). In order
for the district court to exercise its judicial function, there must be “law to apply.” Citizens to
Preserve Overton Park, Inc. v. Volpe, 401 U.S. 402, 410 (1971). In recognition of this sensible
principle, judicial review will not lie where the governing statute and regulations are “drawn so
that a court would have no meaningful standard against which to judge the agency’s exercise of
discretion.” Heckler v. Chaney, 470 U.S. 821, 830 (1985). In the instant case, Plaintiffs readily
concede that neither the Act nor the BLM’s coal leasing regulations “contain absolute, bright-line
criteria for defining a Coal Production Region.” Pls.’ Opp’n at 8. But the concession is a radical
understatement—neither contains any criteria for defining a coal production region. See 30
U.S.C. § 201(a)(1); 43 C.F.R. § 3400.5.
In the face of this statutory and regulatory silence, Plaintiffs suggest that “substantial coal
production” provides a meaningful standard against which to adjudge the BLM’s exercise of its
discretion, language that it pulls from statements made by the BLM in the course of certifying
and decertifying the Powder River Basin, none of which created binding norms governing future
conduct. See, e.g., Identification of Coal Production Regions Having Major Federal Coal
Interests, 44 Fed. Reg. at 65,197 (noting that additional counties could be added to coal
production regions “if future circumstances indicate that substantial production may occur from
these counties.”). True, “judicially manageable standards ‘may be found in formal and informal
policy statements.’” Steenholdt, 314 F.3d at 638 (quoting Padula, 822 F.2d at 100). But even
assuming that “substantial coal production” could constitute a judicially manageable standard,9
9
Such an assumption would be of questionable soundness. Notably, while Plaintiffs
proffer a litany of statistics concerning the increasing levels of coal production in the Powder
River Basin since decertification, they have not even attempted to point to a specific point in time
24
the agency documents upon which Plaintiffs rely do not suggest that the BLM has ever relied
upon the magnitude of coal production to the exclusion of other relevant factors when certifying
and decertifying coal production regions. Indeed, they suggest the opposite. In the notice
published in the Federal Register when the BLM first established coal production regions in
1979, the BLM explained that it considered a variety of factors, including “[s]imilarity in type
and situation of coal,” “[g]eneral transportation and markets,” “[b]road economic and social-
cultural similarities,” “[a]dministrative efficiency,” and “[p]resence of federal leases, preference
right lease applications, and other indications of industry interest.” Identification of Coal
Production Regions Having Major Federal Coal Interests, 44 Fed. Reg. at 65,196. Similarly,
when proposing the decertification of the Powder River Coal Production Region in 1989, the
BLM cited such factors as “limited leasing interest in the region, soft market conditions for the
foreseeable future,” and “administrative efficiency.” Proposed Decertification of All or a Portion
of the Powder River Basin, 54 Fed. Reg. at 6,339-6,400. Even assuming these factors constitute
a closed set, they still do not provide a judicially manageable standard of review. Federal courts
simply are not equipped to evaluate such considerations as “broad economic and social cultural
similarities” or to decide what would best serve “administrative efficiency.” Indeed, the
generality and breadth with which these factors are stated only further evinces that they were not
intended to cabin the discretion committed to the BLM to establish coal productions regions
when and where it sees fit. Therefore, even assuming, arguendo, that the BLM was required to
establish some coal production regions, a review of the pertinent statutory and regulatory
when the levels of coal production allegedly became so “substantial” as to require recertification
of the area, further suggesting that the proffered standard does not provide a judicially
manageable standard of review.
25
framework demonstrates that the question of when and where to establish coal production
regions is a matter that has been committed to the BLM’s discretion by law and therefore lies
beyond the ambit of judicial review.
V. CONCLUSION
The Court has considered the remaining arguments tendered by the parties and has
concluded that they are without merit. Therefore, and for the reasons stated above, the Court
shall grant the Defendant-Intervenors’ [52] Motion for Partial Judgment on the Pleadings and the
Federal Defendants’ [53] Motion for Partial Judgment on the Pleadings. An appropriate order
accompanies this memorandum opinion.
Date: May 8, 2011
/s/
COLLEEN KOLLAR-KOTELLY
United States District Judge